CN110056162A - The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation - Google Patents
The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation Download PDFInfo
- Publication number
- CN110056162A CN110056162A CN201910461652.8A CN201910461652A CN110056162A CN 110056162 A CN110056162 A CN 110056162A CN 201910461652 A CN201910461652 A CN 201910461652A CN 110056162 A CN110056162 A CN 110056162A
- Authority
- CN
- China
- Prior art keywords
- leveling
- connecting rod
- dry method
- finishing material
- mated formation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
- E04F15/02447—Supporting structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
- E04F15/02447—Supporting structures
- E04F15/02464—Height adjustable elements for supporting the panels or a panel-supporting framework
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/02—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Repair (AREA)
- Floor Finish (AREA)
Abstract
The present invention provides the leveling bearing components that a kind of dry method of assembled ground finishing material is integrally mated formation, it includes the spaced component leveling of multiple groups, component leveling includes: multiple support bases, it includes pedestal, support frame and regulating part, it is provided with bottom plate and first connecting rod on pedestal, support plate and the second connecting rod are provided on support frame;First connecting rod is provided with connecting hole, and the second connecting rod and connecting hole are threadedly coupled;Regulating part is sheathed in the second connecting rod and the two is mutually threadedly coupled;Carrier, carrier are set on support frame.The present invention has the advantage that when being laid with ground that laying layer progress is levelling compared to the prior art, later ornament materials can be laid on leveling bearing component, the effect that i.e. dress is lived not only may be implemented, simultaneously have the advantages that environment protection health, efficiently it is convenient, shorten the construction period, in addition, due to passing through module assembled, convenient for disassembly and assembly, recoverable.
Description
Technical field
The present invention relates to the leveling bearing component that a kind of dry method of ground finishing material is integrally mated formation, in particular to
The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation.
Background technique
Assembled decoration is a kind of in recent years emerging decoration construction form.Assembled is decorated as its name suggests, is that will decorate
Required each component component realizes that production is completed in factory, then transports decoration scene and is combined installation,
Traditional decoration scene is eliminated to operations such as measurement, the cuttings of each component component, is constructed more simple and convenient, it can be greatly
The construction efficiency at decoration scene is improved, and construction site is more clean and tidy and beautiful, will not generate excessive ornament materials rubbish,
It is a kind of more environmentally protective decoration construction form.
Traditional tile laying process flow are as follows: base's dabbing, floor leveling, be laid with the pipelines such as floor heating, be laid with filled layer,
The positioning of floor tile snap the line is laid with floor tile, seam finishing.Traditional floor paving process flow are as follows: base's dabbing, floor leveling, paving
If the pipelines such as floor heating, be laid with filled layer, unwrapping wire positioning, be laid with moisture-proof film, basal plate installation, skirting installation, floor walkthrough,
Practical paving.
No matter which kind of above-mentioned paving mode is used, all had the disadvantage that:
One, process is more, long in time limit: the wet construction standard process flows complexity and scarce one on traditional ceramic tile or floor is not
Can, it need to could complete through multinomial process, and process portion is related to naturally dry in wet construction engineering method, extends the duration more;
Two, seriously polluted: a large amount of cement mortar to be used during traditional wet construction engineering method, live dust pollution is serious and easy
There is filthy situation;
Three, later period pipeline maintainance is difficult: the paving process on traditional ceramic tile and floor uses wet process paving, pipeline direct-burried cement
Filled layer, later maintenance need to break ceramic tile or floor, cement filled layer, cumbersome.
Summary of the invention
In consideration of it, the present invention provides the leveling load-bearing groups that a kind of dry method of assembled ground finishing material is integrally mated formation
Part, can be levelling by laying layer progress when being laid with ground, can be laid with ornament materials on leveling bearing component later, not only
The effect that i.e. dress is lived may be implemented, at the same have the advantages that environment protection health, it is efficient it is convenient, shorten the construction period, in addition, due to passing through
Module assembled, therefore convenient for disassembly and assembly, recoverable.
