CN110026907A - A kind of whole disconnected muscle region prestress peen forming method of band muscle siding - Google Patents

A kind of whole disconnected muscle region prestress peen forming method of band muscle siding Download PDF

Info

Publication number
CN110026907A
CN110026907A CN201910268574.XA CN201910268574A CN110026907A CN 110026907 A CN110026907 A CN 110026907A CN 201910268574 A CN201910268574 A CN 201910268574A CN 110026907 A CN110026907 A CN 110026907A
Authority
CN
China
Prior art keywords
muscle
disconnected
siding
peening
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910268574.XA
Other languages
Chinese (zh)
Other versions
CN110026907B (en
Inventor
高国强
赵安安
杨辉
徐刚
张万瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Aircraft Industry Group Co Ltd
Original Assignee
Xian Aircraft Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Aircraft Industry Group Co Ltd filed Critical Xian Aircraft Industry Group Co Ltd
Priority to CN201910268574.XA priority Critical patent/CN110026907B/en
Publication of CN110026907A publication Critical patent/CN110026907A/en
Application granted granted Critical
Publication of CN110026907B publication Critical patent/CN110026907B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24CABRASIVE OR RELATED BLASTING WITH PARTICULATE MATERIAL
    • B24C1/00Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods
    • B24C1/10Methods for use of abrasive blasting for producing particular effects; Use of auxiliary equipment in connection with such methods for compacting surfaces, e.g. shot-peening

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention discloses a kind of disconnected muscle region prestress peen forming methods of entirety band muscle siding, assist prestress peen forming tooling, and effective connection with machine tool guideway according to the production of the sectional dimension of rib is corresponding before siding processing.When integral panel prestressing force clamping starts, fixture for forming is installed in corresponding disconnected muscle region, it is adjusted according to the height of rib to suitable position, fixture for forming and machine tool guideway are fastenedly connected simultaneously, the auxiliary prestressing force clamping to disconnected muscle region is realized by the feeding bolt adjusted on fixture for forming, ensure that integral panel disconnected muscle region during prestressing force clamping is effectively controlled, shape does not mutate, the final round and smooth state for guaranteeing integral panel prestressing force clamping.

