CN200967074Y - Clamp for preventing the cracking of the direct reinforcement when the integral wainscot having reinforcement is formed - Google Patents

Clamp for preventing the cracking of the direct reinforcement when the integral wainscot having reinforcement is formed Download PDF

Info

Publication number
CN200967074Y
CN200967074Y CN 200620148087 CN200620148087U CN200967074Y CN 200967074 Y CN200967074 Y CN 200967074Y CN 200620148087 CN200620148087 CN 200620148087 CN 200620148087 U CN200620148087 U CN 200620148087U CN 200967074 Y CN200967074 Y CN 200967074Y
Authority
CN
China
Prior art keywords
clamp
cracking
holder
preventing
wainscot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620148087
Other languages
Chinese (zh)
Inventor
张新华
曾元松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Air Manufacturing Engineering Inst Chinese Aviation Industry No1 Grou
Original Assignee
Beijing Air Manufacturing Engineering Inst Chinese Aviation Industry No1 Grou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Air Manufacturing Engineering Inst Chinese Aviation Industry No1 Grou filed Critical Beijing Air Manufacturing Engineering Inst Chinese Aviation Industry No1 Grou
Priority to CN 200620148087 priority Critical patent/CN200967074Y/en
Application granted granted Critical
Publication of CN200967074Y publication Critical patent/CN200967074Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model is a clamp used for preventing wainscot integration with tendons from cracking of the straight tendon during molding, which comprises a clamp stand, an adjusting block and an adjusting bolt, and is characterized in that: the clamp stand is of an arch abutment shape, an inner space under which is internally provided with one adjusting block; crack clamped by the adjusting block and the inner wall surface of the clamp stand forms a lock catch for clamping the wainscot straight tendon strip; top of the adjusting block is fixed with an adjusting screw which top is positioned inside a runner at the top of the clamp stand in sliding. The utility model has the advantages that: first, small bulk and weight, therefore, it is applicable for the complex positions of various structures; second, convenient assembly and agility; third, the clamp can be used independently or in combination according to the specific structure; fourth, low manufacturing cost and high utilizing efficiency.

Description

A kind of anchor clamps of straight muscle cracking when preventing to be shaped with the muscle integral panel
Technical field
The utility model is a kind of anchor clamps of straight muscle cracking when preventing to be shaped with the muscle integral panel, belongs to technical field of structures.
Background technology
Modern advanced equipment has proposed more and more higher requirement to indexs such as the lightweight of part, long-lives.Large-scale grid type band muscle integral panel is owing to the direction and the area of section of rib are consistent with the direction and the size of used load, so under the identical condition of intensity, can reduce construction weight, therefore have outstanding structure efficiency, high strength-weight ratio, be the aviation very important class part on the big aircraft that navigates, can improve structure efficiency and weight reduction significantly.
This band muscle integral panel generally adopts the increment bending technology to be shaped, and maximum obstacle is exactly the flexing cracking of rib in the forming process.Because integral panel is to be formed through digital control processing by integral workblank, the processing cost height, the cost of an integral panel reaches hundreds thousand of units, if the flexing cracking of rib takes place during shaping, the monoblock wallboard has just been scrapped, and loses great.Domesticly because key technologys such as rib flexing cracking are not resolved, have in the design open breach at tangential rib in design, processing grid type band muscle integral panel process, this makes the advantage of grid type integral panel weaken greatly.Thereby limited application this advanced person of grid type band muscle, high structure efficiency integral panel.
Summary of the invention
The purpose of this utility model designs at problems of the prior art just provides a kind of anchor clamps of straight muscle cracking when preventing to be shaped with the muscle integral panel, these anchor clamps adopt the way that increases sidewise restraint on rib, can effectively prevent the flexing cracking of grid type band muscle integral panel rib in increment press shaping die process.
The purpose of this utility model realizes by following measure:
The anchor clamps of this kind straight muscle cracking when preventing to be shaped with the muscle integral panel, it is made up of holder, adjustment piece and adjustment screw rod, it is characterized in that: holder is an arch abutment shape, in the inner space of its below a mobilizable adjustment piece is set, the clip-on crack of inner wall surface of itself and holder promptly is formed for the snap close of clamping wallboard straight rib strip, adjust the top of piece and fix an adjustment screw rod, the top of adjusting screw rod is slidably mounted in the chute at holder top.In order in use to arrange, the profile of holder is a trapezoid or trapezoidal, and the angle α of hypotenuse that it is trapezoidal and vertical axial is 20~30 °.
The utility model anchor clamps clamp the rib of its vertical bar shaped in the increment press shaping die process of grid type band muscle integral panel, increased the mode of side constraint, stop the rib lateral displacement, avoid rib flexing cracking.
Description of drawings
Fig. 1 is the overall structure schematic diagram of the utility model product
Fig. 2 is the left view of holder
The specific embodiment
Below with reference to drawings and Examples the utility model product is further described:
Shown in accompanying drawing 1~2, the anchor clamps of this kind straight muscle cracking when preventing to be shaped with the muscle integral panel, it is made up of holder 1, adjustment piece 3 and adjustment screw rod 4, it is characterized in that: holder 1 is an arch abutment shape, in the inner space of its below a mobilizable adjustment piece 3 is set, the clip-on crack of inner wall surface of itself and holder 1 promptly is formed for the snap close 7 of clamping wallboard straight rib strip 6, adjust the top of piece 3 and fix an adjustment screw rod 4, the top of adjusting screw rod 4 is slidably mounted in the chute 5 at holder 1 top.In order in use to arrange, the profile of holder 1 is a trapezoid or trapezoidal, and the angle α of hypotenuse that it is trapezoidal and vertical axial is 20~30 °.
Anchor clamps described in the utility model are used for the moulding of the high bead structures integral panel of a kind of grid type; the rib height of this wallboard reaches 35~40mm; the rib ratio of height to thickness reaches more than 10; the rib shape is various; distribute as net shape; because its complex contour; the shaping difficulty is very big; the rib flexing cracking of forming process is the essential key technology that solves; in the forming process, on the rib 6 of vertical bar shaped, adopt the utility model anchor clamps to carry out clamping, adjust the gap of snap close 8 clampings by adjusting piece 3; and fixing tight, be provided with resilient protection pad 2 at the top of the rib 6 of vertical bar shaped.Prevent rib cracking, flexing in the forming process, the phenomenon of flexing cracking does not appear in the wallboard after the moulding, has satisfied the shape requirement of part.
The utility model product has the following advantages:
1 volume is little, and is in light weight, can adapt to various complex structures position;
2 convenient mounting and clamping, flexible;
3 according to concrete structure, can use separately, again use capable of being combined;
4 low cost of manufactures, the service efficiency height.

Claims (2)

1. the anchor clamps of a straight muscle cracking when preventing to be shaped with the muscle integral panel, it is made up of holder (1), adjustment piece (3) and adjustment screw rod (4), it is characterized in that: holder (1) is an arch abutment shape, in the inner space of its below a mobilizable adjustment piece (3) is set, the clip-on crack of inner wall surface of itself and holder (1) promptly is formed for the snap close (7) of clamping wallboard straight rib strip (6), adjust the top of piece (3) and fix an adjustment screw rod (4), the top of adjusting screw rod (4) is slidably mounted in the chute (5) at holder (1) top.
2. the anchor clamps of straight muscle cracking when preventing to be shaped according to claim 1 with the muscle integral panel, it is characterized in that: the profile of holder (1) is a trapezoid or trapezoidal, the angle α of hypotenuse that it is trapezoidal and vertical axial is 20~30 °.
CN 200620148087 2006-10-25 2006-10-25 Clamp for preventing the cracking of the direct reinforcement when the integral wainscot having reinforcement is formed Expired - Lifetime CN200967074Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620148087 CN200967074Y (en) 2006-10-25 2006-10-25 Clamp for preventing the cracking of the direct reinforcement when the integral wainscot having reinforcement is formed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620148087 CN200967074Y (en) 2006-10-25 2006-10-25 Clamp for preventing the cracking of the direct reinforcement when the integral wainscot having reinforcement is formed

