CN110067381A - A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method - Google Patents

A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method Download PDF

Info

Publication number
CN110067381A
CN110067381A CN201810060790.0A CN201810060790A CN110067381A CN 110067381 A CN110067381 A CN 110067381A CN 201810060790 A CN201810060790 A CN 201810060790A CN 110067381 A CN110067381 A CN 110067381A
Authority
CN
China
Prior art keywords
mould
square steel
steel tube
cast
plate face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810060790.0A
Other languages
Chinese (zh)
Inventor
朱晓元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810060790.0A priority Critical patent/CN110067381A/en
Publication of CN110067381A publication Critical patent/CN110067381A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/40Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/18Devices for suspending or anchoring form elements to girders placed in ceilings, e.g. hangers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of cast-in-place plate face difference of height tool-type hangs mould, between kitchen suitable for the architectural engineering main body construction stage, the high and low poor position of toilet, balcony, including four square steel tube triangular supports, it is characterized by: four square steel tube triangular supports are right angled triangle bracket, two neighboring side on the outside of the square steel pipe port of each right angled triangle bracket is respectively welded with angle bar, and angle bar is equipped with bolt hole;A square steel tube rectangular frame is set up into the mutual split connection of four square steel tube right angled triangle brackets, and the right angle both sides of four square steel tube right angled triangle brackets are equidistantly positioned support rod, reach cast-in-place plate face difference of height tool-type and hang mould.It is simple, easy to make with mold device structure is hung that cast-in-place plate face difference of height tool-type of the invention hangs mould and its making and use method, improve construction quality, to the damage of drop plate corner angle when avoiding demoulding, the advantages of greatly reducing the phenomenon that dropping plate losing fangle, hanging mold device low in cost and reduction engineering cost.

Description

A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method
Technical field
The present invention relates to a kind of working drop board molds in the positions such as toilet, kitchen and balcony, specifically, being a kind of Cast-in-place plate face difference of height tool-type hangs mould and its making and use method.
Background technique
In the actual production process, the face that drop plate technique is related to is wider, such as toilet, kitchen and balcony position.Plate drops Commonplace in the deduction of points phenomenon of quality examination, appearance height controls not in place, positioning and is not allowed usually in drop plate work progress Really, a series of problems, such as poor, demoulding is inconvenient is formed.
Therefore known drop plate construction technology there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of good, convenient for disassembly and assembly, repeatedly used cast-in-place plate face height of Forming Quality Poor tool-type hangs mould.
It is another object of the present invention to propose a kind of good, convenient for disassembly and assembly, repeatedly used cast-in-place plate face of Forming Quality The production method that difference of height tool-type hangs mould.
A further object of the present invention is to propose a kind of good, convenient for disassembly and assembly, repeatedly used cast-in-place plate face of Forming Quality Difference of height tool-type hangs the application method of mould.
To achieve the above object, the technical solution of the invention is as follows:
A kind of cast-in-place plate face difference of height tool-type hangs mould, between the kitchen suitable for the architectural engineering main body construction stage, toilet, sun The high and low poor position of platform, including four square steel tube triangular supports, it is characterised in that:
Four square steel tube triangular supports are right angled triangle bracket, outside the square steel pipe port of each right angled triangle bracket The two neighboring side of side is respectively welded with angle bar, and angle bar is equipped with bolt hole;Four mutual splits of square steel tube right angled triangle bracket A square steel tube rectangular frame is set up into connection, and the long side of square steel tube rectangular frame and the size of short side are according to the ruler for dropping plate region Depending on very little, the long side of square steel tube rectangular frame and the centre of short side are joined with bolts corresponding bolt hole;Four square steel The right angle both sides of pipe right angled triangle bracket are equidistantly positioned support rod, to increase square steel tube rectangular frame intensity, reach cast-in-place Plate face difference of height tool-type hangs mould.
Cast-in-place plate face difference of height tool-type of the invention, which hangs mould, to be further achieved by the following technical measures.
Cast-in-place plate face difference of height tool-type above-mentioned hangs mould, wherein further including one of square steel tube right angled triangle bracket straight On the inner surface of angle, and from the 100mm of square outer vertex be arranged one group of hinge, to avoid tear open hang mould when to drop plate corner angle damage Wound.
Cast-in-place plate face difference of height tool-type above-mentioned hangs mould, wherein the square steel tube specification is 40mm × 40mmm × 4mm Zinc-plated square steel pipe.
Cast-in-place plate face difference of height tool-type above-mentioned hangs mould, wherein the support rod is diameter >=15mm, length >=370mm Round steel.
A kind of cast-in-place plate face difference of height tool-type hangs mould production method, it is characterised in that the following steps are included:
A, need to be arranged four square steel tube right angled triangle brackets according to cast-in-place plate face difference of height, each right angled triangle bracket Two neighboring side on the outside of square steel pipe port is respectively welded with angle bar, and angle bar is equipped with bolt hole;
B, on a right angle inner surface of each square steel tube right angled triangle bracket, and from being set at the 100mm of square outer vertex One group of hinge is set, a right-angle side bending inwardly of each square steel tube right angled triangle bracket is enable;
C, a square steel tube rectangular frame is set up into the mutual split connection of four square steel tube right angled triangle brackets, makes rectangular frame Longer side and a shorter side among be connected with bolt hole on corresponding angle bar;
D, in the equidistant welding one section of internal diameter 16mm, long 50mm pipe in the right angle both sides of four square steel tube right angled triangle brackets, Insertion connection U-shaped support rod reaches cast-in-place plate face difference of height tool to increase square steel tube rectangular frame intensity in two sections of pipes Formula hangs mould.
Cast-in-place plate face difference of height tool-type of the invention hang mould production method can also using technical measures below come It further realizes.
Method above-mentioned, wherein the square steel tube specification is 40mm × 40mmm × 4mm zinc-plated square steel pipe.