Description

A kind of whole disconnected muscle region prestress peen forming method of band muscle siding
Technical field
This application involves aircraft manufacturing technical fields, are further the contour peening manufactures of aircraft target ship, specifically a kind of The whole disconnected muscle region prestress peen forming method of band muscle siding.
Background technique
Shot-blasting formation technique is a kind of more mature plastic molding method of current metal wings siding, bigger in order to obtain Curvature shape, be commonly applied prestressing force during contour peening so that siding occur before shot-peening it is pre- in elastic range Deformation, is then plastically deformed under the shock of high-speed cruising bullet, the final shape for obtaining theory calls.If not applying pre- Stress uses merely bullet to carry out shot-peening, then is difficult to obtain biggish curvature shape, therefore, for the rigidity such as whole band muscle class compared with Strong metal wallboard carries out shot-peening just only under pre-stressed state and can get the shape of theory calls.The whole band muscle of saddle-shape Siding then belongs to the prominent example in such siding, however in practical research and production at present, the whole band muscle siding of saddle-shape is pre- Remain certain problem in stress forming: " the rib length of integral panel is not completely equivalent, and the disconnected muscle region of rib is not It is completely disposed on same vertical plane, the disconnected muscle region of siding and other band muscle area rigids differ greatly, in prestressing force clamping process Prestressing force installation way cannot be selected according to the position for the muscle muscle head that breaks completely, therefore, siding is bound in prestressing force clamping process There is the disconnected muscle region in part to be in " no prestressing force clamping area ", leads to the disconnected muscle muscle Head Section area deformation of prestressing force clamping process and with muscle area Area deformation is inconsistent, and siding integrated prestress clamping is not round and smooth, and disconnected muscle region shape is easy to appear mutation."
When carrying out pre-bending clamping stress column generally is arranged in siding inner surface, in wall in saddle-shape band muscle integral panel Siding is applied prestressing force from outer surface by plate outer surface setting force column, it is desirable that the whole table inside in the longitudinal direction of siding Face protuberance, at this point, being in the disconnected muscle muscle head region shape in " no prestressing force clamping area " can mutate, generates biggish stress collection In, or even occur the phenomenon that rib and covering tearing in prestressing force clamping process, seriously affect the contour peening effect of siding. In this case, it had both been able to satisfy the optimal prestressing force installation way of siding currently without a kind of effective method, simultaneously Also it can guarantee the disconnected ideal pre-stressed state of muscle muscle head region.Also, lack the whole disconnected muscle region of band muscle siding both at home and abroad to answer in advance Power contour peening is directed to Journal of Sex Research, can not preferably solve above-mentioned ask at present by adjusting shot-blast process method and technological parameter Topic.
Summary of the invention
The purpose of the application is to propose a kind of whole band area muscle siding Duan Jin for practical problem of the existing technology Domain prestress peen forming method.
A kind of whole disconnected muscle region prestress peen forming method of band muscle siding, designs disconnected muscle region aids pre stress shot peen Fixture for forming, to length compared with short rib break muscle region carry out prestressing force clamping, in conjunction with the integrated prestress clamping of siding, thus Reach the whole band good prestressing force clamping state of muscle siding.After completing clamping, disconnected muscle region part outer surface is carried out tangential Then contour peening is opened up to contour peening disconnected muscle region inner surface rib, finally carry out shot-peening school according to profile state Shape, until disconnected muscle region shape completes disconnected muscle region contour peening after meeting theory calls.
A kind of whole disconnected muscle region prestress peen forming method of band muscle siding, including an auxiliary prestress peen forming Tooling, auxiliary prestress peen forming tooling include connecting support, U-shaped piece, feeding bolt, connecting support lower part and machine tool guideway Cooperation is slided and can be fixed on guide rail along guide rail, and on the support, U-shaped piece of center is equipped with the spiral shell with feeding bolt for U-shaped piece of fixation Line blind hole breaks muscle Town Card in U-shaped piece of U-shaped opening with muscle siding, and U-shaped opening face is fitted on the web surface of siding, into Row forming method, the following steps are included:
1 is connected auxiliary prestress forming tooling connecting support with lathe lower guideway, and makes the disconnected muscle region of band muscle siding It falls into U-shaped piece of U-shaped opening, feeds U-shaped piece of the bolt pusher pre-bending magnitude for compressing web surface to setting, complete band muscle siding The prestressing force clamping in disconnected muscle region;
Disconnected muscle area surfaces partial region is protected with shot-peening protective glue band after 2 prestressing force clampings
3 pairs of disconnected muscle area surfaces carry out chordwise shot-peening forming
4 pairs of disconnected muscle region inner surfaces are opened up to contour peening
5 open up after shot-peening completion, lay down siding prestressing force clamping, siding are placed on receiver ga(u)ge outside carrying out Shape inspection does not need to carry out shot-peening school shape, conversely, spraying using ultrasonic wave if disconnected muscle region shape is bonded inspection template completely Ball machine carries out shot-peening school shape to disconnected muscle region surfaces externally and internally, judges tangential according to fit-state or opens up to shape and be unsatisfactory for wanting It asks, manual manipulation ultrasonic wave compressed air shotblasting machine is gradually bonded template and carries out tangential or open up to school shape, until finally meeting the requirements.
The beneficial effects of the present application are as follows: problem is shaped for the whole disconnected muscle region shape of band muscle siding at present, proposes solution Certainly method carries out prestress peen forming to disconnected muscle region, by designing disconnected muscle region aids prestress peen forming tooling, Prestressing force is applied to disconnected muscle region, eliminates disconnected muscle region shape phenomenon out of control in integral panel prestressing force clamping process, from And make disconnected muscle region shape under pre-stressed state round and smooth, unstressed centrostigma.From source to the shape in disconnected muscle region into It has gone control, chordwise shot-peening forming then is carried out to disconnected muscle region, is opened up to forming and shot-peening school shape, it is final to obtain disconnected muscle region and close Especially shape.The disconnected muscle region aids prestress peen forming tool structure is simple, and prestressing force clamping is easy to operate, from the root pole Muscle region shape situation easily out of control is resolved in big improvement.In addition, by measuring the area Duan Jin in time in prestressing force clamping process The tangential shape in domain, can be before the chordwise shot-peening forming of disconnected muscle region to disconnected muscle area surfaces part " the obvious region of biconvex trend " It is protected, prevents from generating irreversible shape during " biconvex region " the later period shot-peening.Finally, opening up the craft after forming Ultrasonic wave school shape neatly can carry out shot-peening school shape according to muscle region exact shape of breaking, final to guarantee disconnected muscle region shape light It is suitable.Preferably resolve the problems such as whole band muscle the siding disconnected control of muscle region shape, contour peening.
The application is described in further detail below in conjunction with attached drawing is implemented.
Detailed description of the invention
The schematic diagram of Fig. 1 integral panel prestressing force clamping state;
Fig. 2 does not take in disconnected muscle region status diagram when prestressing force clamping;
Fig. 3 assists the schematic diagram of prestress peen forming tooling and prestress application;
Fig. 4 assists prestress peen forming tooling scheme of installation;
The schematic diagram of Fig. 5 installation auxiliary prestress peen forming tooling squab panel integrality;
The schematic diagram of disconnected muscle zone state after Fig. 6 installation auxiliary prestress peen forming tooling;
The disconnected preceding protection zone of the tangential shot-peening of muscle area surfaces Fig. 7 and chordwise shot-peening forming schematic diagram;
Fig. 8 is opened up to contour peening schematic diagram in disconnected muscle region.
Explanation: 1, integral panel is numbered in figure;2, prestress clamp;3, strengthening rib strip;4, disconnected muscle region;5, auxiliary is answered in advance Power contour peening tooling;6, connecting support;7, U-shaped piece;8, bolt is fed;9, machine tool guideway;10, web surface;11, disconnected muscle region Midpoint;12, siding inner surface;13, rib side;14, elbow jet nozzles
Specific embodiment
A kind of whole disconnected muscle region prestress peen forming method of band muscle siding, including an auxiliary prestress peen forming Tooling 5, auxiliary prestress peen forming tooling 5 include connecting support 6, U-shaped piece 7, feeding bolt 8,6 lower part of connecting support and machine Bed guide rail 9 cooperates, and slides and can be fixed on guide rail along guide rail, U-shaped piece 7 is fixed in connecting support 6, and U-shaped piece of 7 centers are equipped with With the tapped blind hole of feeding bolt 8, it is stuck in U-shaped piece 7 of U-shaped opening with the disconnected muscle region 4 of muscle siding, U-shaped opening face is fitted in On the web surface 10 of siding, the method that is formed, the following steps are included:
1, auxiliary prestress peen forming tooling connecting support is connected with lathe lower guideway, and makes the disconnected muscle of band muscle siding Region is fallen into U-shaped piece of U-shaped opening, feeds U-shaped piece of the bolt pusher pre-bending magnitude for compressing web surface to setting, completes band muscle The prestressing force clamping in the disconnected muscle region of siding;
Referring to attached drawing 1, saddle-shape will be pressed from both sides with integral panel 1 of the muscle integral panel part before contour peening by prestressing force Tool 2 carries out rigid pre-bending, rib cause different in size contained by the integral panel, and rib breaks muscle muscle head not on same vertical plane, In actual production, integral panel 1 breaks muscle region 4 it occur frequently that undesirable deformation, as shown in Fig. 2, should under prestressing force clamping Shape mutation in region cannot be effectively controlled, and seriously affect the integrated prestress clamping state of siding and the forming that siding is final Shape.Shown in Fig. 3, Fig. 4, Fig. 5, operator answers contour peening tooling 5 in the disconnected muscle region 4 installation area Duan Jin auxiliary in advance, and tooling connects It connects 6 lower part of support and machine tool guideway 9 cooperates, be fixed on guide rail along guide rail sliding, realize the connection of tooling and lathe, and made It is fallen into the U-shaped opening on U-shaped piece 7 of 6 top of connecting support with muscle siding muscle region 4 of breaking, feeding bolt 8 pushes U-shaped piece 7 compression abdomen Plate face 10 completes the prestressing force clamping with the disconnected muscle region of muscle siding, eliminates and break outside muscle region shown in Fig. 2 to the pre-bending magnitude of setting The case where shape is mutated occurs, and realizes the round and smooth state of integral panel prestressing force clamping shown in fig. 6.
2, disconnected muscle area surfaces partial region is protected with shot-peening protective glue band after prestressing force clamping
After disconnected muscle region prestressing force clamping is completed, chordwise shot-peening forming carried out to disconnected muscle region, it, need to be to disconnected before shot-peening Muscle area surfaces partial region is protected, and specific region is as shown in Figure 7 close to disconnected muscle head zone, and specific size is as schemed Shown: " to width 80mm, length is from disconnected muscle region midpoint 11 to the rectangular region of disconnected muscle head extension 100mm " uses shot-peening Protective glue band is protected, and purpose bulge shape occurs after preventing the disconnected tangential shot-peening of muscle area surfaces, and it is whole to influence disconnected muscle region 4 External shape state.Due to the special construction in muscle region 4 of breaking, rib rigidity is successively decreased suddenly in disconnected muscle region 4, and the rigidity of covering is then Far it is weaker than rib, therefore under the pre-stressed state of disconnected muscle region, biconvex shape namely bulge trend easily occurs in outer surface, if Shot-peening is improper, which is just biconvex shape, transforms into shape to the later period and school shape brings extreme difficulties.Therefore, which sprays Protection before ball is most important.
3, chordwise shot-peening forming is carried out to disconnected muscle area surfaces
Equipment employed in the chordwise shot-peening forming that this method is introduced be large-sized numerical control contour peening lathe (such as MPR20000 numerical control contour peening lathe), then according to the technological design shot-peening path of entirety early period (according to tangential curvature cloud atlas Tangential shot-peening path is drawn, in general, path is consistent with tangential curvature trend) carry out chordwise shot-peening forming.Shot-peening parameter Selection need according to break muscle region curvature shape requirement formulate, generally use 90 ° of progress shot-peenings, pressure, bullet flow, The parameters such as shot-peening distance, shot peening velocity, nozzle specification are chosen in basic test early period it has been determined that herein can be according to exhibition It requires to be matched to curvature.
4, disconnected muscle region inner surface is opened up to contour peening
After the completion of chordwise shot-peening forming, the exhibition to disconnected muscle region is needed to select siding to contour peening, shot-peening position is carried out Inner surface 12 breaks 13 shot-peening of muscle region rib two sides, as shown in Figure 8.Disconnected muscle region rib two sides are sprayed using elbow jet nozzles Ball carries out rib two sides 13 rib two sides 13 can be made to deform to spanwise direction spray, is obtained and is opened up to shape with this, In addition, rib two sides can be prevented to spray because of deformation caused by shot-peening is uneven.Fig. 8 is shown common one in this method The specification of kind elbow jet nozzles 14, wherein shot-peening distance 80mm is best shot-peening distance.
The shot-peenings parameters such as pressure, bullet flow, shot peening velocity in single reinforcement part basic test early period it has been determined that This can require to be matched according to spanwise curvature.
5, it opens up after shot-peening completion, lays down siding prestress clamp 2, siding is placed on receiver ga(u)ge and is carried out Checking the configuration does not need to carry out shot-peening school shape, conversely, using ultrasonic wave if disconnected 4 shape of muscle region is bonded inspection template completely Compressed air shotblasting machine carries out shot-peening school shape to disconnected 4 surfaces externally and internally of muscle region, judges tangential according to fit-state measurement or opens up to shape not It meets the requirements, manual manipulation ultrasonic wave compressed air shotblasting machine is gradually bonded template and carries out tangential or open up to school shape, until finally meeting the requirements.
Shot-peening school shape described in this method is ultrasonic wave shot-peening school shape, can adjust school shape at any time according to topographies state Parameter and region first carry out the protection zone in Fig. 7 to weaken shot-peening school shape, so that the tangential shape light in the region in general It is suitable round and smooth, then judge that tangential perhaps open up is unsatisfactory for requiring and then carry out tangential or open up to school to shape according to fit-state Shape, until finally meeting the requirements.
To solve realistic problem in production, the application is special, and way is, need to be according to rib before novel siding processing Sectional dimension production corresponding construction disconnected muscle region aids prestress peen forming tooling, the stronger material of selection rigidity carries out Processing and fabricating, and can realize its effective connection with machine tool guideway.In actual production, opened to 1 prestressing force clamping of integral panel When the beginning, in the corresponding disconnected installation of muscle region 4 auxiliary prestress peen forming tooling 5, adjusted according to the height of rib to suitable Position, while auxiliary prestress peen forming tooling 5 being fastenedly connected with machine tool guideway 9,1 prestressing force clamping of integral panel While, the auxiliary in disconnected muscle region 4 is answered in advance by feeding bolt 10 realization adjusted in auxiliary prestress peen forming tooling 5 Power clamping, it is ensured that the disconnected muscle region 4 during prestressing force clamping of integral panel 1 is effectively controlled, and shape does not mutate, The final round and smooth state for guaranteeing 1 prestressing force clamping of integral panel.
It is specifically intended that needing to measure in time outside disconnected muscle region 4 in auxiliary 5 installation process of prestress peen forming tooling Outer surface string shown in 4 in the shape namely Fig. 7 on surface is opened up to shape, its string exhibition can be accurately measured by curvature instrument To shape, prevent the disconnected excessive generation stress of 4 pre-bending of muscle region from concentrating.
This method is applied in practical projects, outside the curvature for preferably obtaining the disconnected muscle region of certain type machine The feasibility of shape, this method is verified.

Claims (1)

  1. Muscle region prestress peen forming method, including an auxiliary prestress peen forming work 1. a kind of whole band muscle siding breaks Dress, it is characterised in that the auxiliary prestress peen forming tooling include connecting support, U-shaped piece, feed bolt, under connecting support Portion and machine tool guideway cooperate, and slide and can be fixed on guide rail along guide rail, U-shaped piece is fixed in connecting support, and U-shaped piece of center is set There is the tapped blind hole with feeding bolt, breaks muscle Town Card in U-shaped piece of U-shaped opening with muscle siding, U-shaped opening face is fitted in wall On the web surface of plate, the method that is formed, the following steps are included:
    1-1 will assist prestressing force forming frock connecting support to be connected with lathe lower guideway, and the disconnected muscle region of band muscle siding is fallen Enter in U-shaped piece of U-shaped opening, feed U-shaped piece of the bolt pusher pre-bending magnitude for compressing web surface to setting, it is disconnected to complete band muscle siding The prestressing force clamping in muscle region;
    Disconnected muscle area surfaces partial region is protected with shot-peening protective glue band after 1-2 prestressing force clamping
    1-3 carries out chordwise shot-peening forming to disconnected muscle area surfaces
    1-4 opens up to contour peening disconnected muscle region inner surface
    1-5 is opened up after shot-peening completion, lays down siding prestressing force clamping, siding is placed on receiver ga(u)ge outside carrying out Shape inspection does not need to carry out shot-peening school shape, conversely, spraying using ultrasonic wave if disconnected muscle region shape is bonded inspection template completely Ball machine carries out shot-peening school shape to disconnected muscle region surfaces externally and internally, judges tangential according to fit-state or opens up to shape and be unsatisfactory for wanting It asks, manual manipulation ultrasonic wave compressed air shotblasting machine is gradually bonded template and carries out tangential or open up to school shape, until finally meeting the requirements.
CN201910268574.XA 2019-04-03 2019-04-03 Prestressed shot blasting forming method for broken rib area of integral ribbed wallboard Active CN110026907B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910268574.XA CN110026907B (en) 2019-04-03 2019-04-03 Prestressed shot blasting forming method for broken rib area of integral ribbed wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910268574.XA CN110026907B (en) 2019-04-03 2019-04-03 Prestressed shot blasting forming method for broken rib area of integral ribbed wallboard

Publications (2)

Publication Number Publication Date
CN110026907A true CN110026907A (en) 2019-07-19
CN110026907B CN110026907B (en) 2021-04-20

Family

ID=67237404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910268574.XA Active CN110026907B (en) 2019-04-03 2019-04-03 Prestressed shot blasting forming method for broken rib area of integral ribbed wallboard

Country Status (1)

