CN203994174U - The prefabricated internal mold of a kind of concrete core slab and assembling frame - Google Patents

The prefabricated internal mold of a kind of concrete core slab and assembling frame Download PDF

Info

Publication number
CN203994174U
CN203994174U CN201420459842.9U CN201420459842U CN203994174U CN 203994174 U CN203994174 U CN 203994174U CN 201420459842 U CN201420459842 U CN 201420459842U CN 203994174 U CN203994174 U CN 203994174U
Authority
CN
China
Prior art keywords
steel pipe
internal mold
concrete core
core slab
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420459842.9U
Other languages
Chinese (zh)
Inventor
张建民
袁帅
姜世波
刘兰平
陈伟
杨伟
王忠贵
王清
李静
吴险云
周晓峰
王志云
于舰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Sinopec Petroleum Construction Shengli Corp
Original Assignee
Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry filed Critical Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry
Priority to CN201420459842.9U priority Critical patent/CN203994174U/en
Application granted granted Critical
Publication of CN203994174U publication Critical patent/CN203994174U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is disclosed is the prefabricated internal mold of a kind of concrete core slab and assembling frame, improves the prefabricated efficiency of concrete core slab.This prefabricated internal mold comprises steel pipe, bracing frame and outsourcing cloth, steel pipe is placed in to the periphery of bracing frame, and the corner of bracing frame and steel pipe are tied up fixing, and outsourcing cloth is wrapped in the outside of steel pipe and ties up fixing.Use assembling frame, according to the length of concrete core slab, determine the assembling number of frame and the length of steel pipe, merogenesis is made the prefabricated internal mold of concrete core slab.The utility model is used steel pipe assembled not only easy to operate, and is easy to change and maintenance, and selection is convenient, manufactures cost low.The dismounting of the utility model assembling simple and fast, particularly internal mold is more convenient, operates among piercing internal mold without personnel.Save labour, accelerated project progress, guaranteed safety in production.Significantly improve the prefabricated efficiency of cored slab, reduced production cost.

Description

The prefabricated internal mold of a kind of concrete core slab and assembling frame
Technical field
The utility model relates to the prefabricated instrument of bridge construction concrete core slab, and the particularly prefabricated internal mold of a kind of concrete core slab and assembling frame improve the prefabricated efficiency of concrete core slab.
Background technology
Along with the application of concrete core slab prefabricating technique with improve constantly, the prefabricated progress of cored slab is also more and more faster, and cored slab internal mold packaging technology is also tending towards variation, but application at present comparatively general or steel plate internal mold.Steel plate internal mold is that merogenesis is assembled, and every joint is provided with left and right two parts bolt, between joint and joint, is joined with bolts, and forms an integral inside molding consistent with concrete core slab inside dimension, length is consistent, by straddle truck or crane lifting.When cored slab carries out internal mold dismounting after building, first by workman, in the inside of steel plate internal mold, set bolt is removed, internal mold merogenesis burst could be removed.Although in this kind of steel plate, mold technique is very ripe, but has many drawbacks: 1, steel plate internal mold dead weight is larger, in assembling and demolishing process, the artificial and machinery needing is more, in operation, workman is existed to potential safety hazard.2, because steel plate internal mold, from great, so in integral hoisting process, easily push web reinforcement skeleton and make its distortion, destroy cushion block of concrete bar protective layer while transferring template, causes built cored slab finished product protection layer became uneven.3, when a slice steel form distortion is larger, cannot repair smoothly, must change separately, so just increased production cost.4, steel plate internal mold is removed from assembling---integral hoisting---, and whole process spended time is longer, affects project progress, increases project cost.5, cored slab inner chamber is generally at 30cm-90cm, and workman cannot normally work in inside.So building of concrete core slab needs a kind of light and fast, maneuverable prefabricated internal mold to solve the problems referred to above.
Summary of the invention
The purpose of this utility model is to provide the prefabricated internal mold of a kind of concrete core slab and assembling frame, be intended to solve the defect in existing steel plate inner mould technology, make its prefabricated internal mold light, assembly and disassembly are convenient, accelerate the progress of the interior mold forming of cored slab and installation, thereby improve the efficiency of building of concrete core slab prefabricated component.
The utility model is achieved in that
The prefabricated internal mold of concrete core slab comprises steel pipe, bracing frame and an outsourcing cloth, steel pipe is placed in to the periphery of bracing frame, and the corner of bracing frame and steel pipe are tied up fixing, and outsourcing cloth is wrapped in the outside of steel pipe and ties up fixing.
Assembling frame for the prefabricated internal mold of a kind of concrete core slab comprises vertical rod, base plate and positioning bar, and vertical rod is welded on the both sides of base plate, between vertical rod and base plate, welds positioning bar.Positioning bar conforms to the polycrystalline substance of bracing frame with the polycrystalline substance that base plate forms, and the width between two vertical rods conforms to the width of concrete core slab inner chamber.
The utility model remarkable result is compared with prior art: use steel pipe and bracing frame to manufacture cored slab internal mold and have and manufacture simple, easy to operately, the internal mold manufactured is light, save the advantages such as cost.According to the length of cored slab, the prefabricated internal mold of concrete core slab is can merogenesis assembled, due to each joint be all one independently whole and there is certain thickness, between joint and joint, need overlap with outsourcing cloth.According to the cross sectional shape of cored slab, by adjusting bracing frame and the assembling size and dimension of frame and the quantity of steel pipe used, can make the cored slab internal mold of various sizes and various cross sectional shapes, for building the cored slab of various sizes and shape.The utility model is used steel pipe assembled not only easy to operate, and is easy to change and maintenance, and selection is convenient, manufactures cost low.The dismounting of the utility model assembling simple and fast, particularly internal mold is more convenient, operates among piercing internal mold without personnel, only need to remove the tied silk of tying up of steel tube end part bracing frame, just steel pipe can be extracted out, bracing frame is pushed over and taken out of, operation is very easy.Save labour, accelerated project progress, guaranteed safety in production.Significantly improve the prefabricated efficiency of cored slab, reduced production cost, there is good use value.
Accompanying drawing explanation
Fig. 1 is building block principle schematic diagram of the present utility model.
Fig. 2 is the prefabricated internal mold sectional view after the utility model assembling.
The specific embodiment
Below in conjunction with accompanying drawing in detail the utility model is described in detail, and unrestricted protection domain of the present utility model.Referring to Fig. 1 and Fig. 2, the prefabricated internal mold of a kind of concrete core slab comprises steel pipe 3, bracing frame 2 and outsourcing cloth 5, steel pipe 3 is placed in to the periphery of bracing frame 2, and the corner of bracing frame 2 and steel pipe 3 are tied up fixing, and outsourcing cloth 5 is wrapped in the outside of steel pipe 3 and ties up fixing.Bracing frame 2 is frame shape structures, welding reinforcement 4 in frame, and the profile of bracing frame 2 conforms to the cavity shape of concrete core slab; One side angle corner and the steel pipe 3 of bracing frame 2 are tied up fixing.According to the shape of bracing frame 2, reinforcement 4 can be ╋ type, Х type, Η type, ¤ type or intersecting parallels structure.Steel pipe 3 is square steel tube or many shuttles shape steel tube, ease of assembly; Outsourcing cloth 5 is Polypropylence Sheet or the rubber cloth of thickness more than 0.2mm, can be fixed steel pipe 3 on the one hand, can also mortar leakage prevention.
Assembling frame for the prefabricated internal mold of a kind of concrete core slab comprises vertical rod 1, base plate 6 and positioning bar 7, and vertical rod 1 is welded on the both sides of base plate 6, between vertical rod 1 and base plate 6, welds positioning bar 7.Positioning bar 7 conforms to the polycrystalline substance of bracing frame 2 with the polycrystalline substance that base plate 6 forms, and the width between two vertical rods 1 conforms to the width of concrete core slab inner chamber.
Use the assemble method of assembling frame to be:
A: determine the assembling number of frame and the length of steel pipe 3 according to the length of concrete core slab, merogenesis is made the prefabricated internal mold of concrete core slab, after the arrangement of assembling frame is opened, is first laid on outsourcing cloth 5 in assembling frame;
B: the bottom that steel pipe 3 is laid in to assembling frame, a side as the prefabricated internal mold of concrete core slab, on steel pipe 3, put bracing frame 2, the bracing frame 2 of steel pipe 3 ends, two ends and the interval between follow-up bracing frame 2 are 1.2 meters-1.5 meters, the bottom corner of the bracing frame 2 of steel pipe 3 ends, two ends and steel pipe 3 are tied up fixing, bracing frame 2 is erected on steel pipe 3;
C: continue to put steel pipe 3 between bracing frame 2 both sides and assembling frame and the steel pipe 3 of bracing frame 2 end faces, the top corner of the bracing frame 2 of steel pipe 3 ends, two ends and steel pipe 3 are tied up fixing;
D: finally outsourcing cloth 5 be wrapped in to steel pipe 3 outsides and tie up fixing.
The prefabricated internal mold of concrete core slab after merogenesis is manufactured, overlaps by outsourcing cloth 5 between joint and joint.
After prefabricated internal mold has been assembled, the outsourcing cloth of the joint area of the prefabricated internal mold of every joint concrete core slab 5 is made to overlap joint parcel, then cored slab locking plug template is installed, can carry out next step operation.While tearing internal mold open after having built, only tying up by tied silk of two end supports frame 2 need be untied, can extract steel pipe 3 out, bracing frame 2 be pushed over to have taken out of and disassemble.

Claims (6)

1. the prefabricated internal mold of concrete core slab, is characterized in that, comprises steel pipe, bracing frame and outsourcing cloth, steel pipe is placed in to the periphery of bracing frame, and the corner of bracing frame and steel pipe are tied up fixing, and outsourcing cloth is wrapped in the outside of steel pipe and ties up fixing.
2. the prefabricated internal mold of a kind of concrete core slab according to claim 1, is characterized in that, support frame as described above is frame shape structure, welding reinforcement in frame, and the profile of bracing frame conforms to the cavity shape of concrete core slab; One side angle corner and the steel pipe of bracing frame are tied up fixing.
3. the prefabricated internal mold of a kind of concrete core slab according to claim 2, is characterized in that, described reinforcement can be ╋ type, Х type, Η type, ¤ type or intersecting parallels structure.
4. the prefabricated internal mold of a kind of concrete core slab according to claim 1, is characterized in that, described steel pipe is square steel tube or many shuttles shape steel tube; Outsourcing cloth is Polypropylence Sheet or the rubber cloth of thickness more than 0.2mm.
5. for the assembling frame of the claim 1 prefabricated internal mold of concrete core slab, it is characterized in that, comprise vertical rod, base plate and positioning bar, vertical rod is welded on the both sides of base plate, between vertical rod and base plate, welds positioning bar.
6. assembling frame according to claim 5, is characterized in that, described positioning bar conforms to the polycrystalline substance of bracing frame with the polycrystalline substance that base plate forms, and the width between two vertical rods conforms to the width of concrete core slab inner chamber.
CN201420459842.9U 2014-08-15 2014-08-15 The prefabricated internal mold of a kind of concrete core slab and assembling frame Expired - Fee Related CN203994174U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420459842.9U CN203994174U (en) 2014-08-15 2014-08-15 The prefabricated internal mold of a kind of concrete core slab and assembling frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420459842.9U CN203994174U (en) 2014-08-15 2014-08-15 The prefabricated internal mold of a kind of concrete core slab and assembling frame

Publications (1)

Publication Number Publication Date
CN203994174U true CN203994174U (en) 2014-12-10

Family

ID=52034237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420459842.9U Expired - Fee Related CN203994174U (en) 2014-08-15 2014-08-15 The prefabricated internal mold of a kind of concrete core slab and assembling frame

Country Status (1)

Country Link
CN (1) CN203994174U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104139451A (en) * 2014-08-15 2014-11-12 中石化胜利建设工程有限公司 Concrete core slab prefabricated internal mold, assembling frame and assembling method
CN104626341A (en) * 2014-12-15 2015-05-20 中交路桥华南工程有限公司 Hollow slab internal mold and assembly and disassembly method thereof
CN107042575A (en) * 2016-02-05 2017-08-15 包头市市政公用工程有限责任公司 A kind of umbrella skeleton support assembled core and prefabricated component manufacture method
CN107388012A (en) * 2017-06-27 2017-11-24 中国海洋石油总公司 The control method of large hollow tubular structure thing precision
CN109610288A (en) * 2018-11-26 2019-04-12 中冶天工集团有限公司 A kind of core model of middle-size and small-size prefabricated case beam is built and casting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104139451A (en) * 2014-08-15 2014-11-12 中石化胜利建设工程有限公司 Concrete core slab prefabricated internal mold, assembling frame and assembling method
CN104626341A (en) * 2014-12-15 2015-05-20 中交路桥华南工程有限公司 Hollow slab internal mold and assembly and disassembly method thereof
CN107042575A (en) * 2016-02-05 2017-08-15 包头市市政公用工程有限责任公司 A kind of umbrella skeleton support assembled core and prefabricated component manufacture method
CN107388012A (en) * 2017-06-27 2017-11-24 中国海洋石油总公司 The control method of large hollow tubular structure thing precision
CN109610288A (en) * 2018-11-26 2019-04-12 中冶天工集团有限公司 A kind of core model of middle-size and small-size prefabricated case beam is built and casting method

Similar Documents

Publication Publication Date Title
CN203994174U (en) The prefabricated internal mold of a kind of concrete core slab and assembling frame
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN104139451A (en) Concrete core slab prefabricated internal mold, assembling frame and assembling method
CN104372947A (en) Integral mold plate feeding and retreating construction method for elevator shaft
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN104074352A (en) Wall body template supporting method in position with narrow space
CN203307840U (en) Integral horizontal moving type formwork construction device for strip-shaped constant-cross-section concrete structure
CN103306463B (en) Metal liner concrete air channel construction method
CN103362069B (en) Steel and concrete combined box girder concrete wing plate formwork and construction method
CN104612057A (en) Assembled rack and use method thereof
CN104153573B (en) V-type cylinder concrete pour mould and construction method
CN104047422A (en) Cylinder die manufacturing and mounting method
CN103572703A (en) Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method
CN102943482A (en) Prefabricate abutment pre-tightening type sealing up cofferdam
CN204040043U (en) Adjustable support supporting movable end
CN103806593A (en) Precast concrete member
CN204059953U (en) Hang mould prefab form
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN102242569B (en) Industrial premises high vacancy takes out post expansion method after changing beam
CN103352570B (en) Assembled construction gateway
CN106088579B (en) The erection method of reinforced concrete wall template
CN101148910A (en) Reinforced composite dismounting-free die building construction method
CN104563496A (en) Construction structure of cylindrical die
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180130

Address after: 100101 Chaoyang District, Jilin City, Beijing mouth road, No. 9

Co-patentee after: SINOPEC PETROLEUM CONSTRUCTION SHENGLI Corp.

Patentee after: SINOPEC OILFIELD SERVICE Corp.

Address before: 257000 No. two, 755 North Road, Dongying District, Shandong, Dongying

Patentee before: SINOPEC PETROLEUM CONSTRUCTION SHENGLI Corp.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20210815

CF01 Termination of patent right due to non-payment of annual fee