Method above-mentioned, wherein the U-shaped support rod is diameter >=15mm, length >=370mm round steel, the bending of round steel both ends The length at end is respectively 40mm, can be inserted into long 50mm pipe.
A kind of cast-in-place plate face difference of height tool-type hangs the application method of mould, it is characterised in that the following steps are included:
A, line setting
It needs to check the position line kitchen, in the high and low poor position of toilet, balcony before mould is hung in installation, it is ensured that Hang the accuracy of mould position;
B, mould assembling is hung
Hang mould position determine it is errorless after, carry out the assembling for hanging mould: first carry out square steel tube rectangular frame length sides connection bolt Just twist, then carry out width edge connection bolt and just twist, after four groups of connection bolts are pre- twist after the completion of carry out twisting eventually again, and add preload Power;
C, Mod correction is hung
Hang after mould is completed, hanging mould bottom using Concrete seat pad, make to hang mould and reach designed elevation, it is formal reinforce before to hanging mould Absolute altitude, position are corrected;
D, mould reinforcing is hung
Certain load can be formed to mould is hung in concrete work progress, add one of support rod at mould interior angle hanging, form one surely The buckle resistance of mould is hung in fixed Delta Region, enhancing, and a possibility that mould deforms is hung in reduction;After hanging Mod correction completion, Mould will be hung and fixes by hanging mould inner ring and being disposed vertically with bar dowel, and bar dowel welds together with baseplate reinforcing bar, plays reinforcing to mould is hung Effect;
E, concrete placings
In concrete placings engineering, after putting down in square steel tube rectangular frame plate face and at the beginning of dropping plate, bracing wire accurately controls floor and square steel tube square Shape frame floor elevation;
F, it tears open and hangs mould
Tearing concrete strength grade when hanging mould open cannot be below 1.2MP, first tears square steel tube rectangular frame inner bracing piece, then loose bolt open, tears open and hang Forbid to strike in mold process, pound, fall phenomenon, avoid square steel tube rectangular frame template deformation, damage, influence, which is hung, imitates fruit.
Cast-in-place plate face difference of height tool-type of the invention hang mould application method can also using technical measures below come It further realizes.
Method above-mentioned, wherein described hang in time clears up the concrete residue on square steel tube rectangular frame surface after mould has been removed Completely, surface brush oil, and number is marked again, it is used convenient for next time.
After adopting the above technical scheme, cast-in-place plate face difference of height tool-type of the invention hangs mould and its making and use method It has the advantage that
1, it is simple, easy to make to hang mold device structure;
2, construction quality is improved, to the damage of drop plate corner angle when avoiding demoulding, the phenomenon that greatly reducing drop plate losing fangle;
3, it is low in cost to hang mold device, reduces engineering cost.
Detailed description of the invention
Fig. 1 is the square steel tube rectangular frame structure schematic diagram of the embodiment of the present invention;
Fig. 2 is the position P enlarged drawing in Fig. 1;
Fig. 3 is the position Q enlarged drawing in Fig. 1.
In figure: 1 square steel tube, 2 support rods, 3 the 1st bolt angle bar, 4 the 2nd bolt angle bar, 5 the 1st bolts, 6 the 2nd bolts, 7 steel Pipeline section, 8 hinges.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Cast-in-place plate face difference of height tool-type of the invention hangs mould, between the kitchen suitable for the architectural engineering main body construction stage, health Between, the high and low poor position of balcony, including four square steel tube triangular supports.
Four square steel tube triangular supports are right angled triangle bracket, the square steel pipe end of each right angled triangle bracket Two neighboring side on the outside of mouthful is respectively welded with angle bar, and angle bar is equipped with bolt hole;Four square steel tube right angled triangle brackets are mutual A square steel tube rectangular frame is set up into split connection, and the long side of square steel tube rectangular frame and the size of short side are according to drop plate region Size depending on, the long side of square steel tube rectangular frame and the centre of short side are joined with bolts corresponding bolt hole;Four The right angle both sides of square steel tube right angled triangle bracket are equidistantly positioned support rod, to increase square steel tube rectangular frame intensity.In side On one right angle inner surface of steel pipe right angle triangular supports, and from the 100mm of square outer vertex be arranged one group of hinge, with Avoid tearing open damage when hanging mould to drop plate corner angle.Reach cast-in-place plate face difference of height tool-type and hangs mould.The square steel tube specification is 40mm × 40mmm × 4mm zinc-plated square steel pipe.The support rod is diameter 15mm, length 370mm round steel.
Embodiment 2
Cast-in-place plate face difference of height tool-type of the invention hangs mould production method, comprising the following steps:
It is the square steel tube rectangular frame structure schematic diagram of the embodiment of the present invention referring now to Fig. 1-Fig. 3, Fig. 1, Fig. 2 is the portion P in Fig. 1 Position enlarged drawing, Fig. 3 are the position Q enlarged drawing in Fig. 1.
A, need to be arranged four square steel tube right angled triangle brackets, each right angled triangle branch according to cast-in-place plate face difference of height Two neighboring side on the outside of the square steel pipe port of frame is respectively welded with angle bar, and angle bar is equipped with bolt hole;
B, on a right angle inner surface of each square steel tube right angled triangle bracket, and from being set at the 100mm of square outer vertex One group of hinge 8 is set, a right-angle side bending inwardly of each square steel tube right angled triangle bracket is enable;
C, a square steel tube rectangular frame is set up into the mutual split connection of four square steel tube right angled triangle brackets, makes rectangular frame Longer side and a shorter side among be connected with bolt hole on corresponding angle bar;Wherein the 1st bolt 5 is connected and fixed two square steel tubes 1 Bolt hole on the angle bar of side, the 2nd bolt 6 are connected and fixed the bolt hole on the angle bar of two 1 other sides of square steel tube.
D, in the equidistant welding one section of internal diameter 16mm, long 50mm steel in the right angle both sides of four square steel tube right angled triangle brackets Pipeline section 7, it is high to reach cast-in-place plate face to increase square steel tube rectangular frame intensity for insertion connection U-shaped support rod 2 in two sections of pipes Low difference tool-type hangs mould.1 specification of square steel tube is 40mm × 40mmm × 4mm zinc-plated square steel pipe.The U-shaped support rod is Diameter 15mm, length 370mm round steel, the length at round steel both ends bending end is respectively 40mm, can be inserted into long 50mm lengths of steel pipes 7.
Embodiment 3
Cast-in-place plate face difference of height tool-type in the embodiment of the present invention 1 or embodiment 2 hangs the application method of mould, including following step It is rapid:
A, line setting
It needs to check the position line kitchen, in the high and low poor position of toilet, balcony before mould is hung in installation, it is ensured that Hang the accuracy of mould position.
B, mould assembling is hung
Hang mould position determine it is errorless after, carry out the assembling for hanging mould: first carry out square steel tube rectangular frame length sides connection bolt Just twist, then carry out width edge connection bolt and just twist, after four groups of connection bolts are pre- twist after the completion of carry out twisting eventually again, and add preload Power.
C, Mod correction is hung
Hang after mould is completed, hanging mould bottom using Concrete seat pad, make to hang mould and reach designed elevation, it is formal reinforce before to hanging mould Absolute altitude, position are corrected.
D, mould reinforcing is hung
Certain load can be formed to mould is hung in concrete work progress, add one of support rod at mould interior angle hanging, form one surely The buckle resistance of mould is hung in fixed Delta Region, enhancing, and a possibility that mould deforms is hung in reduction;After hanging Mod correction completion, Mould will be hung and fixes by hanging mould inner ring and being disposed vertically with bar dowel, and bar dowel welds together with baseplate reinforcing bar, plays reinforcing to mould is hung Effect.
E, concrete placings
In concrete placings engineering, after putting down in square steel tube rectangular frame plate face and at the beginning of dropping plate, bracing wire accurately controls floor and square steel tube square Shape frame floor elevation.
F, it tears open and hangs mould
Tearing concrete strength grade when hanging mould open cannot be below 1.2MP, first tears square steel tube rectangular frame inner bracing piece, then loose bolt open, tears open and hang Forbid to strike in mold process, pound, fall phenomenon, avoid square steel tube rectangular frame template deformation, damage, influence, which is hung, imitates fruit.It is described to hang Mould in time cleans out the concrete residue on square steel tube rectangular frame surface after having removed, surface brush oil, and number is marked again Note uses convenient for next time.
The present invention has substantive distinguishing features and significant technological progress, and cast-in-place plate face difference of height tool-type of the invention hangs mould And its making and use method, hang that mold device structure is simple, easy to make, and construction method is simple, it is low in cost, it is easy to grasp Make, significant effect.
Cast-in-place plate face difference of height tool-type of the invention hangs mould and its making and use method and uses in correlation engineering, effect Significantly, exploiting entity, supervisor and construction unit's abundant affirmation have been obtained.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (9)

1. a kind of cast-in-place plate face difference of height tool-type hangs mould, between the kitchen suitable for the architectural engineering main body construction stage, toilet, The high and low poor position of balcony, including four square steel tube triangular supports, it is characterised in that:
Four square steel tube triangular supports are right angled triangle bracket, outside the square steel pipe port of each right angled triangle bracket The two neighboring side of side is respectively welded with angle bar, and angle bar is equipped with bolt hole;Four mutual splits of square steel tube right angled triangle bracket A square steel tube rectangular frame is set up into connection, and the long side of square steel tube rectangular frame and the size of short side are according to the ruler for dropping plate region Depending on very little, the long side of square steel tube rectangular frame and the centre of short side are joined with bolts corresponding bolt hole;Four square steel The right angle both sides of pipe right angled triangle bracket are equidistantly positioned support rod, to increase square steel tube rectangular frame intensity, reach cast-in-place Plate face difference of height tool-type hangs mould.
2. cast-in-place plate face difference of height tool-type as described in claim 1 hangs mould, which is characterized in that further include square steel tube right angle three On one right angle inner surface of angular support frame, and from one group of hinge is arranged at the 100mm of square outer vertex, mould is hung to avoid tearing open When to drop plate corner angle damage.
3. cast-in-place plate face difference of height tool-type as described in claim 1 hangs mould, which is characterized in that the square steel tube specification is 40mm × 40mmm × 4mm zinc-plated square steel pipe.
4. cast-in-place plate face difference of height tool-type as described in claim 1 hangs mould, which is characterized in that the support rod be diameter >= 15mm, length >=370mm round steel.
5. a kind of cast-in-place plate face difference of height tool-type hangs mould production method, it is characterised in that the following steps are included:
A, need to be arranged four square steel tube right angled triangle brackets according to cast-in-place plate face difference of height, each right angled triangle bracket Two neighboring side on the outside of square steel pipe port is respectively welded with angle bar, and angle bar is equipped with bolt hole;
B, on a right angle inner surface of each square steel tube right angled triangle bracket, and from being set at the 100mm of square outer vertex One group of hinge is set, a right-angle side bending inwardly of each square steel tube right angled triangle bracket is enable;
C, a square steel tube rectangular frame is set up into the mutual split connection of four square steel tube right angled triangle brackets, makes rectangular frame Longer side and a shorter side among be connected with bolt hole on corresponding angle bar;
D, in the equidistant welding one section of internal diameter 16mm, long 50mm pipe in the right angle both sides of four square steel tube right angled triangle brackets, Insertion connection U-shaped support rod reaches cast-in-place plate face difference of height tool to increase square steel tube rectangular frame intensity in two sections of pipes Formula hangs mould.
6. cast-in-place plate face difference of height tool-type as claimed in claim 5 hangs mould production method, which is characterized in that the square steel tube Specification is 40mm × 40mmm × 4mm zinc-plated square steel pipe.
7. cast-in-place plate face difference of height tool-type as claimed in claim 5 hangs mould production method, which is characterized in that the U-shaped branch Strut is diameter >=15mm, length >=370mm round steel, and the length at round steel both ends bending end is respectively 40mm, can be inserted into long 50mm In pipe.
8. the application method that a kind of cast-in-place plate face difference of height tool-type as described in claim 1 hangs mould, it is characterised in that including Following steps:
A, line setting
It needs to check the position line kitchen, in the high and low poor position of toilet, balcony before mould is hung in installation, it is ensured that Hang the accuracy of mould position;
B, mould assembling is hung
Hang mould position determine it is errorless after, carry out the assembling for hanging mould: first carry out square steel tube rectangular frame length sides connection bolt Just twist, then carry out width edge connection bolt and just twist, after four groups of connection bolts are pre- twist after the completion of carry out twisting eventually again, and add preload Power;
C, Mod correction is hung
Hang after mould is completed, hanging mould bottom using Concrete seat pad, make to hang mould and reach designed elevation, it is formal reinforce before to hanging mould Absolute altitude, position are corrected;
D, mould reinforcing is hung
Certain load can be formed to mould is hung in concrete work progress, add one of support rod at mould interior angle hanging, form one surely The buckle resistance of mould is hung in fixed Delta Region, enhancing, and a possibility that mould deforms is hung in reduction;After hanging Mod correction completion, Mould will be hung and fixes by hanging mould inner ring and being disposed vertically with bar dowel, and bar dowel welds together with baseplate reinforcing bar, plays reinforcing to mould is hung Effect;
E, concrete placings
In concrete placings engineering, after putting down in square steel tube rectangular frame plate face and at the beginning of dropping plate, bracing wire accurately controls floor and square steel tube square Shape frame floor elevation;
F, it tears open and hangs mould
Tearing concrete strength grade when hanging mould open cannot be below 1.2MP, first tears square steel tube rectangular frame inner bracing piece, then loose bolt open, tears open and hang Forbid to strike in mold process, pound, fall phenomenon, avoid square steel tube rectangular frame template deformation, damage, influence, which is hung, imitates fruit.
9. cast-in-place plate face difference of height tool-type as claimed in claim 8 hangs mould application method, which is characterized in that the mould that hangs is torn open The concrete residue on square steel tube rectangular frame surface is cleaned out in time later except complete, surface brush oil, and number is marked again, just It is used next time.
CN201810060790.0A 2018-01-22 2018-01-22 A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method Pending CN110067381A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810060790.0A CN110067381A (en) 2018-01-22 2018-01-22 A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810060790.0A CN110067381A (en) 2018-01-22 2018-01-22 A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method