For this purpose, the present invention provides the leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation,
It includes the spaced component leveling of multiple groups, and component leveling includes:
Multiple support bases comprising pedestal, support frame and regulating part are provided with bottom plate and first connecting rod on pedestal,
Support plate and the second connecting rod are provided on support frame;First connecting rod is provided with connecting hole, the second connecting rod and connecting hole spiral shell
Line connection;Regulating part is sheathed in the second connecting rod and the two is mutually threadedly coupled;
Carrier, carrier are set on support frame.
Further, above-mentioned regulating part is nut.
Further, above-mentioned bottom plate and the perpendicular setting of first connecting rod.
Further, above-mentioned support frame and the perpendicular setting of the second connecting rod.
Further, above-mentioned carrier includes loading plate and the connecting plate for being set to two side bottom of loading plate.
Further, the cross section of above-mentioned loading plate is inType.
Further, above-mentioned connecting plate is connect by screw with support plate.
Further, above-mentioned carrier is an integral structure.
Further, the length specification of above-mentioned loading plate is 3 meters/root.
The leveling bearing component that a kind of dry method of assembled ground finishing material provided by the present invention is integrally mated formation, mainly
Including multiple support bases and carrier, carrier is set on support base, and support base includes pedestal, support frame and regulating part,
Pedestal and support frame are threadedly coupled by first connecting rod and the second connecting rod, while adjusting height by regulating part.
When installation, support base is fixed on ground layer first, support base is placed according to cloth office point is pre-designed, if
The out-of-flatness of original ground base needs the height of adjustment support base, then to guarantee the flatness on ground after mating formation;Secondly installation carrying
Carrier is fixed on multiple support bases by frame, and the two is connected by fixing piece;The finally paving ground between adjacent carrier
Decorative layer, while the pre- sunk screw of ground decoration layer being fixed with support base, carrier.
By above structure, so that a kind of dry method of assembled ground finishing material provided by the present invention was integrally mated formation
Leveling bearing component mainly has the advantage that compared to the prior art
1) it, fills to live, environment protection health, is installed by leveling bearing component, overcome traditional wet process installation side
Contamination phenomenon brought by method, each ornament materials are kept under strict control by factory, are all made of health environment-friendly material, are prevented formaldehyde pollution,
Dry method assembling mode is used in fitment process, the noiseless pollution in scene, dust pollution really realize i.e. dress and live, pacify
Loopful is protected;
2) it, efficiently convenient, the reduction duration: is installed by leveling bearing component, realizes that the dry method on ground is integrally mated formation
Mode simplifies the program of original complexity, usual 30m2Ground only needs two workers, can complete within one day;
3), module assembled, dismounting convenience: the paving structure installed by leveling bearing component, by plant produced
Component accessory carries out on-site assembly and is formed, and all pipelines in ground are cavity cabling, and the later period pipeline that needs repairing need to only dismantle porcelain
Brick or floor or support base install recombination, without pounding drill after maintenance, destroy interior decoration structure;
4), recoverable, after being replaced in the component later period, the component being replaced will not still be removed by destructiveness, warp
Recycling can be achieved to recycle, environmentally protective, sustainable use.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field
Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the leveling load-bearing that a kind of dry method of assembled ground finishing material provided in an embodiment of the present invention is integrally mated formation
The side view of component;
Fig. 2 is the leveling load-bearing that a kind of dry method of assembled ground finishing material provided in an embodiment of the present invention is integrally mated formation
The main view of component;
Fig. 3 is the leveling load-bearing that a kind of dry method of assembled ground finishing material provided in an embodiment of the present invention is integrally mated formation
The constitutional diagram of support base in component;
Fig. 4 is the leveling load-bearing that a kind of dry method of assembled ground finishing material provided in an embodiment of the present invention is integrally mated formation
The broken away view of support base in component.
Wherein, 1, regulating part, 21, bottom plate, 22, first connecting rod, 23, connecting hole, 31, support plate, the 32, second connection
Bar, 41, loading plate, 42, connecting plate, 5, screw.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
It is fully disclosed to those skilled in the art.
Embodiment one:
Referring to Fig. 1-4, a kind of dry method of assembled ground finishing material of the offer of the embodiment of the present invention one is shown in figure
The leveling bearing component integrally mated formation comprising the spaced component leveling of multiple groups, component leveling include: multiple support bases,
It includes pedestal, support frame and regulating part 1, and bottom plate 21 and first connecting rod 22 are provided on pedestal, is provided on support frame
Support plate 31 and the second connecting rod 32;First connecting rod 22 is provided with connecting hole 23,23 screw thread of the second connecting rod 32 and connecting hole
Connection;Regulating part 1 is sheathed in the second connecting rod 32 and the two is mutually threadedly coupled;Carrier, carrier are set to support frame
On.Wherein, regulating part 1 is nut, is adjusted more convenient.
The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation provided by the present embodiment, it is main
It to include multiple support bases and carrier, carrier is set on support base, and support base includes pedestal, support frame and regulating part
1, pedestal and support frame are threadedly coupled by first connecting rod 22 and the second connecting rod 32, while being adjusted by regulating part 1
Highly.
When installation, support base is fixed on ground layer first, support base is placed according to cloth office point is pre-designed, if
The out-of-flatness of original ground base needs the height of adjustment support base, then to guarantee the flatness on ground after mating formation;Secondly installation carrying
Carrier is fixed on multiple support bases by frame, and the two is connected by fixing piece;The finally paving ground between adjacent carrier
Decorative layer, while the pre- sunk screw of ground decoration layer being fixed with support base, carrier.
By above structure, so that a kind of dry method of assembled ground finishing material provided by the present invention was integrally mated formation
Leveling bearing component mainly has the advantage that compared to the prior art
1) it, fills to live, environment protection health, is installed by leveling bearing component, overcome traditional wet process installation side
Contamination phenomenon brought by method, each ornament materials are kept under strict control by factory, are all made of health environment-friendly material, are prevented formaldehyde pollution,
Dry method assembling mode is used in fitment process, the noiseless pollution in scene, dust pollution really realize i.e. dress and live, pacify
Loopful is protected;
2) it, efficiently convenient, the reduction duration: is installed by leveling bearing component, realizes that the dry method on ground is integrally mated formation
Mode simplifies the program of original complexity, usual 30m2Ground only needs two workers, can complete within one day;
3), module assembled, dismounting convenience: the paving structure installed by leveling bearing component, by plant produced
Component accessory carries out on-site assembly and is formed, and all pipelines in ground are cavity cabling, and the later period pipeline that needs repairing need to only dismantle porcelain
Brick or floor or support base install recombination, without pounding drill after maintenance, destroy interior decoration structure;
4), recoverable, after being replaced in the component later period, the component being replaced will not still be removed by destructiveness, warp
Recycling can be achieved to recycle, environmentally protective, sustainable use.
Embodiment two:
Referring to Fig. 1-4, a kind of dry method of assembled ground finishing material provided by Embodiment 2 of the present invention is shown in figure
The leveling bearing component integrally mated formation, the present embodiment are also further made that following conduct on the basis of the various embodiments described above
Improved technical solution: bottom plate 21 and the perpendicular setting of first connecting rod 22;Support plate 31 and the second connecting rod 32 is perpendicular sets
It sets.By the setting of above structure, so that support effect is best.
Embodiment three:
Referring to Fig. 1-2, a kind of dry method of assembled ground finishing material of the offer of the embodiment of the present invention three is shown in figure
The leveling bearing component integrally mated formation, the present embodiment are also further made that following conduct on the basis of the various embodiments described above
Improved technical solution: carrier includes loading plate 41 and the connecting plate 42 for being set to 41 liang of side bottoms of loading plate.By above-mentioned
The setting of structure, connection dynamics is best, and both sides are attached simultaneously, and stability and levelness are good.Wherein, carrier is integrated
Formula structure, further increases rigidity.
Example IV
Referring to Fig. 1, the dry method that a kind of assembled ground finishing material of the offer of the embodiment of the present invention four is shown in figure is whole
The leveling bearing component that body is mated formation, the present embodiment are also further made that following be used as changes on the basis of the various embodiments described above
Into technical solution: the cross section of loading plate 41 is inType, specifically, the length specification of loading plate 41 is 3 meters/root.It is logical
The setting of above structure is crossed, pipeline can be installed in the cavity of loading plate 41, avoid mixed and disorderly phenomenon, while improving safety
Performance;
In addition, the length specification of loading plate 41 is 3 meters/root, the length of traditional loading plate is generally 0.6 meter/root, in this way
Since loading plate 41 has length advantage, it is possible to reduce the installation number of loading plate 41 improves installation effectiveness;Meanwhile it is traditional
During dry method is mated formation, need to be arranged the loading plate intersected anyhow, and in the present invention, it is only necessary to more parallel elongated carryings are set
Plate, the lateral loading plate that no setting is required intersects with loading plate, the cost that can be effectively saved on material in this way, and mat formation
It is more easy, it is only necessary to unidirectionally to mat formation along the length direction of loading plate, installation effectiveness is higher.
