CN109989569A - A kind of safety hanging cradle in building construction building - Google Patents

A kind of safety hanging cradle in building construction building Download PDF

Info

Publication number
CN109989569A
CN109989569A CN201910296382.XA CN201910296382A CN109989569A CN 109989569 A CN109989569 A CN 109989569A CN 201910296382 A CN201910296382 A CN 201910296382A CN 109989569 A CN109989569 A CN 109989569A
Authority
CN
China
Prior art keywords
gear
fixing axle
shaft hole
maneuvering board
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910296382.XA
Other languages
Chinese (zh)
Inventor
沈群华
蔡洪祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gong Fangyu
Original Assignee
Gong Fangyu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gong Fangyu filed Critical Gong Fangyu
Priority to CN201910296382.XA priority Critical patent/CN109989569A/en
Publication of CN109989569A publication Critical patent/CN109989569A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Transmission Devices (AREA)
  • Power-Operated Mechanisms For Wings (AREA)
  • Toys (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to technical field of buildings, more particularly to a kind of safety hanging cradle in building construction building, it includes the first wirerope, the first payingoff mechanism, the first fixed plate, the second payingoff mechanism, the second wirerope, T-bar, set casing, the first motor, loading shell etc., wherein the first fixed plate is mounted on the side of building upper end window side;T-bar upper surface is mounted on the first fixed plate lower end surface;First payingoff mechanism is symmetrical about T-bar with the second payingoff mechanism, and the first payingoff mechanism and the second payingoff mechanism are installed on the first fixed plate lower end surface;High building hanging basket in the present invention has when piling up on the ground found near building has barrier; it can achieve the purpose for hiding sundries on ground; the case where sundries collides on hanging basket mechanism and ground is prevented, to play the effect of personnel and article safety in protection hanging basket mechanism.

Description

A kind of safety hanging cradle in building construction building
The application is title are as follows: a kind of building construction safety hanging cradle, application No. is the 2018100761922, applyings date Are as follows: the divisional application of application for a patent for invention on 01 26th, 2018.
Technical field
The invention belongs to high building hanging basket technical field more particularly to a kind of safety hanging cradles in building construction building.
Background technique
Current existing high building hanging basket is that one kind can substitute traditional scaffold, can reduce labor intensity, improves work effect Rate, and the novel high-rise working equipment that can be reused.The use of building hanging basket has been increasingly becoming a kind of trend, in high level External wall construction, curtain wall installation, thermal insulation construction and maintenance cleaning exterior wall of multilayer high building etc., which are higher by operation, to be widely recognized, It can be used for the operation of the engineerings such as large tank, bridge and dam simultaneously.Using high building hanging basket, scaffolding can be exempted from.Make to be constructed into This reduction, operating expenses is the 28% of traditional scaffold, and working efficiency greatly improves.Hanging basket flexible operation, displacement are easy, It is convenient and practical, but the security risk of high building hanging basket is also exposed simultaneously, due to often being piled up on the ground of building Many sundries, so that high building hanging basket is soon landing the phenomenon that heap building materials for laying on the ground Shi Huiyu collides, thus right Personnel and article in high building hanging basket cause unnecessary damage.In order to avoid the generation of such phenomenon, design a kind of for height Safety hanging cradle in building construction building be very it is necessary to.The present invention designs a kind of safety jaw in building construction building Basket solves the problems, such as above.
Summary of the invention
(1) the technical problem to be solved in the present invention
The problem to be solved in the present invention is to provide a kind of safety hanging cradles in building construction building, to overcome in the prior art High building hanging basket is in landing, the problem of often colliding with the sundries for piling up near the building on ground.
(2) technical solution of the present invention
To solve drawbacks described above in the prior art, the present invention discloses a kind of safety hanging cradle in building construction building, it It adopts the following technical solutions to realize.
A kind of safety hanging cradle in building construction building, it is characterised in that: there are many windows for setting on building;It hangs Basket mechanism is mounted on building.
Above-mentioned hanging basket mechanism includes the first wirerope, the first payingoff mechanism, the first fixed plate, the second payingoff mechanism, second Wirerope, T-bar, set casing, the first motor, loading shell, L shape fixed link, C-shaped fixed link, the first maneuvering board, the first tooth Wheel, the second maneuvering board, second gear, third gear, third maneuvering board, the first fixing axle, the 4th maneuvering board, the 4th gear, Five gears, first motor axis, cavity, movement slots, the first belt, the first belt pulley, third belt pulley, the first belt, the 6th tooth Wheel, fixed block, pouring weight, notch, first rotating shaft hole, T-slot, the second shaft hole, square groove, third shaft hole, the 4th shaft hole, electricity Crankshaft bore, the 7th gear, the second belt pulley, the 4th belt pulley, the second fixing axle, the first fixed strip, third fixing axle, the 4th consolidate Dead axle, the 5th fixing axle, the second fixed strip, the first T shape guide groove, first sliding groove, second sliding slot, the 2nd T shape guide groove, first are slided Article, the second draw runner, the first T shape guide block, the 2nd T shape guide block, the 6th fixing axle, wherein the first fixed plate is mounted on building upper end On the side of window side;T-bar upper surface is mounted on the first fixed plate lower end surface;First payingoff mechanism and the second paying out machine Structure is symmetrical about T-bar, and the first payingoff mechanism and the second payingoff mechanism are installed on the first fixed plate lower end surface;The The first wirerope is extended on one payingoff mechanism;The second wirerope is extended on second payingoff mechanism;Set casing is provided on side The square groove of perforation;The T-slot of perforation is provided on set casing upper surface;The notch of perforation is provided on the side of set casing upper surface;Side The second shaft hole, the 4th shaft hole, third shaft hole, first rotating shaft hole are provided on slot end face;Second shaft hole and the 4th shaft Kong Junyu T-slot communicates, and the second shaft hole and the 4th shaft hole are distributed up and down;First rotating shaft hole is distributed close to notch;Third Shaft hole and first rotating shaft hole are in diagonal distribution;Motor axis hole, and electricity are provided at the set casing end face center opposite with T-slot Crankshaft bore is communicated with square groove;Set casing is slidably installed by T-slot and T-bar;First motor is mounted on set casing end On face, and first motor axis passes through motor axis hole;Third gear is mounted on first motor axis by key;Second movement plate end face On be provided with the first T shape guide groove being not penetrated;The first sliding groove of perforation is provided in second movement plate end face;First T shape guide block one end It is mounted on square groove end face, and the first T shape guide block is distributed close to notch side;Second maneuvering board passes through the first T shape guide groove and the One T shape guide block is slidably installed in set casing, and the external tooth opened on the second maneuvering board lower end surface is nibbled with third gear It closes;The 2nd T shape guide groove being not penetrated is provided in third movement plate end face;Second that perforation is provided in third movement plate end face is sliding Slot;2nd T shape guide block one end is mounted on square groove end face, and the 2nd T shape guide block is distributed far from notch side;Third maneuvering board is logical Being slidably installed in set casing of the 2nd T shape guide groove and the 2nd T shape guide block is crossed, and opened on third maneuvering board upper surface External tooth is engaged with third gear;4th fixing axle one end is mounted in the second shaft hole by bearing, and the 4th fixing axle is located at On the upside of second maneuvering board;Second gear is mounted in the 4th fixing axle by key, and second gear is engaged with third gear;First Gear is mounted in the 4th fixing axle by key;Third fixing axle one end is mounted on square groove end face;First belt pulley passes through axis It holds and is mounted in third fixing axle, and the external tooth opened on the first pulley side periphery is engaged with first gear;Second is solid Dead axle one end is mounted in first rotating shaft hole by bearing;Second belt pulley is mounted in the second fixing axle by key;First skin Band is wrapped on the first belt pulley and the second belt pulley;7th gear is mounted in the second fixing axle by key;First draw runner peace In first sliding groove;First fixed strip lower end side is mounted on the first draw runner end face, and the first fixed strip is close to notch point Cloth;First maneuvering board side is mounted on the first fixed strip side, and the external tooth and the 7th opened on the first maneuvering board lower end surface Gear engagement;First wirerope passes through notch far from one end of the first payingoff mechanism and is mounted on the first maneuvering board upper surface;Two A C-shaped fixed link is symmetrical about the first draw runner, and two C-shaped fixed link upper ends are installed in the first maneuvering board close to notch Side on;First fixing axle one end is mounted in the 4th shaft hole by bearing;5th gear is mounted on first by key and consolidates On dead axle, and the 5th gear is engaged with third gear;4th gear is mounted in the first fixing axle by key;6th fixing axle one End is mounted on square groove end face;Third belt pulley is mounted in the 6th fixing axle by bearing, and on third belt pulley outside side The external tooth opened on disc is engaged with the 4th gear;5th fixing axle one end is mounted in third shaft hole by bearing;4th Belt pulley is mounted in the 5th fixing axle by key;6th gear is mounted in the 5th fixing axle by key;The winding of second belt On third belt pulley and the 4th belt pulley;Second draw runner is mounted in second sliding slot;The installation of second fixed strip upper end side On end face of second draw runner far from notch;Fixed block one end is mounted on the 4th maneuvering board far from the end face of notch;4th fortune Movable plate is mounted on upper end of fixing block face, and the external tooth opened on the 4th maneuvering board upper surface is engaged with the 6th gear;Second steel Cord is mounted on upper end of fixing block face far from one end of the second payingoff mechanism;L shape fixed link upper end is mounted on lower end of fixing block On face;There is cavity on loading shell;The movement slots of perforation are provided in cavity side;Pouring weight side is mounted on L shape fixed link one end, And pouring weight and movement slots cooperate;Third gear, first gear, the first belt pulley, the 7th gear, the 4th gear, third belt pulley, The periphery diameter of 6th gear is all the same;Second belt pulley is identical as the periphery diameter of the 4th belt pulley;Second gear with The periphery diameter of 5th gear is identical;The periphery diameter of second gear is 2 times of the periphery diameter of third gear;First The periphery diameter of belt pulley is 4 times of the second belt pulley periphery diameter;First maneuvering board, the second maneuvering board, third movement Plate, the length of the 4th maneuvering board are all the same.
It is advanced optimized as this technology, solid lubrication oil is coated between the first sliding groove and the first draw runner, second is sliding Solid lubrication oil is coated between slot and the second draw runner.
It is advanced optimized as this technology, first wirerope is identical as the diameter of the second wirerope.
It is advanced optimized as this technology, the diameter of first wirerope and the second wirerope is 5mm-10mm.
It is advanced optimized as this technology, the width dimensions of the notch are more than or equal to the outer diameter ruler of the first wirerope It is very little.
It is advanced optimized as this technology, first maneuvering board, the second maneuvering board, third maneuvering board, the 4th plectane Thickness is all the same.
It is advanced optimized as this technology, first maneuvering board, the second maneuvering board, third maneuvering board, the 4th maneuvering board Length dimension be equal to set casing length dimension.
Be arranged on building in the present invention be easy for there are many effect of window by the personnel of floor each in building or Person's article is transported on ground;Hanging basket mechanism is mounted on the personnel or cargo that the effect on building is easy in transport high building.
The effect of hanging basket mechanism in the present invention is easy for personnel or cargo in transport high building;The installation of first fixed plate Effect on the side of building upper end window side is easy for the first payingoff mechanism of installation and the second payingoff mechanism;T-bar Upper surface is mounted on the effect on the first fixed plate lower end surface and is easy for cooperating with the T-slot opened on set casing, to reach The purpose of guidance and limitation set casing movement;First payingoff mechanism is symmetrical about T-bar with the second payingoff mechanism, and first The effect that payingoff mechanism and the second payingoff mechanism are installed on the first fixed plate lower end surface be easy for fixing the first maneuvering board with 4th maneuvering board, to reach delivery set casing, the first maneuvering board, the second maneuvering board, third maneuvering board, the 4th maneuvering board etc. Purpose;The effect that the first wirerope is extended on first payingoff mechanism is easy for tensing the first maneuvering board, so that the first fortune It can be still tightened up in movable plate motion process;The effect that the second wirerope is extended on second payingoff mechanism is easy for tension Four maneuvering boards can be still tightened up in the 4th maneuvering board motion process;The work of the square groove of perforation is provided on set casing side With being easy for the first maneuvering board of installation, the second maneuvering board, third maneuvering board, the 4th maneuvering board etc.;Set casing is provided on upper surface The effect of the T-slot of perforation is easy for for set casing being mounted on T-bar;The notch of perforation is provided on the side of set casing upper surface Effect be easy for the first wirerope and be fixedly mounted on the first maneuvering board;The second shaft hole, the 4th turn are provided on square groove end face The effect of axis hole, third shaft hole, first rotating shaft hole is easy for the 4th fixing axle of installation, the first fixing axle, the 5th fixing axle, the Two fixing axles;Second shaft hole and the 4th shaft hole are communicated with T-slot, and the second shaft hole and the 4th shaft hole are distributed up and down Effect be so that the 4th fixing axle and the first fixing axle are located at the two sides of the second maneuvering board and third maneuvering board;First rotating shaft hole It is distributed close to notch;Third shaft hole and first rotating shaft hole are in that the effect being diagonally distributed is easy for the first maneuvering board and the second movement The movement of plate;Motor axis hole, and the work that motor axis hole is communicated with square groove are provided at the set casing end face center opposite with T-slot Be easy for first motor axis pass through set casing;Set casing is easy for by T-slot and the effect that T-bar is slidably installed Fix the first maneuvering board, the second maneuvering board, third maneuvering board, the 4th maneuvering board etc.;First motor is mounted on set casing end face On, and first motor axis is easy for driving third gear movement across the effect of motor axis hole;Third gear is mounted on by key Effect on first motor axis is easy for the second maneuvering board of driving and third maneuvering board moves;It is provided with not in second movement plate end face The effect of first T shape guide groove of perforation is easy for and is mounted on the cooperation of the first T shape guide block on square groove end face, to reach installation The purpose of second maneuvering board;The effect for the first sliding groove for being provided with perforation in second movement plate end face is easy for the first draw runner of installation; First T shape guide block one end is mounted on square groove end face, and the first T shape guide block is easy for first close to the effect that notch side is distributed Maneuvering board is moved along close to notch direction;Second maneuvering board is slidably installed by the first T shape guide groove and the first T shape guide block In set casing, and the effect that the external tooth opened on the second maneuvering board lower end surface is engaged with third gear is easy for the first fortune of installation Movable plate;Being provided with the effect for the 2nd T shape guide groove being not penetrated in third movement plate end face is led with the 2nd T shape being mounted on square groove Block formation is slidably matched;The effect for the second sliding slot for being provided with perforation in third movement plate end face is easy for the second draw runner of installation;The Two T shape guide block one end are mounted on square groove end face, and the 2nd T shape guide block far from the effect that notch side is distributed be easy for guidance and The movement of third maneuvering board is limited, so that third maneuvering board may be located remotely from the movement of notch direction;Third maneuvering board passes through the The external tooth for being slidably installed in set casing, and being opened on third maneuvering board upper surface of two T shape guide grooves and the 2nd T shape guide block The effect engaged with third gear is easy for the 4th maneuvering board of installation;4th fixing axle one end is mounted on the second shaft by bearing In hole, and the 4th fixing axle is located at the effect on the upside of the second maneuvering board and is easy for installation second gear and first gear;Third is solid The effect that dead axle one end is mounted on square groove end face is easy for the first belt pulley of installation;First belt pulley is mounted on by bearing In three fixing axles, and the effect engaged with the first gear of the external tooth opened on the first pulley side periphery is easy for driving the Two pulley movements;Second fixing axle one end is easy for the second belt of installation by the effect that bearing is mounted in first rotating shaft hole Wheel and the 7th gear;First draw runner is mounted on the effect in first sliding groove and is easy for the first fixed strip of installation;Under first fixed strip End side is mounted on the first draw runner end face, and the first fixed strip is easy for that the first fortune is fixedly mounted close to the effect that notch is distributed Movable plate;First maneuvering board side is mounted on the first fixed strip side, and the external tooth opened on the first maneuvering board lower end surface and The effect of seven gears engagement is easy for the first wirerope of installation and C-shaped fixed link;First wirerope is far from the first payingoff mechanism One end passes through the effect that notch is mounted on the first maneuvering board upper surface and is easy for tensing the first wirerope;Two C-shaped fixed links It is symmetrical about the first draw runner, and two C-shaped fixed link upper ends are installed in the first maneuvering board on the side of notch Effect is easy for that loading shell is fixedly mounted;First fixing axle one end is easy for by the effect that bearing is mounted in the 4th shaft hole 5th gear and the 4th gear are installed;The effect that 6th fixing axle one end is mounted on square groove end face is easy for installation third belt Wheel;Third belt pulley is mounted in the 6th fixing axle by bearing, and the external tooth opened on the periphery of side on third belt pulley The effect engaged with the 4th gear is to drive the 4th pulley movements by the second belt;Pacified by bearing 5th fixing axle one end Effect in third shaft hole is easy for the 4th belt pulley of installation and the 6th gear;Second draw runner is mounted in second sliding slot Effect be easy for installation the second fixed strip;Second fixed strip upper end side is mounted on the second draw runner far from the end face of notch Effect be easy for installation fixed block;Fixed block one end is mounted on the 4th maneuvering board and is easy for far from the effect on the end face of notch 4th fixed plate is installed;4th maneuvering board is mounted on upper end of fixing block face, and the external tooth opened on the 4th maneuvering board upper surface The effect engaged with the 6th gear is easy for the second wirerope of installation and L shape fixed link;Second wirerope is far from the second paying out machine One end of structure is mounted on the 4th maneuvering board that the effect on upper end of fixing block face is easy for tensioning movement;The shape fixed link upper end L peace Effect on lower end of fixing block face is easy for installation pouring weight;Have the function of on loading shell cavity be easy for carrying individuals and Cargo;The effect that the movement slots of perforation are provided in cavity side is easy for the movement of pouring weight;Pouring weight side is mounted on L shape fixed link One end, and the effect of pouring weight and movement slots cooperation is to balance the weight of personnel and cargo in loading shell;Third gear, the first tooth Wheel, the first belt pulley, the 7th gear, the 4th gear, third belt pulley, the periphery diameter of the 6th gear are all the same;Second skin Belt wheel is identical as the periphery diameter of the 4th belt pulley;Second gear is identical as the periphery diameter of the 5th gear;Second gear Periphery diameter be 2 times of periphery diameter of third gear;The periphery diameter of first belt pulley is outside the second belt pulley 4 times of effect of disc diameter is the half for allowing the second maneuvering board and third maneuvering board to move its length, and the first fortune Movable plate can move at a distance from its length with the 4th maneuvering board;First maneuvering board, the second maneuvering board, third maneuvering board, the 4th fortune The effect all the same of the length of movable plate is easy for saving the space of hanging basket mechanism, so that hanging basket mechanism is using upper more flexible;The It is coated with solid lubrication oil between one sliding slot and the first draw runner, the effect of solid lubrication oil is coated between second sliding slot and the second draw runner It is the frictional force reduced between them;The effect identical with the diameter of the second wirerope of first wirerope is so that wirerope makes It can achieve control with cost;The diameter of first wirerope and the second wirerope be the effect of 5mm-10mm be in this way can be While guaranteeing hanging basket agency security energy, the use cost of wirerope is saved;The width dimensions of notch are more than or equal to the The effect of the outer diameter of one wirerope is easy for the first wirerope and is fixedly mounted on the first maneuvering board by set casing;First Maneuvering board, the second maneuvering board, third maneuvering board, the effect that the thickness of the 4th plectane is all the same are the space rulers so that hanging basket mechanism It is very little smaller so that hanging basket mechanism using more flexible;First maneuvering board, the second maneuvering board, third maneuvering board, the 4th maneuvering board Length dimension be equal to set casing length dimension effect be allow set casing smoothly protect the first maneuvering board, second fortune Movable plate, third maneuvering board, the 4th maneuvering board.
Three) the advantages of the present invention
Relative to traditional high building hanging basket technology, the high building hanging basket in the present invention has when heap on the ground found near building When block has barrier, the purpose for hiding sundries on ground can achieve, prevent the case where sundries collides on hanging basket mechanism and ground Occur, to play the effect of personnel and article safety in protection hanging basket mechanism.
Detailed description of the invention
Fig. 1 is global facility distribution schematic diagram.
Fig. 2 is fabric structure schematic diagram.
Fig. 3 is the first payingoff mechanism mounting structure schematic diagram.
Fig. 4 is the second payingoff mechanism mounting structure schematic diagram.
Fig. 5 is the first electric motor mounting structure schematic diagram.
Fig. 6 is third gear installation structure schematic diagram.
Fig. 7 is loading shell structure schematic diagram.
Fig. 8 is the first belt mounting structure schematic diagram.
Fig. 9 is fixed shell structure (one) schematic diagram.
Figure 10 is fixed shell structure (two) schematic diagram.
Figure 11 is C-shaped fixed link mounting structure schematic diagram.
Figure 12 is L shape fixed link mounting structure schematic diagram.
Figure 13 is second gear mounting structure schematic diagram.
Figure 14 is the first structure for mounting belt pulley schematic diagram.
Figure 15 is the 7th gear installation structure schematic diagram.
Figure 16 is the second Sportsboard structures schematic diagram.
Figure 17 is third Sportsboard structures schematic diagram.
Figure 18 is the first fixed strip mounting structure schematic diagram.
Figure 19 is the second fixed strip mounting structure schematic diagram.
Figure 20 is the first maneuvering board, the second maneuvering board, third maneuvering board, the 4th maneuvering board motion principle schematic diagram.
Figure label title: 1, building;2, hanging basket mechanism;3, window;4, the first wirerope;5, the first payingoff mechanism; 6, the first fixed plate;7, the second payingoff mechanism;8, the second wirerope;9, T-bar;10, set casing;11, the first motor;12, Loading shell;13, L shape fixed link;14, C-shaped fixed link;15, the first maneuvering board;16, first gear;17, the second maneuvering board;18, Second gear;19, third gear;20, third maneuvering board;21, the first fixing axle;22, the 4th maneuvering board;23, the 4th gear; 24, the 5th gear;25, first motor axis;26, cavity;27, movement slots;28, the first belt;29, the first belt pulley;30, third Belt pulley;31, the second belt;32, the 6th gear;33, fixed block;34, pouring weight;35, notch;36, first rotating shaft hole;37, T shape Slot;38, the second shaft hole;39, square groove;40, third shaft hole;41, the 4th shaft hole;42, motor axis hole;43, the 7th gear; 44, the second belt pulley;45, the 4th belt pulley;46, the second fixing axle;47, the first fixed strip;48, third fixing axle;49, the 4th Fixing axle;50, the 5th fixing axle;51, the second fixed strip;52, the first T shape guide groove;53, first sliding groove;54, second sliding slot;55, 2nd T shape guide groove;56, the first draw runner;57, the second draw runner;58, the first T shape guide block;59, the 2nd T shape guide block;60, the 6th is fixed Axis.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
See Fig. 1 to Figure 20.As shown in Fig. 2, there are many windows 3 for setting on building 1;As shown in Figure 1, hanging basket mechanism 2 Installation is on the building 1.
As shown in figure 3, above-mentioned hanging basket mechanism 2 includes the first wirerope 4, the first payingoff mechanism 5, the first fixed plate 6, second Payingoff mechanism 7, the second wirerope 8, T-bar 9, set casing 10, the first motor 11, loading shell 12, L shape fixed link 13, C-shaped are solid Fixed pole 14, the first maneuvering board 15, first gear 16, the second maneuvering board 17, second gear 18, third gear 19, third maneuvering board 20, the first fixing axle 21, the 4th maneuvering board 22, the 4th gear 23, the 5th gear 24, first motor axis 25, cavity 26, movement slots 27, the first belt 28, the first belt pulley 29, third belt pulley 30, the first belt 28, the 6th gear 32, fixed block 33, pouring weight 34, notch 35, first rotating shaft hole 36, T-slot 37, the second shaft hole 38, square groove 39, third shaft hole 40, the 4th shaft hole 41, Motor axis hole 42, the 7th gear 43, the second belt pulley 44, the 4th belt pulley 45, the second fixing axle 46, the first fixed strip 47, Three fixing axles 48, the 4th fixing axle 49, the 5th fixing axle 50, the second fixed strip 51, the first T shape guide groove 52, first sliding groove 53, Two sliding slots 54, the 2nd T shape guide groove 55, the first draw runner 56, the second draw runner 57, the first T shape guide block 58, the 2nd T shape guide block the 59, the 6th Fixing axle 60, as shown in Figure 1, wherein the first fixed plate 6 is mounted on the side of 1 upper end window of building, 3 side;Such as Fig. 4 institute Show, 9 upper surface of T-bar is mounted on 6 lower end surface of the first fixed plate;As shown in figure 4, the first payingoff mechanism 5 and the second paying out machine Structure 7 is symmetrical about T-bar 9, and the first payingoff mechanism 5 and the second payingoff mechanism 7 are installed in 6 lower end surface of the first fixed plate On;As shown in figure 4, being extended with the first wirerope 4 on the first payingoff mechanism 5;As shown in figure 4, being extended on the second payingoff mechanism 7 Second wirerope 8;As shown in Figures 9 and 10, the square groove 39 of perforation is provided on 10 side of set casing;As shown in Figures 9 and 10, set casing 10 The T-slot 37 of perforation is provided on upper surface;As shown in figure 9, being provided with the notch 35 of perforation on 10 upper surface side of set casing;Such as figure Shown in 10, the second shaft hole 38, the 4th shaft hole 41, third shaft hole 40, first rotating shaft hole 36 are provided on 39 end face of square groove;Such as Fig. 9, shown in 10, the second shaft hole 38 and the 4th shaft hole 41 are communicated with T-slot 37, and the second shaft hole 38 and the 4th shaft About 41 hole is distributed;As shown in Figures 9 and 10, first rotating shaft hole 36 is distributed close to notch 35;As shown in Figures 9 and 10, third shaft hole 40 are distributed with first rotating shaft hole 36 in diagonal;As shown in figure 9, being provided at the end face center opposite with T-slot 37 of set casing 10 Motor axis hole 42, and motor axis hole 42 is communicated with square groove 39;As shown in Figure 1, set casing 10 is slided by T-slot 37 and T-bar 9 It is coupled;As shown in Figure 5,6, the first motor 11 is mounted on 10 end face of set casing, and first motor axis 25 passes through motor Axis hole 42;As shown in figure 8, third gear 19 is mounted on first motor axis 25 by key;As shown in figure 16, the second maneuvering board 17 The first T shape guide groove 52 being not penetrated is provided on end face;As shown in figure 16, first that perforation is provided on 17 end face of the second maneuvering board is sliding Slot 53;As shown in Fig. 6,19,58 one end of the first T shape guide block is mounted on 39 end face of square groove, and the first T shape guide block 58 is close to notch The distribution of 35 sides;As shown in fig. 6, the second maneuvering board 17 passes through the peace that is slidably matched of the first T shape guide groove 52 and the first T shape guide block 58 In set casing 10, and the external tooth opened on 17 lower end surface of the second maneuvering board is engaged with third gear 19;As shown in figure 17, The 2nd T shape guide groove 55 being not penetrated is provided on three maneuvering boards, 20 end face;As shown in figure 17, it is provided with and passes through on 20 end face of third maneuvering board Logical second sliding slot 54;As shown in Fig. 6,19,59 one end of the 2nd T shape guide block is mounted on 39 end face of square groove, and the 2nd T shape guide block 59 are distributed far from 35 side of notch;As shown in fig. 6, third maneuvering board 20 passes through the 2nd T shape guide groove 55 and the 2nd T shape guide block 59 It is slidably installed in set casing 10, and the external tooth opened on 20 upper surface of third maneuvering board is engaged with third gear 19;Such as Shown in Fig. 8,49 one end of the 4th fixing axle is mounted in the second shaft hole 38 by bearing, and the 4th fixing axle 49 is located at the second fortune 17 upside of movable plate;As shown in figure 13, second gear 18 is mounted in the 4th fixing axle 49 by key, and second gear 18 and third Gear 19 engages;As shown in figure 14, first gear 16 is mounted in the 4th fixing axle 49 by key;As shown in figure 8, third is fixed 48 one end of axis is mounted on 39 end face of square groove;As shown in figure 15, the first belt pulley 29 is mounted on third fixing axle 48 by bearing On, and the external tooth opened on 29 side periphery of the first belt pulley is engaged with first gear 16;As shown in figure 8, the second fixing axle 46 one end are mounted in first rotating shaft hole 36 by bearing;As shown in figure 18, the second belt pulley 44 is mounted on second by key and consolidates On dead axle 46;As shown in figure 18, the first belt 28 is wrapped on the first belt pulley 29 and the second belt pulley 44;As shown in figure 14, 7th gear 43 is mounted in the second fixing axle 46 by key;First draw runner 56 is mounted in first sliding groove 53;As shown in figure 19, First fixed strip, 47 lower end side is mounted on 56 end face of the first draw runner, and the first fixed strip 47 is distributed close to notch 35;Such as figure Shown in 14,15 side of the first maneuvering board is mounted on 47 side of the first fixed strip, and opened on 15 lower end surface of the first maneuvering board External tooth is engaged with the 7th gear 43;As shown in figure 11, the first wirerope 4 passes through notch 35 far from one end of the first payingoff mechanism 5 It is mounted on 15 upper surface of the first maneuvering board;As shown in figure 11, two C-shaped fixed links 14 are symmetrical about the first draw runner 56, And two 14 upper ends of C-shaped fixed link are installed in the first maneuvering board 15 on the side of notch 35;As shown in figure 8, first is solid 21 one end of dead axle is mounted in the 4th shaft hole 41 by bearing;As shown in figure 13, the 5th gear 24 is mounted on first by key In fixing axle 21, and the 5th gear 24 is engaged with third gear 19;As shown in figure 13, the 4th gear 23 is mounted on first by key In fixing axle 21;As shown in figure 8,60 one end of the 6th fixing axle is mounted on 39 end face of square groove;As shown in figure 13, third belt pulley 30 are mounted in the 6th fixing axle 60 by bearing, and the external tooth and the 4th tooth opened on the periphery of side on third belt pulley 30 23 engagement of wheel;As shown in figure 8,50 one end of the 5th fixing axle is mounted in third shaft hole 40 by bearing;Such as Figure 18,19 institutes Show, the 4th belt pulley 45 is mounted in the 5th fixing axle 50 by key;As shown in figure 13, the 6th gear 32 is mounted on by key In five fixing axles 50;As shown in figure 19, the second belt 31 is wrapped on third belt pulley 30 and the 4th belt pulley 45;Second draw runner 57 are mounted in second sliding slot 54;As shown in figure 19,51 upper end side of the second fixed strip is mounted on the second draw runner 57 far from scarce On the end face of mouth 35;As shown in figure 14,33 one end of fixed block is mounted on the 4th end face of the maneuvering board 22 far from notch 35;Such as figure Shown in 14, the 4th maneuvering board 22 is mounted on 33 upper surface of fixed block, and the external tooth opened on 22 upper surface of the 4th maneuvering board with The engagement of 6th gear 32;As shown in figure 12, the second wirerope 8 is mounted on fixed block 33 far from one end of the second payingoff mechanism 7 On end face;As shown in figure 12,13 upper end of L shape fixed link is mounted on 33 lower end surface of fixed block;As shown in fig. 7, on loading shell 12 With cavity 26;As shown in fig. 7, being provided with the movement slots 27 of perforation on 26 side of cavity;As shown in figure 8,34 side of pouring weight is installed In 13 one end of L shape fixed link, and pouring weight 34 and movement slots 27 cooperate;Third gear 19, first gear 16, the first belt pulley 29, 7th gear 43, the 4th gear 23, third belt pulley 30, the periphery diameter of the 6th gear 32 are all the same;Second belt pulley 44 It is identical as the periphery diameter of the 4th belt pulley 45;Second gear 18 is identical as the periphery diameter of the 5th gear 24;Second tooth The periphery diameter of wheel 18 is 2 times of the periphery diameter of third gear 19;The periphery diameter of first belt pulley 29 is second 4 times of 44 periphery diameter of belt pulley;First maneuvering board 15, second maneuvering board 17, third maneuvering board 20, the 4th maneuvering board 22 Length is all the same.
Be coated with solid lubrication oil between the first sliding groove 53 and the first draw runner 56, second sliding slot 54 and the second draw runner 57 it Between be coated with solid lubrication oil.
First wirerope 4 is identical as the diameter of the second wirerope 8.
The diameter of first wirerope 4 and the second wirerope 8 is 5mm-10mm.
The width dimensions of the notch 35 are more than or equal to the outer diameter of the first wirerope 4.
First maneuvering board 15, the second maneuvering board 17, third maneuvering board 20, the thickness of the 4th plectane are all the same.
First maneuvering board 15, the second maneuvering board 17, third maneuvering board 20, the 4th maneuvering board 22 length dimension be equal to The length dimension of set casing 10.
Specific embodiment are as follows: when hanging basket mechanism 2 delivers upper personnel or cargo moves downward, such as a institute of Figure 20 figure Show, the first maneuvering board 15, the second maneuvering board 17, third maneuvering board 20, the 4th maneuvering board 22 at this time is in set casing 10; When realizing has sundries on 1 ground of building, the first motor 11 at this time will will drive first motor axis 25 and rotate, the first electricity Arbor 25 will will drive third gear 19 and rotate, and third gear 19 will will drive second gear 18 and rotate, and second gear 18 will The 4th fixing axle 49 is driven to move, the 4th fixing axle 49 will will drive first gear 16 and move, and first gear 16 will will drive the The movement of one belt pulley 29, the first belt pulley 29 of movement will will drive the first belt 28 and move, and the first belt 28 will will drive the The movement of two belt pulleys 44, the second belt pulley 44 will will drive the second fixing axle 46 and move, and the second fixing axle 46 will will drive the 7th Gear 43 moves, and the 7th gear 43 will will drive the first maneuvering board 15 and move, and the first maneuvering board 15 at this time will will drive C-shaped and consolidate Fixed pole 14 moves, and C-shaped fixed link 14 will will drive loading shell 12 and move, and drives second gear 18 to move in third gear 19 same When, the third gear 19 of movement will will drive the 5th gear 24 and move, and the 5th gear 24 of movement will will drive the first fixing axle 21 movements, the first fixing axle 21 will will drive the 4th gear 23 and move, and the 4th gear 23 will will drive third belt pulley 30 and move, Third belt pulley 30 will will drive the second belt 31 and move, and the second belt 31 will will drive the 4th belt pulley 45 and move, movement 4th belt pulley 45 will will drive the 5th fixing axle 50 and move, and the 5th fixing axle 50 will will drive the 6th gear 32 and move, and the 6th Gear 32 will will drive the 4th maneuvering board 22 and move, and the 4th maneuvering board 22 of movement at this time will will drive fixed block 33 and move, Fixed block 33 will will drive L shape fixed link 13 and move, and L shape fixed link 13 is moved will drive the pouring weight 34 set in advance, this When the third gear 19 that moves, while moving together with loading shell 12 of pouring weight 34 the second maneuvering board 17 will be driven to transport with third Movable plate 20 moves, as shown in the b of Figure 20 figure, so that the first maneuvering board 15, the second maneuvering board 17, third maneuvering board 20, the Four maneuvering boards 22 move out set casing 10, and loading shell 12 at this time will smoothly hide out the sundries of 1 downside of building, pouring weight 34 will balance the weight of loading shell 12 and its personnel or cargo in loading shell 12, build to reach hanging basket mechanism 2 and hide Build the purpose of the barrier under object 1 on ground.
In conclusion it is restricted embodiment of the invention, all those skilled in the art that above embodiment, which is not, On the basis of substantive content of the invention, several improvements and modifications can also be made, these improvements and modifications also should be regarded as this The protection scope of invention.

Claims (3)

1. a kind of safety hanging cradle in building construction building, it is characterised in that: there are many windows for setting on building;Hanging basket Mechanism is mounted on building;
The hanging basket mechanism includes the first wirerope, the first payingoff mechanism, the first fixed plate, the second payingoff mechanism, the second steel wire Rope, T-bar, set casing, the first motor, loading shell, L shape fixed link, C-shaped fixed link, the first maneuvering board, first gear, Two maneuvering boards, second gear, third gear, third maneuvering board, the first fixing axle, the 4th maneuvering board, the 4th gear, the 5th tooth Wheel, is consolidated first motor axis, cavity, movement slots, the first belt, the first belt pulley, third belt pulley, the first belt, the 6th gear Determine block, pouring weight, notch, first rotating shaft hole, T-slot, the second shaft hole, square groove, third shaft hole, the 4th shaft hole, motor shaft Hole, the 7th gear, the second belt pulley, the 4th belt pulley, the second fixing axle, the first fixed strip, third fixing axle, the 4th fix Axis, the 5th fixing axle, the second fixed strip, the first T shape guide groove, first sliding groove, second sliding slot, the 2nd T shape guide groove, the first draw runner, Second draw runner, the first T shape guide block, the 2nd T shape guide block, the 6th fixing axle, wherein the first fixed plate is mounted on building upper window On the side of family side;T-bar upper surface is mounted on the first fixed plate lower end surface;First payingoff mechanism and the second payingoff mechanism It is symmetrical about T-bar, and the first payingoff mechanism and the second payingoff mechanism are installed on the first fixed plate lower end surface;First The first wirerope is extended on payingoff mechanism;The second wirerope is extended on second payingoff mechanism;It is provided with and passes through on set casing side Logical square groove;The T-slot of perforation is provided on set casing upper surface;The notch of perforation is provided on the side of set casing upper surface;Square groove The second shaft hole, the 4th shaft hole, third shaft hole, first rotating shaft hole are provided on end face;Second shaft hole and the 4th shaft hole It is communicated with T-slot, and the second shaft hole and the 4th shaft hole are distributed up and down;First rotating shaft hole is distributed close to notch;Third turns Axis hole and first rotating shaft hole are in diagonal distribution;Motor axis hole, and motor are provided at the set casing end face center opposite with T-slot Axis hole is communicated with square groove;Set casing is slidably installed by T-slot and T-bar;First motor is mounted on set casing end face On, and first motor axis passes through motor axis hole;Third gear is mounted on first motor axis by key;
The first T shape guide groove being not penetrated is provided in second movement plate end face;First that perforation is provided in second movement plate end face is sliding Slot;First T shape guide block one end is mounted on square groove end face, and the first T shape guide block is distributed close to notch side;Second maneuvering board is logical Being slidably installed in set casing of the first T shape guide groove and the first T shape guide block is crossed, and opened on the second maneuvering board lower end surface External tooth is engaged with third gear;The 2nd T shape guide groove being not penetrated is provided in third movement plate end face;It is opened in third movement plate end face There is the second sliding slot of perforation;2nd T shape guide block one end is mounted on square groove end face, and the 2nd T shape guide block is far from notch side point Cloth;Third maneuvering board is slidably installed in set casing by the 2nd T shape guide groove and the 2nd T shape guide block, and third movement The external tooth opened on plate upper surface is engaged with third gear;4th fixing axle one end is mounted in the second shaft hole by bearing, And the 4th fixing axle be located on the upside of the second maneuvering board;Second gear is mounted in the 4th fixing axle by key, and second gear with The engagement of third gear;First gear is mounted in the 4th fixing axle by key;Third fixing axle one end is mounted on square groove end face; First belt pulley is mounted in third fixing axle by bearing, and the external tooth and first opened on the first pulley side periphery Gear engagement;Second fixing axle one end is mounted in first rotating shaft hole by bearing;Second belt pulley is mounted on second by key In fixing axle;First belt is wrapped on the first belt pulley and the second belt pulley;7th gear is mounted on second by key and fixes On axis;First draw runner is mounted in first sliding groove;First fixed strip lower end side is mounted on the first draw runner end face, and first is solid Determine item to be distributed close to notch;First maneuvering board side is mounted on the first fixed strip side, and institute on the first maneuvering board lower end surface The external tooth opened is engaged with the 7th gear;First wirerope passes through notch far from one end of the first payingoff mechanism and is mounted on the first movement On plate upper surface;Two C-shaped fixed links are symmetrical about the first draw runner, and two C-shaped fixed link upper ends are installed in first Maneuvering board is on the side of notch;
First fixing axle one end is mounted in the 4th shaft hole by bearing;5th gear is mounted on the first fixing axle by key On, and the 5th gear is engaged with third gear;4th gear is mounted in the first fixing axle by key;6th fixing axle one end peace On square groove end face;Third belt pulley is mounted in the 6th fixing axle by bearing, and side periphery on third belt pulley On the external tooth opened engaged with the 4th gear;5th fixing axle one end is mounted in third shaft hole by bearing;4th belt Wheel is mounted in the 5th fixing axle by key;6th gear is mounted in the 5th fixing axle by key;Second belt is wrapped in On three belt pulleys and the 4th belt pulley;Second draw runner is mounted in second sliding slot;Second fixed strip upper end side is mounted on Two draw runners are far from the end face of notch;Fixed block one end is mounted on the 4th maneuvering board far from the end face of notch;4th maneuvering board It is mounted on upper end of fixing block face, and the external tooth opened on the 4th maneuvering board upper surface is engaged with the 6th gear;Second wirerope One end far from the second payingoff mechanism is mounted on upper end of fixing block face;L shape fixed link upper end is mounted on lower end of fixing block face; There is cavity on loading shell;The movement slots of perforation are provided in cavity side;Pouring weight side is mounted on L shape fixed link one end, and again Block and movement slots cooperate;Third gear, first gear, the first belt pulley, the 7th gear, the 4th gear, third belt pulley, the 6th The periphery diameter of gear is all the same;Second belt pulley is identical as the periphery diameter of the 4th belt pulley;Second gear and the 5th The periphery diameter of gear is identical;The periphery diameter of second gear is 2 times of the periphery diameter of third gear;First belt The periphery diameter of wheel is 4 times of the second belt pulley periphery diameter;First maneuvering board, the second maneuvering board, third maneuvering board, The length of four maneuvering boards is all the same;
It is coated with solid lubrication oil between the first sliding groove and the first draw runner, solid-state profit is coated between second sliding slot and the second draw runner Lubricating oil;
First wirerope is identical as the diameter of the second wirerope;
The diameter of first wirerope and the second wirerope is 5mm-10mm.
2. a kind of safety hanging cradle in building construction building, it is characterised in that: there are many windows for setting on building;Hanging basket Mechanism is mounted on building;
The hanging basket mechanism includes the first wirerope, the first payingoff mechanism, the first fixed plate, the second payingoff mechanism, the second steel wire Rope, T-bar, set casing, the first motor, loading shell, L shape fixed link, C-shaped fixed link, the first maneuvering board, first gear, Two maneuvering boards, second gear, third gear, third maneuvering board, the first fixing axle, the 4th maneuvering board, the 4th gear, the 5th tooth Wheel, is consolidated first motor axis, cavity, movement slots, the first belt, the first belt pulley, third belt pulley, the first belt, the 6th gear Determine block, pouring weight, notch, first rotating shaft hole, T-slot, the second shaft hole, square groove, third shaft hole, the 4th shaft hole, motor shaft Hole, the 7th gear, the second belt pulley, the 4th belt pulley, the second fixing axle, the first fixed strip, third fixing axle, the 4th fix Axis, the 5th fixing axle, the second fixed strip, the first T shape guide groove, first sliding groove, second sliding slot, the 2nd T shape guide groove, the first draw runner, Second draw runner, the first T shape guide block, the 2nd T shape guide block, the 6th fixing axle, wherein the first fixed plate is mounted on building upper window On the side of family side;T-bar upper surface is mounted on the first fixed plate lower end surface;First payingoff mechanism and the second payingoff mechanism It is symmetrical about T-bar, and the first payingoff mechanism and the second payingoff mechanism are installed on the first fixed plate lower end surface;First The first wirerope is extended on payingoff mechanism;The second wirerope is extended on second payingoff mechanism;It is provided with and passes through on set casing side Logical square groove;The T-slot of perforation is provided on set casing upper surface;The notch of perforation is provided on the side of set casing upper surface;Square groove The second shaft hole, the 4th shaft hole, third shaft hole, first rotating shaft hole are provided on end face;Second shaft hole and the 4th shaft hole It is communicated with T-slot, and the second shaft hole and the 4th shaft hole are distributed up and down;First rotating shaft hole is distributed close to notch;Third turns Axis hole and first rotating shaft hole are in diagonal distribution;Motor axis hole, and motor are provided at the set casing end face center opposite with T-slot Axis hole is communicated with square groove;Set casing is slidably installed by T-slot and T-bar;First motor is mounted on set casing end face On, and first motor axis passes through motor axis hole;Third gear is mounted on first motor axis by key;
The first T shape guide groove being not penetrated is provided in second movement plate end face;First that perforation is provided in second movement plate end face is sliding Slot;First T shape guide block one end is mounted on square groove end face, and the first T shape guide block is distributed close to notch side;Second maneuvering board is logical Being slidably installed in set casing of the first T shape guide groove and the first T shape guide block is crossed, and opened on the second maneuvering board lower end surface External tooth is engaged with third gear;The 2nd T shape guide groove being not penetrated is provided in third movement plate end face;It is opened in third movement plate end face There is the second sliding slot of perforation;2nd T shape guide block one end is mounted on square groove end face, and the 2nd T shape guide block is far from notch side point Cloth;Third maneuvering board is slidably installed in set casing by the 2nd T shape guide groove and the 2nd T shape guide block, and third movement The external tooth opened on plate upper surface is engaged with third gear;4th fixing axle one end is mounted in the second shaft hole by bearing, And the 4th fixing axle be located on the upside of the second maneuvering board;Second gear is mounted in the 4th fixing axle by key, and second gear with The engagement of third gear;First gear is mounted in the 4th fixing axle by key;Third fixing axle one end is mounted on square groove end face; First belt pulley is mounted in third fixing axle by bearing, and the external tooth and first opened on the first pulley side periphery Gear engagement;Second fixing axle one end is mounted in first rotating shaft hole by bearing;Second belt pulley is mounted on second by key In fixing axle;First belt is wrapped on the first belt pulley and the second belt pulley;7th gear is mounted on second by key and fixes On axis;First draw runner is mounted in first sliding groove;First fixed strip lower end side is mounted on the first draw runner end face, and first is solid Determine item to be distributed close to notch;First maneuvering board side is mounted on the first fixed strip side, and institute on the first maneuvering board lower end surface The external tooth opened is engaged with the 7th gear;First wirerope passes through notch far from one end of the first payingoff mechanism and is mounted on the first movement On plate upper surface;Two C-shaped fixed links are symmetrical about the first draw runner, and two C-shaped fixed link upper ends are installed in first Maneuvering board is on the side of notch;
First fixing axle one end is mounted in the 4th shaft hole by bearing;5th gear is mounted on the first fixing axle by key On, and the 5th gear is engaged with third gear;4th gear is mounted in the first fixing axle by key;6th fixing axle one end peace On square groove end face;Third belt pulley is mounted in the 6th fixing axle by bearing, and side periphery on third belt pulley On the external tooth opened engaged with the 4th gear;5th fixing axle one end is mounted in third shaft hole by bearing;4th belt Wheel is mounted in the 5th fixing axle by key;6th gear is mounted in the 5th fixing axle by key;Second belt is wrapped in On three belt pulleys and the 4th belt pulley;Second draw runner is mounted in second sliding slot;Second fixed strip upper end side is mounted on Two draw runners are far from the end face of notch;Fixed block one end is mounted on the 4th maneuvering board far from the end face of notch;4th maneuvering board It is mounted on upper end of fixing block face, and the external tooth opened on the 4th maneuvering board upper surface is engaged with the 6th gear;Second wirerope One end far from the second payingoff mechanism is mounted on upper end of fixing block face;L shape fixed link upper end is mounted on lower end of fixing block face; There is cavity on loading shell;The movement slots of perforation are provided in cavity side;Pouring weight side is mounted on L shape fixed link one end, and again Block and movement slots cooperate;Third gear, first gear, the first belt pulley, the 7th gear, the 4th gear, third belt pulley, the 6th The periphery diameter of gear is all the same;Second belt pulley is identical as the periphery diameter of the 4th belt pulley;Second gear and the 5th The periphery diameter of gear is identical;The periphery diameter of second gear is 2 times of the periphery diameter of third gear;First belt The periphery diameter of wheel is 4 times of the second belt pulley periphery diameter;First maneuvering board, the second maneuvering board, third maneuvering board, The length of four maneuvering boards is all the same;
It is coated with solid lubrication oil between the first sliding groove and the first draw runner, solid-state profit is coated between second sliding slot and the second draw runner Lubricating oil;
First wirerope is identical as the diameter of the second wirerope;
The width dimensions of the notch are more than or equal to the outer diameter of the first wirerope.
3. a kind of safety hanging cradle in building construction building, it is characterised in that: there are many windows for setting on building;Hanging basket Mechanism is mounted on building;
The hanging basket mechanism includes the first wirerope, the first payingoff mechanism, the first fixed plate, the second payingoff mechanism, the second steel wire Rope, T-bar, set casing, the first motor, loading shell, L shape fixed link, C-shaped fixed link, the first maneuvering board, first gear, Two maneuvering boards, second gear, third gear, third maneuvering board, the first fixing axle, the 4th maneuvering board, the 4th gear, the 5th tooth Wheel, is consolidated first motor axis, cavity, movement slots, the first belt, the first belt pulley, third belt pulley, the first belt, the 6th gear Determine block, pouring weight, notch, first rotating shaft hole, T-slot, the second shaft hole, square groove, third shaft hole, the 4th shaft hole, motor shaft Hole, the 7th gear, the second belt pulley, the 4th belt pulley, the second fixing axle, the first fixed strip, third fixing axle, the 4th fix Axis, the 5th fixing axle, the second fixed strip, the first T shape guide groove, first sliding groove, second sliding slot, the 2nd T shape guide groove, the first draw runner, Second draw runner, the first T shape guide block, the 2nd T shape guide block, the 6th fixing axle, wherein the first fixed plate is mounted on building upper window On the side of family side;T-bar upper surface is mounted on the first fixed plate lower end surface;First payingoff mechanism and the second payingoff mechanism It is symmetrical about T-bar, and the first payingoff mechanism and the second payingoff mechanism are installed on the first fixed plate lower end surface;First The first wirerope is extended on payingoff mechanism;The second wirerope is extended on second payingoff mechanism;It is provided with and passes through on set casing side Logical square groove;The T-slot of perforation is provided on set casing upper surface;The notch of perforation is provided on the side of set casing upper surface;Square groove The second shaft hole, the 4th shaft hole, third shaft hole, first rotating shaft hole are provided on end face;Second shaft hole and the 4th shaft hole It is communicated with T-slot, and the second shaft hole and the 4th shaft hole are distributed up and down;First rotating shaft hole is distributed close to notch;Third turns Axis hole and first rotating shaft hole are in diagonal distribution;Motor axis hole, and motor are provided at the set casing end face center opposite with T-slot Axis hole is communicated with square groove;Set casing is slidably installed by T-slot and T-bar;First motor is mounted on set casing end face On, and first motor axis passes through motor axis hole;Third gear is mounted on first motor axis by key;
The first T shape guide groove being not penetrated is provided in second movement plate end face;First that perforation is provided in second movement plate end face is sliding Slot;First T shape guide block one end is mounted on square groove end face, and the first T shape guide block is distributed close to notch side;Second maneuvering board is logical Being slidably installed in set casing of the first T shape guide groove and the first T shape guide block is crossed, and opened on the second maneuvering board lower end surface External tooth is engaged with third gear;The 2nd T shape guide groove being not penetrated is provided in third movement plate end face;It is opened in third movement plate end face There is the second sliding slot of perforation;2nd T shape guide block one end is mounted on square groove end face, and the 2nd T shape guide block is far from notch side point Cloth;Third maneuvering board is slidably installed in set casing by the 2nd T shape guide groove and the 2nd T shape guide block, and third movement The external tooth opened on plate upper surface is engaged with third gear;4th fixing axle one end is mounted in the second shaft hole by bearing, And the 4th fixing axle be located on the upside of the second maneuvering board;Second gear is mounted in the 4th fixing axle by key, and second gear with The engagement of third gear;First gear is mounted in the 4th fixing axle by key;Third fixing axle one end is mounted on square groove end face; First belt pulley is mounted in third fixing axle by bearing, and the external tooth and first opened on the first pulley side periphery Gear engagement;Second fixing axle one end is mounted in first rotating shaft hole by bearing;Second belt pulley is mounted on second by key In fixing axle;First belt is wrapped on the first belt pulley and the second belt pulley;7th gear is mounted on second by key and fixes On axis;First draw runner is mounted in first sliding groove;First fixed strip lower end side is mounted on the first draw runner end face, and first is solid Determine item to be distributed close to notch;First maneuvering board side is mounted on the first fixed strip side, and institute on the first maneuvering board lower end surface The external tooth opened is engaged with the 7th gear;First wirerope passes through notch far from one end of the first payingoff mechanism and is mounted on the first movement On plate upper surface;Two C-shaped fixed links are symmetrical about the first draw runner, and two C-shaped fixed link upper ends are installed in first Maneuvering board is on the side of notch;
First fixing axle one end is mounted in the 4th shaft hole by bearing;5th gear is mounted on the first fixing axle by key On, and the 5th gear is engaged with third gear;4th gear is mounted in the first fixing axle by key;6th fixing axle one end peace On square groove end face;Third belt pulley is mounted in the 6th fixing axle by bearing, and side periphery on third belt pulley On the external tooth opened engaged with the 4th gear;5th fixing axle one end is mounted in third shaft hole by bearing;4th belt Wheel is mounted in the 5th fixing axle by key;6th gear is mounted in the 5th fixing axle by key;Second belt is wrapped in On three belt pulleys and the 4th belt pulley;Second draw runner is mounted in second sliding slot;Second fixed strip upper end side is mounted on Two draw runners are far from the end face of notch;Fixed block one end is mounted on the 4th maneuvering board far from the end face of notch;4th maneuvering board It is mounted on upper end of fixing block face, and the external tooth opened on the 4th maneuvering board upper surface is engaged with the 6th gear;Second wirerope One end far from the second payingoff mechanism is mounted on upper end of fixing block face;L shape fixed link upper end is mounted on lower end of fixing block face; There is cavity on loading shell;The movement slots of perforation are provided in cavity side;Pouring weight side is mounted on L shape fixed link one end, and again Block and movement slots cooperate;Third gear, first gear, the first belt pulley, the 7th gear, the 4th gear, third belt pulley, the 6th The periphery diameter of gear is all the same;Second belt pulley is identical as the periphery diameter of the 4th belt pulley;Second gear and the 5th The periphery diameter of gear is identical;The periphery diameter of second gear is 2 times of the periphery diameter of third gear;First belt The periphery diameter of wheel is 4 times of the second belt pulley periphery diameter;First maneuvering board, the second maneuvering board, third maneuvering board, The length of four maneuvering boards is all the same;
It is coated with solid lubrication oil between the first sliding groove and the first draw runner, solid-state profit is coated between second sliding slot and the second draw runner Lubricating oil;
First wirerope is identical as the diameter of the second wirerope;
First maneuvering board, the second maneuvering board, third maneuvering board, the thickness of the 4th plectane are all the same;First maneuvering board, Second maneuvering board, third maneuvering board, the 4th maneuvering board length dimension be equal to set casing length dimension.
CN201910296382.XA 2018-01-26 2018-01-26 A kind of safety hanging cradle in building construction building Withdrawn CN109989569A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910296382.XA CN109989569A (en) 2018-01-26 2018-01-26 A kind of safety hanging cradle in building construction building

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910296382.XA CN109989569A (en) 2018-01-26 2018-01-26 A kind of safety hanging cradle in building construction building
CN201810076192.2A CN108179869B (en) 2018-01-26 2018-01-26 A kind of building construction safety hanging cradle

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201810076192.2A Division CN108179869B (en) 2018-01-26 2018-01-26 A kind of building construction safety hanging cradle

Publications (1)

Publication Number Publication Date
CN109989569A true CN109989569A (en) 2019-07-09

Family

ID=62551470

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810076192.2A Expired - Fee Related CN108179869B (en) 2018-01-26 2018-01-26 A kind of building construction safety hanging cradle
CN201910296382.XA Withdrawn CN109989569A (en) 2018-01-26 2018-01-26 A kind of safety hanging cradle in building construction building
CN201880018274.XA Active CN110462148B (en) 2018-01-26 2018-03-05 Safety hanging basket for high-rise construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810076192.2A Expired - Fee Related CN108179869B (en) 2018-01-26 2018-01-26 A kind of building construction safety hanging cradle

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201880018274.XA Active CN110462148B (en) 2018-01-26 2018-03-05 Safety hanging basket for high-rise construction

Country Status (2)

Country Link
CN (3) CN108179869B (en)
WO (1) WO2019144468A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107179A (en) * 2021-04-23 2021-07-13 湖南汉坤实业有限公司 Hanging basket clamping device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478664B (en) * 2022-09-15 2024-06-14 中建八局第一建设有限公司 Building wall construction robot

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3854550A (en) * 1972-12-21 1974-12-17 Cyclops Corp Mobile outrigger for scaffolds
JP4067096B2 (en) * 2003-03-14 2008-03-26 工研ゴンドラ株式会社 Electric balance arm device for outdoor wall work
CN200974728Y (en) * 2006-04-06 2007-11-14 韩其顺 One-machine-multiple-rope foursquare suspension swaying-free nacelle synchronous hoisting mechanism
CN201635378U (en) * 2010-02-05 2010-11-17 南通市达欣工程股份有限公司 Special falling protector for single-sheet attached lifting scaffold
CN102704664B (en) * 2012-05-30 2015-04-01 深圳市特辰科技股份有限公司 Self-lifting quick transferring platform
CN102877639A (en) * 2012-09-13 2013-01-16 芜湖三六机械有限公司 Novel falling protector
CN105999570B (en) * 2016-05-20 2019-01-08 山东中恒建设集团有限公司 A kind of aerial fire-fighting and rescue apparatus of skyscraper
CN105926921A (en) * 2016-06-17 2016-09-07 佛山市联智新创科技有限公司 Automatic-positioning building handing basket device
CN109775517A (en) * 2018-01-26 2019-05-21 蔡洪祥 A kind of the telescopic of motor control hides high building hanging basket
CN108275543B (en) * 2018-01-26 2019-06-07 秭归县开明建筑有限责任公司 A kind of high building hanging basket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107179A (en) * 2021-04-23 2021-07-13 湖南汉坤实业有限公司 Hanging basket clamping device
CN113107179B (en) * 2021-04-23 2022-05-27 湖南汉坤实业有限公司 Hanging basket clamping device

Also Published As

Publication number Publication date
CN110462148B (en) 2021-07-02
CN108179869A (en) 2018-06-19
WO2019144468A1 (en) 2019-08-01
CN110462148A (en) 2019-11-15
CN108179869B (en) 2019-11-22

Similar Documents

Publication Publication Date Title
WO2016015450A1 (en) 2d suspended platform
CN108179869B (en) A kind of building construction safety hanging cradle
CN101099026A (en) Oil pumping workover rig
CN108560897B (en) A kind of telescopic based on motor control can avoiding barrier high building hanging basket
CN107285159B (en) A kind of safe anti-falling formula elevator
CN108275542B (en) A kind of telescopic based on motor control hides high building hanging basket
CN211341865U (en) High altitude construction anti-falling device for housing construction engineering
CN205892678U (en) Multilayer construction lift platform
CN108275543B (en) A kind of high building hanging basket
CN109969940B (en) Special crane with fully-removable driving device
CN204873577U (en) River course is bridge crane for pier
CN205204567U (en) No counter weight elevator and lift driving motor , drive unit and actuating system thereof
CN211283631U (en) Building construction platform
CN104444731B (en) Variable travel elevator
CN117684519B (en) Gate hoist for flood control engineering
CN207108183U (en) A kind of elevator overcoat pulley leading truck jacking system
CN208829057U (en) A kind of elevator cable safety protection lock
RU75380U1 (en) DEVICE FOR INSPECTION AND REPAIR OF WATER DRAIN AND WEIR DRAIN ELEMENTS
CN219044780U (en) Escape descent control and fire protection transportation system
CN104563805A (en) Winding displacement lifting type fireproof roller shutter
CN210176288U (en) Well hoisting frame structure
CN207551665U (en) A kind of elevator lifting device
CN215558543U (en) Stable tower crane
CN220951025U (en) Novel transmission device for elevator
CN220011874U (en) Outer wall protection device for hoisting building outer wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190709