CN110056354A - The method of horizontal well pitching sliding sleeve staged fracturing in coal mine tight roof tunnel - Google Patents

The method of horizontal well pitching sliding sleeve staged fracturing in coal mine tight roof tunnel Download PDF

Info

Publication number
CN110056354A
CN110056354A CN201910324612.9A CN201910324612A CN110056354A CN 110056354 A CN110056354 A CN 110056354A CN 201910324612 A CN201910324612 A CN 201910324612A CN 110056354 A CN110056354 A CN 110056354A
Authority
CN
China
Prior art keywords
fracturing
pressure
string
sliding sleeve
horizontal well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910324612.9A
Other languages
Chinese (zh)
Inventor
王衍
马俯波
杨俊哲
王振荣
王尔林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Geological Exploration Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Geological Exploration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Geological Exploration Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201910324612.9A priority Critical patent/CN110056354A/en
Publication of CN110056354A publication Critical patent/CN110056354A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/12Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by injecting into the borehole a liquid, either initially at high pressure or subsequently subjected to high pressure, e.g. by pulses, by explosive cartridges acting on the liquid
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides the methods of horizontal well pitching sliding sleeve staged fracturing in a kind of coal mine tight roof tunnel, comprising: the first pressure difference sliding sleeve is directed at the first fracturing section and puts into the first pressure break ball in fracturing string;Fracturing string is connected to water injecting pump, water injecting pump is opened to inject fracturing fluid into Steel Tube Special the first pressure break ball to be pushed into the first ball seat, when the pressure value in fracturing string reaches preset pressure value, pressure stabilizing preset time on fracturing string so as to have open hole packer completely setting, after all open hole packers are completely setting, continue water filling until the first pressure difference sliding sleeve is opened, fracturing pump continues to inject fracturing fluid to carry out fracturing work to the first fracturing section;Until the discharge capacity pressure value of water injecting pump continually and steadily decline suddenly occurs after discharge capacity pressure value is unchanged to discharge capacity pressure value from pressure, terminate the fracturing work to the first fracturing section.The pressure break period has been saved using this method, has improved the production efficiency of coal mine.