Embodiment five
Referring to Fig. 1-2, a kind of dry method of assembled ground finishing material of the offer of the embodiment of the present invention five is shown in figure
The leveling bearing component integrally mated formation, the present embodiment are also further made that following conduct on the basis of the various embodiments described above
Improved technical solution: connecting plate 42 is connect by screw 5 with support plate 31.By the setting of above structure, connection is more convenient,
It is firm.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (9)
1. the leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation, which is characterized in that including multiple groups
Spaced component leveling, the component leveling include:
Multiple support bases comprising pedestal, support frame and regulating part (1) are provided with bottom plate (21) and first on the pedestal
Connecting rod (22) is provided with support plate (31) and the second connecting rod (32) on support frame as described above;The first connecting rod (22) sets
It is equipped with connecting hole (23), second connecting rod (32) and the connecting hole (23) are threadedly coupled;The regulating part (1) is sheathed on
On second connecting rod (32) and the two is mutually threadedly coupled;
Carrier, the carrier are set on support frame as described above.
2. the leveling bearing component that a kind of dry method of assembled ground finishing material according to claim 1 is integrally mated formation,
It is characterized in that, the regulating part (1) is nut.
3. the leveling load-bearing group that a kind of dry method of assembled ground finishing material according to claim 1 or 2 is integrally mated formation
Part, which is characterized in that the bottom plate (21) and the first connecting rod (22) perpendicular setting.
4. the leveling load-bearing group that a kind of dry method of assembled ground finishing material according to claim 1 or 2 is integrally mated formation
Part, which is characterized in that the support plate (31) and second connecting rod (32) perpendicular setting.
5. the leveling bearing component that a kind of dry method of assembled ground finishing material according to claim 1 is integrally mated formation,
It is characterized in that, the carrier includes loading plate (41) and the connecting plate for being set to (41) two side bottom of loading plate
(42)。
6. the leveling bearing component that a kind of dry method of assembled ground finishing material according to claim 5 is integrally mated formation,
It is characterized in that, the cross section of the loading plate (41) is inType.
7. the leveling bearing component that a kind of dry method of assembled ground finishing material according to claim 5 is integrally mated formation,
It is characterized in that, the connecting plate (42) is connect by screw (5) with the support plate (31).
8. the leveling bearing component that a kind of dry method of assembled ground finishing material according to claim 7 is integrally mated formation,
It is characterized in that, the carrier is an integral structure.
9. the leveling bearing component that a kind of dry method of assembled ground finishing material according to claim 5 is integrally mated formation,
It is characterized in that, the length specification of the loading plate (41) is 3 meters/root.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910461652.8A CN110056162A (en) | 2019-05-30 | 2019-05-30 | The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910461652.8A CN110056162A (en) | 2019-05-30 | 2019-05-30 | The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110056162A true CN110056162A (en) | 2019-07-26 |
Family
ID=67325107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910461652.8A Pending CN110056162A (en) | 2019-05-30 | 2019-05-30 | The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110056162A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924624A (en) * | 2019-12-09 | 2020-03-27 | 北京北方车辆集团有限公司 | Height adjusting device for rotary floor |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200179025Y1 (en) * | 1999-11-18 | 2000-04-15 | 송영택 | A leveling device for carrying out the ground |
KR20020062391A (en) * | 2001-01-20 | 2002-07-26 | 조영민 | A floor system of access-floor type using a glass-ondol and the construction method of it |
KR20050089434A (en) * | 2004-03-05 | 2005-09-08 | 조흥기 | Suspension type floor board |
CN102425293A (en) * | 2011-08-30 | 2012-04-25 | 中国建筑装饰集团有限公司 | Novel composite surface layer fixation screw-concealed raised flooring and construction method thereof |
CN108049592A (en) * | 2017-12-30 | 2018-05-18 | 浙江亚厦装饰股份有限公司 | Ground pavement pedestal, mat formation component and method for paving |
CN208702087U (en) * | 2018-08-20 | 2019-04-05 | 宁夏东睿建筑科技有限公司 | A kind of raised flooring suitable for industrializing Shear Wall Residential |
CN210127599U (en) * | 2019-05-30 | 2020-03-06 | 金螳螂精装科技(苏州)有限公司 | Leveling bearing assembly integrally paved by dry method of assembled ground facing material |
-
2019
- 2019-05-30 CN CN201910461652.8A patent/CN110056162A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200179025Y1 (en) * | 1999-11-18 | 2000-04-15 | 송영택 | A leveling device for carrying out the ground |
KR20020062391A (en) * | 2001-01-20 | 2002-07-26 | 조영민 | A floor system of access-floor type using a glass-ondol and the construction method of it |
KR20050089434A (en) * | 2004-03-05 | 2005-09-08 | 조흥기 | Suspension type floor board |
CN102425293A (en) * | 2011-08-30 | 2012-04-25 | 中国建筑装饰集团有限公司 | Novel composite surface layer fixation screw-concealed raised flooring and construction method thereof |
CN108049592A (en) * | 2017-12-30 | 2018-05-18 | 浙江亚厦装饰股份有限公司 | Ground pavement pedestal, mat formation component and method for paving |
CN208702087U (en) * | 2018-08-20 | 2019-04-05 | 宁夏东睿建筑科技有限公司 | A kind of raised flooring suitable for industrializing Shear Wall Residential |
CN210127599U (en) * | 2019-05-30 | 2020-03-06 | 金螳螂精装科技(苏州)有限公司 | Leveling bearing assembly integrally paved by dry method of assembled ground facing material |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924624A (en) * | 2019-12-09 | 2020-03-27 | 北京北方车辆集团有限公司 | Height adjusting device for rotary floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9185748B2 (en) | Electrical panel heating device and method and building materials for the protection thereof | |
CN206346443U (en) | A kind of new adjustable floor heating paving structure | |
CN101568693A (en) | Building block, building structure and the method of bricking wall using the same | |
CN111305410B (en) | Anti-cracking wall and construction method thereof | |
CN108316606A (en) | A kind of ground overhead system and its installation method | |
CN109267671A (en) | A kind of decoration method of indoor wall system | |
CN110056161A (en) | A kind of the dry method entirety paving structure and method for paving on assembled ground | |
CN110241993A (en) | A kind of assembled ceramic tile concrete composite board metope mounting system and method | |
CN110056162A (en) | The leveling bearing component that a kind of dry method of assembled ground finishing material is integrally mated formation | |
CN110067361A (en) | A kind of assembled facing horizontal splicing mounting structure and installation method | |
CN104831926A (en) | Paving method of joggle type block-shaped surface building floor | |
CN208023883U (en) | Ground hybrid system | |
CN210947550U (en) | Assembled resin leveling piece | |
CN102287039B (en) | Integrated quickly-paved substrate system for electric heating floor heater | |
CN210127599U (en) | Leveling bearing assembly integrally paved by dry method of assembled ground facing material | |
CN110080491A (en) | The lateral assembled paving structure and method for paving of a kind of ground finishing material | |
CN210134616U (en) | Dry-method overall paving structure of fabricated ground | |
CN110656752A (en) | Mounting member and mounting structure of assembled threshold stone | |
CN210134614U (en) | Horizontal assembled structure of mating formation of ground finish material | |
CN103362313B (en) | The assemble method of modularized combination type heat insulating curtain wall panel | |
CN111946011A (en) | Assembled ground/floor heating integrated plate structure | |
CN105401712B (en) | Energy-saving ground tile paving mechanism | |
CN210659109U (en) | Ground veneer leveling supporting device and ground veneer mounting structure | |
CN211341589U (en) | Leveling strip | |
CN210659110U (en) | Assembly type overhead ground installation system of ceramic tile concrete composite board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |