CN110004914A - One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method - Google Patents

One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method Download PDF

Info

Publication number
CN110004914A
CN110004914A CN201910371025.5A CN201910371025A CN110004914A CN 110004914 A CN110004914 A CN 110004914A CN 201910371025 A CN201910371025 A CN 201910371025A CN 110004914 A CN110004914 A CN 110004914A
Authority
CN
China
Prior art keywords
tube
inner tube
outer tube
slurry outlet
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910371025.5A
Other languages
Chinese (zh)
Inventor
祝全兵
房师涛
王波
宋立平
谢强
刘文喜
杨军
焦瑞锋
曹明伟
周建辉
李霄
聂华
杨春灿
张军伟
张骁
李翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Clp Construction Chengdu Construction Investment Co Ltd
PowerChina Railway Construction Co Ltd
Chengdu Hydropower Construction Engineering Co Ltd of Sinohydro Bureau 7 Co Ltd
Original Assignee
Clp Construction Chengdu Construction Investment Co Ltd
PowerChina Railway Construction Co Ltd
Chengdu Hydropower Construction Engineering Co Ltd of Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Clp Construction Chengdu Construction Investment Co Ltd, PowerChina Railway Construction Co Ltd, Chengdu Hydropower Construction Engineering Co Ltd of Sinohydro Bureau 7 Co Ltd filed Critical Clp Construction Chengdu Construction Investment Co Ltd
Priority to CN201910371025.5A priority Critical patent/CN110004914A/en
Publication of CN110004914A publication Critical patent/CN110004914A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method to realize pressure controllable and accurate delamination pour slurry effectively improve grouting quality.Including outer tube, inner tube, rotating handles and device for pressure measurement, the outer tube lower end closed, upper inside wall has internal thread segment, multilayer outer tube slurry outlet is arranged in longitudinal equidistant interval on the tube wall of lower part, every layer of outer tube slurry outlet is made of the slurry outlet of at least two circumferential even cloth, and setting covers the rubber check valve of each layer outer tube slurry outlet on outer tube outer wall.Inner tube lower end closed, multilayer inner tube injected hole is arranged in longitudinal equidistant interval on the tube wall of its underpart, the center of adjacent two layers inner tube injected hole away from the center of adjacent two layers outer tube slurry outlet away from equal, every layer of outer tube injected hole is made of quantity and position at least two injected holes corresponding with slurry outlet, upper end of inner tube is fixedly mounted with the longitudinally through rotation of inner tube in inner tube main body insertion outer tube, and the external thread section of upper part is threadedly coupled with the formation of outer tube internal thread segment.Device for pressure measurement includes the pressure sensor being fixedly mounted at injected hole on outer wall of inner tube.

Description

One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method
Technical field
The present invention relates to geotechnical engineering constructions, in particular to one kind can pressure control delamination pour slurry formula mini-valve tube and grouting method.
Background technique
Utilization is continually developed with the underground space, all kinds of underground engineerings are gradually risen, in work progress inevitably It is worn under encountering, situations such as neighbour wears pile foundation.Such problem usually utilizes slip casting with strengthening stratum, reduces construction to stratum and week It encloses the disturbance of building and then avoids that accident occurs.
Traditional grouting method includes rotary churning pile slip casting, sleeve valve barrel grouting etc., and wherein sleeve valve barrel grouting is by France A kind of slip casting construction method that Soletanche foundation engineering company initiates in the last century 50's, also known as Soletanche3- method. Sleeve valve barrel grouting technique due to can preferably control range of grouting and grouting pressure, can carry out repeat slip casting, and occur grout with The features such as a possibility that grout leaking very little, is known as one of most reliable slip casting construction method both at home and abroad.
When carrying out the engineering similar to a shield crossing clump of piles, to maintain the steady of stratum and surrounding building and a clump of piles It is fixed, need strict control construction method and grouting pressure.Traditional sleeve valve barrel grouting can not according to Different Strata property it is accurate Grouting pressure is adjusted, may cause grouting pressure is excessive stratum unstability or grouting pressure deficiency is caused to lead to stratum consolidation The inadequate situation of intensity.It is also difficult to carry out accurate delamination pour slurry simultaneously, it is undesirable to eventually lead to slip casting effect.
Summary of the invention
Technical problem to be solved by the invention is to provide one kind can pressure control delamination pour slurry formula mini-valve tube, to realize that pressure can Control and accurate delamination pour slurry, effectively improve grouting quality.
It is as follows that the present invention solves technical solution used by above-mentioned technical problem:
One kind of the invention can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that include outer tube, inner tube, rotating handles and pressure Force measuring device, the outer tube lower end closed, upper inside wall have internal thread segment, and longitudinal equidistant interval setting is more on the tube wall of lower part Layer outer tube slurry outlet, every layer of outer tube slurry outlet are made of the slurry outlet of at least two circumferential even cloth, and capping is arranged on outer tube outer wall The rubber check valve of each layer outer tube slurry outlet;Said inner tube lower end closed, multilayer is arranged in longitudinal equidistant interval on the tube wall of its underpart Inner tube injected hole, the center of adjacent two layers inner tube injected hole is away from away from equal, every layer outer with the center of adjacent two layers outer tube slurry outlet Pipe injected hole is made of quantity and position at least two injected holes corresponding with slurry outlet, and upper end of inner tube is fixedly mounted and inner tube Longitudinally through rotating handles;Said inner tube main body is inserted into outer tube, and the external thread section and outer tube internal thread segment of upper part are formed It is threadedly coupled;The device for pressure measurement includes the pressure sensor being fixedly mounted at injected hole on outer wall of inner tube.
Another technical problem to be solved by this invention be to provide above-mentioned one kind can pressure control delamination pour slurry formula mini-valve tube note Paste-making method, method includes the following steps:
1. carrying out mud off vertical drilling in soil body surface;
2. configured sleeve shell material is pumped to the bottom hole of the drilling rod by drilling rod, then from top to bottom to sleeve shell material into Row perfusion;
3. after sleeve shell material is perfused, and can be located in pressure control delamination pour slurry formula mini-valve tube vertically be pressed into and drill The center of drilling;
4. the position of stratum and expected grouting pressure reinforced as needed, according to inner tube angle line, inner tube graduation mark With successive step injected hole at the beginning of outer tube angle line and slurry outlet height and registration;
5. being put into slip casting core pipe in inner tube carries out pre-pouring grout, injected hole is adjusted according to the measured value of pressure sensor and is gone out The registration for starching hole, is adjusted to design value for grouting pressure;
6. carrying out formal slip casting;
7. adjust slip casting position after the stratum slip casting, repeat step 4. to step 6., until all stratum Slip casting is completed.
The invention has the advantages that length and the circumferential direction relative position of being inserted into inner tube by changing outer tube, adjust slip casting Hole 11 and 4 height of slurry outlet and registration, realize pressure controllable and accurate delamination pour slurry, to effectively improve grouting quality; Structure is simple, easy to operate.
Detailed description of the invention
This specification includes following seven width attached drawing:
Fig. 1 be one kind of the present invention can pressure control delamination pour slurry formula mini-valve tube structural schematic diagram;
Fig. 2 be one kind of the present invention can pressure control delamination pour slurry formula mini-valve tube middle external tube structural schematic diagram;
Fig. 3 be one kind of the present invention can in pressure control delamination pour slurry formula mini-valve tube inner tube structural schematic diagram;
Fig. 4 is that one kind of the present invention can pressure control delamination pour slurry formula mini-valve tube middle external tube upper port top view;
Fig. 5 be one kind of the present invention can in pressure control delamination pour slurry formula mini-valve tube inner tube upper external thread section Local map;
Fig. 6 be one kind of the present invention can in pressure control delamination pour slurry formula mini-valve tube rotating handles main view;
Fig. 7 be one kind of the present invention can in pressure control delamination pour slurry formula mini-valve tube rotating handles rearview;
Component and corresponding label: outer tube 1, pressure display meter 2, holder 3, slurry outlet 4, rubber check valve are shown in figure 5, inner tube 6, inner tube angle line 7, external thread section 8, inner tube graduation mark 9, inner tube reference line 10, injected hole 11, pressure sensor 12, Outer tube angle line 13, outer tube reference line 14, rotating handles 15, bolt 16, handle 17.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
Referring to Fig.1, one kind of the invention can pressure control delamination pour slurry formula mini-valve tube include outer tube 1, inner tube 6, rotating handles 15 And device for pressure measurement.Referring to Fig. 2,1 lower end closed of outer tube, upper inside wall has internal thread segment, longitudinal direction on the tube wall of lower part Multilayer outer tube slurry outlet is arranged in equidistant interval, and every layer of outer tube slurry outlet is made of the slurry outlet 4 of at least two circumferential even cloth, outer tube Setting covers the rubber check valve 5 of each layer outer tube slurry outlet on 1 outer wall.Referring to Fig. 3,6 lower end closed of said inner tube, its underpart pipe Longitudinal equidistant interval is arranged multilayer inner tube injected hole on wall, and the center of adjacent two layers inner tube injected hole with adjacent two layers outer tube away from going out The center in hole is starched away from equal, every layer of outer tube injected hole is by quantity and position at least two injected hole 11 corresponding with slurry outlet 4 Composition, 6 upper end of inner tube are fixedly mounted and the longitudinally through rotating handles 15 of inner tube 6.The device for pressure measurement includes fixed peace Mounted in the pressure sensor 12 at injected hole 11 on 6 outer wall of inner tube.Referring to Fig.1, in 6 main body of said inner tube insertion outer tube 1, thereon The external thread section 8 in portion is threadedly coupled with the formation of 1 internal thread segment of outer tube.Change inner tube 6 and 1 corresponding positions of outer tube by rotating handles 15 It sets, changes injected hole 11 and 4 height of slurry outlet and registration, to adjust slip casting position and grouting pressure.
Referring to Fig. 4, for convenience of adjusting, circumferential equidistant interval is carved with outer tube angle line 13 in the upper port of the outer tube 1, Wherein quantity is that position overstriking corresponding with 4 center of slurry outlet scribes to form outer tube reference line 14.6 external wall of upper portion of said inner tube On be carved with the vertically extending inner tube graduation mark 9 of inner tube angle line 7 and circumferential equidistant interval, wherein quantity is position and slip casting Formed inner tube reference line 10 is scribed in the corresponding overstriking in 11 center of hole.
Referring to Fig.1, the device for pressure measurement further includes the pressure display meter 2 connecting with pressure sensor 12, in outer tube 1 Overhanging holder 3 is welded in outer wall upper end, and pressure display meter 2 is fixedly mounted on holder 3.It is suffered when outer tube is squeezed into reduce Resistance, the tapered closing in lower end of the outer tube 1.
Referring to Fig. 6 master map 7, the handle 17 being laterally extended, rotating handles 15 are fixedly installed in the two sides of the rotating handles 15 It is formed a fixed connection by a pair of bolts 16 and 6 upper end of inner tube for being installed on the side wall of two sides.
As a kind of typical embodiment, referring to figs. 1 to Fig. 5, the slurry outlet 4,11 aperture of injected hole are equal.It is described The quantity of outer tube slurry outlet is 5 layers, and every layer of outer tube slurry outlet is made of 4 slurry outlets 4 at circumferentially-spaced 90 degree of its center, described The quantity of outer tube reference line 14 is 4, and circumferentially-spaced 90 degree are scribed.The quantity of said inner tube injected hole is 3 layers, every layer of inner tube note 4 injected holes 11 composition at circumferentially-spaced 90 degree of the center Kong Youqi is starched, the quantity of said inner tube reference line 10 is 4, between circumferential direction It is scribed every 90 degree.
Inner tube 6 is inserted in outer tube 1, its coincidence length is adjusted and injected hole 11 is completely coincident with slurry outlet 4.Utilize rotation Handle hand 15 twists inner tube 6, rotates inner tube 6 in outer tube 1 and rises or falls.When rotated, injected hole 11 and slurry outlet 4 exist Offset will be generated on horizontal and vertical direction, to realize the purpose of adjustment grouting pressure.When injected hole 11 and slurry outlet 4 are complete When full weight is closed, grouting pressure is minimum, and the smaller then grouting pressure of overlapping area is bigger.Since slurry outlet 4 is arranged symmetrically, may be implemented Towards the isobaric uniform slip casting of four direction, according to inner tube angle line 7, inner tube graduation mark 9 and the judgement note of outer tube angle line 13 when slip casting The degree that is overlapped in hole 11 and slurry outlet 4 is starched, foundation is arranged in the pressure sensor 12 of inner tube injected hole 11 and is arranged in outer tube 1 On pressure display meter 2, to grouting pressure carry out refinement adjustment to reach expected grouting pressure., it is set on 1 outer wall of outer tube Rubber check valve 5 can effectively prevent slurry reflux, improve grouting quality.Slip casting depth can be judged according to inner tube graduation mark 9, from And realize the slip casting to specific position stratum.
Referring to Fig.1, one kind of the present invention can pressure control delamination pour slurry formula mini-valve tube grouting method, comprising the following steps:
1. carrying out mud off vertical drilling in soil body surface;
2. configured sleeve shell material is pumped to the bottom hole of the drilling rod by drilling rod, then from top to bottom to sleeve shell material into Row perfusion;
3. after sleeve shell material is perfused, and can be located in pressure control delamination pour slurry formula mini-valve tube vertically be pressed into and drill The center of drilling;
4. the position of stratum and expected grouting pressure reinforced as needed, according to inner tube angle line 7, inner tube graduation mark 9 and outer tube angle line 13 just successive step injected hole 11 and 4 height of slurry outlet and registration;
5. being put into slip casting core pipe in inner tube 6 carries out pre-pouring grout, injected hole is adjusted according to the measured value of pressure sensor 12 11 and slurry outlet 4 registration, grouting pressure is adjusted to design value;
6. carrying out formal slip casting;
7. adjust slip casting position after the stratum slip casting, repeat step 4. to step 6., until all stratum Slip casting is completed.
The above only explain through diagrams one kind of the present invention can pressure control delamination pour slurry formula mini-valve tube and grouting method one A little principles are not intended to for the present invention being confined in shown and described specific structure and the scope of application, therefore all possibility The corresponding modification being utilized and equivalent belong to the applied the scope of the patents of the present invention.

Claims (9)

1. one kind can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that include outer tube (1), inner tube (6), rotating handles (15) and pressure Force measuring device, outer tube (1) lower end closed, upper inside wall have internal thread segment, and longitudinal equidistant interval is set on the tube wall of lower part Multilayer outer tube slurry outlet is set, every layer of outer tube slurry outlet is made of the slurry outlet (4) of at least two circumferential even cloth, outer tube (1) outer wall Upper setting covers the rubber check valve (5) of each layer outer tube slurry outlet;Said inner tube (6) lower end closed, it is longitudinal on the tube wall of its underpart Equidistant interval is arranged multilayer inner tube injected hole, the center of adjacent two layers inner tube injected hole away from in adjacent two layers outer tube slurry outlet Away from equal, every layer of outer tube injected hole is made of the heart quantity and position at least two injected holes (11) corresponding with slurry outlet (4), Inner tube (6) upper end is fixedly mounted and inner tube (6) longitudinally through rotating handles (15);Said inner tube (6) main body is inserted into outer tube (1) Interior, the external thread section (8) of upper part is threadedly coupled with the formation of outer tube (1) internal thread segment;The device for pressure measurement includes fixing It is mounted on the pressure sensor (12) at injected hole (11) on inner tube (6) outer wall.
2. one kind as described in claim 1 can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that: the slurry outlet (4), slip casting Hole (11) aperture is equal.
3. one kind as claimed in claim 2 can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that: the upper end of the outer tube (1) Circumferential equidistant interval is carved with outer tube angle line (13) on mouth, and wherein quantity adds for position is corresponding with slurry outlet (4) center The system of broaching forms outer tube reference line (14);Between being carved with inner tube angle line (7) and circumferential direction in said inner tube (6) external wall of upper portion equidistantly Every vertically extending inner tube graduation mark (9), wherein quantity be position overstriking corresponding with injected hole (11) center scribe shape At inner tube reference line (10).
4. one kind as claimed in claim 3 can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that: the number of the outer tube slurry outlet Amount is 5 layers, and every layer of outer tube slurry outlet is made of 4 slurry outlets (4) at circumferentially-spaced 90 degree of its center, the outer tube reference line (14) quantity is 4, and circumferentially-spaced 90 degree are scribed.
5. one kind as claimed in claim 4 can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that: the number of said inner tube injected hole Amount is 3 layers, and every layer of inner tube injected hole is made of 4 injected holes (11) at circumferentially-spaced 90 degree of its center, said inner tube reference line (10) quantity is 4, and circumferentially-spaced 90 degree are scribed.
6. one kind as described in claim 1 can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that: the device for pressure measurement is also Including the pressure display meter (2) connecting with pressure sensor (12), overhanging holder (3) are welded in outer tube (1) outer wall upper end, Pressure display meter (2) is fixedly mounted on holder (3).
7. one kind as described in claim 1 can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that: the lower end of the outer tube (1) Tapered closing.
8. one kind as described in claim 1 can pressure control delamination pour slurry formula mini-valve tube, it is characterized in that: the rotating handles (15) Two sides are fixedly installed the handle (17) that is laterally extended, and rotating handles (15) pass through a pair of bolts (16) for being installed on the side wall of two sides It forms a fixed connection with inner tube (6) upper end.
9. using one kind as claimed in any one of claims 1 to 7 can pressure control delamination pour slurry formula mini-valve tube grouting method, packet Include following steps:
1. carrying out mud off vertical drilling in soil body surface;
2. configured sleeve shell material to be pumped to the bottom hole of the drilling rod by drilling rod, then sleeve shell material is filled from top to bottom Note;
3. after sleeve shell material is perfused, and drilling can be located in pressure control delamination pour slurry formula mini-valve tube vertically be pressed into and drill Center;
4. the position of stratum and expected grouting pressure reinforced as needed, according to inner tube angle line (7), inner tube graduation mark (9) and outer tube angle line (13) just successive step injected hole (11) and slurry outlet (4) height and registration;
5. being put into slip casting core pipe in inner tube (6) carries out pre-pouring grout, injected hole is adjusted according to the measured value of pressure sensor (12) (11) and the registration of slurry outlet (4) grouting pressure, is adjusted to design value;
6. carrying out formal slip casting;
7. adjust slip casting position after the stratum slip casting, repeat step 4. to step 6., until all stratum slip castings It completes.
CN201910371025.5A 2019-05-06 2019-05-06 One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method Pending CN110004914A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910371025.5A CN110004914A (en) 2019-05-06 2019-05-06 One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910371025.5A CN110004914A (en) 2019-05-06 2019-05-06 One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method

Publications (1)

Publication Number Publication Date
CN110004914A true CN110004914A (en) 2019-07-12

Family

ID=67175821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910371025.5A Pending CN110004914A (en) 2019-05-06 2019-05-06 One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method

Country Status (1)

Country Link
CN (1) CN110004914A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110017152A (en) * 2019-03-23 2019-07-16 新汶矿业集团有限责任公司孙村煤矿 A kind of underground engineering country rock substep grouting strengthening method smashed to pieces
CN110629622A (en) * 2019-10-08 2019-12-31 林建国 Grouting reinforcement device for roadbed construction and use method thereof
CN110965545A (en) * 2019-11-15 2020-04-07 安徽中固建设有限公司 Construction settlement control building foundation grouting pre-reinforcement method
CN113107531A (en) * 2021-05-20 2021-07-13 中铁四局集团第四工程有限公司 Tunnel segment wall post-grouting method
CN113846656A (en) * 2021-09-16 2021-12-28 沈阳建筑大学 Device for reinforcing multi-layer soft rock slope of strip mine
CN114892487A (en) * 2022-04-15 2022-08-12 安徽优特公路养护科技有限公司 Multistage slip casting formula slip casting pipe

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2357720A1 (en) * 1976-03-19 1978-02-03 Toa Grout Kogyo Co Borehole seal and injector for high pressure grouting - is switched from boring to injecting with changed internal alignment
KR101754206B1 (en) * 2017-02-01 2017-07-06 (주)태화개발 Grouting apparatus with improved injection performance and grouting method using the same
CN108193693A (en) * 2018-03-16 2018-06-22 沈阳建筑大学 A kind of orientation given layer grouting sleeve valve pipe and grouting method
CN108221952A (en) * 2018-03-16 2018-06-29 沈阳建筑大学 A kind of pressure-adjustable orientation grouting sleeve valve pipe and grouting method
CN210341885U (en) * 2019-05-06 2020-04-17 中国电建集团铁路建设有限公司 Pressure-controllable layered grouting type sleeve valve pipe

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2357720A1 (en) * 1976-03-19 1978-02-03 Toa Grout Kogyo Co Borehole seal and injector for high pressure grouting - is switched from boring to injecting with changed internal alignment
KR101754206B1 (en) * 2017-02-01 2017-07-06 (주)태화개발 Grouting apparatus with improved injection performance and grouting method using the same
CN108193693A (en) * 2018-03-16 2018-06-22 沈阳建筑大学 A kind of orientation given layer grouting sleeve valve pipe and grouting method
CN108221952A (en) * 2018-03-16 2018-06-29 沈阳建筑大学 A kind of pressure-adjustable orientation grouting sleeve valve pipe and grouting method
CN210341885U (en) * 2019-05-06 2020-04-17 中国电建集团铁路建设有限公司 Pressure-controllable layered grouting type sleeve valve pipe

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110017152A (en) * 2019-03-23 2019-07-16 新汶矿业集团有限责任公司孙村煤矿 A kind of underground engineering country rock substep grouting strengthening method smashed to pieces
CN110629622A (en) * 2019-10-08 2019-12-31 林建国 Grouting reinforcement device for roadbed construction and use method thereof
CN110965545A (en) * 2019-11-15 2020-04-07 安徽中固建设有限公司 Construction settlement control building foundation grouting pre-reinforcement method
CN113107531A (en) * 2021-05-20 2021-07-13 中铁四局集团第四工程有限公司 Tunnel segment wall post-grouting method
CN113107531B (en) * 2021-05-20 2022-09-27 中铁四局集团第四工程有限公司 Tunnel segment wall post-grouting method
CN113846656A (en) * 2021-09-16 2021-12-28 沈阳建筑大学 Device for reinforcing multi-layer soft rock slope of strip mine
CN113846656B (en) * 2021-09-16 2022-12-13 沈阳建筑大学 Device for reinforcing multi-layer soft rock slope of strip mine
CN114892487A (en) * 2022-04-15 2022-08-12 安徽优特公路养护科技有限公司 Multistage slip casting formula slip casting pipe
CN114892487B (en) * 2022-04-15 2024-05-28 安徽优特公路养护科技有限公司 Multistage slip casting formula slip casting pipe

Similar Documents

Publication Publication Date Title
CN110004914A (en) One kind can pressure control delamination pour slurry formula mini-valve tube and grouting method
CN106400782B (en) A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
CN104405410B (en) A kind of constructing structure and construction method on reinforcing shield tunnel end stratum
CN208167713U (en) A kind of film bag grouting and reinforcing type filling pile structure
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN205206838U (en) Collapsible loess tunnel supporting construction
CN208472708U (en) A kind of grouting behind shaft or drift lining filling pile structure
CN108411920A (en) A kind of the multiple spot bellows grouting device and its method of control soil deformation
CN206052722U (en) A kind of device of prestressed pipe post-pressure grouting
CN101614008A (en) The casting head that is used for compaction grouting
CN102134853A (en) CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof
CN108547644A (en) A kind of Tunnel Passing crushed zone canopy protection structure and method for protecting support
CN105672248B (en) A kind of irregular shallow karst cavity reinforcement slip casting interstitital texture and construction method
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN210341885U (en) Pressure-controllable layered grouting type sleeve valve pipe
CN104141304A (en) Extrusion formed precast pile stiffness core and cement soil combined Y-shaped pile and construction method thereof
CN110872839B (en) Construction method of conical pile tip tubular pile capable of post-grouting
CN210918893U (en) Drill bit for rapidly repairing wall of pile hole
CN201296932Y (en) Segmentation prefabricating sunken outer wall and guide wall thereof
CN217580080U (en) Drilling and grouting drilling tool for compaction grouting dry construction
CN206971210U (en) A kind of long casing in pile foundation construction
CN202688990U (en) Steel-concrete structure for reinforcing bored cast-in-place pile with insufficient concrete mark
CN105442528B (en) A kind of cement injection sheet pile with sealing ring
CN109877088A (en) Shield machine shield shell is consolidated mortar package processing method
CN205688443U (en) It is applicable to the core stake guider of cement slotting built pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100070 701, 7th floor, building 3, yard 10, Automobile Museum East Road, Fengtai District, Beijing

Applicant after: China Power Construction Railway Construction Investment Group Co.,Ltd.

Applicant after: CHENGDU HYDROPOWER CONSTRUCTION ENGINEERING CO., LTD., SINOHYDRO BUREAU 7 Co.,Ltd.

Applicant after: POWERCHINA CHENGDU CONSTRUCTION INVESTMENT Co.,Ltd.

Address before: 100044 1001, 10th floor, building 2, yard 22, Chegongzhuang West Road, Haidian District, Beijing

Applicant before: POWERCHINA RAILWAY CONSTRUCTION Co.,Ltd.

Applicant before: CHENGDU HYDROPOWER CONSTRUCTION ENGINEERING CO., LTD., SINOHYDRO BUREAU 7 Co.,Ltd.

Applicant before: POWERCHINA CHENGDU CONSTRUCTION INVESTMENT Co.,Ltd.