Description

The method of horizontal well pitching sliding sleeve staged fracturing in coal mine tight roof tunnel
Technical field
The present invention relates to coal mining technology fields, in particular to horizontal well in a kind of coal mine tight roof tunnel The method of pitching sliding sleeve staged fracturing.
Background technique
If having tight roof will cause in coal mining, deformation of the surrounding rock in tunnel is serious, advanced mine pressure acutely shows, or even makes At rock blast hazard.The Coal Mine Accidents as caused by tight roof, existing similar techniques are orientation hydraulic fracturing technologies, this There are the following problems in practice for method:
1, increase orientation grooving process when pressing crack construction before each pressure break, construction period is caused to extend.
2, existing fracturing tool cannot be pushed into net horizontal section.
3, deviated directional drilling drilling depth is small, generally less than 150m, and working face deep outstanding problem not can solve.
4, deviated directional drilling wellbore is small, and depth is more than that 100m fracturing tool is difficult tripping in.
5, fracturing tool diameter is small, small by pulling force, pressure, and tool feeding can only take artificial pushing style, Gong Renlao Fatigue resistance is big, needs number more, and it is limited to be sent into depth.
Summary of the invention
The main purpose of the present invention is to provide horizontal well pitching sliding sleeve staged fracturings in a kind of coal mine tight roof tunnel Method, to solve the problems, such as long construction period in the prior art.
To achieve the goals above, according to an aspect of the invention, there is provided a kind of coal mine tight roof tunnel Nei Shui The method of horizontal well pitching sliding sleeve staged fracturing, method is the following steps are included: step 1: in coal mine roadway drilling machine by fracturing string It is pushed in the open-hole horizontal well being deployed in face roof preset range, until the first pressure difference sliding sleeve is directed at the first pressure break Section simultaneously puts into the first pressure break ball in fracturing string;Step 2: connection fracturing string opens water injecting pump with to high pressure to water injecting pump Injection fracturing fluid is preset so that the first pressure break ball to be pushed into the first ball seat when the pressure value in fracturing string reaches first in steel pipe When pressure value, pressure stabilizing preset time so that having on fracturing string open hole packer is completely setting, when all open hole packers Completely it is setting after, continue water filling being forced into the second preset pressure value until the first pressure difference sliding sleeve open, fracturing pump continue injection pressure Liquid is split to carry out fracturing work to the first fracturing section;Step 3: when filling the water pump pressure and rising to up to roof strata fracture pressure, Keep the discharge capacity pressure of water injecting pump with vee crack, until the discharge capacity pressure value of water injecting pump is from pressure continually and steadily to discharge capacity pressure There is decline suddenly after discharge capacity pressure value is unchanged in value, terminates the fracturing work to the first fracturing section;Step 4: in pressure break The second pressure break ball is put into tubing string, repeats step 2 and step 3 so that the second pressure break ball is located at corresponding with the second fracturing section second In ball seat, and by injection fracturing fluid so that the second pressure difference sliding sleeve corresponding with the second fracturing section is opened to complete to the second pressure break The fracturing work of section.
Further, before step 1 further include: step 01: by the open-hole horizontal well in face roof preset range Multiple fracturing sections are divided into, fracturing work is successively carried out to multiple fracturing sections using fracturing string, wherein using on fracturing string The N pressure difference sliding sleeve and M pressure break ball being arranged successively carry out fracturing work to multiple fracturing sections, and multiple fracturing sections include the first pressure Split section and the second fracturing section.
Further, pressure stabilizing preset time is T, wherein 4min≤T≤6min.
Further, before step 1 further include: before constructing to open-hole horizontal well, on the top of open-hole horizontal well The predetermined position of the same level of plate manufactures many cracks.
Further, preset pressure value, the first preset value are P1, wherein 5MPa≤P1≤6MPa.;Second preset value is P2, wherein 8MPa≤P2≤10MPa.
Further, after the completion of successively carrying out fracturing work to multiple fracturing sections, Steel Tube Special is carried out to bleed off pressure processing, Fracturing string is risen by coal mine roadway drilling machine, is completed to fractured horizontal well construction operation.
Further, method further include: in fracturing process, using passive micro-seismic monitoring method, in heading cloth Set receiver, real-time monitoring crack three-dimensional trend.
Further, method further include: in fracturing process, install pressure discharge capacity recorder in water filling pump discharge, in real time Monitor frac pressure and discharge capacity.
Further, during constructing to open-hole horizontal well, the distance of two neighboring packer is less than 20m.
