CN109972659A - The novel municipal administration of one kind checks well construction and construction method - Google Patents

The novel municipal administration of one kind checks well construction and construction method Download PDF

Info

Publication number
CN109972659A
CN109972659A CN201910280271.XA CN201910280271A CN109972659A CN 109972659 A CN109972659 A CN 109972659A CN 201910280271 A CN201910280271 A CN 201910280271A CN 109972659 A CN109972659 A CN 109972659A
Authority
CN
China
Prior art keywords
construction
pit shaft
roadbase
holding force
walling crib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910280271.XA
Other languages
Chinese (zh)
Other versions
CN109972659B (en
Inventor
王换玲
张道源
程家栋
吕全苗
许茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201910280271.XA priority Critical patent/CN109972659B/en
Publication of CN109972659A publication Critical patent/CN109972659A/en
Application granted granted Critical
Publication of CN109972659B publication Critical patent/CN109972659B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention belongs to municipal works technical fields, and in particular to check well construction and construction method to a kind of novel municipal administration, be made of prefabricated pit shaft, well lid, base's enhancement layer, holding force walling crib, colored steel fiber reinforced concrete etc.;Base's enhancement layer is located at prefabricated pit shaft surrounding, while being located at roadbase bottom;Holding force walling crib is embedded in roadbase, and well lid is fixed in holding force walling crib, and colored steel fiber reinforced concrete is set to around well lid, color and road surface solid colour.The present invention improves inspection shaft ambient intensity, improves the construction efficiency, quality and durability of inspection shaft, realizes the accuracy of walling crib mounting height, realizes the unification of well lid ambient color Yu pavement structure color.

Description

The novel municipal administration of one kind checks well construction and construction method
Technical field
The invention belongs to municipal works technical fields, and in particular to check well construction and construction party to a kind of novel municipal administration Method.
Background technique
Important component of the urban road inspection shaft as municipal pipeline engineering, while being also the control of municipal works quality Difficult point and emphasis.Urban road inspection shaft under the repeated action of vehicular load, road surface can all occur in various degree with inspection The relevant destruction of well, such as the sinking of inspection shaft well lid, locally there is cracking, breakage etc., needs often to repair in well periphery bitumen layer, It wastes man power and money, waste of manpower influences urban transportation order.
For traditional municipal inspection shaft construction technology, application number 201710846639.5, a kind of entitled " town road Heavy well cover walling crib ruggedized construction and its construction method " Chinese patent disclose a kind of inspection of walling crib prefabricated at the top of pit shaft Well reinforcement process, this method pit shaft are traditional brickwork construction, and the durability of pit shaft is poor;The pedestal foot and coagulation of prefabricated walling crib The contact surface of soil is inclined-plane, and relative displacement easily occurs for the two, while can drawing crack concrete generation crack;Pit shaft week within the scope of roadbed Side is backfilled using graded sand and stone, and the plate body of graded sand and stone is not so good as cement stabilized granular;In addition, low density polyethylene (LDPE) cystosepiment category In flexible structure, road surface checks that well construction can generate vertical strain after receiving vehicular load, and asphalt surface course can generate over time Fatigue rupture generates crack in turn, influences structure durability;Application number 201720144293.X, a kind of entitled " reinforcement type inspection Cha Jing " Chinese patent disclose it is a kind of pit shaft periphery pour plain concrete reinforce inspection shaft technique, this method element coagulation Soil is primary concreting, influences often paving for base.In addition, plain concrete bottom is located on dirt road base, for a long time by vehicle The defects of will appear part sedimentation after the impact of load, and then generating pavement destruction.
Summary of the invention
The present invention to solve the deficiencies in the prior art, provides the novel municipal administration of one kind and checks well construction and construction method.
The present invention is achieved by the following technical solutions:
A kind of novel municipal administration checks well construction, including the prefabricated pit shaft of several sections, between the prefabricated pit shaft by step structure according to Secondary assembly;Prefabricated pit shaft is surrounded by base's enhancement layer, and base's enhancement layer is located at below roadbase, prefabricated pit shaft top installation There is prefabricated holding force walling crib, holding force walling crib is connected with well lid upwardly through expansion bolt;The holding force walling crib is divided into convex portion And flared portions, holding force walling crib flared portions upper surface are flushed with roadbase top mark height;The outside roadbase of prefabricated pit shaft Top is affixed with TGXG, TGXG paving to the bottom of holding force walling crib convex portion, TGXG top Paving roadways Surface layer paves chromatic colour steel fiber reinforced concrete in well lid surrounding, the mark of the upper surface of colored steel fiber reinforced concrete and road deck layer High consistent with color, the distance that colored steel fiber reinforced concrete paves outward is less than the outside distance of holding force walling crib.
Preferably, the prefabricated pit shaft is formed by concrete prefabricated.
Preferably, the prefabricated well barrel thickness is 25cm, is formed using label not less than C25 concrete for making.Further , base's enhancement layer outer diameter is 0.8-2.0m bigger than the outer diameter of prefabricated pit shaft.
Preferably, the TGXG is the double drawing plastic grills of polypropylene.
Preferably, the holding force walling crib is reinforced concrete structure, outer diameter 2.2-3.2m.
Preferably, the expansion bolt is M20 expansion bolt.
Preferably, the colored steel fiber reinforced concrete label is not less than C30.
A kind of novel municipal inspection shaft structure construction engineering method of the invention, includes the following steps:
(1) production of prefabricated pit shaft and holding force walling crib;Prefabricated pit shaft is made, prefabricated pit shaft is divided into several sections, passes through between every section Step structure is successively assembled;Prefabricated holding force walling crib, prefabricated holding force walling crib are reinforced concrete structure, are divided into convex portion and outer Expand part, the top mark height of convex portion upper surface height and road deck cutting optimal maintains an equal level, the upper surface height of flared portions with The top mark height of roadbase maintains an equal level, and expansion bolt is reserved in the convex portion of holding force walling crib.
(2) prefabricated pit shaft is first installed in inspection shaft to flushing with the top mark height of roadbed, inspection shaft well head is faced using steel plate When cover, carry out the roller compaction construction of roadbed, then to the roadbed on prefabricated pit shaft periphery carry out it is anti-downwards dig, it is anti-dig after returned It fills out, the materials of backfill are as the materials of roadbase.
(3) after the completion of the construction of base's enhancement layer, the steel plate temporarily covered is removed, peace is then continued up in inspection shaft Prefabricated pit shaft is filled, the prefabricated pit shaft of installation is flushed with the underlayment top mark height of roadbase, temporarily covers well head using steel plate, so Laggard trade base course underlayment paves, rolls, and completes the construction of roadbase underlayment;The steel plate temporarily covered is removed, Continue that prefabricated pit shaft is installed then up, so that prefabricated pit shaft and roadbase are gone to a grassroots level, top mark height is flushed, interim using steel plate Well head is covered, what then progress roadbase was gone to a grassroots level paves, rolls, and completes the construction of going to a grassroots level of roadbase;Roadbase It goes to a grassroots level after construction, carries out paving, rolling for base on roadbase, complete the construction of the upper base of roadbase, until The construction of this roadbase is completed.
(4) base on the roadbase on inspection shaft periphery is abolished, takes out steel plate, holding force walling crib, paving soil are installed Work grid, TGXG are spread to the convex portion bottom of holding force walling crib, and then Paving roadways surface layer, installs well lid, pass through expansion Well lid and holding force walling crib are fixed together by bolt.
(5) finally the road deck in well lid peripheral extent is abolished, pours colored steel fiber reinforced concrete, it is colored The solid colour of steel fiber reinforced concrete and road deck upper layer.
Preferably, in the step (4), well lid install when expansion bolt position in such a way that billet is set into Row adjusts installed height mark.
The invention has the benefit that
One, base's enhancement layer is set in roadbase bottom, prefabricated pit shaft surrounding, improves inspection shaft ambient intensity and inspection shaft Bearing capacity and durability.
Two, the intensity that the setting of prefabricated pit shaft can be improved construction efficiency and quality, while pit shaft can be improved itself.
Three, the setting of holding force walling crib can expand the holding force area of inspection shaft, have and improve structural bearing capacity and durability Effect.
Four, the setting of colored steel fiber reinforced concrete, realizes the unification of well lid ambient color Yu pavement structure color, perception Property is preferable.
Five, the setting of TGXG improves well lid peripheral structure globality, prevents reflection crack.
Six, the setting of billet is played the role of being finely adjusted well lid installed height mark, it is ensured that installed height mark it is accurate Property.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of the prefabricated pit shaft of the present invention.
In figure, 1 prefabricated pit shaft, 2 base's enhancement layers, 3 roadbeds, 4 roadbases, 5 road decks, 6 convex portions, 7 holding forces Walling crib, 8 colored steel fiber reinforced concretes, 9 well lids, 10 expansion bolts, 11 TGXG.
Specific embodiment
Specific embodiments of the present invention are given below, it should be noted that the invention is not limited to implement in detail below Example, all equivalent transformations made on the basis of the technical solutions of the present application each fall within protection scope of the present invention.
Novel municipal administration of the invention checks well construction, including the prefabricated pit shaft 1 of several sections, between made prefabricated pit shaft 1 It is successively assembled by step structure.Prefabricated pit shaft 1 is surrounded by base's enhancement layer 2, and base's enhancement layer 2 is located under roadbase 4 Side.Prefabricated 1 top of pit shaft is equipped with prefabricated holding force walling crib 7, and holding force walling crib 7 is connected with well lid 9 upwardly through expansion bolt 10. The holding force walling crib 7 is divided for convex portion 6 and flared portions, and 7 flared portions upper surface of holding force walling crib and 4 top mark of roadbase are high It flushes.TGXG 11 is affixed with above the outside roadbase 4 of prefabricated pit shaft 1,11 paving of TGXG is convex to holding force walling crib 7 The bottom of part 6 is played, 11 top Paving roadways surface layer 5 of TGXG paves chromatic colour steel fiber reinforced concrete 8 in 9 surrounding of well lid, The absolute altitude and color of the upper surface of colored steel fiber reinforced concrete 8 and road deck 5 layer are consistent, and colored steel fiber reinforced concrete 8 is outward The distance to pave is less than the outside distance of holding force walling crib 7.
The invention also includes the construction methods of above-mentioned inspection well construction, (include with thick 4% cement treated material of the 48cm that constructs below Underlayment is gone to a grassroots level, upper base), for internal diameter 700mm inspection shaft, illustrate that the present invention checks the concrete construction method of well construction, Include the following steps:
(1) production of prefabricated pit shaft 1 and holding force walling crib 7;Prefabricated pit shaft 1, the prefabricated pit shaft of the present embodiment are made in precasting yard first 1, with a thickness of 25cm, is formed using C25 concrete for making, and prefabricated pit shaft 1 divides for several sections, between every section by step structure according to Secondary assembly, step structure is as shown in Fig. 2, and prefabricated pit shaft 1 is connected together by mutual corresponding step structure.Prefabricated pit shaft The intensity that 1 setting can be improved inspection shaft construction efficiency and quality, while inspection shaft can be improved itself.Holding force walling crib 7 is reinforcing bar Concrete prefabricated, the outer diameter of prefabricated holding force walling crib 7 is 2.2m, and internal diameter is consistent with prefabricated 1 internal diameter of pit shaft, and internal diameter 0.7m is held Power walling crib 7 is divided for convex portion 6 and flared portions, and 6 upper surface height of convex portion and the top mark height of 5 cutting optimal of road deck are held Flat, the upper surface height of flared portions and the top mark height of roadbase 4 maintain an equal level.M20 is reserved in the convex portion 6 of holding force walling crib 7 Expansion bolt 10,10 numbers of expansion bolt are 4, and 10 buried depth of expansion bolt is not less than 140mm.
(2) it is flushed firstly, first installing prefabricated pit shaft 1 to the top mark height with roadbed 3 in inspection shaft, well head uses steel plate Interim covering, then carries out the roller compaction construction of roadbed 3, carries out anti-downwards dig to the roadbed 3 within the scope of the outside 1m of prefabricated pit shaft 1 40cm is backfilled after anti-digging, and for the materials of backfill as the materials of roadbase 4, the present embodiment preferably uses 4% cement Stabilization gravel is backfilling and compacted, two layers of progress of backfill point.It is provided with base's enhancement layer 2 in this way around inspection shaft, effectively mentions Intensity, bearing capacity and durability around high inspection shaft.
(3) after the completion of base's enhancement layer 2 is constructed, the steel plate temporarily covered is removed, peace is then continued up in inspection shaft Prefabricated pit shaft 1 is filled, the prefabricated pit shaft 1 of installation is flushed with the underlayment top mark height of roadbase 4, temporarily covers well using steel plate Mouthful, paving, rolling for 4 underlayment of roadbase is then carried out, the construction of the underlayment of roadbase 4 is completed;4 bottom of roadbase After the completion of base layer construction, the steel plate temporarily covered is removed, then continues up the prefabricated pit shaft 1 of installation, so that prefabricated pit shaft 1 and road The top mark height of going to a grassroots level of base 4 flushes, and temporarily covers well head using steel plate, and what then progress roadbase 4 was gone to a grassroots level paves, grinds Pressure completes the construction of roadbase 4 gone to a grassroots level;Roadbase 4 is gone to a grassroots level after construction, is then carried out on roadbase 4 Base paves, and is rolled after paving, and completes the construction of the upper base of roadbase 4, so far the construction of roadbase 4 is complete At.
(4) base on the roadbase 4 within the scope of the 50cm of inspection shaft periphery is abolished, abolishes with a thickness of 16cm, takes The steel plate temporarily covered out, then installs holding force walling crib 7, paving TGXG 11, and TGXG 11 spreads convex to holding force walling crib 7 6 bottom of part, i.e. 6 not paving TGXG 11 of convex portion are played, TGXG 11 draws plastic grill using polypropylene is double.Geotechnique Grid 11 has the effect of raising 9 peripheral structure globality of well lid, prevents reflection crack.Then Paving roadways surface layer 5, peace Well lid 9 is filled, well lid 9 and holding force walling crib 7 are fixed together by expansion bolt 10.Well lid 9 can be in expansion bolt 10 when installing Installed height mark is adjusted by way of billet is arranged in position, plays the role of being finely adjusted 9 installed height mark of well lid, really Protect the accuracy of installed height mark.
(5) after above-mentioned steps, the road deck 5 within the scope of 9 periphery 50cm of well lid is abolished, it is fine to pour colored steel Tie up concrete eight, it is preferable that colored 8 label of steel fiber reinforced concrete is not less than C30, on colored steel fiber reinforced concrete 8 and road deck 5 The solid colour of surface layer.The setting of colored steel fiber reinforced concrete 8 realizes 9 ambient color of well lid and pavement structure solid colour, Perception is preferable.
Embodiment described above, only one kind of the present invention more preferably specific embodiment, those skilled in the art The usual variations and alternatives that member carries out within the scope of technical solution of the present invention should be all included within the scope of the present invention.

Claims (10)

1. a kind of novel municipal administration checks well construction, including the prefabricated pit shaft of several sections (1), it is characterised in that: the prefabricated pit shaft (1) Between by step structure it is successively assembled;Prefabricated pit shaft (1) is surrounded by base's enhancement layer (2), and base's enhancement layer (2) is located at road Below base course (4), prefabricated pit shaft (1) top is equipped with prefabricated holding force walling crib (7), and holding force walling crib (7) is upwardly through expansion Bolt (10) is connected with well lid (9);The holding force walling crib (7) is divided into convex portion (6) and flared portions, and holding force walling crib (7) is outside Expand part upper surface to flush with roadbase (4) top mark height;Soil is affixed with above the outside roadbase (4) of prefabricated pit shaft (1) Work grid (11), TGXG (11) paving to the bottom of holding force walling crib (7) convex portion (6), TGXG (11) top booth Causeway supercrust (5) paves chromatic colour steel fiber reinforced concrete (8) in well lid (9) surrounding, colored steel fiber reinforced concrete (8) and road The absolute altitude of the upper surface of supercrust (5) layer is consistent with color, and the distance that colored steel fiber reinforced concrete (8) paves outward is less than holding force The outside distance of walling crib (7).
2. novel municipal administration according to claim 1 checks well construction, it is characterised in that: the prefabricated pit shaft (1) is by coagulation Soil is prefabricated to be formed.
3. it is according to claim 2 it is novel municipal administration check well construction, it is characterised in that: the prefabricated pit shaft (1) with a thickness of 25cm is formed using label not less than C25 concrete for making.
4. novel municipal administration according to claim 1 checks well construction, it is characterised in that: base's enhancement layer (2) outer diameter Outer diameter than prefabricated pit shaft (1) is 0.8-2.0m big.
5. novel municipal administration according to claim 1 checks well construction, it is characterised in that: the TGXG (11) is poly- third Alkene is double to draw plastic grill.
6. novel municipal administration according to claim 1 checks well construction, it is characterised in that: the holding force walling crib (7) is reinforcing bar Concrete structure, outer diameter 2.2-3.2m.
7. novel municipal administration according to claim 1 checks well construction, it is characterised in that: the expansion bolt (10) is M20 Expansion bolt.
8. novel municipal administration according to claim 1 checks well construction, it is characterised in that: the colour steel fiber reinforced concrete (8) label is not less than C30.
9. a kind of novel municipal inspection shaft structure construction engineering method, characterized by the following steps:
(1) production of prefabricated pit shaft (1) and holding force walling crib (7);It making prefabricated pit shaft (1), prefabricated pit shaft (1) is divided into several sections, It is successively assembled by step structure between every section;Prefabricated holding force walling crib (7), prefabricated holding force walling crib (7) are divided into convex portion (6) And flared portions, the top mark height of convex portion (6) upper surface height and road deck (5) cutting optimal maintain an equal level, flared portions it is upper Face height and the top mark height of roadbase (4) maintain an equal level, and reserve expansion bolt (10) in the convex portion (6) of holding force walling crib (7);
(2) prefabricated pit shaft (1) is first installed in inspection shaft to flushing with the top mark height of roadbed (3), inspection shaft well head uses steel plate Interim covering, carries out the roller compaction construction of roadbed (3), then anti-downwards to roadbed (3) progress on prefabricated pit shaft (1) periphery to dig, instead It is backfilled after digging, the materials of backfill are as the materials of roadbase (4);
(3) after the completion of base's enhancement layer (2) construction, the steel plate temporarily covered is removed, installation is then continued up in inspection shaft Prefabricated pit shaft (1), the prefabricated pit shaft (1) of installation are flushed with the underlayment top mark height of roadbase (4), are temporarily covered using steel plate Then well head carries out paving, rolling for roadbase (4) underlayment, complete the construction of roadbase (4) underlayment;Removal is faced When the steel plate that covers, continue that prefabricated pit shaft (1) is installed then up, the top so that prefabricated pit shaft (1) and roadbase (4) are gone to a grassroots level Absolute altitude flushes, and temporarily covers well head using steel plate, and what then progress roadbase (4) was gone to a grassroots level paves, rolls, and completes Road Base The construction of layer (4) gone to a grassroots level;Roadbase (4) is gone to a grassroots level after construction, carry out the paving of base on roadbase (4), It rolls, completes the construction of the upper base of roadbase (4), so far the construction of roadbase (4) is completed;
(4) base on the roadbase (4) on inspection shaft periphery is abolished, takes out steel plate, installed holding force walling crib (7), paving TGXG (11), TGXG (11) are spread to convex portion (6) bottom of holding force walling crib (7), then Paving roadways surface layer (5), well lid (9) are installed, well lid (9) and holding force walling crib (7) is fixed together by expansion bolt (10);
(5) finally the road deck (5) in well lid (9) peripheral extent is abolished, pours colored steel fiber reinforced concrete (8), The solid colour of colored steel fiber reinforced concrete (8) and road deck (5) upper layer.
10. novel municipal inspection shaft structure construction engineering method according to claim 9, it is characterised in that: the step (4) In, installed height mark is adjusted in such a way that billet is set in expansion bolt (10) position when well lid (9) is installed.
CN201910280271.XA 2019-04-09 2019-04-09 Novel municipal inspection well structure and construction method Active CN109972659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910280271.XA CN109972659B (en) 2019-04-09 2019-04-09 Novel municipal inspection well structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910280271.XA CN109972659B (en) 2019-04-09 2019-04-09 Novel municipal inspection well structure and construction method

Publications (2)

Publication Number Publication Date
CN109972659A true CN109972659A (en) 2019-07-05
CN109972659B CN109972659B (en) 2024-05-03

Family

ID=67083647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910280271.XA Active CN109972659B (en) 2019-04-09 2019-04-09 Novel municipal inspection well structure and construction method

Country Status (1)

Country Link
CN (1) CN109972659B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685203A (en) * 2019-09-19 2020-01-14 杭州南岳建设工程有限公司 Method for ensuring compactness of periphery of gully of inspection well
CN110939157A (en) * 2019-12-06 2020-03-31 安徽建川市政工程有限公司 Construction, installation and acceptance inspection method for assembly type inspection well
CN111648408A (en) * 2020-06-05 2020-09-11 中铁六局集团有限公司 Inspection well lifting construction method
CN111827358A (en) * 2020-07-27 2020-10-27 福建兴港建工有限公司 Protective structure of water collecting well and construction method thereof
CN112227502A (en) * 2020-10-28 2021-01-15 中建七局安装工程有限公司 Drainage inspection well construction method
CN112411725A (en) * 2020-11-08 2021-02-26 王寒啸 Integrated high-efficiency assembled prefabricated pump station mechanism
CN112627237A (en) * 2020-11-20 2021-04-09 中国市政工程中南设计研究总院有限公司 Manhole or valve well cover heightening device convenient for pavement upgrading and reconstruction and construction method
CN114635451A (en) * 2022-03-30 2022-06-17 中国五冶集团有限公司 Assembled composite sheet hydraulic pressure lift inspection shaft platform
CN114809238A (en) * 2022-04-27 2022-07-29 扬州市建筑设计研究院有限公司 Municipal road inspection well and construction method thereof
CN114855878A (en) * 2022-06-15 2022-08-05 中建二局第二建筑工程有限公司 Sewage disposal well and construction method thereof
CN115976906A (en) * 2022-12-13 2023-04-18 南京智鹤电子科技有限公司 Anti-settlement manhole cover construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006009881A (en) * 2004-06-24 2006-01-12 Mitsui Kagaku Sanshi Kk Burying method for tubular body
CN202047332U (en) * 2011-04-21 2011-11-23 江苏中设工程咨询集团有限公司 Reinforcing structure of pavement around inspection well
CN104088298A (en) * 2014-07-03 2014-10-08 河海大学 Municipal road prefabricated concrete inspection well and construction method thereof
CN204418215U (en) * 2014-12-15 2015-06-24 青岛城建集团有限公司 Prefabricated assembled manhole
CN106759792A (en) * 2016-12-02 2017-05-31 安徽省公路桥梁工程有限公司 A kind of inspection shaft construction technique
CN108560684A (en) * 2018-04-30 2018-09-21 安徽省公路桥梁工程有限公司 Heavy Traffic road inspection well walling crib and its construction method
CN210002442U (en) * 2019-04-09 2020-01-31 济南城建集团有限公司 novel municipal administration inspection shaft structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006009881A (en) * 2004-06-24 2006-01-12 Mitsui Kagaku Sanshi Kk Burying method for tubular body
CN202047332U (en) * 2011-04-21 2011-11-23 江苏中设工程咨询集团有限公司 Reinforcing structure of pavement around inspection well
CN104088298A (en) * 2014-07-03 2014-10-08 河海大学 Municipal road prefabricated concrete inspection well and construction method thereof
CN204418215U (en) * 2014-12-15 2015-06-24 青岛城建集团有限公司 Prefabricated assembled manhole
CN106759792A (en) * 2016-12-02 2017-05-31 安徽省公路桥梁工程有限公司 A kind of inspection shaft construction technique
CN108560684A (en) * 2018-04-30 2018-09-21 安徽省公路桥梁工程有限公司 Heavy Traffic road inspection well walling crib and its construction method
CN210002442U (en) * 2019-04-09 2020-01-31 济南城建集团有限公司 novel municipal administration inspection shaft structure

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685203A (en) * 2019-09-19 2020-01-14 杭州南岳建设工程有限公司 Method for ensuring compactness of periphery of gully of inspection well
CN110939157A (en) * 2019-12-06 2020-03-31 安徽建川市政工程有限公司 Construction, installation and acceptance inspection method for assembly type inspection well
CN111648408A (en) * 2020-06-05 2020-09-11 中铁六局集团有限公司 Inspection well lifting construction method
CN111827358B (en) * 2020-07-27 2021-08-31 福建兴港建工有限公司 Protective structure of water collecting well and construction method thereof
CN111827358A (en) * 2020-07-27 2020-10-27 福建兴港建工有限公司 Protective structure of water collecting well and construction method thereof
CN112227502A (en) * 2020-10-28 2021-01-15 中建七局安装工程有限公司 Drainage inspection well construction method
CN112411725A (en) * 2020-11-08 2021-02-26 王寒啸 Integrated high-efficiency assembled prefabricated pump station mechanism
CN112627237A (en) * 2020-11-20 2021-04-09 中国市政工程中南设计研究总院有限公司 Manhole or valve well cover heightening device convenient for pavement upgrading and reconstruction and construction method
CN114635451A (en) * 2022-03-30 2022-06-17 中国五冶集团有限公司 Assembled composite sheet hydraulic pressure lift inspection shaft platform
CN114809238A (en) * 2022-04-27 2022-07-29 扬州市建筑设计研究院有限公司 Municipal road inspection well and construction method thereof
CN114855878A (en) * 2022-06-15 2022-08-05 中建二局第二建筑工程有限公司 Sewage disposal well and construction method thereof
CN115976906A (en) * 2022-12-13 2023-04-18 南京智鹤电子科技有限公司 Anti-settlement manhole cover construction method
CN115976906B (en) * 2022-12-13 2024-05-28 南京智鹤电子科技有限公司 Construction method of anti-sedimentation road well lid

Also Published As

Publication number Publication date
CN109972659B (en) 2024-05-03

Similar Documents

Publication Publication Date Title
CN109972659A (en) The novel municipal administration of one kind checks well construction and construction method
Hoppe Guidelines for the use, design, and construction of bridge approach slabs
CN101368383B (en) Method for treating soft soil roadbed by artificial composite crust layer
CN102644295A (en) Construction method for preventing peripheral and local sedimentation of road surface inspection well
CN107460890B (en) A kind of city bituminous concrete pavement inspection shaft construction method
CN103741595B (en) A kind of bridgehead structures for administering bumping at bridge-head
CN106567410A (en) New construction method of municipal road inspection well
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN110080051B (en) Geotextile bag bridge type embankment structure and construction method thereof
CN105421571A (en) Sewer well and rainwater well construction process
CN112695582A (en) Assembly type construction and repair structure of highway pavement and rapid construction method thereof
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN110670436B (en) Structure for preventing urban road subgrade from being unevenly settled and construction method thereof
CN104452510A (en) Immediate construction method of rural road
CN110144784A (en) The town road and its construction method constructed based on prestressed concrete plate stake
CN201411713Y (en) Manhole of various kinds of pipe networks for urban roads having hole mouth reinforcing mechanism
CN210002442U (en) novel municipal administration inspection shaft structure
CN203808105U (en) Prefabricated member-combined circular mouth inspection well
CN210529400U (en) Solidified building residue soil road structure
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN107558324A (en) The Steel Fibre Concrete Pavement and its construction technology of a kind of tramcar and road usual friendship mouth
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN115030224A (en) Municipal road inspection well and construction method thereof
CN211815447U (en) Maintenance structure that sinks is damaged to road surface of crossing pipeline department bituminous paving

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant