CN110073768A - A kind of high altitude localities side slope Spray turfing construction method - Google Patents

A kind of high altitude localities side slope Spray turfing construction method Download PDF

Info

Publication number
CN110073768A
CN110073768A CN201910269256.5A CN201910269256A CN110073768A CN 110073768 A CN110073768 A CN 110073768A CN 201910269256 A CN201910269256 A CN 201910269256A CN 110073768 A CN110073768 A CN 110073768A
Authority
CN
China
Prior art keywords
spray
slope surface
construction
side slope
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910269256.5A
Other languages
Chinese (zh)
Inventor
王海生
赵刚
宋育花
戴克吉
王学旭
李宜明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Shengyuan Landscape Engineering Co Ltd
Original Assignee
Qinghai Shengyuan Landscape Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Shengyuan Landscape Engineering Co Ltd filed Critical Qinghai Shengyuan Landscape Engineering Co Ltd
Priority to CN201910269256.5A priority Critical patent/CN110073768A/en
Publication of CN110073768A publication Critical patent/CN110073768A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C7/00Sowing
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Abstract

The invention discloses a kind of high altitude localities side slope Spray turfing construction methods, include the following steps: step 1, unwrapping wire;Step 2, slope surface cleaning;Step 3 installs anchor pole;Step 4, linked network;Raw substrate is planted in step 5, injection;Step 6, maintenance;Step 7, the acceptance of work;The present invention passes through vegetation of sowing grass seeds by duster in side slope, effectively prevent washing away and soil erosion phenomenon for rainwater side slope, the near-earth miniclimate of formation, effectively improve the environment of highway, and surrounding area can be promoted to accelerate environmental greening, the process of beautification, mechanization degree of the present invention is high, speed of application is fast, soil is stirred by hydroseeder, organic fertilizer, water-retaining agent, adhesive, the stirring injection of the materials such as water, the grass-seed uniformity is high, the denser in conjunction with soil, coverage rate is high after grass out, and entirety is formed with slope surface wire netting, ability to resist splash erosion greatly improves.

Description

A kind of high altitude localities side slope Spray turfing construction method
Technical field
The present invention relates to side slope Spray turfing technical field of construction, specially a kind of high altitude localities side slope Spray turfing is applied Work method.
Background technique
Due to severe growing environment condition, vegetation growth is extremely difficult for high altitude localities, the infrastructure such as highway, railway In process of construction, a large amount of bare side sloping is formd, common slope protection project measure can generate a large amount of dust, to ring Border cannot purify, and with going deep into for environmental protection concept and green highway theory, requirement of the highway construction to ecological, environmental protective is higher and higher, Simple slope project safeguard procedures can no longer meet the requirement of green highway development, therefore, design a kind of high altitude localities Side slope Spray turfing construction method is necessary.
Summary of the invention
The purpose of the present invention is to provide a kind of high altitude localities side slope Spray turfing construction methods, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme: a kind of high altitude localities side slope Spray turfing is constructed Method includes the following steps: step 1, unwrapping wire;Step 2, slope surface cleaning;Step 3 installs anchor pole;Step 4, linked network;Step Rapid five, raw substrate is planted in injection;Step 6, maintenance;Step 7, the acceptance of work;
Wherein in above-mentioned step one, before engineering starts construction, first by measurement the place on construction drawing Setting-out and measurement control elevation are being carried out on the spot, provide benchmark for the construction of next step;
Wherein in above-mentioned step two, when clearing up slope surface, machine finish is first passed through, and use and manually repair Slope removes slope surface float stone, danger stone etc., slope surface is made to keep smooth substantially;
Wherein in above-mentioned step three, installation anchor pole, screw-thread steel of the bolt diameter for 6-8cm, the long 0.3-0.4m of anchor pole, Spacing 2m × 2m between anchor pole, exposed 10cm when placing anchor pole, galvanized wire mesh use anchor pole at 50cm on the inside of the platform and embedding top Encryption is fixed, anchor pole spacing 50cm;
Wherein in above-mentioned step four, including following steps:
1) laying of galvanized wire mesh should be close to slope surface as far as possible, and the spacing with slope surface is 2-5cm, be laid on side slope surface Machine compiles galvanized wire mesh, mesh wire diameter 2.0-3.0mm, and sizing grid is 5cm × 5cm, and the specification that machine compiles galvanized wire mesh is 2m × 10m, and fixed with anchor pole;
2) 10cm should be not less than for Liang Zhang galvanized wire mesh lap-joint, lap-joint can be fixed with φ 8U fashioned iron nail;
3) laying that machine compiles galvanized wire mesh should keep slope and slopes two sides to cover not less than 0.5m, be less than 0.5m application more More anchor poles are fixed, dense bolt at local out-of-flatness;
Wherein in above-mentioned step five, including following steps:
1) when sprayed construction, spray attachment person should from top to bottom spray slope surface and guarantee ejiction opening and slope surface as far as possible Vertically, distance is maintained at 3m-10m, a spray attachment width 1m-3m;
2) it after being thoroughly mixed the proportioned substrate of precise and vegetation seed mixture, is sprayed using spraying machine To the engineering slope surface that need to be protected, and keep the thin and thick of spray attachment face uniform, spray attachment should divide 3-5 progress, preceding first spray attachment base several times, base Layer has seed layer with a thickness of 2-4 centimeter/time, last time spray attachment, and spray attachment is with a thickness of 0.5-2 centimeters;
3) it after operation of sowing grass seeds by duster is completed, is covered using non-woven fabrics or safety net, non-woven fabrics lap-joint is not less than 5cm, overlap joint Place is fixed by 1m spacing;
It wherein in above-mentioned step six, is spilt using spray water to slope surface, infiltrates saturating substrate by specific thickness, except sprinkling water Maintenance is outer, carries out Various Seasonal top dressing for physical condition, wherein top dressing process is including following steps:
1) in implementation 2.5 months or so of sowing grass seeds by duster, single-dose application is carried out, dose: 5-10g/ square metres of urea, compound fertilizer (5 : 10: 5), about 20g/ square metres;
2) spring (the 4-5 month) dose: 15g/ square metres of urea, 35g/ square metres of compound fertilizer (5: 10: 5);Autumn (9-10 Month) dose: 40g/ square metres of compound fertilizer (5: 10: 10).Practical dose is flexibly grasped according to vegetation and season;
Wherein in above-mentioned step seven, the regulation according to national relevant laws, regulation and specifications of engineering construction, standard is complete It is required at Engineering Documents and every content of contract engagement, construction unit has obtained the work that related authorities, government provide Journey construction quality, fire-fighting, planning, environmental protection, urban construction etc. are checked and accepted file or are permitted using after file, and organizational project final acceptance of construction is simultaneously compiled System completes " construction project final acceptance of construction report ".
According to the above technical scheme, in the step 6, on the whole in the insufficient situation of seedling strain number, in confirmation reason On the basis of effectively filled spray.
According to the above technical scheme, in the step 4, if portion and slope surface distance are too big, can with straw or The filling of the materials such as non-woven fabrics.
According to the above technical scheme, in the step 4, carry out linked network when, need jointing type to be laid with, cannot Indirect type is unified to be laid with.
According to the above technical scheme, in the step 2,10cm soil layer on stratum is rotated to loose shape using tipper State.
According to the above technical scheme, in the step 5, achievable injection soil moved in improve the original and 80-120 square metres of grass-seed per hour.
According to the above technical scheme, in the step 5, soil, organic fertilizer, water-retaining agent, bonding are stirred by hydroseeder The stirring injection of the materials such as agent, water.
Compared with prior art, the beneficial effects of the present invention are: the present invention passes through vegetation of sowing grass seeds by duster in side slope, effective ground resistance Stop washing away for rainwater side slope and effectively improves the row of highway with soil erosion phenomenon, the near-earth miniclimate of formation Vehicle environment, and surrounding area can be promoted to accelerate environmental greening, the process of beautification, mechanization degree of the present invention is high, and speed of application is fast, The stirring injection of the materials such as soil, organic fertilizer, water-retaining agent, adhesive, water is stirred by hydroseeder, the grass-seed uniformity is high, with soil In conjunction with denser, coverage rate is high after grass out, and forms entirety with slope surface wire netting, and ability to resist splash erosion greatly improves.
Detailed description of the invention
Fig. 1 is preparation technology flow chart of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution: a kind of high altitude localities side slope Spray turfing construction method, Include the following steps: step 1, unwrapping wire;Step 2, slope surface cleaning;Step 3 installs anchor pole;Step 4, linked network;Step 5, Raw substrate is planted in injection;Step 6, maintenance;Step 7, the acceptance of work;
Wherein in above-mentioned step one, before engineering starts construction, first by measurement the place on construction drawing Setting-out and measurement control elevation are being carried out on the spot, provide benchmark for the construction of next step;
Wherein in above-mentioned step two, when clearing up slope surface, machine finish is first passed through, and use and manually repair Slope removes slope surface float stone, danger stone etc., slope surface is made to keep smooth substantially, is rotated 10cm soil layer on stratum to thin using tipper Loose state;
Wherein in above-mentioned step three, installation anchor pole, screw-thread steel of the bolt diameter for 6-8cm, the long 0.3-0.4m of anchor pole, Spacing 2m × 2m between anchor pole, exposed 10cm when placing anchor pole, galvanized wire mesh use anchor pole at 50cm on the inside of the platform and embedding top Encryption is fixed, anchor pole spacing 50cm;
Wherein in above-mentioned step four, including following steps:
1) laying of galvanized wire mesh should be close to slope surface as far as possible, and the spacing with slope surface is 2-5cm, be laid on side slope surface Machine compiles galvanized wire mesh, mesh wire diameter 2.0-3.0mm, and sizing grid is 5cm × 5cm, and the specification that machine compiles galvanized wire mesh is 2m × 10m, and fixed with anchor pole, if portion and slope surface distance are too big, the filling of the materials such as straw or non-woven fabrics can be used;
2) 10cm should be not less than for Liang Zhang galvanized wire mesh lap-joint, lap-joint can be fixed with 8U fashioned iron nail;
3) laying that machine compiles galvanized wire mesh should keep slope and slopes two sides to cover not less than 0.5m, be less than 0.5m application more More anchor poles are fixed, dense bolt at local out-of-flatness, carry out linked network when, need jointing type to be laid with, cannot be indirect Formula is unified to be laid with;
Wherein in above-mentioned step five, including following steps:
1) when sprayed construction, spray attachment person should from top to bottom spray slope surface and guarantee ejiction opening and slope surface as far as possible Vertically, distance is maintained at 3m-10m, a spray attachment width 1m-3m;
2) it after being thoroughly mixed the proportioned substrate of precise and vegetation seed mixture, is sprayed using spraying machine To the engineering slope surface that need to be protected, and keep the thin and thick of spray attachment face uniform, spray attachment should divide 3-5 progress, preceding first spray attachment base several times, base Layer has seed layer with a thickness of 2-4 centimeter/time, last time spray attachment, and spray attachment is stirred with a thickness of 0.5-2 centimeters by hydroseeder The stirring injection of the materials such as soil, organic fertilizer, water-retaining agent, adhesive, water;
3) it after operation of sowing grass seeds by duster is completed, is covered using non-woven fabrics or safety net, non-woven fabrics lap-joint is not less than 5cm, overlap joint Place is fixed by 1m spacing, per hour achievable injection soil moved in improve the original and 80-120 square metres of grass-seed;
It wherein in above-mentioned step six, is spilt using spray water to slope surface, infiltrates saturating substrate by specific thickness, except sprinkling water Maintenance is outer, carries out Various Seasonal top dressing for physical condition, wherein top dressing process is including following steps:
1) in implementation 2.5 months or so of sowing grass seeds by duster, single-dose application is carried out, dose: 5-10g/ square metres of urea, compound fertilizer (5 : 10: 5), about 20g/ square metres;
2) spring (the 4-5 month) dose: 15g/ square metres of urea, 35g/ square metres of compound fertilizer (5: 10: 5);Autumn (9-10 Month) dose: 40g/ square metres of compound fertilizer (5: 10: 10).Practical dose is flexibly grasped according to vegetation and season, on the whole In the insufficient situation of seedling strain number, effectively filled spray on the basis of confirming reason;
Wherein in above-mentioned step seven, the regulation according to national relevant laws, regulation and specifications of engineering construction, standard is complete It is required at Engineering Documents and every content of contract engagement, construction unit has obtained the work that related authorities, government provide Journey construction quality, fire-fighting, planning, environmental protection, urban construction etc. are checked and accepted file or are permitted using after file, and organizational project final acceptance of construction is simultaneously compiled System completes " construction project final acceptance of construction report ".
Based on above-mentioned, it is an advantage of the current invention that ecological benefits are significant, by vegetation of sowing grass seeds by duster in side slope, effective ground resistance Stop washing away for rainwater side slope and effectively improves the row of highway with soil erosion phenomenon, the near-earth miniclimate of formation Vehicle environment, mechanization degree is high, and speed of application is fast, and mechanical equipment needed for alien earth sparging is fairly simple, and mainly soil moved in improve the original sprays Equipment and grass-seed hydroseeding equipment stir the stirring injection of the materials such as soil, organic fertilizer, water-retaining agent, adhesive, water by hydroseeder, The grass-seed uniformity is high, the denser in conjunction with soil, and coverage rate is high after grass out, and forms entirety, anti-rainwater with slope surface wire netting Scouring capability greatly improves.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of high altitude localities side slope Spray turfing construction method, includes the following steps: it is characterized by: step 1, unwrapping wire; Step 2, slope surface cleaning;Step 3 installs anchor pole;Step 4, linked network;Raw substrate is planted in step 5, injection;Step 6, maintenance; Step 7, the acceptance of work;
Wherein in above-mentioned step one, before engineering starts construction, first by measuring the place on construction drawing in reality Ground carries out setting-out and measurement control elevation, provides benchmark for the construction of next step;
Wherein in above-mentioned step two, when clearing up slope surface, machine finish is first passed through, and using manually slope is repaired, clearly Except slope surface float stone, danger stone etc., slope surface is made to keep smooth substantially;
Wherein in above-mentioned step three, anchor pole is installed, bolt diameter is the screw-thread steel of 6-8cm, the long 0.3-0.4m of anchor pole, anchor pole Between spacing 2m × 2m, exposed 10cm when placing anchor pole, galvanized wire mesh encrypts at 50cm with anchor pole on the inside of the platform and embedding top It is fixed, anchor pole spacing 50cm;
Wherein in above-mentioned step four, including following steps:
1) laying of galvanized wire mesh should be close to slope surface as far as possible, and the spacing with slope surface is 2-5cm, compile in side slope surface laydown machine Galvanized wire mesh, mesh wire diameter 2.0-3.0mm, sizing grid be 5cm × 5cm, machine compile galvanized wire mesh specification be 2m × 10m, and fixed with anchor pole;
2) 10cm should be not less than for Liang Zhang galvanized wire mesh lap-joint, lap-joint can be fixed with φ 8U fashioned iron nail;
3) laying that machine compiles galvanized wire mesh should keep slope and slopes two sides to cover not less than 0.5m, and it is more to be less than 0.5m application Anchor pole is fixed, dense bolt at local out-of-flatness;
Wherein in above-mentioned step five, including following steps:
(1) when sprayed construction, spray attachment person should from top to bottom spray slope surface and guarantee that ejiction opening and slope surface hang down as far as possible Directly, distance is maintained at 3m-10m, a spray attachment width 1m-3m;
(2) it after being thoroughly mixed the proportioned substrate of precise and vegetation seed mixture, is ejected into using spraying machine The engineering slope surface that need to be protected, and keep the thin and thick of spray attachment face uniform, spray attachment should divide 3-5 progress, preceding first spray attachment base several times, base With a thickness of 2-4 centimeter/time, last time spray attachment has seed layer, and spray attachment is with a thickness of 0.5-2 centimeters;
(3) it after operation of sowing grass seeds by duster is completed, is covered using non-woven fabrics or safety net, non-woven fabrics lap-joint is not less than 5cm, and lap-joint presses 1m spacing is fixed;
It wherein in above-mentioned step six, is spilt using spray water to slope surface, infiltrates saturating substrate by specific thickness, except wanting sprinkling maintenance Outside, Various Seasonal top dressing is carried out for physical condition, wherein top dressing process is including following steps:
1) in implementation 2.5 months or so of sowing grass seeds by duster, single-dose application is carried out, dose: 5-10g/ square metres of urea, compound fertilizer (5: 10: 5), about 20g/ square metres;
2) spring (the 4-5 month) dose: 15g/ square metres of urea, 35g/ square metres of compound fertilizer (5: 10: 5);Autumn (the 9-10 month) Dose: 40g/ square metres of compound fertilizer (5: 10: 10).Practical dose is flexibly grasped according to vegetation and season;
Wherein in above-mentioned step seven, work is completed according to the regulation of national relevant laws, regulation and specifications of engineering construction, standard Journey design document requires and every content of contract engagement, construction unit have obtained the engineering that related authorities, government provide and applied Working medium amount, fire-fighting, planning, environmental protection, urban construction etc. are checked and accepted file or are permitted using after file, and organizational project final acceptance of construction has simultaneously been worked out At " construction project final acceptance of construction report ".
2. a kind of high altitude localities side slope Spray turfing construction method according to claim 1, it is characterised in that: the step In rapid six, on the whole in the insufficient situation of seedling strain number, effectively filled spray on the basis of confirming reason.
3. a kind of high altitude localities side slope Spray turfing construction method according to claim 1, it is characterised in that: the step In rapid four, if portion and slope surface distance are too big, the filling of the materials such as straw or non-woven fabrics can be used.
4. a kind of high altitude localities side slope Spray turfing construction method according to claim 1, it is characterised in that: the step In rapid four, carry out linked network when, need jointing type to be laid with, be unable to that indirect type is unified to be laid with.
5. a kind of high altitude localities side slope Spray turfing construction method according to claim 1, it is characterised in that: the step In rapid two, 10cm soil layer on stratum is rotated to rarefaction using tipper.
6. a kind of high altitude localities side slope Spray turfing construction method according to claim 1, it is characterised in that: the step In rapid five, achievable injection soil moved in improve the original and 80-120 square metres of grass-seed per hour.
7. a kind of high altitude localities side slope Spray turfing construction method according to claim 1, it is characterised in that: the step In rapid five, the stirring injection of the materials such as soil, organic fertilizer, water-retaining agent, adhesive, water is stirred by hydroseeder.
CN201910269256.5A 2019-04-03 2019-04-03 A kind of high altitude localities side slope Spray turfing construction method Pending CN110073768A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910269256.5A CN110073768A (en) 2019-04-03 2019-04-03 A kind of high altitude localities side slope Spray turfing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910269256.5A CN110073768A (en) 2019-04-03 2019-04-03 A kind of high altitude localities side slope Spray turfing construction method

Publications (1)

Publication Number Publication Date
CN110073768A true CN110073768A (en) 2019-08-02

Family

ID=67414325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910269256.5A Pending CN110073768A (en) 2019-04-03 2019-04-03 A kind of high altitude localities side slope Spray turfing construction method

Country Status (1)

Country Link
CN (1) CN110073768A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110432058A (en) * 2019-08-14 2019-11-12 三峡大学 A kind of greening method of pole gradient slope
CN112482402A (en) * 2020-11-05 2021-03-12 河南省恒丰集成技术有限责任公司 Construction method for greening ecological soil slope protection
CN115067156A (en) * 2022-06-15 2022-09-20 中电建十一局工程有限公司 Construction method for planting grass on fully weathered rock slope in severe cold and rainy region

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003166179A (en) * 2001-11-28 2003-06-13 Bridgestone Corp Water-swellable sheet and water-intercepting sheet using the same
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN103774679A (en) * 2012-10-22 2014-05-07 北京林业大学 Rock side slope net hanging method
CN104782383A (en) * 2015-05-15 2015-07-22 黄石市园林花木有限责任公司 High and steep side slope ecological retrieved green spray-seeding base material and preparation method and application of base material
CN109315200A (en) * 2018-08-20 2019-02-12 江苏绿岩生态技术股份有限公司 In Qinghai Area slope of highway vegetation repair method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003166179A (en) * 2001-11-28 2003-06-13 Bridgestone Corp Water-swellable sheet and water-intercepting sheet using the same
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN103774679A (en) * 2012-10-22 2014-05-07 北京林业大学 Rock side slope net hanging method
CN104782383A (en) * 2015-05-15 2015-07-22 黄石市园林花木有限责任公司 High and steep side slope ecological retrieved green spray-seeding base material and preparation method and application of base material
CN109315200A (en) * 2018-08-20 2019-02-12 江苏绿岩生态技术股份有限公司 In Qinghai Area slope of highway vegetation repair method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110432058A (en) * 2019-08-14 2019-11-12 三峡大学 A kind of greening method of pole gradient slope
CN112482402A (en) * 2020-11-05 2021-03-12 河南省恒丰集成技术有限责任公司 Construction method for greening ecological soil slope protection
CN115067156A (en) * 2022-06-15 2022-09-20 中电建十一局工程有限公司 Construction method for planting grass on fully weathered rock slope in severe cold and rainy region

Similar Documents

Publication Publication Date Title
CN110073768A (en) A kind of high altitude localities side slope Spray turfing construction method
CN104255280B (en) A kind of high precipitous rock slope vegetation implantation methods
CN104314087A (en) Slope greening protective structure and construction method thereof
CN105625443B (en) High-steep soil nail grass planting slope protection structure system and construction method thereof
CN104196038A (en) High and steep rock side slope active protection method and facility
CN107711316A (en) A kind of laying method of Ecological Slope vegetation net
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN103290854A (en) Fast construction method of rock slope protection
CN114351733A (en) Rock slope vegetation system and vegetation planting construction method
CN103774679A (en) Rock side slope net hanging method
CN103924606B (en) The basalt fibre of powdery soil slope combines antiscour protection construction method with polyvinyl alcohol
CN105340614A (en) Novel hard slope lattice ecological afforestation structure and method
JP7278865B2 (en) Slope protection method and slope protection member
CN110700287A (en) Rock engineering wound ecological restoration method
CN105123212A (en) Method for protecting slope vegetation through plant fiber blankets
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN105780788B (en) The flexible greening protection networks of SNS and its construction method administered for rock side slope
CN107237334A (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN110447481B (en) Granule spray-seeding construction method
CN109601272A (en) A kind of slag, rubble quality slope vegetation restoration method
CN105089065B (en) Method for improving reinforcement effect on habitat matrixes and preventing matrixes from splashing in ejecting planting process
CN113914261A (en) Reservoir engineering concrete precast block ecological slope protection construction method
CN210031859U (en) Greening system for reinforcing side slope
CN204238225U (en) High steep rock slope active defense facility
CN108222036A (en) A kind of ecology flexible water drainage ditch and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802

RJ01 Rejection of invention patent application after publication