CN109958059A - 一种隧道跨越溶洞大跨度贝雷梁施工装置 - Google Patents
一种隧道跨越溶洞大跨度贝雷梁施工装置 Download PDFInfo
- Publication number
- CN109958059A CN109958059A CN201910271504.XA CN201910271504A CN109958059A CN 109958059 A CN109958059 A CN 109958059A CN 201910271504 A CN201910271504 A CN 201910271504A CN 109958059 A CN109958059 A CN 109958059A
- Authority
- CN
- China
- Prior art keywords
- bailey beam
- solution cavity
- bracket
- crossed
- large span
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 241001669679 Eleotris Species 0.000 claims description 8
- 235000015170 shellfish Nutrition 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000000916 dilatatory effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910271504.XA CN109958059A (zh) | 2019-04-04 | 2019-04-04 | 一种隧道跨越溶洞大跨度贝雷梁施工装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910271504.XA CN109958059A (zh) | 2019-04-04 | 2019-04-04 | 一种隧道跨越溶洞大跨度贝雷梁施工装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109958059A true CN109958059A (zh) | 2019-07-02 |
Family
ID=67025757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910271504.XA Pending CN109958059A (zh) | 2019-04-04 | 2019-04-04 | 一种隧道跨越溶洞大跨度贝雷梁施工装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109958059A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110745161A (zh) * | 2019-11-05 | 2020-02-04 | 重庆华渝重工机电有限公司 | 一种整体转辙式单轨道岔驱动方法 |
CN113216021A (zh) * | 2021-06-02 | 2021-08-06 | 中国建筑第八工程局有限公司 | 既有混凝土桥梁的板梁快速无损更换方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0356561A1 (de) * | 1988-09-01 | 1990-03-07 | MAN Gutehoffnungshütte Aktiengesellschaft | Handbaubare Grabenbrücke und Verfahren zur Aufstellung derselben |
CN104481552A (zh) * | 2014-10-29 | 2015-04-01 | 中铁三局集团有限公司 | 特大溶洞洞顶落石防护施工方法 |
CN106592962A (zh) * | 2016-12-24 | 2017-04-26 | 中铁十八局集团有限公司 | 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备 |
CN108797347A (zh) * | 2018-07-20 | 2018-11-13 | 中交武汉港湾工程设计研究院有限公司 | 循环牵引入锚系统 |
CN210013127U (zh) * | 2019-04-04 | 2020-02-04 | 中交一公局第四工程有限公司 | 一种隧道跨越溶洞大跨度贝雷梁施工装置 |
-
2019
- 2019-04-04 CN CN201910271504.XA patent/CN109958059A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0356561A1 (de) * | 1988-09-01 | 1990-03-07 | MAN Gutehoffnungshütte Aktiengesellschaft | Handbaubare Grabenbrücke und Verfahren zur Aufstellung derselben |
CN104481552A (zh) * | 2014-10-29 | 2015-04-01 | 中铁三局集团有限公司 | 特大溶洞洞顶落石防护施工方法 |
CN106592962A (zh) * | 2016-12-24 | 2017-04-26 | 中铁十八局集团有限公司 | 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备 |
CN108797347A (zh) * | 2018-07-20 | 2018-11-13 | 中交武汉港湾工程设计研究院有限公司 | 循环牵引入锚系统 |
CN210013127U (zh) * | 2019-04-04 | 2020-02-04 | 中交一公局第四工程有限公司 | 一种隧道跨越溶洞大跨度贝雷梁施工装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110745161A (zh) * | 2019-11-05 | 2020-02-04 | 重庆华渝重工机电有限公司 | 一种整体转辙式单轨道岔驱动方法 |
CN110745161B (zh) * | 2019-11-05 | 2021-08-06 | 重庆华渝重工机电有限公司 | 一种整体转辙式单轨道岔驱动方法 |
CN113216021A (zh) * | 2021-06-02 | 2021-08-06 | 中国建筑第八工程局有限公司 | 既有混凝土桥梁的板梁快速无损更换方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105970833B (zh) | 预制节段逐跨拼装造桥机 | |
CN101736703B (zh) | 120米跨度双层四线公铁两用钢桁桥整孔架设之3000吨级特种架桥机 | |
CN103195460B (zh) | 一种液压支架转向平台 | |
CN109958059A (zh) | 一种隧道跨越溶洞大跨度贝雷梁施工装置 | |
CN201770945U (zh) | 连续刚构桥施工挂篮的同步移篮装置 | |
CN205954489U (zh) | 桥梁上跨营业线现浇空间钢构施工防护移动支架 | |
CN208995928U (zh) | 一种适用于叠合梁施工的多功能桥面吊机 | |
CN207987749U (zh) | 骑索式桥面吊机 | |
CN210013127U (zh) | 一种隧道跨越溶洞大跨度贝雷梁施工装置 | |
CN206538687U (zh) | 斜拉桥边跨梁段架设系统 | |
CN103288002A (zh) | 简易组合门架高空重物吊装装置 | |
CN106400700A (zh) | 双线悬臂式架桥机 | |
CN108086168A (zh) | 骑索式桥面吊机 | |
CN210457238U (zh) | 一种管桩专用起重机 | |
CN203768817U (zh) | 隧道内架梁设备 | |
CN210977498U (zh) | 一种适用于隧道全断面法和微台阶法施工的开挖作业台架 | |
CN202688892U (zh) | 一种用于架设水利渡槽的专用架槽机 | |
CN203878478U (zh) | 一种单臂箱梁架桥机 | |
CN103496630B (zh) | 一种吊具及使用该吊具的起重设备 | |
CN103966954B (zh) | 隧道内架梁设备及架梁方法 | |
CN202643143U (zh) | 一种双向移动的高空作业物料提升装置 | |
CN201614550U (zh) | 双层四线公铁两用钢桁桥整孔架设用3000吨级架桥机 | |
CN102747692A (zh) | 一种用于架设水利渡槽的专用架槽机 | |
CN211446609U (zh) | 一种钢混梁架桥机 | |
CN204980928U (zh) | 一种挤压土的垂直提升外运装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: ShangGuan Zhoujing Inventor after: Zhao Xinghua Inventor after: Chen Jianguang Inventor after: Li Wei Inventor after: Zhang Yi Inventor after: Zhang Zhibo Inventor after: Liang Guangzhen Inventor before: Zhao Xinghua Inventor before: ShangGuan Zhoujing Inventor before: Chen Jianguang Inventor before: Li Wei Inventor before: Zhang Yi Inventor before: Zhang Zhibo Inventor before: Liang Guangzhen |
|
CB03 | Change of inventor or designer information |