It applies the technical scheme of the present invention, using the implementation method, capable of making fracturing string, activity is freely in horizontal well Feeding and pull-out.Coal mine is exploited using this method, is effectively reduced the intensity of hand labor, so that a pressure break pipe Column can realize multiple staged fracturing, save the pressure break period, improve the production efficiency of coal mine.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present invention, and of the invention shows Examples and descriptions thereof are used to explain the present invention for meaning property, does not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 shows the structural schematic diagram of the embodiment of horizontal well pitching sliding sleeve fracturing strings according to the present invention;
Fig. 2 shows the structural schematic diagrams of the embodiment of horizontal well pitching sliding sleeve staged fracturing technique according to the present invention.
Wherein, the above drawings include the following reference numerals:
1, guide shoe;2, ball seat;3, pressure difference sliding sleeve;4, packer;5, safety joint;6, open-hole horizontal well;7, fracturing string;
8, water pot;9, high pressure water-injection pump;10, accumulator;11, pressure sensor;12, flow sensor;13, pressure flow Data acquisition;14, high-pressure hose;15, hydraulic control high pressure gate;16, drilling machine, 17, ESD control device;18, microseism data processing Device;19, microseism inductor;20, fracturing string;21, horizontal well.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
It should be noted that term " first ", " second " etc. in the description and claims of this application and attached drawing It is to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that the art used in this way Language is interchangeable under appropriate circumstances, so that presently filed embodiment described herein for example can be in addition to illustrating herein Or the sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that Cover it is non-exclusive include, for example, containing the process, method, system, product or equipment of a series of steps or units need not limit In step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, produce The other step or units of product or equipment inherently.
For ease of description, spatially relative term can be used herein, as " ... on ", " ... top ", " ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy The spatial relation of sign.It should be understood that spatially relative term is intended to comprising the orientation in addition to device described in figure Except different direction in use or operation.For example, being described as if the device in attached drawing is squeezed " in other devices It will be positioned as " under other devices or construction after part or construction top " or the device of " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " may include " ... top " and " in ... lower section " two kinds of orientation.The device can also be positioned with other different modes and (is rotated by 90 ° or in other orientation), and And respective explanations are made to the opposite description in space used herein above.
Now, the illustrative embodiments according to the application are more fully described with reference to the accompanying drawings.However, these are exemplary Embodiment can be implemented by many different forms, and should not be construed to be limited solely to embodiment party set forth herein Formula.It should be understood that it is thoroughly and complete to these embodiments are provided so that disclosure herein, and these are shown The design of example property embodiment is fully conveyed to those of ordinary skill in the art, in the accompanying drawings, for the sake of clarity, it is possible to expand The big thickness of layer and region, and make that identical device is presented with like reference characters, thus omission retouches them It states.
Referring to figs. 1 and 2, according to an embodiment of the invention, providing horizontal in a kind of coal mine tight roof tunnel The method of well pitching sliding sleeve staged fracturing.
Specifically, method includes the following steps: step 1: fracturing string being pushed to portion with drilling machine in coal mine roadway Administration is in the open-hole horizontal well in face roof preset range, until the first pressure difference sliding sleeve is directed at the first fracturing section and in pressure break The first pressure break ball is put into tubing string;Step 2: connection fracturing string to water injecting pump opens water injecting pump to inject into Steel Tube Special Fracturing fluid is the first pressure break ball to be pushed into the first ball seat, when the pressure value in fracturing string reaches the first preset pressure value P1 When, pressure stabilizing preset time so that having on fracturing string open hole packer is completely setting, when all complete seats of open hole packer It is honored as a queen, continues water filling until the first pressure difference sliding sleeve is opened when pressure rises to the second preset pressure value P2, fracturing pump continues injection pressure Liquid is split to carry out fracturing work to the first fracturing section;Step 3: when filling the water pump pressure and rising to up to roof strata fracture pressure, Keep the discharge capacity pressure of water injecting pump with vee crack, until the discharge capacity pressure value of water injecting pump is from pressure continually and steadily to discharge capacity pressure There is decline suddenly after discharge capacity pressure value is unchanged in value, terminates the fracturing work to the first fracturing section;Step 4: in pressure break The second pressure break ball is put into tubing string, repeats step 2 and step 3 so that the second pressure break ball is located at corresponding with the second fracturing section second In ball seat, and by injection fracturing fluid so that the second pressure difference sliding sleeve corresponding with the second fracturing section is opened to complete to the second pressure break The fracturing work of section.
In the present embodiment, using the implementation method, can make fracturing string in horizontal well activity feeding freely and It pulls out.Coal mine is exploited using this method, is effectively reduced the intensity of hand labor, so that a fracturing string can be realized Multiple staged fracturing has saved the pressure break period, improves the production efficiency of coal mine.
Before step 1 further include: step 01: the open-hole horizontal well in face roof preset range being divided into multiple Fracturing section successively carries out fracturing work to multiple fracturing sections using fracturing string, wherein using the N being arranged on fracturing string Pressure difference sliding sleeve and M pressure break ball successively carry out fracturing work to multiple fracturing sections, and multiple fracturing sections include the first fracturing section and the Two fracturing sections.
Preferably, pressure stabilizing preset time is T, wherein 4min≤T≤6min.
Further, before step 1 further include: before constructing to open-hole horizontal well, on the top of open-hole horizontal well The predetermined position of the same level of plate manufactures many cracks.Preset pressure value, the first preset value are P1, wherein 5MPa≤ P1≤6MPa.;Second preset value is P2, wherein 8MPa≤P2≤10MPa.It is complete that multiple fracturing sections are successively carried out with fracturing work Cheng Hou carries out Steel Tube Special to bleed off pressure processing, rises by fracturing string in coal mine roadway drilling machine, fractured horizontal well is applied in completion Work industry.
Further, method further include: in fracturing process, using passive micro-seismic monitoring method, in heading cloth Set receiver, real-time monitoring crack three-dimensional trend.In fracturing process, pressure discharge capacity recorder is installed in water filling pump discharge, it is real When monitoring frac pressure and discharge capacity.During constructing to open-hole horizontal well, the distance of two neighboring packer is less than 20m.
Specifically, tight roof horizontal well pitching sliding sleeve staged fracturing method in coal mine roadway provided by the present application is coal Mine solves top plate outstanding problem in advance comprehensively and provides solution, and economy reliability is prominent.
Staged fracturing is carried out to the open-hole horizontal well being deployed within face roof preset range in coal mine roadway, What this method was implemented is mainly characterized in that pitching sliding sleeve, fixed tubular column, i.e., merges into one-trip string with completion tubular column and fracturing string Tripping in together, using tools lower going-into-wells such as suspension expanding open hole packer, pitching sliding sleeve, pressure difference sliding sleeve and setting ball seats It is interior, insulate horizontal segment using open hole packer, realize fracturing work well section laterally selective staged isolation, according to pressure break number of segment into Row staged fracturing realizes the complete fracturing work of full well section.Details are as follows for the chief component of this method:
Fracturing string: the double envelope single deck tape-recorder fracturing strings schematic diagrames of horizontal well are as shown in Figure 1, fracturing tool includes pressure break pipe (packer includes open hole packer n, pitching sliding sleeve n, naked eye packing for column 7 (high pressure water injection steel pipe), safety joint 5, packer 4 Device n-1, pitching sliding sleeve n-1 ... open hole packer 2, pitching sliding sleeve 2, open hole packer 1), oil pipe, pressure difference sliding sleeve 3, ball seat 2, Guide shoe 1, wherein 6 be open-hole horizontal well, and A is top plate, and B is coal seam.
Fracturing tool: high pressure water injection outer diameter of steel pipes is generally less than or equal to 73mm in coal mine open-hole horizontal well, and pressure-bearing is big In or equal to 70MPa, used to adapt to drilling machine in tunnel, every high pressure water injection length of steel pipe is less than or equal to 3m.
In place for convenience of drilling tool push, chamfering, bottom cooperation semicircle are drawn up and down for all steel pipes and tool hoop on tubing string Shoes, high pressure water injection steel pipe add centralizer every 20m to 30m, and lower contact is machined with centralizer on open hole packer.Spherical structure is adopted Meet material ball with low-density, is pressed into differential 0.125 inch of diameter of setting of well sequence.
Pressure break equipment: using ordi-nary drilling machine in tunnel tripping in or rise fracturing string, drilling machine push power and pulling force be greater than Or it is equal to 10T.Fracturing pump uses driven high voltage water injecting pump, and power is greater than or equal to 50KW, and operating pressure is greater than or equal to 70MPa, discharge capacity are less than or equal to 1000L/min.
Fracturing pump is connected with high pressure water injection steel pipe to be connected using 70-105MPa high-pressure hose, horizontal well well head high pressure water injection 105MPa high pressure hydraulic control needle valve is installed at steel pipe, is controlled by independent hydraulic station, energy emergency shutdown, safety equipment when being pressure break, Prevent high-pressure hose explosion from leading to the problem of tunnel and shaft safety.
Fracturing fluid: coal mine water or riverfrac treatment liquid are used.Roof pressure break does not need plus sandfilling crack, it is only necessary to clear High pressure generates crack to water in short-term.
Fracturing parameter: construction parameter determines principle small displacement, high pressure, it is ensured that seam is long as long as possible.
Fracturing section divides: coal mine uses the complete well of open-hole horizontal well, determines number of fragments according to horizontal well lithologic character.2 Open hole packer card seals distance less than 20 meters.
Fracturing effect monitoring: it can selectively monitor according to production needs, using passive micro-seismic monitoring method, in coal seam lane Receiver, real-time monitoring crack three-dimensional trend are arranged in road;Pressure break pump discharge installs pressure discharge capacity recorder, monitors pressure break pressure in real time Power and discharge capacity.
According to another embodiment of the application, including step 1: assembling fracturing string according to design.
Step 2: fracturing string being pushed to drilling machine in coal mine roadway and has been deployed within face roof preset range Open-hole horizontal well in, until the first pressure difference sliding sleeve be aligned the first fracturing section carry out pressure break.
Step 3: throwing the first pressure break ball, connection fracturing string to fracturing pump in fracturing string, turn on pump water filling pushes the first pressure Blastomere slowly boosts to open hole packer setting pressure P1, pressure stabilizing 5min, setting all open hole packers to the first ball seat.
Step 4: continuing to boost to the cracking pressure P2 of the first pressure difference sliding sleeve, open the first pressure difference sliding sleeve.
Step 5: fracturing pump continue injection pressure split it is hydraulic split the first fracturing section, water filling pump pressure rapidly rises to up to roof strata Fracture pressure maintains discharge capacity pressure vee crack, until discharge capacity is stable, pressure declines suddenly, observation pressure trend is unchanged, knot The fracturing work of beam first segment fracturing section.
Step 6: the second pressure break ball in fracturing string, fracturing pump injection fracturing fluid push away the second pressure break ball into the second ball Seat repeats step 4 and completes the second fracturing section.Step 5, step 6 are repeated, N sections of pressing crack constructions can be completed, wherein N can be Natural number more than or equal to 3.It slowly bleeds off pressure to Steel Tube Special internal pressure 0MPa, plays fracturing string in coal mine roadway drilling machine Out, the construction of horizontal well pitching sliding sleeve staged fracturing is completed.
It is that hard difficulty collapses siltstone according to certain coal mine face roof according to another embodiment of the application, Preboring open-hole horizontal well at 30 meters of top plate, 400 meters of well depth, 250 meters of horizontal segment, implementing staged fracturing, steps are as follows:
Step 1: according to horizontal well lithology information, dividing 15 sections of fractured interval.
Step 2: assembling fracturing string, fracturing string is pushed to 380 meters with drilling machine in coal mine roadway.
Step 3: connection fracturing string to water injecting pump puts into the first pressure break ball, turn on pump water filling push the first pressure break ball of investment To the first ball seat, pump pressure is raised slowly to 5MPa, pressure stabilizing 5min, setting all open hole packers.
Step 4: continuing to boost to the first pressure difference sliding sleeve cracking pressure 10MPa, open the first pressure difference sliding sleeve.
Step 5: fracturing pump continues to infuse fracturing fluid, the first fracturing section of pressure break, and fracturing pump pressure 55MPa roof strata ruptures, Discharge capacity pressure 5-10min vee crack is maintained, pressure declines suddenly, and observation pressure trend is unchanged, terminates to the first fracturing section Fracturing work.
Step 6: the second pressure break ball in fracturing string, fracturing pump injection fracturing fluid push away the second pressure break ball into the second ball Seat repeats the fracturing work that step 5 completes the second fracturing section.Step 5, step 6 are repeated, the pressure break for completing 3-15 fracturing section is applied Work.It slowly bleeds off pressure to Steel Tube Special internal pressure 0MPa, rises by fracturing string in coal mine roadway drilling machine, it is sliding to complete horizontal well pitching Set segmented pressing crack construction.Design of string pipe and optimization make tubing string be sent into horizontal well and pull-out activity freely, utilize drilling machine construction Labor intensity is reduced, a fracturing string can realize n times staged fracturing (N >=10), greatly save pressure break period, Ke Yi Top plate same level fixed point manufacture many cracks, destroy entire face roof structure, extinction in advance, and overall effect is obvious. It can solve working face deep top plate extinction problem using this method in open-hole horizontal well.Running string is not moved in construction period It is dynamic, construction success rate can be greatly improved.This method is particularly suitable for the tight roofs such as coal mine siltstone, carbonate, can it is advanced, It is economical, reliable to solve top plate outstanding problem.
Wherein, as shown in Fig. 2, during fracturing work, water pot 8, high pressure water-injection pump 9, accumulator 10, pressure are also used Sensor 11, flow sensor 12, pressure flow data acquire 13, high-pressure hose 14, hydraulic control high pressure gate 15, drilling machine 16, ESD Control device 17, microseism data processing equipment 18, microseism inductor 19, fracturing string 20.Wherein, in Fig. 2 21 for level Well, C are tunnel.
Than that described above, it is also necessary to which explanation is " one embodiment " spoken of in the present specification, " another implementation Example ", " embodiment " etc. refer to that specific features, structure or the feature of embodiment description is combined to be included in the application summary Property description at least one embodiment in.It is not centainly to refer to the same reality that statement of the same race, which occur, in multiple places in the description Apply example.Furthermore, it is understood that is advocated is knot when describing a specific features, structure or feature in conjunction with any embodiment Other embodiments are closed to realize that this feature, structure or feature are also fallen within the scope of the present invention.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment Point, reference can be made to the related descriptions of other embodiments.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. the method for horizontal well pitching sliding sleeve staged fracturing in a kind of coal mine tight roof tunnel, which is characterized in that the method The following steps are included:
Step 1: fracturing string being pushed to the naked eye being deployed in face roof preset range with drilling machine in coal mine roadway In horizontal well, until the first pressure difference sliding sleeve is directed at the first fracturing section and puts into the first pressure break ball in fracturing string;
Step 2: connection fracturing string opens water injecting pump to inject fracturing fluid into Steel Tube Special with by the first pressure break to water injecting pump Ball be pushed into the first ball seat in, when the pressure value in the fracturing string reaches the first preset pressure value, pressure stabilizing preset time with Make on the fracturing string it is described have that open hole packer is completely setting, after all open hole packers are completely setting, continue Water filling is forced into the second preset pressure value until the first pressure difference sliding sleeve is opened, and fracturing pump continues to inject fracturing fluid to the first pressure break Duan Jinhang fracturing work;
Step 3: when filling the water pump pressure and rising to up to roof strata fracture pressure, the discharge capacity pressure of water injecting pump being kept to split to extend Seam, until the discharge capacity pressure value of water injecting pump continually and steadily decline suddenly occurs up to discharge capacity pressure value to discharge capacity pressure value from pressure After unchanged, terminate the fracturing work to the first fracturing section;
Step 4: putting into the second pressure break ball in fracturing string, repeat step 2 and step 3 so that the second pressure break ball is located at and second In corresponding second ball seat of fracturing section, and by injection fracturing fluid so that the second pressure difference sliding sleeve corresponding with the second fracturing section is opened To complete the fracturing work to the second fracturing section.
2. the method according to claim 1, wherein before step 1 further include:
Step 01: the open-hole horizontal well in face roof preset range being divided into multiple fracturing sections, using fracturing string pair Multiple fracturing sections successively carry out fracturing work, wherein using the N pressure difference sliding sleeve and M pressure break ball pair being arranged on fracturing string Multiple fracturing sections successively carry out fracturing work, and multiple fracturing sections include the first fracturing section and the second fracturing section.
3. the method according to claim 1, wherein pressure stabilizing preset time is T, wherein 4min≤T≤6min.
4. the method according to claim 1, wherein before step 1 further include: carried out to open-hole horizontal well Before construction, many cracks are manufactured in the predetermined position of the same level of the top plate of open-hole horizontal well.
5. the method according to claim 1, wherein the first preset value is P1, wherein 5MPa≤P1≤6MPa.; Second preset value is P2, wherein 8MPa≤P2≤10MPa.
6. according to the method described in claim 2, it is characterized in that, after the completion of successively carrying out fracturing work to multiple fracturing sections, Steel Tube Special is carried out to bleed off pressure processing, rises by fracturing string in coal mine roadway drilling machine, completes to construct to fractured horizontal well and make Industry.
7. the method according to claim 1, wherein the method also includes:
In fracturing process, using passive micro-seismic monitoring method, receiver is arranged in heading, real-time monitoring crack is three-dimensional Trend.
8. the method according to claim 1, wherein the method also includes:
In fracturing process, pressure discharge capacity recorder is installed in water filling pump discharge, monitors frac pressure and discharge capacity in real time.
9. two neighboring the method according to claim 1, wherein during constructing to open-hole horizontal well The distance of packer is less than 20m.
CN201910324612.9A 2019-04-22 2019-04-22 The method of horizontal well pitching sliding sleeve staged fracturing in coal mine tight roof tunnel Pending CN110056354A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910324612.9A CN110056354A (en) 2019-04-22 2019-04-22 The method of horizontal well pitching sliding sleeve staged fracturing in coal mine tight roof tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910324612.9A CN110056354A (en) 2019-04-22 2019-04-22 The method of horizontal well pitching sliding sleeve staged fracturing in coal mine tight roof tunnel

Publications (1)

Publication Number Publication Date
CN110056354A true CN110056354A (en) 2019-07-26

Family

ID=67320122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910324612.9A Pending CN110056354A (en) 2019-04-22 2019-04-22 The method of horizontal well pitching sliding sleeve staged fracturing in coal mine tight roof tunnel

Country Status (1)

Country Link
CN (1) CN110056354A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253113A (en) * 2020-09-10 2021-01-22 中煤科工集团西安研究院有限公司 Method for weakening hard gangue layer by coal mine underground directional long drilling and staged hydraulic fracturing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6123394A (en) * 1998-03-02 2000-09-26 Commonwealth Scientific And Industrial Research Organisation Hydraulic fracturing of ore bodies
CN103015955A (en) * 2012-12-28 2013-04-03 中国石油集团渤海钻探工程有限公司 Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN108756884A (en) * 2018-06-12 2018-11-06 王帆 Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN108843320A (en) * 2018-06-12 2018-11-20 王帆 Shift to an earlier date outburst elimination method in the tunnel of coal mine tight roof full face

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6123394A (en) * 1998-03-02 2000-09-26 Commonwealth Scientific And Industrial Research Organisation Hydraulic fracturing of ore bodies
CN103015955A (en) * 2012-12-28 2013-04-03 中国石油集团渤海钻探工程有限公司 Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN108756884A (en) * 2018-06-12 2018-11-06 王帆 Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN108843320A (en) * 2018-06-12 2018-11-20 王帆 Shift to an earlier date outburst elimination method in the tunnel of coal mine tight roof full face

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张永利: "《磨料两相射流理论及在油井增产中的应用》", 31 December 2010 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253113A (en) * 2020-09-10 2021-01-22 中煤科工集团西安研究院有限公司 Method for weakening hard gangue layer by coal mine underground directional long drilling and staged hydraulic fracturing

Similar Documents

Publication Publication Date Title
CN108894787B (en) Leave the pressure break release method of ore pillar stress concentration in Overburden gob area
CN108678747B (en) A kind of method and apparatus of pulsed water fracturing control Top coal caving characteristic
CA2855417C (en) Improved hydrocarbon recovery process exploiting multiple induced fractures
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN103306660B (en) A kind of method of shale gas reservoir fracturing volume increase
CN109958424B (en) Method for effectively plugging end part of hydraulic fracture
CN113738317A (en) Method for combined exploitation of deep coal bed gas and dry hot rock type geothermal
CN109931062A (en) The method of the double envelope single deck tape-recorder staged fracturings of tight roof horizontal well in coal mine roadway
CN104790951B (en) Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam
CN110056353A (en) The method of tight roof horizontal well water-jet staged fracturing in coal mine roadway
CN105545307A (en) Method for over-pit and under-pit cooperative control of roofs of far and near fields of extra-large stoping space
CN104879159B (en) A kind of devices and methods therefor of weak seam stope anti-reflection mash gas extraction
CN105507858A (en) Immiscible gas injection and oil replacement type exploitation method for ultra-deep fractured-vuggy carbonate reservoirs
CN104963671B (en) A kind of fracturing reform method of High angle from formula well reservoir
CN108843320A (en) Shift to an earlier date outburst elimination method in the tunnel of coal mine tight roof full face
CN103967471A (en) Fracturing process for realizing single-layer multi-seam by means of three-dimensional staggered directional perforation technology
CN108756884A (en) Coal mine tight roof full face ground shifts to an earlier date outburst elimination method
CN102493795A (en) Method for gasification fracturing of liquid nitrogen in hydrocarbon reservoirs
CN106761612B (en) The asynchronous water injection oil extraction method of double different wells of pressure break horizontal well of zip mode cloth seam
CN106761606A (en) The asynchronous note CO of different well of symmetrical expression cloth seam2Oil production method
US20160312594A1 (en) Method for orienting hydraulic fractures in multilateral horizontal wells
US3062286A (en) Selective fracturing process
CN109025940A (en) A kind of CO for compact oil reservoir2Pressure break displacement of reservoir oil integration oil production method
US10017995B2 (en) Penetrating a subterranean formation
CN111594123A (en) Jet staged fracturing method for bare hole immovable pipe column of ultra-short radius horizontal well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726

RJ01 Rejection of invention patent application after publication