Country Link
CN (1) CN110026907B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110549249A (en) * 2019-08-02 2019-12-10 西安飞机工业(集团)有限责任公司 Method for improving shot blasting forming rate of riveting type single-curvature wing wall plate
CN110666701A (en) * 2019-09-20 2020-01-10 西安飞机工业(集团)有限责任公司 Shot blasting forming method for small-area sharply bent biconvex ribbed wallboard
CN111112395A (en) * 2020-01-03 2020-05-08 中国航空制造技术研究院 Pre-bending tool for obtaining double-curvature wall plate and shot blasting forming process
CN111546017A (en) * 2020-05-28 2020-08-18 上海工程技术大学 Method for correcting and strengthening prestress of welded light alloy medium and heavy plates
CN111715739A (en) * 2020-06-24 2020-09-29 中国航空制造技术研究院 Pre-bending tool for integral wall plate with ribs and shot blasting forming method
CN111716255A (en) * 2020-06-24 2020-09-29 中国航空制造技术研究院 Pre-bending tool for ribbed wallboard and shot blasting forming method
CN111922922A (en) * 2020-08-26 2020-11-13 中国航空制造技术研究院 Shot peening strengthening deformation regulating and controlling method for large-curvature biconvex integral wall plate with ribs
CN114011958A (en) * 2021-11-18 2022-02-08 中国航空制造技术研究院 Shot blasting forming method for prolonging fatigue life of ribbed integral wallboard
CN114643318A (en) * 2022-03-14 2022-06-21 中国航空制造技术研究院 Prestress tool and shot blasting forming method for complex hyperbolic ribbed integral wall plate
CN116422509A (en) * 2023-04-12 2023-07-14 广州市天滢卫浴科技有限公司 Bathtub massage nozzle and installation method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2317845A1 (en) * 2000-09-08 2002-03-08 Steven Kennerknecht Shaped metal panels and forming same by shot peening
EP1343609A2 (en) * 2000-12-12 2003-09-17 Remmele Engineering Inc. Monolithic part and process for making the same
CN101045287A (en) * 2006-12-15 2007-10-03 西安飞机工业(集团)有限责任公司 Prestressing shot-blasting formation technique for double-curved wallboard
CN200967074Y (en) * 2006-10-25 2007-10-31 中国航空工业第一集团公司北京航空制造工程研究所 Clamp for preventing cracking of straight rib during forming of ribbed integral wallboard
CN200970610Y (en) * 2006-10-25 2007-11-07 中国航空工业第一集团公司北京航空制造工程研究所 Clamp for preventing cross rib from cracking during forming of ribbed integral wall plate
CN101530959A (en) * 2009-04-17 2009-09-16 中国航空工业第一集团公司北京航空制造工程研究所 A peen forming method for a ribbed structure
CN105598851A (en) * 2015-12-24 2016-05-25 中国航空工业集团公司北京航空制造工程研究所 Shot peen forming method realizing torsional deformation of high-rib integral panel
CN106694724A (en) * 2016-12-19 2017-05-24 上海交通大学 Flexible prestressed clamp for peen forming of large-scale wallboard workpieces
CN107617656A (en) * 2017-10-17 2018-01-23 西安飞机工业(集团)有限责任公司 A kind of rigid pre-bending method of integral panel

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2317845A1 (en) * 2000-09-08 2002-03-08 Steven Kennerknecht Shaped metal panels and forming same by shot peening
EP1343609A2 (en) * 2000-12-12 2003-09-17 Remmele Engineering Inc. Monolithic part and process for making the same
CN200967074Y (en) * 2006-10-25 2007-10-31 中国航空工业第一集团公司北京航空制造工程研究所 Clamp for preventing cracking of straight rib during forming of ribbed integral wallboard
CN200970610Y (en) * 2006-10-25 2007-11-07 中国航空工业第一集团公司北京航空制造工程研究所 Clamp for preventing cross rib from cracking during forming of ribbed integral wall plate
CN101045287A (en) * 2006-12-15 2007-10-03 西安飞机工业(集团)有限责任公司 Prestressing shot-blasting formation technique for double-curved wallboard
CN101530959A (en) * 2009-04-17 2009-09-16 中国航空工业第一集团公司北京航空制造工程研究所 A peen forming method for a ribbed structure
CN105598851A (en) * 2015-12-24 2016-05-25 中国航空工业集团公司北京航空制造工程研究所 Shot peen forming method realizing torsional deformation of high-rib integral panel
CN106694724A (en) * 2016-12-19 2017-05-24 上海交通大学 Flexible prestressed clamp for peen forming of large-scale wallboard workpieces
CN107617656A (en) * 2017-10-17 2018-01-23 西安飞机工业(集团)有限责任公司 A kind of rigid pre-bending method of integral panel

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110549249A (en) * 2019-08-02 2019-12-10 西安飞机工业(集团)有限责任公司 Method for improving shot blasting forming rate of riveting type single-curvature wing wall plate
CN110666701A (en) * 2019-09-20 2020-01-10 西安飞机工业(集团)有限责任公司 Shot blasting forming method for small-area sharply bent biconvex ribbed wallboard
CN111112395B (en) * 2020-01-03 2022-03-04 中国航空制造技术研究院 Pre-bending tool for obtaining double-curvature wall plate and shot blasting forming process
CN111112395A (en) * 2020-01-03 2020-05-08 中国航空制造技术研究院 Pre-bending tool for obtaining double-curvature wall plate and shot blasting forming process
CN111546017A (en) * 2020-05-28 2020-08-18 上海工程技术大学 Method for correcting and strengthening prestress of welded light alloy medium and heavy plates
CN111546017B (en) * 2020-05-28 2022-02-08 上海工程技术大学 Method for correcting and strengthening prestress of welded light alloy medium and heavy plates
CN111715739A (en) * 2020-06-24 2020-09-29 中国航空制造技术研究院 Pre-bending tool for integral wall plate with ribs and shot blasting forming method
CN111716255A (en) * 2020-06-24 2020-09-29 中国航空制造技术研究院 Pre-bending tool for ribbed wallboard and shot blasting forming method
CN111716255B (en) * 2020-06-24 2021-10-29 中国航空制造技术研究院 Pre-bending tool for ribbed wallboard and shot blasting forming method
CN111922922A (en) * 2020-08-26 2020-11-13 中国航空制造技术研究院 Shot peening strengthening deformation regulating and controlling method for large-curvature biconvex integral wall plate with ribs
CN114011958A (en) * 2021-11-18 2022-02-08 中国航空制造技术研究院 Shot blasting forming method for prolonging fatigue life of ribbed integral wallboard
CN114011958B (en) * 2021-11-18 2023-08-04 中国航空制造技术研究院 Shot blasting forming method for prolonging fatigue life of ribbed integral wallboard
CN114643318A (en) * 2022-03-14 2022-06-21 中国航空制造技术研究院 Prestress tool and shot blasting forming method for complex hyperbolic ribbed integral wall plate
CN114643318B (en) * 2022-03-14 2023-12-01 中国航空制造技术研究院 Prestressing tool and shot blasting forming method for complex hyperbolic ribbed integral wallboard
CN116422509A (en) * 2023-04-12 2023-07-14 广州市天滢卫浴科技有限公司 Bathtub massage nozzle and installation method thereof
CN116422509B (en) * 2023-04-12 2023-11-10 广州市天滢卫浴科技有限公司 Bathtub massage nozzle and installation method thereof

Also Published As

Publication number Publication date
CN110026907B (en) 2021-04-20

Similar Documents

Publication Publication Date Title
CN110026907A (en) A kind of whole disconnected muscle region prestress peen forming method of band muscle siding
CA2412092C (en) A method and device for shaping structural parts
CN111716255B (en) Pre-bending tool for ribbed wallboard and shot blasting forming method
CN110666701B (en) Shot blasting forming method for small-area sharply bent biconvex ribbed wallboard
CN102513942A (en) Supersonic shot-peening forming method for single or double curvature integral panels
CN101530959A (en) A peen forming method for a ribbed structure
CN107553345B (en) A kind of the aircraft target ship pre stress shot peen tooling and ball blasting method of multiple spot active load
CN111112395B (en) Pre-bending tool for obtaining double-curvature wall plate and shot blasting forming process
CN115090750B (en) Shot-peening pre-bending tool for high-strength discontinuous wall plate and forming method using same
CN110936109A (en) Large-size titanium alloy skin composite forming method
CN114011958B (en) Shot blasting forming method for prolonging fatigue life of ribbed integral wallboard
CN102653031A (en) Laser drive combined flyer forming method and device thereof
CN216027464U (en) Tool for applying prestress to thickened area of chord-wise shot blasting forming of ribbed wallboard
CN201871445U (en) Adhesive tape surface spray painting machine
CN207431112U (en) Compartment fender bracket bending device
CN108758142A (en) A kind of supervisor's reducing tee and its production technology
CN111922922A (en) Shot peening strengthening deformation regulating and controlling method for large-curvature biconvex integral wall plate with ribs
CN107931833B (en) Weld actuating station in aluminium alloy sheet T connector laser welding robot's arm end
CN202951825U (en) Device for rivet pressing launch vehicle tail-end crossbeam and skin
CN216323067U (en) Glue injection sealing glue coating nozzle structure
CN101966640B (en) Forced manufacturing method of skylight cover body of sweeping machine
CN107803428A (en) A kind of pipe fitting angle welds heading forming frock
CN105479095A (en) Shot blasting forming method based on friction stir machining local plasticization
Liu et al. Multi-step forming simulation and experiment of swing arms for torsion beam
CN220762271U (en) Deep hole shot blasting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant