CN110080210A - Cast-in-place pile construction method in discarded ground - Google Patents
Cast-in-place pile construction method in discarded ground Download PDFInfo
- Publication number
- CN110080210A CN110080210A CN201910320812.7A CN201910320812A CN110080210A CN 110080210 A CN110080210 A CN 110080210A CN 201910320812 A CN201910320812 A CN 201910320812A CN 110080210 A CN110080210 A CN 110080210A
- Authority
- CN
- China
- Prior art keywords
- pile
- foundation
- general layout
- stake
- old
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to the dedicated stake field of foundation engineering, cast-in-place pile construction method in specially a kind of discarded ground.Cast-in-place pile construction method in a kind of discarded ground, it is characterized in that: successively implementing as follows: 1. summarizing old figure;2. summarizing new figure;3. being overlapped;4. handling.The present invention removes obstacles quickly, and it is convenient to construct, adaptable.
Description
Technical field
The present invention relates to the dedicated stake field of foundation engineering, cast-in-place pile construction method in specially a kind of discarded ground.
Background technique
Steel mill due to its workshop character of use, foundation all contain deep reinforced concrete foundation, bottom plate,
Level ground and all kinds of pile foundations (prefabricated pile, bored concrete pile etc.), steel-making powerhouse foundation is even also containing Slag Layer, waste steel plate etc., such
It is huge that newly-built pile foundation construction difficulty is carried out on place, it is necessary to could construct after first Ground Treatment.
Summary of the invention
In order to overcome the drawbacks of the prior art, a kind of foundation structure structure quick, that construction is convenient, adaptable of removing obstacles is provided
Part, the invention discloses cast-in-place pile construction methods in a kind of discarded ground.
The present invention reaches goal of the invention by following technical solution:
Cast-in-place pile construction method in a kind of discarded ground, it is characterized in that: successively implementing as follows:
1. summarizing old figure: by factory building foundation plan view, including terrace, basis, pile foundation etc., all summarizing to one first and always put down
On the figure of face, the situation on original underground installation basis in clear workshop place, including basic top surface are drawn on the first general layout
Absolute altitude, buried depth, overall size, pile foundation type, stake is long, the information such as diameter, and the first general layout selects cellophane paper or onionskin,
The graphic color of first general layout is black and white;
Further, can by the first general layout and the second general layout in autoCAD software respectively draw after, then by this
Two figures overlap;
2. summarizing new figure: the newly-built stake bit plan of required construction is summarized to second general layout;
3. overlapping: the first general layout and the second general layout being overlapped, i.e., are inserted in the newly-built stake bit plan of required construction
Factory building foundation plan view marks out the position of new pile in package two general layouts and old basis overlapping;
4. processing: according to the difference of mark situation, it is divided into different treatment measures:
1. 4.: the pile foundation of non-overlapping part is excavated terrace hard formation concrete disintegrating digging machine using pick machine, foundation pit backfill element
It constructs after soil pile foundation;
2. 4.: it is Chong Die with cushion cap foundation, but old pile foundation is encountered, then expose foundation platform after being crushed terrace hard formation concrete, puts
Slope, which is excavated, excavates entire foundation platform, then backfills rammed earth, pile foundation of constructing;
3. 4.: the broken ground hard formation concrete Chong Die with old pile foundation is dug out to cushion cap top, and specific accurate stake position is made in measurement,
The compacting of backfill horsestone, is laid with steel plate, pulls out old stake after installing pile pulling mechanical equipment all casing drill, old stake backfills element after pulling out
Soil pressure is real, is irrigated pile driving construction using long casing;
4. 4.: stake machine is in place, drills, installs steel reinforcement cage, installation conduit, casting concrete etc..
Cast-in-place pile construction method in the discarded ground, it is characterized in that: step 1. with step 2. when, the first general layout
On graphic color and the second general layout on graphic color select different colors to draw.
Cast-in-place pile construction method in the discarded ground, it is characterized in that: step 4. -3. when, filling pile construction steel shield
Tube length degree is not less than the depth for backfill of removing obstacles, and steel pile casting length is not less than 3 meters.
The invention has the following beneficial effects: solve the problems, such as filling pile construction in the old factory site base such as steel mill, Ke Yiyou
It targetedly removes obstacles, accelerates pile foundation construction progress, reduce construction cost and accelerate progress, be suitable for old the reconstruction of steel mill or again
Utilize the infrastructure in discarded steel mill.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
Cast-in-place pile construction method in a kind of discarded ground is successively implemented as follows as shown in Figure 1::
1. summarizing old figure: by factory building foundation plan view, including terrace, basis, pile foundation etc., all summarizing to one first and always put down
On the figure of face, the situation on original underground installation basis in clear workshop place, including basic top surface are drawn on the first general layout
Absolute altitude, buried depth, overall size, pile foundation type, stake is long, the information such as diameter, and the first general layout selects cellophane paper or onionskin,
The graphic color of first general layout is black and white;
Further, can by the first general layout and the second general layout in autoCAD software respectively draw after, then by this
Two figures overlap;
2. summarizing new figure: the newly-built stake bit plan of required construction is summarized to second general layout;
The graphic color in graphic color and the second general layout on first general layout selects different colors to draw, generally
The figure on ground, the first general layout selects black to draw, and the figure of the second general layout selects red or other colored colors
It draws;The color of complementary color each other can also be selected with the graphic color in the graphic color and the second general layout on the first general layout
Colored drawing system, so that the figure color contrast on two general layouts is larger;
3. overlapping: paper is inserted in old foundation plan
First general layout and the second general layout are overlapped, i.e., the newly-built stake bit plan of required construction is inserted in factory building foundation
Plan view, by new pile (generally i.e. chrominance section) in package two general layouts and old basis (generally i.e. black and white part) overlapping
Position mark out;
4. processing: according to the difference of mark situation, it is divided into different treatment measures:
1. 4.: the pile foundation of non-overlapping part is excavated terrace hard formation concrete disintegrating digging machine using pick machine, foundation pit backfill element
It constructs after soil pile foundation;
2. 4.: it is Chong Die with cushion cap foundation, but old pile foundation is encountered, then expose foundation platform after being crushed terrace hard formation concrete, puts
Slope, which is excavated, excavates entire foundation platform, then backfills rammed earth, pile foundation of constructing;
3. 4.: the broken ground hard formation concrete Chong Die with old pile foundation is dug out to cushion cap top, and specific accurate stake position is made in measurement,
The compacting of backfill horsestone, is laid with steel plate, pulls out old stake after installing pile pulling mechanical equipment all casing drill, old stake backfills element after pulling out
Soil pressure is real, is irrigated pile driving construction using long casing, and the steel pile casting length of filling pile construction is not less than the depth for backfill of removing obstacles,
And steel pile casting length is not less than 3 meters;
4. 4.: stake machine is in place, drills, installs steel reinforcement cage, installation conduit, casting concrete etc..
Claims (3)
1. cast-in-place pile construction method in a kind of discarded ground, it is characterized in that: successively implementing as follows:
1. summarizing old figure: factory building foundation plan view, including terrace, basis, pile foundation all summarize to first general layout
On figure, the situation on original underground installation basis in clear workshop place, including basic top surface mark are drawn on the first general layout
Height, buried depth, overall size, pile foundation type, stake is long, diameter information, the first general layout selection cellophane paper or onionskin, and first
The graphic color of general layout is black and white;
2. summarizing new figure: the newly-built stake bit plan of required construction is summarized to second general layout;
3. overlapping: the first general layout and the second general layout being overlapped, i.e., are inserted in the newly-built stake bit plan of required construction
Factory building foundation plan view marks out the position of new pile in package two general layouts and old basis overlapping;
4. processing: according to the difference of mark situation, it is divided into different treatment measures:
1. 4.: the pile foundation of non-overlapping part is excavated terrace hard formation concrete disintegrating digging machine using pick machine, foundation pit backfill element
It constructs after soil pile foundation;
2. 4.: it is Chong Die with cushion cap foundation, but old pile foundation is encountered, then expose foundation platform after being crushed terrace hard formation concrete, puts
Slope, which is excavated, excavates entire foundation platform, then backfills rammed earth, pile foundation of constructing;
3. 4.: the broken ground hard formation concrete Chong Die with old pile foundation is dug out to cushion cap top, and specific accurate stake position is made in measurement,
The compacting of backfill horsestone, is laid with steel plate, pulls out old stake after installing pile pulling mechanical equipment all casing drill, old stake backfills element after pulling out
Soil pressure is real, is irrigated pile driving construction using long casing;
4. 4.: stake machine is in place, drilling, installation steel reinforcement cage, installation conduit, is poured concrete.
2. cast-in-place pile construction method in discarded ground as described in claim 1, it is characterized in that: step 1. with step 2. when, the
The graphic color in graphic color and the second general layout on one general layout selects different colors to draw.
3. cast-in-place pile construction method in discarded ground as claimed in claim 1 or 2, it is characterized in that: step 4. -3. when, perfusion
The steel pile casting length of pile driving construction is not less than the depth for backfill of removing obstacles, and steel pile casting length is not less than 3 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910320812.7A CN110080210A (en) | 2019-04-20 | 2019-04-20 | Cast-in-place pile construction method in discarded ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910320812.7A CN110080210A (en) | 2019-04-20 | 2019-04-20 | Cast-in-place pile construction method in discarded ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110080210A true CN110080210A (en) | 2019-08-02 |
Family
ID=67415877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910320812.7A Pending CN110080210A (en) | 2019-04-20 | 2019-04-20 | Cast-in-place pile construction method in discarded ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110080210A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101761083A (en) * | 2008-12-24 | 2010-06-30 | 上海市基础工程公司 | Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle |
CN103485344A (en) * | 2013-09-17 | 2014-01-01 | 常熟理工学院 | Method for extracting construction engineering pile foundation |
CN104746519A (en) * | 2015-02-04 | 2015-07-01 | 邵阳学院 | Obstacle clearing construction method |
CN106930276A (en) * | 2017-04-11 | 2017-07-07 | 广州智弘建筑物检测与鉴定技术有限公司 | The deep hole blasting of rotary digging bored concrete pile and the construction method of conduit rotary digging removing obstacles |
CN108978661A (en) * | 2018-07-28 | 2018-12-11 | 江苏地基工程有限公司 | Cast-in-situ bored pile pulls out construction method |
-
2019
- 2019-04-20 CN CN201910320812.7A patent/CN110080210A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101761083A (en) * | 2008-12-24 | 2010-06-30 | 上海市基础工程公司 | Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle |
CN103485344A (en) * | 2013-09-17 | 2014-01-01 | 常熟理工学院 | Method for extracting construction engineering pile foundation |
CN104746519A (en) * | 2015-02-04 | 2015-07-01 | 邵阳学院 | Obstacle clearing construction method |
CN106930276A (en) * | 2017-04-11 | 2017-07-07 | 广州智弘建筑物检测与鉴定技术有限公司 | The deep hole blasting of rotary digging bored concrete pile and the construction method of conduit rotary digging removing obstacles |
CN108978661A (en) * | 2018-07-28 | 2018-12-11 | 江苏地基工程有限公司 | Cast-in-situ bored pile pulls out construction method |
Non-Patent Citations (3)
Title |
---|
萧甬铁路有限责任公司: "《宁波站改建工程总结》", 30 November 2017, 中国铁道出版社 * |
陈辉: "《老建筑物遗留障碍物的处理技术》", 《建筑施工》 * |
顾宏: "《振动沉管拔桩清除地下障碍物的施工技术》", 《山西建筑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104846829B (en) | Shield-reserved penetration composite type foundation pit support wall and construction method thereof | |
JP2022502586A (en) | Grouting consolidation method of ready-made piles guided by all-casing excavation, and the ready-made piles | |
CN205172598U (en) | Pipe curtain spouts a supporting construction soon | |
CN104153352A (en) | Karst geology rotary-drilling bored concrete pile hole forming process | |
CN106437798B (en) | A kind of preprocess method of the anchor cable group across shield driving section | |
CN102286984A (en) | Water-stop curtain and construction method thereof | |
CN102162253B (en) | Precipitation construction method employing pipe embedded in deep foundation pits | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN108532586A (en) | A kind of construction method of garage parking diaphram wall | |
CN101481911A (en) | Construction method for special underground continuous wall | |
CN108442370A (en) | The broken pile connector processing method of prestressed concrete pipe pile | |
CN104294819A (en) | Construction method of cast-in-place pile | |
CN107514262A (en) | The construction method of shield piping lane | |
CN115341533B (en) | Drilling construction method for easy-collapse stratum cast-in-situ pile | |
CN112064751A (en) | Deep groove construction method for drainage pipeline | |
CN105735383A (en) | Partial underground obstacle removing construction method capable of reserving structural system | |
CN206428707U (en) | A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation | |
CN105369800B (en) | One-step forming construction method for inserting steel pipe column into cast-in-situ bored pile in pilot tunnel | |
JP3908464B2 (en) | Construction method of underwater tunnel | |
CN104153403A (en) | Construction method for reverse construction method cast-in-place pile static load test pile | |
CN105484270B (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN209760299U (en) | light and shade of avoiding house to tear open and move is dug and is combined subway station structure | |
CN217053672U (en) | Large-diameter inspection well pile drilling method construction system | |
CN110512594A (en) | The simple and easy method of churning driven opportunity cavity pore-forming | |
CN110080210A (en) | Cast-in-place pile construction method in discarded ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190802 |
|
RJ01 | Rejection of invention patent application after publication |