Publications (1)

Publication Number Publication Date
CN110067381A true CN110067381A (en) 2019-07-30

Family

ID=67364725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810060790.0A Pending CN110067381A (en) 2018-01-22 2018-01-22 A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method

Country Status (1)

Country Link
CN (1) CN110067381A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677896A (en) * 2012-05-23 2012-09-19 中天建设集团有限公司 Bathroom settlement plate shaping mould and construction method
CN205224585U (en) * 2015-11-26 2016-05-11 福建省二建建设集团有限公司 Hanging mould structure for high-low difference concrete construction
CN106285002A (en) * 2015-05-28 2017-01-04 五冶集团上海有限公司 Cast-in-place walls difference of height tool-type hoisting die construction method
CN206091297U (en) * 2016-08-30 2017-04-12 北京首钢建设集团有限公司 Board assembly typical forms falls
CN206189850U (en) * 2016-11-10 2017-05-24 海通建设集团有限公司 Formula of sinking bathroom cast in situ concrete structural steel stencil assembly

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677896A (en) * 2012-05-23 2012-09-19 中天建设集团有限公司 Bathroom settlement plate shaping mould and construction method
CN106285002A (en) * 2015-05-28 2017-01-04 五冶集团上海有限公司 Cast-in-place walls difference of height tool-type hoisting die construction method
CN205224585U (en) * 2015-11-26 2016-05-11 福建省二建建设集团有限公司 Hanging mould structure for high-low difference concrete construction
CN206091297U (en) * 2016-08-30 2017-04-12 北京首钢建设集团有限公司 Board assembly typical forms falls
CN206189850U (en) * 2016-11-10 2017-05-24 海通建设集团有限公司 Formula of sinking bathroom cast in situ concrete structural steel stencil assembly

Similar Documents

Publication Publication Date Title
CN110924572B (en) Calculation method for splicing nodes of steel plate bin combined shear wall
CN206368533U (en) A kind of wide-angle tilt profile steel concrete column constructing structure
CN205058277U (en) Prefabricated T girder iron muscle mould
CN107524232B (en) Integrated profile steel and on-site splicing structure thereof
CN205712590U (en) A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post
CN203994174U (en) The prefabricated internal mold of a kind of concrete core slab and assembling frame
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN206752533U (en) A kind of uplift pile reaction frame experimental rig
CN110067381A (en) A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method
CN207092469U (en) For the finished product construction joint in floor construction
CN207063479U (en) Cantilever frame draws system to one side
KR100873846B1 (en) Connector for pre-fabricating the reinforced bar
CN204849737U (en) A stake of pre -buried formula combination stand for foundation ditch
CN111042436A (en) Section steel concrete tongue-and-groove for precast concrete beam
CN206144008U (en) Reinforced concrete precast component
CN207362880U (en) Side goes out formula, from the prefabricated piping lane template in blanking monoblock type list storehouse
CN202644989U (en) Form erecting cradle for outer wall outer cornice
CN206385794U (en) Wall connecting piece and connecting system thereof
CN105442833A (en) Cast-in-situ template reinforcing device of T-shaped connection position between external assembly walls and internal cast-in-situ wall
CN213105259U (en) Road and bridge steel reinforcement cage main reinforcement coaxial lap welding construction device
CN210342374U (en) Cleaning-free system for truss reinforcing steel bars
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN202744965U (en) Arch rib collecting mechanism of steel pipe concrete arch bridge
CN204326486U (en) Outrigger oblique pull wire rope fixing device
CN203247716U (en) Connecting device for concrete pipes with round interiors and square exteriors

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730

RJ01 Rejection of invention patent application after publication