Publications (1)

Publication Number Publication Date
CN200967074Y true CN200967074Y (en) 2007-10-31

Family

ID=38966646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620148087 Expired - Lifetime CN200967074Y (en) 2006-10-25 2006-10-25 Clamp for preventing the cracking of the direct reinforcement when the integral wainscot having reinforcement is formed

Country Status (1)

Country Link
CN (1) CN200967074Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110026907A (en) * 2019-04-03 2019-07-19 西安飞机工业(集团)有限责任公司 A kind of whole disconnected muscle region prestress peen forming method of band muscle siding
CN112719058A (en) * 2020-12-02 2021-04-30 中国航空制造技术研究院 Method for improving spanwise prestress of shot blasting forming of high-rib integral wallboard

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110026907A (en) * 2019-04-03 2019-07-19 西安飞机工业(集团)有限责任公司 A kind of whole disconnected muscle region prestress peen forming method of band muscle siding
CN110026907B (en) * 2019-04-03 2021-04-20 西安飞机工业(集团)有限责任公司 Prestressed shot blasting forming method for broken rib area of integral ribbed wallboard
CN112719058A (en) * 2020-12-02 2021-04-30 中国航空制造技术研究院 Method for improving spanwise prestress of shot blasting forming of high-rib integral wallboard
CN112719058B (en) * 2020-12-02 2022-04-29 中国航空制造技术研究院 Method for improving spanwise prestress of shot blasting forming of high-rib integral wallboard

Similar Documents

Publication Publication Date Title
CN102359213B (en) Wind load resistant connector for unitized curtain walls
CN101736837B (en) Glass curtain wall hidden frame
CN200967074Y (en) Clamp for preventing the cracking of the direct reinforcement when the integral wainscot having reinforcement is formed
CN200970610Y (en) Clamp for preventing cross bar from cracking while forming ribbed integrated wall plate
CN101966960A (en) Mounting structure of inner protecting wall on escalator or moving pavement
CN202644875U (en) Moveable connector for guardrail
CN104947933A (en) Combined type stair template device
CN201183528Y (en) Reinforcing plate apparatus of vehicle tail door lock catch
CN206737183U (en) The outer page board fabricated shear wall of lightweight
CN202559241U (en) Universal displacement telescopic device
CN202299035U (en) Air-pressure resisting connecting piece of unit curtain wall
CN202578001U (en) Movable reinforced steel bar binding mold applicable to movable mold frame
CN201824318U (en) Device for controlling clearances between step of escalator and aprons
CN104444746A (en) Cover plate for floor plate
CN104343236A (en) Fastening clamp for web side formwork of stiffened concrete beam
CN207109591U (en) A kind of road and bridge construction Bridge Erector height adjuster
CN201791793U (en) Curved honeycomb panel forming device
CN205893908U (en) Multidirectional displacement comb shape board rubber slab bridge roof beam telescoping device of unit formula
CN111305547A (en) Aluminum-wood combined structure
CN205853043U (en) A kind of mould lower limb assembly of brick-making mould
CN211333786U (en) Split type cold drawing side forms of PC component
CN219509222U (en) Integral hoisting of outer wall keel of large-span pre-assembled composite board
CN208235349U (en) Tapered pier template adjustment structure
CN215553567U (en) Top cover skirt side cover assembly for passenger car
CN212201257U (en) Core aluminum die internal corner of riser area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20071031

EXPY Termination of patent right or utility model