CN109933746B - 悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法 - Google Patents

悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法 Download PDF

Info

Publication number
CN109933746B
CN109933746B CN201910233676.8A CN201910233676A CN109933746B CN 109933746 B CN109933746 B CN 109933746B CN 201910233676 A CN201910233676 A CN 201910233676A CN 109933746 B CN109933746 B CN 109933746B
Authority
CN
China
Prior art keywords
span
mid
main cable
change
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910233676.8A
Other languages
English (en)
Other versions
CN109933746A (zh
Inventor
周毅
夏勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201910233676.8A priority Critical patent/CN109933746B/zh
Publication of CN109933746A publication Critical patent/CN109933746A/zh
Application granted granted Critical
Publication of CN109933746B publication Critical patent/CN109933746B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供一种悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法,属于桥梁结构分析技术领域。该方法首先计算中跨主缆温度变化引起的中跨主缆跨中挠度变化,然后计算边跨主缆温度变化引起的中跨主缆跨中挠度变化和桥塔温度变化引起的中跨主缆跨中挠度变化,最后计算温度变化引起的中跨主缆跨中挠度总变化。该方法在计算悬索桥中跨主缆的温度变形时,同时考虑了中跨主缆、边跨主缆、桥塔三部分的贡献,与仅考虑中跨主缆贡献的方法相比,精度得到了极大提高。该方法可仅凭悬索桥总体尺寸布置估计温度效应,适于现场匡算;可用于指导悬索桥初步设计阶段参数的合理取值;或优化悬索桥结构健康监测系统的温度测点布设,为温度变形基准模型的建立提供先验知识。

Description

悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法
技术领域
本发明涉及桥梁结构分析和结构健康监测技术领域,特别是指一种悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法。
背景技术
主缆跨中挠度是悬索桥设计、监测中的关键指标。现场监测发现,该指标在桥梁正常运营期间会随着环境温度变化而发生可观的变化,从而掩盖由结构损伤或退化引起的指标变化。如果能从实测总挠度变化中分离掉与温度相关的挠度变化,则可凸显由结构损伤或退化引起的挠度异常变化,更准确地判断结构的健康状况。因此,研究环境温度变化与悬索桥主缆跨中挠度的关系十分必要。
目前根据温度变化计算悬索桥主缆跨中挠度变化的方法大致有三类:(1)回归分析;(2)有限元分析;(3)物理机理公式。回归分析不反映变量间的因果关系,所得模型仅针对特定桥梁,通用性差;有限元分析虽然精度高,但需要详细的设计资料和必要的专业知识,对不同的桥梁要分别建模,同样存在模型通用性差的弊端;物理机理公式虽然是近似估算,但概念清晰,通用性强,方便参数分析和现场匡算,具有前两种方法所不具备的优势。然而,现有悬索桥温度变形的物理机理公式采用单根悬索的变形公式,相当于只考虑中跨主缆伸长的影响。悬索桥是具有梁、塔、索的高次超静定结构,不同构件的变形随自身温度变化而变化且相互影响,导致主缆挠度与温度的关系十分复杂,仅考虑中跨主缆的单根悬索计算公式存在明显误差。
本发明提供的环境温度变化下悬索桥中跨主缆跨中挠度和高程变化的实用计算方法属于物理机理公式法,计算中除考虑中跨主缆的热胀冷缩效应外,创造性地引入了边跨主缆和桥塔热胀冷缩引起的中跨主缆跨中挠度变化,大大提高了挠度和高程估计精度,使公式真正具有实用性。
本发明在公式推导中未限制两座桥塔塔顶高度相等的条件(即中跨主缆的弦线可不等于水平跨距),使公式更具普遍性。同时,对于数量最多的两塔等高的情况,本发明给出了形式简单的实用计算公式。由于计入桥塔热胀冷缩的影响,本发明的实用计算公式包含桥塔温度和线膨胀系数。然而,目前的桥梁结构健康监测对悬索桥中跨主缆温度变形的认识不足,许多悬索桥未安装桥塔温度计。本发明亦对此类情况给出了相应的估算公式,以方便工程技术人员使用。
本发明提供的悬索桥中跨主缆跨中挠度和高程随温度变化的实用计算方法概念清晰,计算便捷,通用性强,可仅凭悬索桥总体尺寸布置估计温度效应,适用于现场匡算;亦可用于指导悬索桥初步设计阶段参数的合理取值,便于方案比选;还可用于优化悬索桥结构健康监测系统的温度测点布设,并为温度变形基准模型的建立提供先验知识。
发明内容
本发明要解决的技术问题是提供一种悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法。
该方法针对地锚式双塔悬索桥由环境温度变化引起的中跨主缆的跨中挠度和中跨主缆的跨中高程的变化,提出估算公式。由于悬索桥的主缆和主梁在中跨跨中处的竖向位移几乎相等,所以悬索桥中跨主梁的跨中高程也可以按照中跨主缆的跨中高程公式估计。具体过程如下:
(1)计算中跨主缆温度变化引起的中跨主缆跨中挠度变化:
Figure GDA0002517554690000041
其中:δf01为中跨主缆温度变化时中跨主缆跨中挠度(即中跨跨中相对于塔顶连线的铅直距离)变化,增大表示主缆向下挠曲,l0为桥塔水平间距,n为中跨主缆的垂跨比(主缆跨中挠度与桥塔水平间距l0之比),α为塔顶连线与水平线的夹角(右侧塔顶高于左侧塔顶时,α为正;反之为负),θC为主缆的线膨胀系数,δTC为主缆的温度变化;
(2)计算边跨主缆温度变化引起的中跨主缆跨中挠度变化:计算中跨主缆跨中挠度变化时,需考虑边跨主缆、桥塔温度变化的影响。边跨主缆的影响机理为:其因热胀冷缩产生的长度变化会引起塔顶的纵向水平位移,从而间接改变中跨主缆的跨中挠度。边跨主缆温度变化引起的中跨主缆跨中挠度计算公式为:
Figure GDA0002517554690000051
其中:δf02为边跨主缆温度变化时中跨主缆跨中挠度变化,m分别取值1和2时,l1和l2分别为左、右边跨主缆在锚碇处锚固点到对应桥塔塔顶的水平距离,h1和h2分别是左、右边跨主缆在锚碇处锚固点与对应桥塔塔顶的高程差;
(3)计算桥塔温度变化引起的中跨主缆跨中挠度变化:桥塔温度变化对中跨主缆跨中挠度的影响机理为:桥塔的热胀冷缩会改变塔顶的高程,引起边跨主缆塔端锚固位置的改变。边跨主缆的另一端固定于锚碇处且边跨主缆长度不变,由此会造成塔顶在桥梁纵向的偏移,间接改变中跨主缆的跨中挠度。桥塔温度变化引起的中跨主缆跨中挠度计算公式为:
Figure GDA0002517554690000052
其中:δf03为桥塔温度变化时中跨主缆跨中挠度变化,m取值1和2时,hP1和hP2分别为左、右桥塔的总高度,θP为桥塔的线膨胀系数,δTP为桥塔的温度变化;
(4)计算温度变化引起的中跨主缆跨中挠度总变化:采用中跨主缆、边跨主缆、桥塔三部分热胀冷缩效应的叠加计算中跨主缆的跨中挠度变化。由环境温度变化引起的中跨主缆跨中挠度总变化的计算公式为:
δf0=δf01+δf02+δf03
其中:δf0为温度变化时中跨主缆的跨中挠度总变化;
综合上述,
Figure GDA0002517554690000061
(5)计算温度变化引起的中跨主缆高程变化:主缆跨中高程以竖直向上为正方向,表示绝对位置,而跨中挠度以竖直向下为正方向,表示跨中主缆相对于塔顶连线的铅直距离。根据高程与挠度的换算关系,可得到中跨主缆跨中高程随温度变化的计算公式:
Figure GDA0002517554690000062
其中:ΔH0_abs为主缆在中跨跨中位置的高程变化。
该方法适用于双塔地锚式悬索桥。
当悬索桥的桥塔高程相等时,中跨主缆的弦线倾角α=0,此时,温度变化引起的中跨主缆跨中挠度总变化
Figure GDA0002517554690000063
温度变化引起的中跨主缆跨中高程的变化为
Figure GDA0002517554690000071
实际估算中,当悬索桥的桥塔高程相等,即α=0,并且对精度要求不高(误差在10%左右)或没有桥塔温度数据的情况,hPm与hm视为相等,且θC·δTC与θP·δTP视为相等,温度变化引起的中跨主缆跨中挠度总变化
Figure GDA0002517554690000072
其中:L为主缆左、右锚碇锚固点之间的水平距离。
此时,温度变化引起的中跨主缆跨中高程变化:
Figure GDA0002517554690000073
因θC·δTC与θP·δTP视为相等,且不考虑桥塔温度数据,所以:
Figure GDA0002517554690000074
本发明的上述技术方案的有益效果如下:
上述方案中,提供了双塔地锚式悬索桥中跨主缆跨中挠度和高程随环境温度变化的实用计算方法。该方法既不需要建立有限元计算模型,也不需要通过积累长期实测数据建立回归模型,计算便捷,可仅凭悬索桥总体尺寸布置估计温度效应,适用于现场匡算温度变形的大致范围;同时,结果采用公式表示,物理意义明确、通用性强,易于进行参数分析,可用于指导悬索桥初步设计阶段参数的合理取值,便于方案比选;还可用于优化悬索桥结构健康监测系统的温度测点布设,并为温度变形基准模型的建立提供先验知识。
附图说明
图1为本发明实施例中地锚式双塔悬索桥简化分析模型;
图2为本发明实施例中中跨主缆长度变化效应分析模型;
图3为本发明实施例中塔顶间距变化效应分析模型;
图4为本发明实施例中边跨主缆温度变化对塔顶纵向水平位移影响的分析模型;
图5为本发明实施例中桥塔温度变化对塔顶纵向水平位移影响的分析模型。
具体实施方式
为使本发明要解决的技术问题、技术方案和优点更加清楚,下面将结合附图及具体实施例进行详细描述。
本发明提供一种悬索桥中跨主缆跨中挠度和高程随温度变化的实用计算方法。
该方法包括步骤如下:
(1)计算中跨主缆温度变化引起的中跨主缆跨中挠度变化:
由中跨主缆热胀冷缩引起的中跨主缆跨中挠度变化:
Figure GDA0002517554690000091
其中:δf01为中跨主缆温度变化时中跨主缆的跨中挠度(即中跨跨中相对于塔顶连线的铅直距离)变化,增大表示主缆向下挠曲;l0是桥塔水平间距,n是中跨主缆的垂跨比(主缆跨中挠度与l0之比),α为塔顶连线与水平线的夹角(右侧塔顶高于左侧塔顶时,α为正;反之为负),θC为主缆的线膨胀系数,δTC为主缆的温度变化;
(2)计算边跨主缆温度变化引起的中跨主缆跨中挠度变化:
由左、右边跨主缆热胀冷缩引起的中跨主缆跨中挠度变化:
Figure GDA0002517554690000092
其中:δf02为边跨主缆温度变化时中跨主缆的跨中挠度变化,公式中的下标m是变量,可以取1和2(注意累加符号
Figure GDA0002517554690000093
),其中l1和l2分别为左、右边跨主缆在锚碇处锚固点到对应桥塔塔顶的水平距离,h1和h2分别是左、右边跨主缆在锚碇处锚固点与对应桥塔塔顶的高程差;
(3)计算桥塔温度变化引起的中跨主缆跨中挠度变化:
由左、右桥塔热胀冷缩引起的中跨主缆跨中挠度变化:
Figure GDA0002517554690000101
其中:δf03为桥塔温度变化时中跨主缆的跨中挠度变化,hP1和hP2分别为左、右桥塔的总高度,θP为桥塔的线膨胀系数,δTP为桥塔的温度变化;
(4)按分类叠加计算环境温度变化下中跨主缆的跨中挠度总变化:
δf0=δf01+δf02+δf03
其中:δf0为温度变化时中跨主缆的跨中挠度总变化;
(5)计算环境温度变化下中跨主缆的跨中高程变化:
Figure GDA0002517554690000102
其中:ΔH0_abs为主缆在中跨跨中位置的高程变化。
对于中跨主缆的弦线倾角α=0的特殊情况:
虽然中跨主缆的弦线倾角α=0的情况属于应用特例,但是绝大多数的双塔悬索桥满足这一条件。则上述步骤(1)-(3)中公式可简化为:
Figure GDA0002517554690000103
Figure GDA0002517554690000111
Figure GDA0002517554690000112
此时,温度变化引起的中跨主缆跨中挠度的总变化为:
Figure GDA0002517554690000113
此时,由温度变化引起的中跨主缆的跨中高程变化为
Figure GDA0002517554690000114
对精度要求不高或没有桥塔温度数据的情况,考虑到大多数悬索桥的hPm与hm大致相当(m=1,2),且θC·δTC与θP·δTP也相差不大,则温度变化引起的中跨主缆跨中挠度总变化:
Figure GDA0002517554690000115
其中:L是主缆左、右锚碇锚固点之间的水平距离。
与此相应的中跨主缆跨中高程的变化为(因θC·δTC与θP·δTP视为相等):
Figure GDA0002517554690000116
下面结合实施例对于上述估算方法进一步说明。
步骤(1)中中跨主缆温度变化引起的中跨主缆跨中挠度变化的推导具体为:
对于附图1中的双塔悬索桥分析模型,记中跨主缆跨距(桥塔水平间距)为l0,中跨主缆的跨中挠度为f0,中跨主缆的弦线倾角为α(右侧塔顶高于左侧塔顶时,α为正;反之为负),两座桥塔顶部的高程差为h0(h0=l0·tanα),左、右桥塔塔顶到各自一侧锚碇的主缆锚固点的水平距离分别为l1和l2,左、右桥塔塔顶到各自一侧锚碇的主缆锚固点的高程差分别为h1和h2,左、右桥塔的总高度(发生热胀冷缩的长度)分别为hP1和hP2,左、右锚碇的主缆锚固点的水平距离为L。
选取中跨主缆(参考附图2)分析其长度变化引起的中跨主缆跨中挠度变化。单根悬索长度计算公式为:
Figure GDA0002517554690000121
式中n=f0/l0是中跨主缆的垂跨比。对式(1)两端变分(变分符号为δ(·)),并考虑δn=δf0/l0得到跨中挠度的变化为
Figure GDA0002517554690000122
式中δS0=S0·θC·δTC,其中θC和δTC分别是主缆的线膨胀系数和温度变化。按照《公路悬索桥设计规范(JTG/T D65-05—2015)》,主缆的垂跨比n一般取1/11~1/9。因此,式(1)和式(2)中n的高阶项可以略去,得到中跨主缆温度变化引起的中跨主缆挠度变化:
Figure GDA0002517554690000123
步骤(2)中边跨主缆温度变化引起的中跨主缆跨中挠度变化的推导具体为:
边跨主缆对中跨主缆跨中挠度的影响机理为:边跨主缆因热胀冷缩产生的长度变化会引起塔顶的纵向水平位移,从而间接改变中跨主缆的跨中挠度。根据附图3的分析模型,可推出塔顶间距变化与跨中挠度变化的关系。仍然对式(1)两端变分,有
Figure GDA0002517554690000124
其中δn、δl0、δα前面的系数表达式分别为
Figure GDA0002517554690000131
Figure GDA0002517554690000132
Figure GDA0002517554690000133
注意到δn与δl0存在以下关系:
Figure GDA0002517554690000134
因两塔顶间的高程差h0=l0·tanα保持不变,故δα与δl0之间存在以下关系:
Figure GDA0002517554690000135
将式(8)和式(9)代入式(4),且因δS0=0,得到δf0与δl0的关系:
Figure GDA0002517554690000136
考虑到n的绝对值较小,略去高阶项后可得
Figure GDA0002517554690000137
式(11)表示了中跨主缆跨中挠度变化δf0与塔顶间距变化δl0的关系。下面以悬索桥的左边跨为例,结合附图4推导边跨主缆温度变化引起的塔顶纵向水平位移。
边跨主缆的垂度较小,可按弦线长度估计主缆长度。边跨主缆长度S1
Figure GDA0002517554690000138
对上式两端变分,并由δS1=S1·θC·δTC可得:
Figure GDA0002517554690000139
塔顶间距的变化需要考虑两个桥塔塔顶纵向水平位移,根据δl0=-(δl1+δl2),并将式(13)代入式(11),可得边跨主缆温度变化引起的中跨主缆跨中挠度变化,即:
Figure GDA00025175546900001310
步骤(3)中桥塔温度变化引起的中跨主缆跨中挠度变化的推导具体为:
桥塔温度变化对中跨主缆跨中挠度的影响机理为:桥塔的热胀冷缩会改变塔顶的高程,引起边跨主缆塔端锚固位置的改变。边跨主缆的另一端固定于锚碇处且边跨主缆长度不变,由此会造成塔顶在桥梁纵向的偏移,间接改变中跨主缆的跨中挠度。仍以悬索桥的左边跨为例,结合附图5推导桥塔温度变化引起的塔顶纵向水平位移。对式(12)的两端变分,此时l1和h1都是变量
Figure GDA0002517554690000141
注意到边跨主缆长度不变,即δS1=0,且
δh1=δhP1=hP1·θP·δTP (16)
其中θP是桥塔材料的线膨胀系数;δTP代表桥塔的温度变化;δhP1代表桥塔顶端的竖向位移;hP1是桥塔发生热胀冷缩的长度,一般不等于h1但区别不大。由式(15)和式(16)可得
Figure GDA0002517554690000142
按式(17)分别计算两座桥塔因自身温度变化引起的塔顶纵向水平位移,根据δl0=-(δl1+δl2)得到塔顶间距的变化,最后代入式(11)得到中跨主缆跨中挠度的变化,即:
Figure GDA0002517554690000143
步骤(4)中温度变化引起的中跨主缆跨中挠度总变化只需将式(3)、式(14)、式(18)的计算结果相加即可,即:
Figure GDA0002517554690000144
绝大多数的双塔悬索桥的桥塔高程相等,中跨主缆的弦线倾角α=0。此时上式可简化成:
Figure GDA0002517554690000145
当悬索桥的桥塔高程相等,即α=0,并且对精度要求不高或没有桥塔温度数据的情况,考虑到大多数悬索桥的hPm与hm大致相当(m=1,2),且θC·δTC与θP·δTP也相差不大,则式(20)可进一步简化为:
Figure GDA0002517554690000146
桥塔的热胀冷缩会改变塔顶高程,也就是中跨主缆的弦线位置。因此,在估计中跨主缆的跨中高程变化时,若以高程增加为正,则应将式(19)、式(20)或式(21)的结果变号后再加上主缆弦线中点由塔高变化引起的高程变化Δ0
Figure GDA0002517554690000151
即式(19)、式(20)、式(21)分别为:
Figure GDA0002517554690000152
Figure GDA0002517554690000153
Figure GDA0002517554690000154
对于式(25),因θC·δTC与θP·δTP相差不大,且不考虑桥塔温度数据,所以可以采用下式估计:
Figure GDA0002517554690000155
悬索桥主梁与主缆在中跨跨中位置的竖向位移变化大致相同,所以中跨主梁跨中位置的高程随温度的变化也可以采用上述公式估计。
在具体应用过程中,某地锚式双塔悬索桥的主跨l0=1377m,两座桥塔至各自一侧锚碇的主缆锚固点的水平距离分别为l1=455m和l2=300m,因此L=2132m;中跨主缆的跨中挠度为f0=127.82m,所以垂跨比n=0.0928;桥塔塔顶高程均为206.4m,底部承台底面高程为2m,因此塔高hP1=hP2=204.4m,中跨主缆的弦线倾角α=0;塔顶高程与同侧锚碇处主缆锚固点的高程差分别为h1=174.4m,h2=158.4m;主缆钢材与桥塔混凝土的线膨胀系数分别取θC=1.2e-5/℃和θP=1.0e-5/℃。
另一方面,实际测得主缆在2005年冬季某日低温时刻和夏季某日高温时刻的有效温度分别为13.7℃和36.6℃,它们之差即为主缆温度变化δTC=23.0℃。根据经验,混凝土桥塔冬、夏季的温度变化与主缆接近,也取δTP=23.0℃。
实测监测系统测得的中跨主缆跨中断面从冬季低温时刻至夏季高温时刻的高程变化为ΔHm_abs=-1.169m,其中交通荷载、风荷载对实测高程的影响已通过对数据取小时平均予以减弱。将背景桥梁的相关参数代入式(24),可计算出由温度引起的中跨主缆跨中高程的变化量为ΔH0_abs=-1.139m,它与实测值的相对误差的绝对值约2.6%。若将背景桥梁的相关参数代入式(26),则计算出的中跨主缆跨中高程的变化量为ΔH0_abs=-1.142m,它与实测值的相对误差的绝对值约2.4%。可见按式(24)、式(26)所得估算值非常接近实测值。
值得注意的是,如果估算中只考虑中跨主缆的热胀冷缩,则估计出的中跨主缆跨中高程变化为ΔH0_abs=-0.768m,它与实测值的相对误差的绝对值为34.3%。如果估算中考虑中跨主缆、边跨主缆的热胀冷缩而不计桥塔温度变化的影响,则估计出的中跨主缆跨中高程变化为ΔH0_abs=-1.273m,它与实测值的相对误差的绝对值为8.8%,同样明显大于式(24)、式(26)约2.5%的相对误差。这一算例清楚表明,在计算悬索桥中跨主缆跨中挠度或高程随温度的变化时,需同时考虑中跨主缆、边跨主缆、桥塔三部分的贡献。它与仅考虑中跨主缆贡献的单根悬索计算方法相比,精度得到了极大提高。
以上所述是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明所述原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。

Claims (4)

1.一种悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法,其特征在于:包括步骤如下:
(1)计算中跨主缆温度变化引起的中跨主缆跨中挠度变化:
Figure FDA0002517554680000011
其中:δf01为中跨主缆温度变化时中跨主缆跨中挠度变化,l0为桥塔水平间距,n为中跨主缆的垂跨比,α为塔顶连线与水平线的夹角,右侧塔顶高于左侧塔顶时,α为正,右侧塔顶低于左侧塔顶时,α为负,θC为主缆的线膨胀系数,δTC为主缆的温度变化;
(2)计算边跨主缆温度变化引起的中跨主缆跨中挠度变化:
Figure FDA0002517554680000012
其中:δf02为边跨主缆温度变化时中跨主缆跨中挠度变化;m分别取值1和2时,l1和l2分别为左、右边跨主缆在锚碇处锚固点到对应桥塔塔顶的水平距离,h1和h2分别是左、右边跨主缆在锚碇处锚固点与对应桥塔塔顶的高程差;
(3)计算桥塔温度变化引起的中跨主缆挠度变化:
Figure FDA0002517554680000021
其中:δf03为桥塔温度变化时中跨主缆跨中挠度变化;m分别取值1和2时,hP1和hP2分别为左、右桥塔的总高度;θP为桥塔的线膨胀系数,δTP为桥塔的温度变化;
(4)计算温度变化引起的中跨主缆跨中挠度总变化:
δf0=δf01+δf02+δf03
Figure FDA0002517554680000022
其中:δf0为温度变化时中跨主缆跨中挠度总变化;
(5)计算温度变化引起的中跨主缆跨中高程变化:
Figure FDA0002517554680000023
其中:ΔH0_abs为主缆在中跨跨中位置的高程变化。
2.根据权利要求1所述的悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法,其特征在于:该方法适用于双塔地锚式悬索桥。
3.根据权利要求1所述的悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法,其特征在于:当悬索桥的塔顶高程相等时,中跨主缆的弦线倾角α=0,此时,温度变化引起的中跨主缆跨中挠度总变化
Figure FDA0002517554680000031
温度变化引起的中跨主缆跨中高程的变化为
Figure FDA0002517554680000032
4.根据权利要求1所述的悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法,其特征在于:当悬索桥的塔顶高程相等,即α=0,并且没有桥塔温度数据时,hPm与hm视为相等,且θC·δTC与θP·δTP视为相等,温度变化引起的中跨主缆跨中挠度变化为:
Figure FDA0002517554680000033
其中:L为主缆左、右锚碇锚固点之间的水平距离;
此时,温度变化引起的中跨主缆跨中高程的变化为
Figure FDA0002517554680000034
CN201910233676.8A 2019-03-26 2019-03-26 悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法 Active CN109933746B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910233676.8A CN109933746B (zh) 2019-03-26 2019-03-26 悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910233676.8A CN109933746B (zh) 2019-03-26 2019-03-26 悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法

Publications (2)

Publication Number Publication Date
CN109933746A CN109933746A (zh) 2019-06-25
CN109933746B true CN109933746B (zh) 2020-08-07

Family

ID=66988207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910233676.8A Active CN109933746B (zh) 2019-03-26 2019-03-26 悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法

Country Status (1)

Country Link
CN (1) CN109933746B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110457799A (zh) * 2019-07-30 2019-11-15 中国航发沈阳发动机研究所 一种高温试验器阻尼网设计方法
CN110837705B (zh) * 2019-10-28 2023-11-28 江苏科技大学 一种悬索桥拉索找力分析方法
CN110941872B (zh) * 2019-12-16 2021-08-03 北京科技大学 悬索桥主缆垂度和塔顶水平位移随温度变化的确定方法
CN112016143B (zh) * 2020-08-13 2021-09-07 北京科技大学 一种梁式桥跨中竖向位移随温度变化的计算方法
CN113255167B (zh) * 2021-06-28 2022-08-05 中交第二航务工程局有限公司 悬索桥索夹位置的有应力长度放样方法
CN114136582B (zh) * 2021-11-29 2023-09-22 陕西墨斗星智能科技有限公司 一种桥梁波浪振动监测装置、稳定系统及使用方法
CN117216837A (zh) * 2023-08-24 2023-12-12 中铁大桥局集团第二工程有限公司 一种斜拉桥主梁合龙口温度位移快速计算方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109101745B (zh) * 2018-08-28 2021-08-20 北京科技大学 一种斜拉桥跨中挠度随温度变化的估算方法

Also Published As

Publication number Publication date
CN109933746A (zh) 2019-06-25

Similar Documents

Publication Publication Date Title
CN109933746B (zh) 悬索桥中跨主缆跨中挠度和高程随温度变化的估算方法
CN110941872B (zh) 悬索桥主缆垂度和塔顶水平位移随温度变化的确定方法
Klein et al. Real-time ampacity and ground clearance software for integration into smart grid technology
CN109101745A (zh) 一种斜拉桥跨中挠度随温度变化的估算方法
CN113591186A (zh) 一种钢桁梁制造构形确定方法和系统
CN112523273A (zh) 一种用于基坑冠梁水平位移监测数据的增补分析方法
CN111967085B (zh) 大跨径悬索管道桥成桥风索线形计算方法
JP2011164024A (ja) 光ファイバセンサを備えた構造物のたわみ量の算定方法および装置
CN110657882B (zh) 一种利用单测点响应的桥梁实时安全状态监测方法
CN105824988B (zh) 一种考虑索梁温差效应的混凝土斜拉桥的增量调索法
CN103972889A (zh) 一种配电线路阻抗在线辨识方法
CN112035927A (zh) 基于修正影响矩阵的悬索管道桥成桥风索线形计算方法
CN111859655B (zh) 一种基于温度变形的缆索系统异常识别方法
US20060047370A1 (en) Efficient look-ahead load margin and voltage profiles contingency analysis using a tangent vector index method
US11579038B2 (en) Method for calculating temperature-dependent mid-span vertical displacement of girder bridge
Ramachandran et al. On-line monitoring of sag in overhead transmission lines with leveled spans
CN112211114A (zh) 一种塔梁固结体系斜拉桥的悬臂拼装施工方法
CN111737862B (zh) 基于静力平衡的多跨架空输电线覆冰找形计算方法
CN111737863B (zh) 基于能量法的多跨架空输电线覆冰找形计算方法
CN111046458A (zh) 一种基于马尔科夫链的金属屋面性能退化模型及其方法
Carrington New technologies for transmission line uprating
CN110474329A (zh) 一种基于多项式回归技术的连续潮流变步长方法及系统
Nascimento et al. The state of the art for increased overhead line ampacity utilizing new technologies and statistical criteria
CN117668988A (zh) 基于卷积神经网络多源数据融合的宽幅挂篮线性预测方法
Albizu et al. Tension-temperature behaviour of an overhead conductor in operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant