CN109941419A - 海上风电施工船舶基于dp模块的施工方法 - Google Patents

海上风电施工船舶基于dp模块的施工方法 Download PDF

Info

Publication number
CN109941419A
CN109941419A CN201910203078.6A CN201910203078A CN109941419A CN 109941419 A CN109941419 A CN 109941419A CN 201910203078 A CN201910203078 A CN 201910203078A CN 109941419 A CN109941419 A CN 109941419A
Authority
CN
China
Prior art keywords
control system
module
workboat
construction
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910203078.6A
Other languages
English (en)
Inventor
周宏勤
郁杰翔
廖鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HUAXICUN OFFSHORE ENGINEERING SERVICE Co Ltd
Original Assignee
JIANGSU HUAXICUN OFFSHORE ENGINEERING SERVICE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HUAXICUN OFFSHORE ENGINEERING SERVICE Co Ltd filed Critical JIANGSU HUAXICUN OFFSHORE ENGINEERING SERVICE Co Ltd
Priority to CN201910203078.6A priority Critical patent/CN109941419A/zh
Publication of CN109941419A publication Critical patent/CN109941419A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Wind Motors (AREA)

Abstract

本发明一种海上风电施工船舶基于DP模块的施工方法,所述施工方法的步骤为:步骤一、输入目标位置的经纬度坐标信息;步骤二、DP控制系统关闭DP模块并将DP模块翻转上升至海面上方;步骤三、船载控制系统启动船用推进器驱动施工船前往至目标位置附近;步骤四、DP控制系统翻转DP模块至海水中;步骤五、DP控制系统根据施工船和周边海况等信息调整安装于施工船四周的DP模块的动力输出功率值和动力输出方向,将施工船稳定在目标位置;步骤六、施工船完成作业后返回步骤一。一种海上风电施工船舶基于DP模块的施工方法,施工效率高、作业精度优。

Description

海上风电施工船舶基于DP模块的施工方法
技术领域
本发明涉及一种DP模块定位方法,尤其是涉及一种应用于海上风电施工船舶上的基于DP模块实现的施工方法,属于海上风电施工技术领域。
背景技术
目前,在海上风电施工作业过程中,需要等待到达时间窗口后才能正常施工作业(非作业时间窗口的海况恶劣,无法正常驳船施工作业),因此作业时间十分宝贵;常规的施工船前往目的地后需要停船进行抛锚定位(该作业过程在深海区域有时甚至需要数天),然后在目标地架设桩管后起锚再前往下一目的地再次抛锚,整个过程需要多次抛锚和起锚,浪费了大量宝贵的时间,降低了施工效率。
如今,船用动力定位DP模块(Dynamic positioning system)是最为先进的动态传动定位系统,其模块化程度高,安装使用均十分方便;使用时,位置传感器、航向传感器、姿态传感器、风传感器、海流传感器等传感设备实时实地精确获取数据,并把这些数据信息及时传输给控制器,控制器再将其与储存的预定停泊位置资料对照,找出差别,继而向各推进器发出指令,调整其推力,实行差别修正,直至到达预定位置、停稳;其完美的实现了无锚驳船,且不受水深限制,可适用于多种海域情况下;因为急需一种能够实现将船用动力定位DP模块结合在海上风电施工船舶上的施工作业方法,以提高施工效率。
发明内容
本发明的目的在于克服上述不足,提供一种施工效率高、作业精度优的海上风电施工船舶基于DP模块的施工方法。
本发明的目的是这样实现的:
一种海上风电施工船舶基于DP模块的施工方法,所述施工方法的步骤为:
步骤一、向船载控制系统输入目标位置的经纬度坐标信息,船载控制系统将目标位置的经纬度坐标信息同步更新至DP控制系统中;
步骤二、DP控制系统关闭DP模块并将DP模块翻转上升至海面上方;
步骤三、船载控制系统启动船用推进器驱动施工船前往至目标位置附近;
步骤四、船载控制系统关闭船用推进器,DP控制系统翻转DP模块至海水中;
步骤五、DP控制系统通过安装于施工船上的位置传感器、航向传感器、姿态传感器获取施工船的位置、航行方向和当前姿态信息,DP控制系统通过风传感器、海流传感器获取施工船周围的风向、风速、海流流向和海流流速信息;DP控制系统根据上述信息调整安装于施工船四周的DP模块的动力输出功率值和动力输出方向,将施工船稳定在目标位置;
步骤六、施工船完成作业后返回步骤一。
与现有技术相比,本发明的有益效果是:
本发明利用DP模块快速定位以实现高效施工作业,而且在施工作业过程中,可有效的抵御风浪造成的晃动,使得作业效果更佳。
具体实施方式
本发明涉及的一种海上风电施工船舶基于DP模块的施工方法,所述施工方法的步骤为:
步骤一、向船载控制系统输入目标位置的经纬度坐标信息,船载控制系统将目标位置的经纬度坐标信息同步更新至DP控制系统中;
步骤二、DP控制系统关闭DP模块并将DP模块翻转上升至海面上方;
步骤三、船载控制系统启动船用推进器驱动施工船前往至目标位置附近;
步骤四、船载控制系统关闭船用推进器,DP控制系统翻转DP模块至海水中;
步骤五、DP控制系统通过安装于施工船上的位置传感器、航向传感器、姿态传感器获取施工船的位置、航行方向和当前姿态信息,DP控制系统通过风传感器、海流传感器获取施工船周围的风向、风速、海流流向和海流流速信息;DP控制系统根据上述信息调整安装于施工船四周的DP模块的动力输出功率值和动力输出方向,将施工船稳定在目标位置;
步骤六、施工船完成作业后返回步骤一。
整个过程实现了无锚驳船,节约了大量时间用于施工作业,从而提高了施工效率;并且在施工船施工作业过程中,通过DP模块的动态定位可使得施工船稳定的保持在目标海域,相对于常规的抛锚停泊方式,抵抗风浪的能力进一步得到了加强,保证了施工的精度。
另外:需要注意的是,上述具体实施方式仅为本专利的一个优化方案,本领域的技术人员根据上述构思所做的任何改动或改进,均在本专利的保护范围之内。

Claims (1)

1.一种海上风电施工船舶基于DP模块的施工方法,其特征在于:所述施工方法的步骤为:
步骤一、向船载控制系统输入目标位置的经纬度坐标信息,船载控制系统将目标位置的经纬度坐标信息同步更新至DP控制系统中;
步骤二、DP控制系统关闭DP模块并将DP模块翻转上升至海面上方;
步骤三、船载控制系统启动船用推进器驱动施工船前往至目标位置附近;
步骤四、船载控制系统关闭船用推进器,DP控制系统翻转DP模块至海水中;
步骤五、DP控制系统通过安装于施工船上的位置传感器、航向传感器、姿态传感器获取施工船的位置、航行方向和当前姿态信息,DP控制系统通过风传感器、海流传感器获取施工船周围的风向、风速、海流流向和海流流速信息;DP控制系统根据上述信息调整安装于施工船四周的DP模块的动力输出功率值和动力输出方向,将施工船稳定在目标位置;
步骤六、施工船完成作业后返回步骤一。
CN201910203078.6A 2019-03-18 2019-03-18 海上风电施工船舶基于dp模块的施工方法 Pending CN109941419A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910203078.6A CN109941419A (zh) 2019-03-18 2019-03-18 海上风电施工船舶基于dp模块的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910203078.6A CN109941419A (zh) 2019-03-18 2019-03-18 海上风电施工船舶基于dp模块的施工方法

Publications (1)

Publication Number Publication Date
CN109941419A true CN109941419A (zh) 2019-06-28

Family

ID=67008407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910203078.6A Pending CN109941419A (zh) 2019-03-18 2019-03-18 海上风电施工船舶基于dp模块的施工方法

Country Status (1)

Country Link
CN (1) CN109941419A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6799528B1 (en) * 2002-12-23 2004-10-05 Joannes Raymond Mari Bekker Portable dynamic positioning system with self-contained diesel hydraulic thrusters
CN105857521A (zh) * 2016-03-31 2016-08-17 中交第三航务工程局有限公司 一种用于风电施工船的船舶定位系统及方法
CN107237722A (zh) * 2017-05-26 2017-10-10 江苏华西村海洋工程服务有限公司 一种海上风电施工工艺
CN206885282U (zh) * 2017-05-26 2018-01-16 亨通华西海洋工程有限公司 一种海上风电施工用动力定位系统
CN108490946A (zh) * 2018-04-13 2018-09-04 武汉理工大学 一种船舶动力定位控制方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6799528B1 (en) * 2002-12-23 2004-10-05 Joannes Raymond Mari Bekker Portable dynamic positioning system with self-contained diesel hydraulic thrusters
CN105857521A (zh) * 2016-03-31 2016-08-17 中交第三航务工程局有限公司 一种用于风电施工船的船舶定位系统及方法
CN107237722A (zh) * 2017-05-26 2017-10-10 江苏华西村海洋工程服务有限公司 一种海上风电施工工艺
CN206885282U (zh) * 2017-05-26 2018-01-16 亨通华西海洋工程有限公司 一种海上风电施工用动力定位系统
CN108490946A (zh) * 2018-04-13 2018-09-04 武汉理工大学 一种船舶动力定位控制方法

Similar Documents

Publication Publication Date Title
CN102841970B (zh) 采用动态禁止角的动力定位推力分配装置及其分配方法
US20160252907A1 (en) Apparatus and method
GB2511731B (en) Autonomous Vessel Robot AI System
CN108357634B (zh) 无锚系自动复位深远海定点观测浮标及方法
US11118646B2 (en) Active tuned mass damper applied to offshore monopile wind turbine installation
Willis et al. Tidal turbine deployment in the Bristol Channel: a case study
CN106385228B (zh) 一种方位角自动跟踪水面浮动光伏阵列
CN105242023A (zh) 一种水域多功能监测无人船
CN103092077A (zh) 动力定位系统的推力分配方法
CN104199464B (zh) 一种基于环境估计的实时环境最优艏向船舶动力定位控制方法
CN112000097B (zh) 一种港区无人拖航作业的拖船集群自适应控制方法
CN112511594B (zh) 一种基于5g与北斗卫星的渔船安全管理监控系统
CN105549602A (zh) 浮力均衡装置辅助的uuv主动坐底方法
CN203094366U (zh) 一种喷水组合推进体尾部舵壳阻力实验测试装置
CN202486622U (zh) 一种船舶定位系统
CN109941419A (zh) 海上风电施工船舶基于dp模块的施工方法
CN111522334A (zh) 一种波浪滑翔器局部路径规划方法
CN105151238B (zh) 太阳能无人驾驶气象探测艇及其探测方法
CN207367390U (zh) 海上拖带系统ais虚拟警戒标标示系统
CN203975153U (zh) 动力定位式海洋浮标
CN109489639A (zh) 一种用于测绘的测深装置及其使用方法
JP2003048594A (ja) インテリジェントブイ
JPS63170189A (ja) 定点保持用ブイシステム
CN112068546A (zh) 一种船舶无人自主航行控制系统及方法
CN112208715A (zh) 基于云端控制的无人驾驶航标船系统及其航标船移动方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190628