CN109915446A - A kind of holder combination - Google Patents

A kind of holder combination Download PDF

Info

Publication number
CN109915446A
CN109915446A CN201910108945.8A CN201910108945A CN109915446A CN 109915446 A CN109915446 A CN 109915446A CN 201910108945 A CN201910108945 A CN 201910108945A CN 109915446 A CN109915446 A CN 109915446A
Authority
CN
China
Prior art keywords
guide rail
mounting hole
guide
holder combination
fall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910108945.8A
Other languages
Chinese (zh)
Other versions
CN109915446B (en
Inventor
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Hua Gu Building Supporting Engineering Co Ltd
Original Assignee
Suzhou Hua Gu Building Supporting Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hua Gu Building Supporting Engineering Co Ltd filed Critical Suzhou Hua Gu Building Supporting Engineering Co Ltd
Priority to CN202410381336.0A priority Critical patent/CN118208471A/en
Priority to CN202410601581.8A priority patent/CN118482082A/en
Priority to CN202410601498.0A priority patent/CN118482080A/en
Priority to CN202410601508.0A priority patent/CN118482081A/en
Publication of CN109915446A publication Critical patent/CN109915446A/en
Application granted granted Critical
Publication of CN109915446B publication Critical patent/CN109915446B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/18Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The present invention provides a kind of holder combination, including the first guide rail and the second guide rail, first guide rail uses U-shaped groove structure, including the first guide wall and the first notch, and at least a pair of first mounting hole is provided in first guide wall;Second guide rail uses U-lag mechanism, including the second guide wall and the second notch, and at least a pair of second mounting hole is provided in second guide wall;It is characterized in that, the width of first notch is greater than the width of second guide rail, wherein one end of second guide rail is placed in first notch, and first guide rail and second guide rail to bolt is worn at least a pair of first mounting hole is worn at least a pair of second mounting hole by being fixedly connected.Installation method of the invention is simple, allow construction worker can be convenient check bolt installation and fastening the case where, facilitate the quality inspection and maintenance to holder combination, exclude security risk in time.

Description

A kind of holder combination
Related application
This application claims 201821049507.6 " a kind of buildings of (i) Chinese utility model application submitted July 3 in 2018 Anti-dropping rack in object room " and (ii) 201821046477.3 " a kind of Indoor environment Anti-dropping rack right-angle connector structure " Priority, these utility model applications are incorporated by.
Technical field
The invention belongs to building technical field of auxiliary facilities, and in particular to a kind of holder combination.
Background technique
Finished product bracket is that sizing channel steel and various connectors are directly produced by factory, and construction personnel is then transferred to carry out Site-assembled support system.This support system can be used for supporting various pipes and pipeline, have in Indoor environment installation There is important meaning.Finished product bracket needs to be attached between guide rail and guide rail when being assembled into door type structure.It is currently used Connection type is that connector is fixed on the guide rail for needing to connect using fashioned iron padlock.
Although it is many excellent that currently used connection type has that installation speed is quick, tie point position can flexibly finely tune etc. Point, but there are many security risks in practical applications: for example, fashioned iron padlock passes through rack gear and channel steel type side on its closing piece Involute edge squeezes, connector is fastened on channel steel by occlusion.Therefore, steadily whether the rack gear of fashioned iron padlock and channel steel type side Occlusion just becomes extremely important.If rack gear is engaged the dislocation of unstable or rack gear with channel steel type side, channel steel type is not withstood at all Side then the support system for installing out may have the danger that guide rail falls off suddenly, and then causes support system to support Pipeline fall, cause personal injury or spoilage (for example, the pipeline that falls in parking lot smashes vehicle).Moreover, because Padlock rack gear is engaged in the notch of channel steel with channel steel type side, and occlusion situation is hidden in notch, therefore padlock rack gear and slot The occlusion situation on steel type side is difficult to check after mounting.In other words, installer is difficult to examine after tightening fashioned iron padlock Installation situation is looked into, so that it is implicit to leave safety.Quality inspection work and maintenance workers are also difficult to find the problem during quality inspection and maintenance, And even suspect that there are installation questions, to re-secure connector process also can be troublesome.
For example, attached in CN201680078997.X " fixed and arranged structure " figures 1 and 2 disclose that a kind of technical solution, uses Nut of hanging one's head sticks in the edge section of mounting rail side wall, and is fastened and abutted against onto connecting component by screw.This technology In scheme, hang one's head nut in sidewall edge section recline position and degree just becomes extremely important.If recline it is not close or There is subtle deviation in person position, then nut of hanging one's head just can not be abutted against steadily by fastening onto interconnecting piece.When holder combination is held After carrying pipeline, after the pipelines such as especially heavy water pipe perhaps the set-up time it is longer after or meet with after vibration (for example, installation Holder combination in high-speed rail station, subway station) it is easy for setting out that mounting rail skids off, bracket falls the problems such as more.And hang one's head nut with Sidewall edge section sticks on the inside of mounting rail, it is difficult to be adjusted after installation is complete, quality inspection and maintenance, to leave peace Full hidden danger.
Therefore, present invention trial provides a kind of alternative solution, changes the connection type between guide rail and guide rail, allows installer Can easily, easily check whether the connection between guide rail and guide rail is stable, and can overhaul in time after mounting, to advise Keeping away in existing basis there is technical issues that using fashioned iron padlock, nut of hanging one's head.
Summary of the invention
In view of the above technical problems, described the present invention provides a kind of holder combination, including the first guide rail and the second guide rail First guide rail uses U-shaped groove structure, including the first guide wall and the first notch, is provided in first guide wall at least a pair of First guide rail mounting hole;Second guide rail uses U-lag mechanism, including the second guide wall and the second notch, and described second leads At least a pair of second guide rail mounting hole is provided on rail wall;The width of first notch is greater than the width of second guide rail, Wherein one end of second guide rail is placed in first notch, first guide rail and second guide rail by pair Bolt is worn at least a pair of first guide rail mounting hole is worn at least a pair of second guide rail mounting hole to be fixedly connected.
Preferably, first guide wall includes the first guiding cheekn of two sides and the first guide rail bottom wall;First guide rail Bottom wall is arranged between first guiding cheekn of two sides, and is respectively perpendicular the inner edge for connecting first guiding cheekn of two sides The outer edge of edge, first guiding cheekn of two sides is all made of planar structure.
Preferably, it is additionally provided with guide rail reinforcer on first guide rail, including guide rail reinforcer interconnecting piece and guide rail add Strong part support portion;The guide rail reinforcer interconnecting piece is fixedly connected with first guiding cheekn of two sides, thus by the guide rail Reinforcer is fixedly connected on first guide rail;The guide rail reinforcer support portion uses hard material by the two sides first The relative position of guiding cheekn is fixed, and the relative position of first guiding cheekn of two sides and the first guide rail bottom wall is stablized And shape.
Preferably, at least one described guide rail reinforcer is just set in the length of each meter of first guide rail.
Preferably, the guide rail reinforcer uses U-shaped groove structure, and the guide rail reinforcer interconnecting piece includes that two panels guide rail adds Strong part side plate and guide rail reinforcer top plate, the two panels guide rail reinforcer side plate are symmetrically disposed in the guide rail reinforcer top plate Relative edge on, the two panels guide rail reinforcer side plate is fitted closely with first guiding cheekn of two sides, and is fixedly connected.
Preferably, it is respectively arranged with reinforcer mounting hole on the two panels guide rail reinforcer side plate, described pair is worn bolt pair The reinforcement mounting hole and first guide rail mounting hole are worn, the two panels guide rail reinforcer side plate is fixed on described first and is led On rail wall.
Preferably, the size of first notch can accommodate the guide rail reinforcer, and the guide rail reinforcer is placed In first notch, strengthen the shape of first guide rail.
Preferably, first guide rail is single side channel steel.
Preferably, the first guide rail graduation mark, the first guide rail graduation mark mark are provided on the first guide wall outside The position of bright first guide rail mounting hole.
Preferably, the holder combination includes multiple first guide rail mounting holes, is arranged along first rail length direction, A preset first guide rail mounting hole spacing is spaced between each first guide rail mounting hole.
Preferably, for first guide rail mounting hole using circle, the first guide rail mounting hole spacing is five centimetres.
Preferably, second guide wall includes the second guiding cheekn of two sides and the second guide rail bottom wall, second guide rail Bottom wall is arranged between second guiding cheekn of two sides, and is respectively perpendicular the inner edge for connecting second guiding cheekn of two sides Edge, the outer edge of second guiding cheekn of two sides are described interior respectively to the back-shaped in-flanges in a pair of the second notch infolding The edge of flange is equipped with positioning tooth socket.
Preferably, one or more tube banks are additionally provided on second guide rail.
Preferably, second guide rail is single side channel steel or Two bors d's oeuveres channel steel.
Preferably, the second guide rail graduation mark, the second guide rail graduation mark mark are provided on the second guide wall outside The position of bright second guide rail mounting hole.
Preferably, including multiple second guide rail mounting holes, it is arranged along second rail length direction, each described second A preset second guide rail mounting hole spacing is spaced between guide rail mounting hole.
Preferably, second guide rail mounting hole uses slotted hole, and the first guide rail mounting hole spacing is five centimetres.
Preferably, first guide rail and second guide rail being fixedly connected are mutually right angle.
Preferably, first guide rail mounting hole and second guide rail mounting hole are all made of 45 ° of square hole and rotation Assume diamond in shape shape.
Preferably, the holder combination further includes pedestal, and the pedestal includes at least one base fixture and at least one A base rail connector;The pedestal includes at least one base fixture and the fixed company of at least one base rail connector It connects, the pedestal can be fixed on a surface by least one described base fixture, and the pedestal can pass through At least one described base rail connector is fixedly connected with first guide rail.
Preferably, the base rail connector includes multiple base side walls, and pedestal peace is provided on the base side wall It fills hole, the multiple base side wall and first guide wall and the base installing hole and first guide rail is passed through by bolt Mounting hole is fixedly connected.
Preferably, the base fixture use one or more plate, one or more described plate with it is the multiple Base side wall vertically connects.
Preferably, the holder combination further includes anti-fall connector, including the first guide rail join domain and the second guide rail connect Connect region;The first guide rail join domain can be placed in first notch, be fixedly connected with first guide rail; The second guide rail join domain can be placed in second notch, be fixedly connected with second guide rail.
Preferably, the anti-fall connector includes two pieces of first anti-fall fixed plates and the second anti-fall fixation being placed in parallel Plate, anti-fall connecting plate;The anti-fall connecting plate is arranged between the described first anti-fall fixed plate and the second anti-fall fixed plate, And it is separately connected the edge of the described first anti-fall fixed plate Yu the described second anti-fall fixed plate;The first anti-fall fixed plate and institute The first side for stating the second anti-fall fixed plate is respectively provided with the first anti-fall screw hole, forms the first guide rail join domain, and place In first notch, bolt connects first guide rail to wearing the described first anti-fall screw hole and first guide rail mounting hole Region is fixedly connected with first guide rail;Second side of the first anti-fall fixed plate and the second anti-fall fixed plate is all provided with The second anti-fall screw hole is set, forms the second guide rail join domain, and be placed in second notch, bolt is described to wearing The second guide rail join domain is fixedly connected by the second anti-fall screw hole and second guide rail mounting hole with second guide rail.
Preferably, it is provided with anti-fall support tube in the described first anti-fall screw hole and/or the second anti-fall screw hole, it is described anti- It falls support tube and uses hollow cylindrical structure.
Preferably, the first side of the described first anti-fall fixed plate and the second anti-fall fixed plate is respectively provided at least two institutes State the first anti-fall screw hole.
Preferably, the holder combination further includes third guide rail and adjustable connecting components;The third guide rail uses U-lag knot Third guide rail mounting hole is arranged in the third guide wall for structure, including third guide wall and third notch;The adjustable connecting components Including the third guide rail interconnecting piece and the first guide rail interconnecting piece being fixedly connected, the third guide rail interconnecting piece includes connector installation Hole is led the third guide rail with the third by bolt to wearing the third guide rail mounting hole and the connector mounting hole Rail interconnecting piece is fixedly connected;The first guide rail interconnecting piece includes at least a pair of adjustable clamping side plate, described at least a pair of adjustable Multiple adjustable screw holes are set on clamping side plate, and the multiple adjustable screw hole continuously intersects arrangement, and the multiple adjustable The center of screw hole is located in same vertical line.
Preferably, the third guide rail interconnecting piece includes third rail support plate, third guide rail fixed plate A, third guide rail Fixed plate B;The third rail support plate is arranged between the third guide rail fixed plate A and the third guide rail fixed plate B, One or more connector mounting holes are respectively provided on the third guide rail fixed plate A and the third guide rail fixed plate B;Described Three guide rails are placed on the third rail support plate, the third guide rail fixed plate A and the third guide rail fixed plate B The third guide rail is fixed by the connection mounting hole and the third guide rail mounting hole.
Preferably, the third guide rail is single side channel steel or Two bors d's oeuveres channel steel.
Preferably, one or more tube banks are additionally provided on the third guide rail.
Preferably, the third guide rail and first guide rail are mutually right angle.
Preferably, the third guide rail mounting hole uses oblong.
Preferably, the holder combination further includes saddle connector;The saddle connector uses zigzag shape, including saddle Transverse slat, saddle support plate, saddle fixed plate;The saddle transverse slat, the saddle support plate, the saddle fixed plate include horse Saddle fixation hole;The saddle transverse slat and the saddle support plate pass through the saddle fixation hole and first guide rail and/or institute The second guide rail is stated to be fixedly connected;The saddle fixed plate is fixedly connected by the saddle fixation hole with a surface.
The present invention also provides a kind of holder combination, including a pair of first guide rail, at least one second guide rail, at least one Third guide rail;First notch of the pair of first guide rail is oppositely arranged, and the both ends of at least one second guide rail are put respectively It sets in first notch being oppositely arranged, is fixedly connected in such a way that bolt is through;At least one third guide rail Both ends are connect by adjustable connecting components with the pair of first guide rail;The adjustable connecting components and at least one described third guide rail It is fixedly connected in such a way that bolt is through;The adjustable connecting components and the pair of first guide rail have multiple fixed points, with bolt On one that the adjustable connecting components are fixed in the multiple fixed point by through mode.
Preferably, the pair of first guide rail is vertically fixed on the lower section of a horizontal plane by a pair of of pedestal.
Preferably, the holder combination includes one or more a few font saddle connectors, and the pair of first is led One or more in rail, at least one described second guide rail and at least one described third guide rail is horizontally fixed on one and hangs down The side of straight plane.
Preferably, the holder combination further includes anti-fall connector, and the anti-fall connector is placed on described first and leads The position that rail is connect with second guide rail, and be also secured on first guide rail and second guide rail.
Preferably, the anti-fall connector includes being used for the through anti-fall screw hole of bolt, is provided in the anti-fall screw hole Anti-fall support tube.
Preferably, guide rail reinforcer, including guide rail are provided in first notch of at least a pair of first guide rail Reinforcer interconnecting piece and guide rail reinforcer support portion;The guide rail reinforcer interconnecting piece is fixed with the inner wall in first notch Connection, the guide rail reinforcer is fixed in first notch;The guide rail reinforcer support portion uses hard material branch Support the shape of first notch.
The present invention also provides a kind of holder combination, including the first guide rail and the second guide rail, first guide rail uses U Shape slot structure, including the first guide wall and the first notch are provided at least one set of first guide rail installation in first guide wall Hole is arranged along first rail length direction;Second guide rail uses U-lag mechanism, including the second guide wall and second Notch is provided at least one set of second guide rail mounting hole in second guide wall, arranges along second rail length direction; Wherein one end of second guide rail is placed in first notch, and will be at least one set of first guide rail mounting hole One or more be aligned by bolt with the one or more at least one set of second guide rail mounting hole to wearing, thus by institute The first guide rail is stated to be fixedly connected with second guide rail.
Preferably, the holder combination further includes guide supporting set;The guide supporting set includes the first support sleeve arm With the second support sleeve arm;The first support sleeve arm and the second support sleeve arm respectively include one or more support sleeves and fix Hole, respectively with one or more of at least one set of first guide rail mounting hole described in (i), and (ii) described at least one set of second One or more alignment in guide rail mounting hole, and by bolt to wearing, thus by the first support sleeve arm and second described Support set arm is separately fixed in first guide wall and second guide wall.
Preferably, the first support sleeve arm and the second support sleeve arm respectively further comprise one or more support sleeves can Adjust hole, respectively with one or more of at least one set of first guide rail mounting hole described in (i), and (ii) described at least one set of the One or more alignment in two guide rail mounting holes, and by bolt to wearing, thus by the first support sleeve arm and described second Support sleeve arm is separately fixed in first guide wall and second guide wall;The support sleeve adjustable port includes adjustable port Long side and adjustable port short side, the adjustable port short side allow bolt to pass snugly through, and the adjustable port long side allows bolt along institute It is mobile to state adjustable port long side.
Preferably, the holder combination further includes mating bolt and matching nut, tightens the mating bolt in installation When, the matching nut not transfer;The matching nut is previously positioned at first guide rail mounting hole and second guide rail Mounting hole is located at the inside in notch, for receiving the mating bolt.
Preferably, first guide wall and second guide wall include the symmetrical guiding cheekn in two sides and connection institute State the guide rail bottom wall of the symmetrical guiding cheekn in two sides;Rail-sides of first guide wall with second guide wall in the same side Wall is fixedly connected by the guide supporting set.
Preferably, the edge of the first support sleeve arm and the second support sleeve arm is provided with support sleeve varus Side;The outer edge of first guide wall and second guide wall is enclosed within the support sleeve in-flanges.
Preferably, the guide supporting set uses L-type structure, and the first support sleeve arm and the second support sleeve arm are mutual At right angle.
Preferably, the support sleeve fixation hole uses oblong using circle, the support sleeve adjustable port.
Technical solution provided by the present invention connected using the through mode of bolt the guide rail in finished product bracket with it is all kinds of Components, allow construction worker, quality inspection worker etc. can be more clearly visible that each junction installation situation (for example, bolt head, Nut is exposed to outside guide rail, it is easy to be checked), and can be safeguarded and be reinforced in time (for example, increasing installation spiral shell The quantity of bolt;Add guide supporting set and strengthen guide rail connection, increase the load-bearing capacity of holder combination), so that security risk is excluded, Evade in the prior art because guide-rail coupling member (for example, section steel lock catch structure) is usually in the notch of guide rail channel steel, to applying The competency profiling of work worker is higher, and the technical problems such as is difficult to check after mounting.
In addition, can effectively enhance the overall load of holder combination by using components such as pedestal, anti-fall connectors, because This, basic structure can have both can be used to prop up according to the actual demand of erecting bed, flexible setting support combination in construction worker Light pipe is supportted, it can also be by components such as addition pedestal, anti-fall connector, guide supporting sets come heavy pipeline, multiple Miscellaneous pipeline.Scheme compared to the prior art, holder combination provided by the present invention installation it is more flexible, adapt to scene more Extensively-for example, usually adopted a set of special guide rail and connector for the bracket of heavy pipeline in the prior art, structure is special, Higher cost, it is necessary to prior perfecting program.And the load of holder combination provided by the present invention easy can easily improve, both It can be used for light pipe (foundation structure), can be used for heavy pipeline (increasing auxiliary accessories).
In addition, because of the first guide rail in the present invention, i.e. upright guide rail/vertical beam, using the channel steel of no inner bead, in this way Channel steel structure it is relatively simple, cost is relatively low.Invention also provides (i) be placed on guide rail reinforcer in guide-track groove and (ii) the anti-fall support tube being mounted in anti-fall connector screw hole, avoid after channel steel is hung vertically may wrench deformation ask Topic, to increase the stability and installation of entire holder combination.
In addition, in some embodiments, can allow guide rail as unit of 1 centimetre the present invention also provides adjusting connector Position adjusting is carried out, thus demand when having taken into account holder combination installation to installation site flexibility.In addition, of the invention is some Connecting hole, mounting hole and adjustable orifice on components can be using shapes such as oblong/round rectangle/ellipses, to allow spiral shell Bolt to fine position is carried out with can be convenient when wearing screw hole, allow construction worker can be convenient according to erecting bed the case where progress It adjusts.
Detailed description of the invention
Below by attached drawing embodiment of the present invention will be described in more detail:
Fig. 1 is the structural schematic diagram of the first guide rail of holder combination embodiment of the present invention;
Fig. 2 a is the structural schematic diagram of the second guide rail of holder combination embodiment of the present invention;
Fig. 2 b is the structural schematic diagram of the third guide rail of holder combination embodiment of the present invention;
Fig. 2 c is the structural schematic diagram that the guide rail of holder combination embodiment of the present invention connects;‘
Fig. 3 a is the structural schematic diagram of the reinforcer of holder combination embodiment of the present invention;
Fig. 3 b is the reinforcer of holder combination embodiment of the present invention and the scheme of installation of the first guide rail;
Fig. 3 c is a kind of reinforcer cross-sectional structure schematic diagram (U-shaped) of holder combination embodiment of the present invention;
Fig. 3 d is a kind of reinforcer cross-sectional structure schematic diagram (rectangle) of holder combination embodiment of the present invention;
Fig. 3 e is a kind of reinforcer cross-sectional structure schematic diagram (rectangular band diagonal line) of holder combination embodiment of the present invention;
Fig. 4 a is a kind of structural schematic diagram of pedestal of holder combination embodiment of the present invention;
Fig. 4 b is the structural schematic diagram of another pedestal of holder combination embodiment of the present invention;
Fig. 4 c is a kind of scheme of installation of pedestal of holder combination embodiment of the present invention;
Fig. 4 d is the scheme of installation of another pedestal of holder combination embodiment of the present invention;
Fig. 5 a is a kind of structural schematic diagram of anti-fall connector of holder combination embodiment of the present invention;
Fig. 5 b is the structural schematic diagram of the anti-fall connector of another kind of holder combination embodiment of the present invention;
Fig. 5 c is a kind of scheme of installation of anti-fall connector of holder combination embodiment of the present invention;
Fig. 5 d is the scheme of installation of the anti-fall connector of another kind of holder combination embodiment of the present invention;
Fig. 5 e is the scheme of installation of the anti-fall connector of another kind of holder combination embodiment of the present invention;
Fig. 5 f is that a kind of anti-fall connector of holder combination embodiment of the present invention is mounted on the scheme of installation on guide rail;
Fig. 6 a is a kind of structural schematic diagram of adjustable connecting components of holder combination embodiment of the present invention;
Fig. 6 b is a kind of scheme of installation of adjustable connecting components of holder combination embodiment of the present invention;
Fig. 7 a is a kind of structural schematic diagram of saddle connector of holder combination embodiment of the present invention;
Fig. 7 b is a kind of scheme of installation of saddle connector of holder combination embodiment of the present invention;
Fig. 8 is a kind of combination of holder combination embodiment of the present invention;
Fig. 9 is a kind of combination of holder combination embodiment of the present invention;
Figure 10 a is a kind of combination (carrying cable testing bridge) of holder combination embodiment of the present invention;
Figure 10 b is a kind of combination (carrying ventilation shaft) of holder combination embodiment of the present invention;
Figure 10 c is a kind of combination (installation tube bank) of holder combination embodiment of the present invention;
Figure 10 d is a kind of combination (carrying cable testing bridge) of holder combination embodiment of the present invention;
Figure 10 e is a kind of combination (carrying ventilation shaft) of holder combination embodiment of the present invention;
Figure 10 f is a kind of combination (installation tube bank) of holder combination embodiment of the present invention;
Figure 11 a is a kind of combination (L-type guide supporting set) of holder combination embodiment of the present invention;
Figure 11 b is in Figure 11 a along a kind of cross section that dotted line is cut;
Figure 11 c is in Figure 11 a along a kind of cross section that dotted line is cut;
Figure 11 d is a kind of combination (trapezoidal rails support sleeve) of holder combination embodiment of the present invention.
Specific embodiment
Applicant will elaborate by way of examples below, but be not to this hair to the description of embodiment Bright limitation, it is any it is made according to the present invention be only that formal but not substantive equivalent transformation is regarded as this hair Bright technical solution scope.
The concept of all directionality for being related to upper, lower, left, right, front and rear or directionality is all in the following description For the location of current Fig. 1 state, thus the spy to technical solution provided by the invention cannot be understood as It does not limit.
In present specification, " guide rail " word refers to slot or ridge made of metal (for example, steel) or other materials, can It bears, is fixed, guiding various pipes and pipeline.For example, the guide rail in the present invention can use U-type groove steel (i.e. track cross-section For U-shaped/c-type/concave, therefore C-shaped channel steel, c-type rail, groove type channel steel can also be referred to as etc.), connection forms holder combination, For supporting, fixing and guiding the various pipes such as cable testing bridge, air hose, water pipe." guide rail " in present specification can also root It is referred to as crossbeam, vertical beam, column, rail body, mounting rail etc. according to the position of installation.
Each type component in present specification can be process by steel, such as Q235B.The table of all kinds of fashioned iron components Face can carry out preservative treatment, such as carry out 55 μm of 5-8 μm/galvanizing by dipping of electrogalvanizing.
In present specification, " bolt to wear " word, which is meant, makes bolt (including bolt head, stud) to passing through zero Preset screw hole (for example, mounting hole, fixation hole, connecting hole) on part, and cooperate with nut to after screw hole (for example, twisting Tightly) realize connection and fastening between connection components.The mode that bolts and nuts are tightened both had included being come using spanner rotating nut The fastening for realizing bolts and nuts, also includes the side that nut is fixed on to mounting hole in advance, is passed through certainly to the bolt worn and entered The fastening of body rotation (nut not transfer) Lai Shixian bolts and nuts.For example, in some holder combinations, it is difficult to go to turn with spanner It moves nut (for example, nut is located in the notch of channel steel), therefore nut is fixed on to the inside of mounting hole in advance, it is only necessary to rotate spiral shell The fastening of screw bolt and nut can be realized in bolt.
Holder combination mentioned in present specification, it can it is that construction worker on construction ground install by scene, Each components are gradually added from ceiling, room beam, metope etc. to extend out, and are also possible to be pre-assembled holder combination, so Integral hoisting at the construction field (site) afterwards.
Embodiment 1
Embodiment 1 discloses a kind of holder combination, including the first guide rail (can also be referred to as " perpendicular in some embodiments Beam ") 100 and second guide rail (" support beam " can also be referred to as in some embodiments) 200, first guide rail 100 is adopted With U-shaped groove structure, including the first guide wall 106 and the first notch 103, it is provided in first guide wall 106 at least a pair of First mounting hole 105.Second guide rail 200 uses U-shaped groove structure, including the second guide wall 206 and the second notch 203, institute It states and is provided at least a pair of second mounting hole in the second guide wall 206 and (" support beam can also be referred to as in some embodiments Screw hole ") 205.In this embodiment, (i.e. Fig. 1, first notch 103 is along the direction Y-Y ' for the width of first notch 103 Openings of sizes) be greater than second guide rail width (i.e. Fig. 1, second guide rail 200 along the direction Y-Y ' size, by institute Including the guide wall THICKNESS CALCULATION for stating the second guide rail 200).
Wherein one end of second guide rail 200 is placed in first notch 103.First guide rail, 100 He Second guide rail 200 by wear bolt 101 to wear at least a pair of first mounting hole (in some embodiments can also be with Referred to as " vertical beam screw hole ") it 105 is fixedly connected at least a pair of second mounting hole 205.
When finished product holder combination uses above-mentioned bolt to connection type is worn, because some parts of bolt can be exposed on branch Frame combination outer surface (for example, bolt head, nut), can allow installation personnel, quality inspection personnel be more easily observed guide rail with Whether the connection between guide rail has been correctly completed, to evade in the prior art because being fastenedly connected using section steel lock catch It is difficult to check whether lock rack gear stings tight guide rail channel steel curls inward type side when part and guide rail, and then leads to the problem of security risk.No Only in this way, when being connected by screw bolts, in order to increase safety, mounting hole can be neatly provided near connecting portion Position, which is further added by, to be more bolted, to simplify the maintenance of finished product holder combination, maintenance and reinforcement.
" a pair " in " a pair of first mounting hole " and " a pair of second mounting hole " referred in this example means guide rail Position of the mounting hole in guide wall is opposite, and size matches, and a bolt can be allowed to break-through.For example, in Fig. 1, The first mounting hole 105 and 105 ' on first guiding cheekn 106a, 106b constitutes a pair of first mounting hole, and one to wearing bolt 101 can pass through first mounting hole 105 and 105 ' (Fig. 2 c).
The bolt referred in this example includes, but are not limited to connection is worn such as under type: the pair of first mounting hole and institute Stating a pair of second mounting hole can be aligned, allow bolt 101 sequentially pass through one 105 in the pair of first mounting hole, it is described One 205 in a pair of second mounting hole, in the pair of second mounting hole another 205 ' and the pair of first installation Another 105 ' (bolt to wear mode A) in hole.Another bolt to wear connection type need using two matching screws and Nut is matched to complete: inside of second mounting hole in second notch is fixedly installed the matching spiral shell in advance Mother, when to bolt is worn, it is only necessary to matching screw be sequentially inserted into the first mounting hole and the second mounting hole of alignment, then Matching screw is tightened on the matching nut through fixing can be completed being fixedly connected for the first guide rail and the second guide rail side. In the same way by another matching screw to wearing the first guide rail and the second guide rail in the first mounting hole of the other side and second Mounting hole, and matching screw is tightened on matching nut can (bolt to wear mode B).In contrast, bolt is to wearing mode A The screw rod of required bolt is longer, can tighten screw bolt and nut by way of rotating nuts;And bolt is to wearing mode B The screw rod of required bolt is shorter, but needs more bolts, and needs the fixed setting matching in advance on mounting hole Nut, allowing installer only to need to tighten bolt can be completed installation.
Refer to that the width of first notch 103 is greater than the width 203 of second guide rail in this example.This is because guide rail Wall usually has certain thickness, therefore the width of first notch 103 is not only greater than the width of second notch 203, But also (the thickness of second guide wall itself also to be calculated with the overall width 203 of second guide rail greatly It is interior), one end of second guide rail 200 can be integrally placed into first notch 103 (Fig. 2 c).
In some embodiments, first guide wall 106 can also include the first guiding cheekn of two sides 106a, 106b With the first guide rail bottom wall 106c.First guide rail bottom wall 106c setting described the first guiding cheekn of two sides 106a, 106b it Between, and it is respectively perpendicular the inward flange 108b for connecting described the first guiding cheekn of two sides 106a, 106b, first guide rail of two sides The outer edge 108a of side wall 106a, 106b are all made of planar structure, i.e. are not provided with crimping at outer edge 108a.In the prior art Channel steel because use fashioned iron padlock, it is therefore desirable to by the section steel edge of channel steel to notch varus and with upper rack be used to be engaged fashioned iron Rack gear on lock, and the first guide wall in this example is without bead structure, manufacture craft is simpler and required steel Material is less.
In some embodiments, guide rail reinforcer can also be arranged on first guide rail (in some embodiments may be used To be referred to as " channel steel reinforcer ") 300, for reinforcing and stablizing the shape of the first guide rail 100, prevent vertically arranged first to lead Rail 100 is twisted or is deformed.
In some embodiments, the guide rail reinforcer 300 include guide rail reinforcer interconnecting piece (in some embodiments Can be referred to as " channel steel reinforcer side plate ") 303,302 and guide rail reinforcer support portion (be also referred to as in some embodiments " channel steel reinforcer top plate ") 301, guide rail reinforcer interconnecting piece 303,302 and the first guiding cheekn of two sides 106a, 106b is fixedly connected, so that the guide rail reinforcer 300 is fixedly connected on first guide rail 100;The guide rail is reinforced Part support portion 301 is fixed the relative position of described the first guiding cheekn of two sides 106a, 106b using hard material, thus surely The relative position of fixed described two sides the first guiding cheekn 106a, 106b and the first guide rail bottom wall 106c and shape-are reinforced With the shape for stablizing first notch.
In some embodiments, the guide rail reinforcer interconnecting piece 303,302 and the guide rail reinforcer support portion 301 Junction be all made of arc-shaped transition.
In some embodiments, at least one described guide rail is just arranged in the length of each meter of first guide rail to reinforce Part.For example, a guide rail reinforcer is then arranged at one meter when the length of first guide rail is three meters, amount to Three guide rail reinforcers;When the length of first guide rail is six meters, then six guide rail reinforcers are used.
In some embodiments, the guide rail reinforcer 300 uses U-shaped groove structure, the guide rail reinforcer interconnecting piece packet Include two panels guide rail reinforcer side plate 302,303 and guide rail reinforcer top plate 301, the two panels guide rail reinforcer side plate 302,303 Be symmetrically disposed on the relative edge of the guide rail reinforcer top plate 301, the two panels guide rail reinforcer side plate 302,303 with Both sidewalls 106a, 106b of first guide rail 100 fit closely, and are fixedly connected.
In some embodiments, reinforcer mounting hole is respectively arranged on the two panels guide rail reinforcer side plate 302,303 304, described pair is worn bolt to the reinforcement mounting hole 304 and the first mounting hole 105 is worn, by the two panels guide rail reinforcer side plate 302, it 303 is fixed in first guide wall 106.
The guide rail reinforcer 300 can also use in some embodiments in addition to using U-type groove structure (Fig. 3 a-3c) Hollow structure (Fig. 3 d) or other structures (Fig. 3 e) etc..Specifically, the guide rail reinforcer of the hollow structure uses Two guide rail reinforcer support portion 301a, 301b connect guide rail reinforcer interconnecting piece 303,302, the guide rail reinforcer constituted Cross section be in rectangle, enhance guide rail reinforcer support effect, be better protected from guide rail deformation.The guide rail of hollow structure adds An auxiliary support plate 306 can also be set in strong part, connect the guide rail reinforcer interconnecting piece 303,302 in rectangular cross-sectional Two on face are diagonal.Be also equipped with reinforcer mounting hole on the auxiliary support plate 306, with guide rail reinforcer interconnecting piece 303, Mounting hole on 302 is corresponding, allows bolt to break-through.The guide rail reinforcer of this spline structure being capable of more securely supporting guide The position of side wall keeps the shape of guide rail notch to prevent from leading to further enhance the support effect of guide rail reinforcer Rail deforms (be especially adapted for use in those length longer, vertically arranged guide rail) after right angle setting.
In some embodiments, the size of first notch 103 can accommodate the guide rail reinforcer 300, described to lead Rail reinforcer 300 is placed in first notch 103, to strengthen, stablize the shape of first guide rail 100.One In a little embodiments, the guide rail reinforcer 300 may be provided at first guide rail 100 and 200 junction of the second guide rail Above and or below, improves the intensity of first guide rail 100 with 200 junction of the second guide rail, to prevent described the The deformation of one guide rail 100.
In some embodiments, first guide rail 100 is single side channel steel.In some embodiments, first guide rail Two bors d's oeuveres channel steel can also be used.
In some embodiments, it is provided with the first guide rail graduation mark 107 on first guide wall, 100 outside, described the One guide rail graduation mark 107 indicates the position of first mounting hole 105, measures size and finds accurately during installation convenient for construction worker Position.
In some embodiments, first mounting hole 105 uses circular.
In some embodiments, first guide rail 100 further includes multiple first mounting holes 105, along first guide rail 100 length directions (X '-X) arrange, and are separated by preset first guide rail mounting hole between each first guide rail mounting hole Spacing.For first guide rail mounting hole using circle, the first guide rail mounting hole spacing is five centimetres.
In some embodiments, second guide wall 200 includes that two sides the second guiding cheekn 206a, 206b is led with second Rail bottom wall 206c, the second guide rail bottom wall 200 are arranged between described the second guiding cheekn of two sides 206a, 206b, and point Do not connect the inward flange 208b of described the second guiding cheekn of two sides 206a, 206b vertically, second guiding cheekn of two sides it is outer For edge 208a respectively to the back-shaped in-flanges in a pair of 203 infolding of the second notch, the edge of the in-flanges is equipped with positioning Tooth socket 210.
In some embodiments, be additionally provided on second guide rail 200 it is one or more tube bank (for example, air hose pipe clamp, Keeping beam, vermiculite insulation tube bank).
In some embodiments, second guide rail 200 is single side channel steel or Two bors d's oeuveres channel steel.
In some embodiments, it is provided with the second guide rail graduation mark 207 on second guide wall, 206 outside, described the Two guide rail graduation marks 207 indicate the position of second mounting hole 205, measure size and find accurately during installation convenient for construction worker Position.
In some embodiments, second mounting hole 205 is described oval using oblong, ellipse or round rectangle The length direction (Fig. 2 a X '-X) of the long axis of shape, ellipse and round rectangle and second guide rail 200 is consistent.Using these The benefit of shape is that the position of bolt is allowed to be finely adjusted, and carries out bolt to wearing according to building site actual conditions convenient for construction worker.
In some embodiments, second guide rail 200 includes multiple second mounting holes 205, along second guide rail The 2200 length direction (Fig. 2 a X '-X) arranges, the preset second guide rail peace in one, interval between each second mounting hole 205 Fill pitch of holes.
In some embodiments, for first guide rail mounting hole using circle, the first guide rail mounting hole spacing is five Centimetre.
In some embodiments, first guide rail 100 and second guide rail 200 being fixedly connected are mutually right angle.
In some embodiments, first mounting hole 105 and second mounting hole 205 are all made of square hole and rotation Turn 45 ° of shapes that assume diamond in shape.
Embodiment 2
Please refer to Fig. 4.This example difference from Example 1 is that the holder combination further includes pedestal 400.The bottom Seat 400 includes at least one base fixture 402 and at least one base rail connector 404.The pedestal 400 can pass through At least one described base fixture 402 is fixed on a surface (for example, metope, ground, steel construction).The pedestal 400 can be fixedly connected by least one described base rail connector 404 with first guide rail 100.
In some embodiments, the base rail connector 404 includes multiple base side walls 406, the base side wall It is provided with base installing hole 405 on 406, the multiple base side wall 406 and first guide wall 106 are by wearing bolt 101 pass through the base installing hole 405 is fixedly connected with first mounting hole 105.
In some embodiments, the described use of base fixture 402 one or more plate 402a, 402b, described one piece Or muti-piece plate is vertical with the multiple base side wall 404 connect.
Fig. 4 a is please referred to, in some embodiments, the pedestal 400 includes pedestal connecting plate 402 and pedestal connector sleeve 404, the pedestal connecting plate 402 uses slab construction, and the pedestal connector sleeve 404 uses hollow rectangular parallelepiped structure;The bottom Connector sleeve 404 is vertical with the pedestal connecting plate 402 connect for seat, and makes 404 He of pedestal connector sleeve by the modes such as welding The pedestal connecting plate 402 forms an overall structure.
The area of the pedestal connecting plate 402 be greater than the pedestal connector sleeve 404 cross-sectional area, and with it is described It is provided with pedestal fixation hole on part other than the coincidence of pedestal connector sleeve, for the pedestal connecting plate 402 is fixed on one On surface.The pedestal connecting plate 402 is fixed on across the pedestal fixation hole for example, expansion bolt can be used in installer On ceiling or crossbeam.
Include pedestal connecting hole 405 on the side wall 406 of the pedestal connector sleeve 404, the first guide rail can be placed into It, will be described by bolt from outside to inside successively to the first mounting hole 105 and pedestal connecting hole 405 is worn in 100 the first notch 103 Pedestal connector sleeve 404 is fixedly connected with first guide rail 100.The pedestal connector sleeve 404 can also use bigger structure, The top of first guide rail is directly inserted in the pedestal connector sleeve 404, by bolt from outside to inside successively to wearing pedestal The pedestal connector sleeve 404 is fixedly connected by connecting hole 405 and the first mounting hole 105 with first guide rail 100.Using this The holder combination of kind pedestal has biggish load (therefore can also be referred to as " heavy pedestal "), can be used to carry 100DN Or more the heavy pipeline (i.e. water pipe diameter is at 100 millimeters or more) such as water pipe.
Fig. 4 b is please referred to, in some embodiments, the pedestal 400 includes a pedestal link slot 404, and cross section is in U-shaped structure, shape can be matched with 100 shape of the first guide rail: the pedestal link slot 404 can both use larger structure will 404 sets of the pedestal link slot 100 top of the first guide rail (i.e. by the upper end after 100 right angle setting of the first guide rail) On, the pedestal link slot 404 can also be inserted into 103 mouthfuls of the first slot of first guide rail 100 using smaller structure; It is provided with pedestal connecting hole 405 on the cell wall of the pedestal link slot 404, it can be by bolt to wearing the pedestal connecting hole 405 are fixedly connected with the pedestal link slot 404 and first guide wall 106 with the mode of first mounting hole 105 Come.
In some embodiments, the cell wall of the pedestal link slot shares more side walls, and wherein at least both sidewalls are distinguished Extend pedestal the connection wing 402a, 402b;The described pedestal connection wing 402a, 402b and the pedestal link slot mutually claim right angle, and And including one or more pedestal fixation holes, it is used to the pedestal 400 is fixed on a surface.For example, installer can It passes through the pedestal fixation hole using expansion bolt the pedestal connection wing 402a, 402b are fixed on ceiling or crossbeam. Load using the holder combination of this pedestal is smaller (therefore can also be referred to as " light-duty pedestal "), can be used to carry 100DN pipeline below.
Embodiment 3
This example difference from Example 1 is, the holder combination further include anti-fall connector (in some embodiments Alternatively referred to as " right-angle connector ") 500, including the first guide rail join domain 500a and the second guide rail join domain 500b.It is described First guide rail join domain 500a can be placed in first notch 103, be fixedly connected with first guide rail 100. The second guide rail join domain 500b can be placed in second notch 203, with the fixed company of second guide rail 200 It connects.
In some embodiments, the anti-fall connector 500 includes two pieces of first anti-fall fixed plates 501 being placed in parallel With the second anti-fall fixed plate 502, anti-fall connecting plate 503.The anti-fall connecting plate 503 is vertically set on the described first anti-fall fixation Between plate 501 and the second anti-fall fixed plate 502, and it is separately connected the described first anti-fall fixed plate 501 and prevents with described second Fall cathetus edges 501a, 502b of fixed plate 502.The first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 The first side be respectively provided with the first anti-fall screw hole, form the first guide rail join domain 500a, and be placed on first slot In mouthfuls 103, first guide rail is connected with first mounting hole 105 to bolt 101 is worn to wearing the described first anti-fall screw hole Region 500a is fixedly connected with first guide rail 100.The first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 second side is respectively provided with the second anti-fall screw hole, forms the second guide rail join domain 500b, and be placed on described second 203 in notch, second guide rail is connected to bolt 101 is worn to wearing the described second anti-fall screw hole and second mounting hole 205 Region 500b is met to be fixedly connected with second guide rail 200.
In some embodiments, the anti-fall connecting plate 503 and the described first anti-fall fixed plate 501 and described second anti-fall Junction 501a, 502a of fixed plate 502 are all made of arc-shaped transition.The anti-fall connector 500 can make first guide rail Shape connects at an angle of 90 between 100 and second guide rail 200, guarantees that first guide rail 100 is pacified with second guide rail 200 Verticality when dress, the overlap joint suitable for channel member.
In some embodiments, the first side of the described first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 is equal At least two first anti-fall screw holes 505 are set.
In some embodiments, the described first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 are along described (Fig. 5 a X-X ') and it is located at the leftward position of main anti-fall screw hole 505a that interval opens up respectively on the length direction of two guide rails 200 There is at least one anti-fall screw hole 505b, and is provided with a support sleeve 509 in described anti-fall screw hole 505b, thus plus The strong load-bearing capacity of second guide rail, 200 guide rail.The first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 (Fig. 5 a Z-Z ') and are located at the top position of main anti-fall screw hole 505 on the length direction along first guide rail 100 It is respectively separated and offers at least one anti-fall screw hole 505b.
In some embodiments, the described first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 are along described (Fig. 5 b X-X ') and it is located at the leftward position of main anti-fall screw hole 505a that interval opens up respectively on the length direction of two guide rails 200 There is at least one anti-fall screw hole 505b.The first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 are along described (Fig. 5 b Z-Z ') and it is located at the top position of main anti-fall screw hole 505 that interval opens up respectively on the length direction of first guide rail 100 There are at least two anti-fall screw hole 505b, and be equipped with a support sleeve 509 respectively in described two anti-fall screw hole 505b, To further enhance the ability that first guide rail 100 resists shrinkage stress.
In some embodiments, the described first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 are along described (Fig. 5 c X-X ') and it is located at the leftward position of main anti-fall screw hole 505a that interval opens up respectively on the length direction of two guide rails 200 There are at least two anti-fall screw hole 505b.The first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 are along described (Fig. 5 c Z-Z ') and it is located at the top position of main anti-fall screw hole 505 and is also respectively separated out on the length direction of first guide rail 100 If there are two time anti-fall screw hole 505b, and are equipped with a support sleeve 509 in described two anti-fall screw hole 505b respectively, The ability of shrinkage stress and the load-bearing of second guide rail 200 are resisted to further enhance first guide rail 100 Power.
In some embodiments, the anti-fall connector 500 by first guide rail 100 and second guide rail 200 with Following manner is fixedly connected with (Fig. 5 f): the section of first guide rail 100 is in U-shape and in two sides side wall relative to each other It is respectively separated along its length on 106a, 106b and offers multiple first mounting holes 105.The section of second guide rail 200 It is equally in U-shape and is respectively separated along its length on two sides side wall 206a, 206b relative to each other and offer multiple second peaces Fill hole 205.First guide rail 100 is provided with anti-fall connector 500 in junction with second guide rail 200.It is described anti- Pendant connector 500 includes that anti-fall connecting plate 503 and a pair connect and face each other with anti-fall 503 two sides of connecting plate respectively First anti-fall fixed plate 501 and the second anti-fall fixed plate 502 disposed in parallel.The first anti-fall fixed plate 501 and described Two anti-fall fixed plates 502 are arranged on the junction of first guide rail 100 and second guide rail 200, and can be put It sets into first notch 103 and second notch 203.
The first anti-fall fixed plate 501 and described and the second anti-fall fixed plate 502 and the institute relative to the junction It states and offers a main anti-fall screw hole 505a at the first mounting hole 105 and 205 position of the second mounting hole respectively.Described first is anti- Fixed plate 501 is fallen along the length direction of second guide rail 200 (Fig. 5 f X-X ') and positioned at the anti-fall screw hole of the master It is spaced apart at the leftward position of 505a and is equipped at least one anti-fall screw hole 505b.The first anti-fall fixed plate 501 is along institute State the length side (Fig. 5 f Z-Z ') of the first guide rail 100 upwards, and the interval at the top position of the anti-fall screw hole 505a of the master Offer at least one anti-fall screw hole 505b.It is provided with and the described first anti-fall fixation in the second anti-fall fixed plate 502 The anti-fall screw hole 505a of the corresponding master of plate 501 and time anti-fall screw hole 505b, that is, allow to wear bolt 101 can be anti-fall by the master Screw hole 505a and described anti-fall 505b, the described first anti-fall fixed plate 501 and the second anti-fall fixed plate 502 is fixed On first guide rail 100 and second guide rail 200.
In some embodiments, be additionally provided in anti-fall screw hole 505 mounting hole 105 on 509 pairs of perforating rails of a support sleeve, 205 and anti-fall connector on anti-fall screw hole 505.In some embodiments, the support sleeve be not passed through mounting hole 105, 205, but bear against its both ends in guide rail two sides side wall (for example, the first guide wall 106, the second guide wall 206, third Guide wall 206x) medial surface on.The support sleeve 509 auxiliary to wearing bolt 101 to wearing mounting hole and anti-fall screw hole 505, and And more preferable support is provided for the holder combination, preventing guide rail, deformation occurs (in particular for the first of no side wall inner bead Guide rail/column).In some embodiments, the support sleeve 509 uses hollow cylindrical structure.In some embodiments, described Support sleeve 509 is cut by seamless steel pipe.
In some embodiments, when the outer edge 108a of the first guide wall 106 of used first guide rail 100 is all made of Planar structure, that is, be not provided with crimping, in the anti-fall screw hole of the first guide rail join domain 500a of the anti-fall connector It is provided with the support sleeve 509.The first guide rail 100 for being not provided with crimping is easy the rotational deformation after suspension, therefore uses First guide rail, 100 rotational deformation can be prevented to the support sleeve 509 for wearing anti-fall screw hole 505 and the first mounting hole 105, to support The structure of first notch increases the stability of holder combination.
In some embodiments, by solid to bolt 101 is worn between first guide rail 100 and second guide rail 200 Fixed connection, wears bolt 101 for described pair and sequentially passes through the first mounting hole 105 of 100 side of the first guide rail, described second respectively Second mounting hole 205 of 200 side of guide rail, the anti-fall screw hole 505a of master in the first anti-fall fixed plate 501, described First mounting hole 105 of second mounting hole 205 of two guide rails, 200 other side and 100 other side of the first guide rail It is fixedly connected afterwards with main nut 102.
By being fixedly connected to wearing bolt 101 between first guide rail 100 and the anti-fall connector 500.It is described right It wears bolt 101 and sequentially passes through first mounting hole 105 of 100 side of the first guide rail, first mounting hole respectively First mounting hole 105 and the main nut 41 of support sleeve 509 and 100 other side of the first guide rail in 105 are fixed Connection.By being fixedly connected to wearing bolt 101 between second guide rail 200 and anti-fall connector 500.Described pair is worn bolt 101 sequentially pass through second mounting hole 205 of 200 side of the second guide rail, the institute in the first anti-fall fixed plate 501 respectively Second mounting hole 205 and the main nut 41 for stating time anti-fall screw hole 505b and 200 other side of the second guide rail are fixed Connection.
In some embodiments, first mounting hole 105 and second mounting hole 205 are square the rotation of 45 ° of hole Assume diamond in shape shape setting after turning, and the anti-fall screw hole 505 of the master is then round hole.
In further embodiments, first mounting hole 105 and second mounting hole 205 are all made of ellipse, and And ellipse long axis is consistent with the length direction of first guide rail 100 and second guide rail 200, and the anti-fall screw hole of the master 505 are round hole.
Holder combination can neatly be adjusted by increasing and decreasing anti-fall connector using the technical advantage of anti-fall connector Load-bearing capacity, with the actual conditions of Matching installation status.For example, if it find that the pipeline weight of erecting bed is larger, then originally Invention only needs to increase the quantity of anti-fall connector, and/or increases the size of screw hole and the quantity of screw hole on anti-fall connector, It can solve.In the prior art, when needing to carry heavy pipeline, it usually needs use special heavy duty guide rail and bracket group It closes, it is necessary to design and purchase in advance, it is difficult to flexibly be handled according to in-site installation situation, be easy to produce waste, increase installation cost.
Embodiment 3
This example and embodiment 1,2 the difference is that, further include third guide rail 200x and adjustable connecting components 600.Some In embodiment, the third guide rail 200x and second guide rail 200 constitute the horizontal gird in holder combination, used Structure is identical, but may have different length.
In some embodiments, the third guide rail 200x uses U-shaped groove structure, including third guide wall 206x and third Third mounting hole 205x is set on notch 203x, the third guide wall 206x.The adjustable connecting components 600 include being fixedly connected Third guide rail interconnecting piece (being alternatively referred to as " support portion " in some embodiments) 602 and the first guide rail interconnecting piece (in some realities Apply in example alternatively referred to as " clamping portion ") 601.The third guide rail interconnecting piece 602 includes connector mounting hole 606, by wearing Bolt 101 is to wearing the third mounting hole 205x and the connector mounting hole 606 for the third guide rail 200x and described the Three guide rail interconnecting pieces 602 are fixedly connected.
In some embodiments, the first guide rail interconnecting piece 601 includes at least a pair of adjustable clamping side plate 607, described Multiple adjustable screw holes 608, the multiple adjustable continuously intersection of screw hole 608 are set at least a pair of adjustable clamping side plate 607 Arrangement, and the center of the multiple adjustable screw hole 608 is located in same vertical line.Vertical line described herein is referred to when described Such as Fig. 6 a of adjustable connecting components 600 is when being placed on a horizontal plane, perpendicular to the vertical line of this horizontal plane;Also when whole After a holder combination is mounted well, perpendicular to the vertical line of ground level.
In some embodiments, the spacing at the center of the multiple adjustable screw hole 608 of direct neighbor is 1 centimetre, is allowed The adjustable connecting components 600 can carry out fine position along first guide rail 100 as unit of 1 centimetre.
In some embodiments, the positive diamond shape screw hole group that the multiple adjustable screw hole 608 is arranged by multiple continuous intersections At (i.e. four interior angles of diamond shape are right angle;Positive diamond shape screw hole) (such as Fig. 6 a).Such positive diamond shape screw hole is provided to bolt Power be supported on two groups of lopsided inclined-planes of diamond hole and form shearing force, effectively dispersed stress surface and made stress more The situation for adding deformation and fracture caused by uniformly avoiding bracket due to discontinuity, improves the safety that bracket uses Can, extend its service life.In particular for adjustable connecting components 600, the demand finely tuned when installation can be taken into account using diamond shape screw hole
In some embodiments, the third guide rail interconnecting piece 602 is led including third rail support plate 604c, two panels third Rail fixed plate 604a, 604b.The third rail support plate 604c is arranged in the two panels third guide rail fixed plate (in some realities Apply in example alternatively referred to as " fixed gusset ") between 604a, 604b.The two panels third guide rail fixed plate is (in some embodiments Alternatively referred to as " fixed gusset ") one or more connector mounting holes 606 are respectively provided on 604a, 604b.The third guide rail 200x is placed on the third rail support plate 604c, and two panels third guide rail fixed plate 604a, 604b passes through described It connects mounting hole 606 and the third mounting hole 205x and the third guide rail 200x is fixed on the third guide rail interconnecting piece On 602.
In some embodiments, the third guide rail 200x is single side channel steel or Two bors d's oeuveres channel steel.
In some embodiments, one or more tube banks are additionally provided on the third guide rail 200x (for example, air hose pipe Card, keeping beam, vermiculite insulation tube bank).
In some embodiments, the third guide rail 200x and the first guide rail 100 are mutually right angle.
In some embodiments, the third mounting hole 205x is using oblong or ellipse or round rectangle.Some In embodiment, the third mounting hole 205x is with 5 centimetres of spacing arrangement on third guide wall 206x.In some embodiments In, third guide rail graduation mark 207x, the third guide rail graduation mark 207x mark are provided on the outside third guide wall 206x The position of the bright third mounting hole 205x, measures size and capturing position during installation convenient for construction worker.
In some embodiments, including saddle connector 700, the section of the saddle connector 700 are zigzag shape, including Saddle transverse slat 701, saddle support plate 702, saddle fixed plate 703.The saddle transverse slat 701, the saddle support plate 702, institute Stating saddle fixed plate 703 includes saddle fixation hole 704.The saddle transverse slat 701 and the saddle support plate 702 pass through institute It states saddle fixation hole 704 and first guide rail 100, second guide rail 200, and/or the third guide rail 200 ' is solid Fixed connection.The saddle fixed plate 703 be fixedly connected by the saddle fixation hole 704 with a surface (for example, metope, ground, Steel construction).In some embodiments, the saddle fixation hole 704 in the saddle fixed plate 703 is arranged to ellipse.
Embodiment 4
Referring to Fig. 8, the present embodiment is related to a kind of Indoor environment finished product Anti-dropping rack combination 800, including a pair first Guide rail 810a, 810b, at least one second guide rail 820, at least one third guide rail 821;The pair of first guide rail 810a, First notch 812a, 812b of 810b is oppositely arranged;The both ends of at least one second guide rail 820 are individually positioned in opposite set In described first notch 812a, the 812b set, and it is fixedly connected in such a way that bolt is through;At least one described third guide rail 821 both ends then pass through adjustable connecting components 860 and connect 810a, 810b with the pair of first guide rail;The adjustable connecting components 860 It is fixedly connected in such a way that bolt is through at least one described third guide rail 821;The adjustable connecting components 860 and described one There are multiple fixed positions to first guide rail 810a, 810b, and the adjustable connecting components are fixed on institute in such a way that bolt is through It states on one in multiple fixed positions.Such holder combination provides double-deck (or multilayer) guide rail, can support simultaneously more Class pipeline.Especially third guide rail is connect in (direction Fig. 8, Z-Z ') by adjustable connecting components with the first vertical guide rail, therefore is propped up Frame installer second guide rail 820 according to the duct size flexible modulation of required support and the third guide rail 821 The distance between m.
In some embodiments, the pair of first guide rail 810a, 810b are by a pair of pedestal 840a, 840b by vertically solid It is scheduled on the lower section an of horizontal plane (for example, ceiling, house beam).In some embodiments it is contemplated that the side of holder combination It may need to carry more weight, heavy pedestal 840b can be used, first guide rail of the side that need to carry more weight hangs down Directly it is fixed on the lower section an of plane (for example, ceiling, house beam, rail).And the relatively small number of side of load capacity then can be with First guide rail is vertically fixed on to the lower section an of plane (for example, ceiling, house beam, rail) using light-duty pedestal 840a. For example, should then select heavy type when the pipeline of required support is the water pipe of 100DN or more (i.e. 100 millimeters of diameter or more) Pedestal.Such finished product holder combination can be used to supported weight multiple pipelines unevenly distributed, for example, when heavy pipeline and When light pipe is placed on simultaneously on a guide rail, the load-bearing pressure of side is greater than the other side.At this point, using the branch in this example Frame combination (side uses light-duty pedestal using heavy pedestal, side), can save while meeting load-bearing and demand for security Material cost.
In some embodiments, the holder combination 800 further includes one or more a few font saddle connectors 870, will In the pair of first guide rail 810a, 810b, at least one described second guide rail 820 and at least one described third guide rail 821 One or more be horizontally fixed on the side of a vertical plane.The holder combination of this example can be allowed using saddle connector 800 adapt to more polynary installation environment, can be installed on different surfaces.
In some embodiments, the holder combination 800 further includes anti-fall connector 850, the anti-fall connector 850 It is placed on the position that first guide rail 810 is connect with second guide rail 820, and is also secured to described first and led On rail 810 and second guide rail 820.For example, the anti-fall connector 850 can be placed on the of first guide rail simultaneously It in one notch and in the second notch of second guide rail, and is fixedly connected, reaches with the first guide wall and the second guide wall simultaneously To the technical effect of reinforcing guide rail connection, and increase the load-bearing capacity and stability of entire holder combination 800.
In some embodiments, the anti-fall connector 850 includes being used for the through anti-fall screw hole of bolt, the anti-fall spiral shell Support sleeve is provided in hole.Installation personnel, quality inspection personnel can be allowed more to hold to be fixedly connected using the through mode of bolt The case where seeing bolt of changing places so as to handle inappropriate installation in time evades security risk.
In some embodiments, it is provided in first notch of first guide rail 810a, 810b of described at least a pair Guide rail reinforcer 830, the guide rail reinforcer 830 withstand guide wall using hard material in first notch, support institute State the shape of the first notch.Using guide rail reinforcer 830 can more securely the position of supporting guide side wall, keep guide rail notch Shape prevent guide rail from deforming after right angle setting to further enhance the support effect of guide rail reinforcer (be especially adapted for use in those length longer, vertically arranged guide rail).
In some embodiments, the holder combination includes at least first guide rail 810a, 810b of a pair, at least one second Guide rail 820 and at least one third guide rail 821.Described at least first guide rail 810a, 810b of a pair is rigid using U-type groove, U-type groove The opening of mouth is oppositely arranged.The both ends of second guide rail 820 are separately placed the pair of first guide rail 810a, 810b Notch in, by wearing bolt 801 to the first mounting hole and second guide wall at least a pair of first guide wall Upper second mounting hole is fixedly connected.Its both ends is fixed on described at least one by adjustable connecting components 860 by the third guide rail 821 To on the first guide rail 100, and fine position can be carried out.In some embodiments, described first guide rail 810a, 810b pass through 840 times of fixations of pedestal are on a surface.In some embodiments, described first guide rail 810a, 810b pass through saddle connector 870 fix on a surface.In some embodiments, setting one or more in the U type slot of described first guide rail 810a, 810b A guide rail reinforcer.
In some embodiments, the holder combination further includes guide rail end cap 880, and PE material can be used, be mounted on guide rail End can to avoid installation when scratch worker, dust-proof effect is provided and can prevent channel steel end aoxidize.In some realities It applies in example, the holder combination further includes nut retainers, and the nut retainers can be used to hold-doun nut (for example, flange Nut), it installs and adjusts convenient for worker.The nut retainers can use PE material.
Embodiment 5
Referring to Fig. 9, the present embodiment is related to a kind of Indoor environment finished product Anti-dropping rack, including a head piece 100a, one To straight down and be oppositely arranged on 100 both ends of head piece vertical beam 100b and at least one be arranged in the pair of vertical beam The one or more support beams 200 being intervally arranged between 100b and along the length direction of vertical beam 2.The head piece 100a with A guide rail connector 900 is respectively arranged between vertical beam 100b.The head piece 100a, the vertical beam 100b, the support are horizontal Beam 200 and the guide rail connector 900 are all made of U-type groove structure, include two sides side wall and bottom wall.Divide on the two sides side wall It is not spaced apart along its length and is equipped with one group of head piece screw hole 105a, one group of vertical beam screw hole 105b, one group of support beam screw hole 205 With one group of guide rail connector screw hole 905.
In some embodiments, the crossbeam screw hole 105a, the vertical beam screw hole 105b, the support beam screw hole 205 With the shape setting that assumes diamond in shape after 45 ° of the respectively square hole of guide rail connector screw hole 905 and rotation, so that each crossbeam spiral shell Hole 105a, the vertical beam screw hole 105b, the support beam screw hole 205 and the guide rail connector screw hole 905 are formed by water chestnut One diagonal line in shape hole connects along the head piece 100a, the vertical beam 100b, the support beam 200 and the guide rail respectively The length direction of connector 900 extends.
In some embodiments, the cross sectional shape of the head piece 100a and the vertical beam 100b are in U-shape respectively.Wherein institute State head piece 100a Open Side Down (that is, Fig. 8 is from Z to Z ' direction).The notch 103b of the pair of vertical beam 100b is facing with each other Face is oppositely arranged.The cross sectional shape of the guide rail connector 900 is equally in U-shape, the open end two sides of the guide rail connector 900 It is respectively turned inwards and is formed with and reinforces side/inner bead 908.
Connected respectively by head piece screw 101a structure to be fixed between the head piece 100a and the guide rail connector 900 Connect, specifically, the head piece screw 101a sequentially pass through head piece screw hole 105b on the head piece 100a one side, The connector screw hole on guide rail connector screw hole 905a, 900 another side of guide rail connector on 900 one side of guide rail connector It is fixedly connected after head piece screw hole 105a on 905a and the another side the head piece 100a with head piece nut 102a.
Respectively by vertical beam screw 101b structure to be fixedly connected between the vertical beam 100b and the guide rail connector 900, Specifically, the vertical beam screw 101b sequentially passes through vertical beam screw hole 105b, guide rail connector on the vertical beam 100b one side The guide rail connector screw hole 905b on guide rail connector screw hole 905b, 900 another side of guide rail connector on 900 one sides It is fixedly connected with after the vertical beam screw hole 105b on the another side the vertical beam 100b with vertical beam nut 102b.
Further, in some embodiments, the cross sectional shape of the support beam 200 is also in U-shape, the support beam 200 203 opening upwards of notch and open end two sides are respectively turned inwards and are formed with crossbeam installation side/inner bead 208, Passing through support beam screw 101c structure between the support beam 200 and the vertical beam 100b respectively is to be fixedly connected.Specifically, The support beam screw 101c sequentially passes through vertical beam screw hole 105c on the vertical beam 100b one side, the support beam Support beam screw hole 205 on 200 one sides, the support beam screw hole 205 ' on 200 another side of the support beam and institute The vertical beam screw hole 105c ' on the another side vertical beam 100b is stated to be fixedly connected with the support beam nut 102c afterwards.
Further, in some embodiments, the support beam 200 is on the side bottom surface opposite with its open end And it is spaced apart is equipped with multiple support beam fixation holes 209 along its length.The hole shape of the fixation hole 209 is strip hole or circle Hole, two kinds of interruption-like cross arrangements of hole shape.
Further, in some embodiments, the head piece 100a, the vertical beam 100b, the support beam 200 Be arranged at intervals with along its length respectively on the two sides of guide rail connector 900 head piece scale 107a, vertical beam scale 107b, Support beam scale 207 and guide rail connector scale 907.
During installation, the head piece screw 101a, the vertical beam screw 101b and the support beam screw 101c are each From across the corresponding head piece screw hole 105a, the vertical beam screw hole 105b, the support beam screw hole 205 and the guide rail Connector screw hole 905, and it is respectively supported at the head piece screw hole 105a, the vertical beam screw hole 105b, the support beam spiral shell On hole 205 and two groups of lopsided inclined-planes of the constituted diamond hole of the guide rail connector screw hole 905, it is formed simultaneously shearing force Producing balanced forces improve what bracket used so as to avoid bracket because of the situation of deformation and fracture caused by discontinuity Security performance extends its service life.
Embodiment 6
Referring to Fig. 10, the present embodiment is related to a kind of combination of Indoor environment finished product Anti-dropping rack, including at least a pair of the One guide rail 100, at least one second guide rail 200.The opening of the U type slot of at least a pair of first guide rail 100 is oppositely arranged. The both ends of second guide rail 200 are separately placed in the notch of the pair of first guide rail 100, by wearing bolt 101 First mounting hole at least a pair of first guide wall is fixedly connected with the second mounting hole in second guide wall.
In some embodiments, the pair of first guide rail 100 is consolidated by one or more saddle connectors 700 respectively (Figure 10 a-Figure 10 c) is scheduled on a surface 1005.
In some embodiments, the pair of first guide rail 100 is fixed on a surface 1005 by pedestal respectively (Figure 10 d-Figure 10 f).
In some embodiments, at least a pair of first guide rail 100 is being connect at least one described second guide rail 200 Place is additionally provided with anti-fall connector 500, enhances the bonding strength between the first guide rail 100 and the second guide rail 200, allows the bracket group Conjunction can carry bigger weight (Figure 10 a-figure f).
In some embodiments, pipeline fixed plate 1001 is additionally provided at least one described second guide rail 200.Such as figure Shown in 10a, Figure 10 d, square pipe (for example, cable testing bridge) 1002 is fixed on the branch by the two pipeline fixed plates 1001 in left and right Frame group is closed.
In some embodiments, the holder combination can directly carry a biggish square pipe (for example, by 6 millis Air hose made of rice iron sheet) 1003 (as shown in Figure 10 b, Figure 10 e).
In some embodiments, tube bank 1004 (such as Figure 10 c, figure are additionally provided at least one described second guide rail 200 Shown in 10f).The tube bank 1004 can be one or more of air hose pipe clamp, keeping beam, vermiculite insulation tube bank.
Embodiment 7
Figure 11 is please referred to, the present embodiment is related to a kind of finished product holder combination, including the first guide rail 1110 and the second guide rail 1120, U-shaped groove structure, including the first guide wall and the first notch, first guide wall can be used in first guide rail 1110 On be provided at least one set of first guide rail mounting hole 1112, the length direction along first guide rail 1110 arranges (Figure 11 a, Z- The direction Z ').Second guide rail 1120 also uses U-lag mechanism, including the second guide wall and the second notch, second guide rail At least one set of second guide rail mounting hole 1122 is provided on wall, along the second rail length direction arrangement (side Figure 11 a, X-X ' To);Also, wherein one end of second guide rail 1120 is placed in first notch, and by described at least one set of One or more of one guide rail mounting hole 1112 at least one set of second guide rail mounting hole 1122 one or more It is aligned by bolt to wearing, so that first guide rail 1110 is fixedly connected with second guide rail 1120.Described in this example In finished product holder combination, first guide rail 1110 after installation is complete perpendicular to horizontal plane, pacifying by second guide rail 1120 It is parallel to the horizontal plane after the completion of dress.When the finished product holder combination of this example uses above-mentioned bolt to connection type is worn, because bolt Some parts can be exposed on the outer surface (for example, bolt head, nut) of holder combination, can allow installation personnel, quality inspection personnel It is more easily observed whether the connection between guide rail and guide rail has been correctly completed, to evade in the prior art because adopting It is difficult to check whether lock rack gear stings tight guide rail channel steel curls inward type side when fastening connection piece and guide rail with section steel lock catch, and then produced The problem of raw security risk.Moreover, multiple guide rail mounting holes are provided on the guide rail of this example, when being bolted, In order to increase safety, the position that mounting hole neatly can be provided near connecting portion according to load bearing demand is further added by It is more bolted, to simplify the maintenance of finished product holder combination, maintenance and reinforcement.
In some embodiments, the holder combination further includes guide supporting set 1150.1150 packet of guide supporting set Include the first support sleeve arm 1150a and the second support sleeve arm 1150b;The first support sleeve arm 1150a and second support sleeve Arm 1150b respectively includes one or more support sleeve fixation holes 1152, respectively at least one set of first guide rail mounting hole described in (i) One or more alignment in one or more of 1112, and (ii) described at least one set of second guide rail mounting hole 1122, And by bolt to wearing, to the first support sleeve arm 1150a and the second support sleeve arm 1150b are separately fixed at described In first guide wall and second guide wall.The guide supporting set 1150 can be enhanced and reinforce rail attachment point, be promoted The load of holder combination.Moreover, because guide supporting set 1150 using the form of fixation hole installer can pacify Security risk is easily handled by installation guide supporting set 1150 when dress, quality inspection and maintenance.
In some embodiments, the first support sleeve arm 1150a and the second support sleeve arm 1150b are respectively further comprised One or more support sleeve adjustable ports 1154, respectively with one at least one set of first guide rail mounting hole 1112 described in (i) or It is multiple, and one or more alignment in (ii) described at least one set of second guide rail mounting hole 1122, and by bolt to wearing, from And the first support sleeve arm 1150a and the second support sleeve arm 1150b are separately fixed at first guide wall and institute It states in the second guide wall;The support sleeve adjustable port includes adjustable port long side and adjustable port short side, and the adjustable port short side allows Bolt passes snugly through, and the adjustable port long side allows bolt to move along the adjustable port long side.Using support sleeve adjustable port Technological merit is to allow installer that can carry out fine position when installing the support sleeve on guide rail (i.e. by long along adjustable port Move bolt in side), when solving the problems, such as to assemble holder combination now because subtle position deviation there may be (for example, because Fashioned iron position deviation leads to be difficult to alignment track mounting hole and guide supporting covers fixation hole, leads to be difficult to realize bolt to wearing).
In some embodiments, the holder combination uses mating bolt and matching nut.It is tightened in installation described mating When bolt 101, the 102 not transfer of matching nut;The preparatory fixed placement of the matching nut 102 is installed in first guide rail Hole 1112 and second guide rail mounting hole 1122 are located inside, for receiving the mating bolt.Such mating bolt and Matching nut, which allows, installation and safeguards that simpler-worker need to only twist bolt the fastening of bolts and nuts can be realized, avoid because The technical issues of twisting nut is difficult to for reasons such as installation site narrow spaces.
In some embodiments, first guide wall and second guide wall include the symmetrical guiding cheekn in two sides The guide rail bottom wall 1116c of 1116a, 1116b and the connection symmetrical guiding cheekn in two sides;First guide wall and described the Guiding cheekn of two guide walls in the same side is fixedly connected by the guide supporting set.In other words, guide rail and rail attachment point Two guide supporting sets 1150 of Matching installation are at least wanted, the two sides of guide rail are separately mounted to, by different guide rails leading in the same side Rail wall is fixedly connected.For the guide rail using U-shaped/C-shaped channel steel, can be balanced, steadily using two panels guide supporting set It is attached and reinforces from two sides to guide rail, the stability of lift rail connection.
With reference to Figure 11 b (a kind of embodiment of-i.e. Figure 11 a along the cross section that dotted line is cut), the first of the holder combination Guide rail and the second guide rail are all made of U-shaped/C-shaped channel structure, and using mating bolt carried out with matching nut guide rail connect and Fasten two panels guide supporting set: when the mating bolt 101 is tightened in installation, the 102 not transfer of matching nut;It is described mating The preparatory fixed placement of nut 102 is located in notch in first guide rail mounting hole 1112 and second guide rail mounting hole 1122 Inside, for receiving the mating bolt 101.Such mating bolt and matching nut allow installation and maintenance it is simpler- Worker, which need to only twist bolt, can be realized the fastening of bolts and nuts, avoid because of guide rail notch narrow space, worker is difficult to Tool is put into notch the technical issues of twisting nut.
Certainly, in some embodiments, the holder combination can also use elongated bolt 101, entirely lead to wearing completely Rail cross section (another embodiment of Figure 11 c-i.e. Figure 11 a along the cross section that dotted line is cut), i.e., the described elongated bolt 101 according to It is secondary to cover the support sleeve fixation hole 1152 or 1154 on 1150a across (i) a piece of guide supporting, side in (ii) first guide wall Mounting hole 1112, on the mounting hole 1112 of the other side in (iii) first guide wall, with (iv) another guide supporting set 1150a Support sleeve fixation hole 1152, finally match and tighten with nut.
Mode when bolt is to perforating rail support sleeve and the second guide rail is similar with aforesaid way, can also use above-mentioned matching The mode or the through mode of elongated bolt of bolt/nut.
In some embodiments, the edge of the first support sleeve arm 1150a and the second support sleeve arm 1150b are equal It is provided with support sleeve in-flanges 1156 (Figure 11 c);The outer edge of first guide wall 1110 and second guide wall 1120 It is enclosed within the support sleeve in-flanges 1156.Support sleeve arm can be allowed closer, accurate using support sleeve in-flanges 1156 Ground is engaged guide wall, and supporting point (i.e. guide wall outer edge withstands support sleeve in-flanges) is further added by except bolt, allows The guide rail connection of finished product holder combination is more stable and firm.
In some embodiments, guide supporting set uses L-type structure, the first support sleeve arm and second described Support set arm is mutually right angle.Other than L-type, the guide supporting set can also be such as trapezoidal (with reference to figure from using other structures 11d), a part of the trapezoidal rails support sleeve is covered in the first guide wall (i.e. the first support sleeve arm) 1150a, another A part is then covered in the second guide wall (i.e. the second support sleeve arm) 1150b, reinforce first guide rail (vertical beam) with it is described The connection of second guide rail (crossbeam), increases the load-bearing capacity of holder combination.
In some embodiments, the support sleeve fixation hole 1152 is using round, the adjustable 1154 hole use of support sleeve Oblong or ellipse.
In some embodiments, the finished product Anti-dropping rack combination, including the first guide rail 1110,1120 and of the second guide rail Guide supporting set 1150.First guide rail 1110 and second guide rail 1120 are provided with two rows in its longitudinal direction respectively First mounting hole 1112 and two ranked second mounting hole 1122.The guide supporting set 1150 is whole L-shaped, including the first guide rail connects Arm 1150a and the second guide rail linking arm 1150b are met, each guide rail interconnecting piece includes one or more support sleeve fixation holes and one A or multiple support sleeve adjustable ports.The one row support sleeve fixation hole 1152 is made of multiple circular holes, wherein at least one circular hole It can be matched at least one mounting hole (i.e. described first mounting hole or second mounting hole) on guide rail, make bolt can be with To wearing, and the row support sleeve fixation hole 1152 and mounting hole 1112,1122 are passed sequentially through, thus by guide rail and guide supporting Set is fixedly connected.
In some embodiments, the row support sleeve adjustable port 1154 include at least one slotted hole, described at least one A slotted hole can be matched at least one mounting hole (i.e. described first mounting hole or second mounting hole) on guide rail, be made Bolt can be to wearing, and passes sequentially through the row support sleeve adjustable port 1154 and mounting hole 1112,1122, thus by guide rail with Guide supporting set is fixedly connected.
In some embodiments, first guide rail 1110 and second guide rail 1120 are all made of U-type groove structure, including Parallel opposite a pair of guide rails side wall and the bottom wall for connecting the pair of guiding cheekn.Using guide supporting set 1150 When connecting first guide rail 1110 and second guide rail 1120, the guiding cheekn of every side passes through the guide supporting set It is fixedly connected.In other words, each junction of first guide rail 1110 and second guide rail 1120 uses two A guide supporting set 1150.
Embodiment 8
The purpose of the present embodiment is to provide for a kind of Indoor environment Anti-dropping rack right-angle connector structure, facilitates excellent Change connection structure and use the bonding strength improved between vertical beam and crossbeam, is conducive to the connection structure for optimizing connector and vertical beam And use the problem of preventing the two sides side wall of vertical beam from deforming to vertical beam caused by contract and crossbeam can not be installed again.
What the purpose of the present embodiment was such to reach, a kind of Indoor environment Anti-dropping rack right-angle connector structure, The Indoor environment Anti-dropping rack includes vertical beam and crossbeam, and the section of the vertical beam is in U-shape and relative to each other two It is respectively separated along its length on the side wall of side and offers one group of vertical beam screw hole, the section of the crossbeam is equally in U-shape and at that It is respectively separated along its length on this opposite two sides side wall and offers one group of crossbeam screw hole, the vertical beam and crossbeam are connecting Place is provided with right-angle connector, which is characterized in that the right-angle connector includes a connection piece ontology, the connector ontology by One connecting plate and a pair are connect respectively with connecting plate two sides and the fixed plate composition disposed in parallel that faces each other, described Fixed plate offers respectively at the junction of vertical beam and crossbeam and vertical beam screw hole and crossbeam screwhole position relative to junction One main connecting hole, the fixed plate are respectively separated on the length direction along crossbeam and at the leftward position of main connecting hole Offer at least one crossbeam connecting hole, top of the fixed plate on the length direction along vertical beam and positioned at main connecting hole It is spaced apart respectively at position and is equipped at least one vertical beam connecting hole, be equipped with a support tube in the vertical beam connecting hole, the branch The both ends of stay tube are born against on the medial surface of vertical beam two sides side wall.
In some embodiments, it is fixedly connected between the vertical beam and crossbeam by main screw, the main screw point The vertical beam screw hole of vertical beam side, the crossbeam screw hole of crossbeam side, the main connecting hole in fixed plate, the crossbeam other side are not sequentially passed through Crossbeam screw hole and the vertical beam other side vertical beam screw hole after be fixedly connected with main nut.
In some embodiments, it is fixedly connected between the vertical beam and connector ontology by vertical beam screw, it is described Vertical beam screw sequentially passes through the vertical beam of the vertical beam screw hole of vertical beam side, the support tube in vertical beam connecting hole and the vertical beam other side respectively Screw hole is fixedly connected with vertical beam nut.
In some embodiments, it is fixedly connected between the crossbeam and connector ontology by crossbeam screw, it is described Crossbeam screw sequentially passes through the crossbeam of the crossbeam screw hole of crossbeam side, the crossbeam connecting hole in fixed plate and the crossbeam other side respectively Screw hole is fixedly connected with crossbeam nut.
In some embodiments, the vertical beam screw hole and crossbeam screw hole are square hole and assume diamond in shape shape after 45 ° of rotations Setting.
In some embodiments, the main connecting hole is round hole.
The present embodiment after adopting the above structure, has the advantages that firstly, since connector ontology is distinguished by screw It is to be fixedly connected, thus improve between vertical beam and crossbeam with the junction structure of both crossbeams with vertical beam, crossbeam and vertical beam Bonding strength;Secondly, bearing against and being supported on perpendicular by the both ends of support tube by the extension supporting pipe in vertical beam connecting hole On the medial surface of the two sides side wall of beam, it is thus possible to the deformation for preventing the two sides side wall of vertical beam from generating by shrinkage stress, and Any influence will not be generated to crossbeam is installed again;Third, vertical beam, crossbeam screw hole on vertical beam and crossbeam using after diamond hole, when For connector ontology when being fixedly connected with crossbeam, vertical beam by screw, power is supported on two groups of lopsided inclined-planes of diamond hole Shearing force is gone up and formed, stress surface has effectively been dispersed and makes to be more uniformly stressed, beam body is avoided and is made because of discontinuity At deformation and fracture situation, extend service life.
Embodiment 9
The task of the present embodiment is to provide for a kind of Indoor environment Anti-dropping rack, helps to optimize Screw hole structure and use Increase stress surface be uniformly dispersed in active force around tie point, is conducive to avoid the occurrence of deformation of timbering in extreme circumstances The case where with fracture.
What the task of the present embodiment was performed by, a kind of Indoor environment Anti-dropping rack, including a head piece, a pair Straight down and be oppositely arranged on head piece both ends vertical beam and at least one the length between two vertical beams and along vertical beam is set The support beam that direction is intervally arranged is respectively arranged with a connector between the head piece and vertical beam, it is characterised in that: institute It is spaced apart along its length respectively on the two sides side wall of head piece, vertical beam, support beam and the connector stated and is equipped with one group of top cross Beam screw hole, one group of vertical beam screw hole, one group of support beam screw hole and one group of connector screw hole, the crossbeam screw hole, vertical beam screw hole, Support beam screw hole and connector screw hole are respectively square hole and the shape setting that assumes diamond in shape after rotating 45 °, so that each crossbeam Screw hole, vertical beam screw hole, support beam screw hole and connector screw hole be formed by a diagonal line of diamond hole respectively along head piece, The length direction of vertical beam, support beam and connector extends.
In some embodiments, the cross sectional shape of the head piece and vertical beam is in U-shape respectively, wherein the opening of head piece Downwards, the opening of vertical beam, which faces each other, is oppositely arranged;The cross sectional shape of the connector is equally in U-shape, the connector Open end two sides are respectively turned inwards and are formed with and reinforce side, pass through head piece spiral shell between the head piece and connector respectively Nail structure is to be fixedly connected, and the head piece screw sequentially passes through head piece screw hole on head piece one side, connector side After the head piece screw hole on the connector screw hole and head piece another side on connector screw hole, connector another side on face It is fixedly connected with head piece nut;It is described respectively by vertical beam screw structure to be fixedly connected between the vertical beam and connector Vertical beam screw to sequentially pass through the vertical beam screw hole on vertical beam one side, the connector screw hole on connector one side, connector another It is fixedly connected after the vertical beam screw hole on connector screw hole and vertical beam another side on one side with vertical beam nut.
In some embodiments, the cross sectional shape of the support beam is in U-shape, the opening upwards of the support beam and Open end two sides are respectively turned inwards and are formed with crossbeam installation side, pass through support between the support beam and vertical beam respectively Crossbeam screw structure is to be fixedly connected, and the support beam screw sequentially passes through vertical beam screw hole, support cross on vertical beam one side It is perpendicular on the support beam screw hole and vertical beam another side on support beam screw hole, support beam another side on beam one side It is fixedly connected after beam screw hole with support beam nut.
In some embodiments, the support beam is on the side bottom surface opposite with its open end and along its length It is spaced apart and is equipped with multiple fixation holes, the hole shape of the fixation hole is strip hole or circular hole, the interruption-like intersection row of two kinds of hole shapes Cloth.
In some embodiments, respectively along length on the two sides of the head piece, vertical beam, support beam and connector Direction is arranged at intervals with head piece scale, vertical beam scale, support beam scale and connector scale.
The present embodiment after adopting the above structure, has the advantages that firstly, since by the crossbeam screw hole of square, erecting Beam screw hole, support beam screw hole and connector screw hole assume diamond in shape after rotating 45 ° respectively shape setting, so that the one of each diamond hole Diagonal line extends along the length direction of head piece, vertical beam, support beam and connector respectively, thus screw with crossbeam spiral shell When hole, vertical beam screw hole, support beam screw hole and connector screw hole are fixed, power is supported on two groups of lopsided inclined-planes of diamond hole Shearing force is gone up and formed, stress surface has effectively been dispersed and makes to be more uniformly stressed, bracket is avoided and is made because of discontinuity At deformation and fracture situation, improve the security performance that bracket uses, extend its service life;Secondly as head piece, Head piece scale, vertical beam scale, support beam scale and connector is respectively arranged on vertical beam, support beam and connector to carve Degree, thus the installation of bracket can be facilitated and greatly improve the installation effectiveness of bracket, save labor cost.
Anyone skilled in the art without departing from the spirit and scope of the present invention, modify above-described embodiment Or change.Therefore, has usually intellectual in the technical field without departing from disclosed spirit and technology such as All equivalent modifications completed under thought or change should be covered by the claims of the present invention.

Claims (47)

1. a kind of holder combination, including the first guide rail and the second guide rail,
First guide rail uses U-shaped groove structure, including the first guide wall and the first notch, is provided in first guide wall At least a pair of first guide rail mounting hole;
Second guide rail uses U-lag mechanism, including the second guide wall and the second notch, is provided in second guide wall At least a pair of second guide rail mounting hole;
It is characterized in that, the width of first notch is greater than the width of second guide rail, wherein the one of second guide rail End is placed in first notch, and first guide rail and second guide rail are by wearing bolt to wearing described at least one First guide rail mounting hole is fixedly connected at least a pair of second guide rail mounting hole.
2. holder combination as described in claim 1, which is characterized in that first guide wall includes the first guiding cheekn of two sides With the first guide rail bottom wall;The first guide rail bottom wall is arranged between first guiding cheekn of two sides, and the company of being respectively perpendicular The inward flange of first guiding cheekn of two sides is connect, the outer edge of first guiding cheekn of two sides is all made of planar structure.
3. holder combination as claimed in claim 2, which is characterized in that it is additionally provided with guide rail reinforcer on first guide rail, Including guide rail reinforcer interconnecting piece and guide rail reinforcer support portion;The guide rail reinforcer interconnecting piece and first guide rail of two sides Side wall is fixedly connected, so that the guide rail reinforcer is fixedly connected on first guide rail;The guide rail reinforcer support The relative position of first guiding cheekn of two sides is fixed using hard material by portion, stablizes first guiding cheekn of two sides Relative position and shape with the first guide rail bottom wall.
4. holder combination as claimed in claim 3, which is characterized in that be just arranged extremely in the length of each meter of first guide rail A few guide rail reinforcer.
5. holder combination as claimed in claim 4, which is characterized in that the guide rail reinforcer uses U-shaped groove structure, described to lead Rail reinforcer interconnecting piece includes two panels guide rail reinforcer side plate and guide rail reinforcer top plate, the two panels guide rail reinforcer side plate pair Ground is claimed to be arranged on the relative edge of the guide rail reinforcer top plate, the two panels guide rail reinforcer side plate is led with the two sides first Trackside wall fits closely, and is fixedly connected.
6. holder combination as claimed in claim 5, which is characterized in that be respectively arranged on the two panels guide rail reinforcer side plate Reinforcer mounting hole, described pair is worn bolt to the reinforcement mounting hole and first guide rail mounting hole is worn, and the two panels is led Rail reinforcer side plate is fixed in first guide wall.
7. holder combination as claimed in claim 3, which is characterized in that the size of first notch can accommodate the guide rail Reinforcer, the guide rail reinforcer are placed in first notch, strengthen the shape of first guide rail.
8. holder combination as described in claim 1, which is characterized in that first guide rail is single side channel steel.
9. holder combination as described in claim 1, which is characterized in that be provided with the first guide rail on the outside of first guide wall Graduation mark, the first guide rail graduation mark indicate the position of first guide rail mounting hole.
10. holder combination as described in claim 1, which is characterized in that including multiple first guide rail mounting holes, along described first Rail length direction arranges, and a preset first guide rail mounting hole spacing is spaced between each first guide rail mounting hole.
11. holder combination as described in claim 1, which is characterized in that first guide rail mounting hole is using round, and described the One guide rail mounting hole spacing is five centimetres.
12. holder combination as described in claim 1, which is characterized in that second guide wall includes the second rail-sides of two sides Wall and the second guide rail bottom wall, the second guide rail bottom wall is arranged between second guiding cheekn of two sides, and is respectively perpendicular The inward flange of second guiding cheekn of two sides is connected, the outer edge of second guiding cheekn of two sides is respectively to second slot The mouth back-shaped in-flanges in a pair of infolding, the edge of the in-flanges are equipped with positioning tooth socket.
13. holder combination as claimed in claim 12, which is characterized in that be additionally provided on second guide rail one or more Tube bank.
14. holder combination as described in claim 1, which is characterized in that second guide rail is single side channel steel or Two bors d's oeuveres channel steel.
15. holder combination as described in claim 1, which is characterized in that be provided with second on the outside of second guide wall and lead Rail graduation mark, the second guide rail graduation mark indicate the position of second guide rail mounting hole.
16. holder combination as described in claim 1, which is characterized in that including multiple second guide rail mounting holes, along described second Rail length direction arranges, and a preset second guide rail mounting hole spacing is spaced between each second guide rail mounting hole.
17. holder combination as claimed in claim 16, which is characterized in that second guide rail mounting hole uses slotted hole, institute Stating the first guide rail mounting hole spacing is five centimetres.
18. holder combination as described in claim 1, which is characterized in that first guide rail being fixedly connected and described Two guide rails are mutually right angle.
19. holder combination as described in claim 1, which is characterized in that first guide rail mounting hole and second guide rail Mounting hole is all made of 45 ° of shapes that assume diamond in shape of square hole and rotation.
20. holder combination as described in claim 1, which is characterized in that the holder combination further includes pedestal, the pedestal packet Include at least one base fixture and at least one base rail connector;The pedestal include at least one base fixture and At least one base rail connector is fixedly connected, and the pedestal can be fixed on by least one described base fixture On one surface, the pedestal can be fixedly connected by least one described base rail connector with first guide rail.
21. holder combination as claimed in claim 20, which is characterized in that the base rail connector includes multiple base sides Wall is provided with base installing hole on the base side wall, and the multiple base side wall is worn with first guide wall by bolt The base installing hole is crossed with first guide rail mounting hole to be fixedly connected.
22. holder combination as claimed in claim 20, which is characterized in that the base fixture is flat using one or more Plate, one or more described plate is vertical with the multiple base side wall to be connect.
23. holder combination as described in claim 1, which is characterized in that the holder combination further includes anti-fall connector, including First guide rail join domain and the second guide rail join domain;The first guide rail join domain can be placed on first slot In mouthful, it is fixedly connected with first guide rail;The second guide rail join domain can be placed in second notch, with Second guide rail is fixedly connected.
24. holder combination as claimed in claim 23, which is characterized in that the anti-fall connector includes two pieces and is placed in parallel First anti-fall fixed plate and the second anti-fall fixed plate, anti-fall connecting plate;
The anti-fall connecting plate is arranged between the described first anti-fall fixed plate and the second anti-fall fixed plate, and is separately connected The edge of the first anti-fall fixed plate and the described second anti-fall fixed plate;
First side of the first anti-fall fixed plate and the second anti-fall fixed plate is respectively provided with the first anti-fall screw hole, described in formation First guide rail join domain, and being placed in first notch, bolt is to wearing the described first anti-fall screw hole and described first The first guide rail join domain is fixedly connected by guide rail mounting hole with first guide rail;
Second side of the first anti-fall fixed plate and the second anti-fall fixed plate is respectively provided with the second anti-fall screw hole, described in formation Second guide rail join domain, and being placed in second notch, bolt is to wearing the described second anti-fall screw hole and described second The second guide rail join domain is fixedly connected by guide rail mounting hole with second guide rail.
25. holder combination as claimed in claim 24, which is characterized in that the first anti-fall screw hole and/or described second anti- Anti-fall support tube is provided in pendant screw hole, the anti-fall support tube uses hollow cylindrical structure.
26. holder combination as claimed in claim 24, which is characterized in that the first anti-fall fixed plate and described second anti-fall First side of fixed plate is respectively provided at least two first anti-fall screw holes.
27. holder combination as described in claim 1, which is characterized in that further include third guide rail and adjustable connecting components;Described Three guide rails use U-shaped groove structure, including third guide wall and third notch, and setting third guide rail is installed in the third guide wall Hole;The adjustable connecting components include the third guide rail interconnecting piece being fixedly connected and the first guide rail interconnecting piece, and the third guide rail connects Socket part includes connector mounting hole, by bolt to wearing the third guide rail mounting hole and the connector mounting hole for described Three guide rails are fixedly connected with the third guide rail interconnecting piece;The first guide rail interconnecting piece includes at least a pair of adjustable clamping side Multiple adjustable screw holes are arranged at least a pair of adjustable clamping side plate in plate, and the multiple adjustable screw hole continuously intersects cloth It sets, and the center of the multiple adjustable screw hole is located in same vertical line.
28. holder combination as claimed in claim 27, which is characterized in that the third guide rail interconnecting piece includes third guide rail branch Fagging, third guide rail fixed plate A, third guide rail fixed plate B;The third rail support plate setting is fixed in the third guide rail Between plate A and the third guide rail fixed plate B, it is respectively provided on the third guide rail fixed plate A and the third guide rail fixed plate B One or more connector mounting holes;The third guide rail is placed on the third rail support plate, the third guide rail The fixed plate A and third guide rail fixed plate B is by the connection mounting hole and the third guide rail mounting hole by the third Guide rail is fixed.
29. the holder combination as described in claim 27 or 28, which is characterized in that the third guide rail is single side channel steel or Two bors d's oeuveres Channel steel.
30. the holder combination as described in claim 27 or 28, which is characterized in that be additionally provided on the third guide rail it is a kind of or A variety of tube banks.
31. the holder combination as described in claim 27 or 28, which is characterized in that the third guide rail and first guide rail are mutual At right angle.
32. the holder combination as described in claim 27 or 28, which is characterized in that the third guide rail mounting hole is using oval Shape.
33. holder combination as described in claim 1, including saddle connector;The saddle connector uses zigzag shape, including Saddle transverse slat, saddle support plate, saddle fixed plate;The saddle transverse slat, the saddle support plate, the saddle fixed plate are wrapped Include saddle fixation hole;The saddle transverse slat and the saddle support plate by the saddle fixation hole and first guide rail and/ Or second guide rail is fixedly connected;The saddle fixed plate is fixedly connected by the saddle fixation hole with a surface.
34. a kind of holder combination, including a pair of first guide rail, at least one second guide rail, at least one third guide rail;Described one First notch of the first guide rail is oppositely arranged, the both ends of at least one second guide rail are individually positioned in the institute being oppositely arranged It states in the first notch, is fixedly connected in such a way that bolt is through;The both ends of at least one third guide rail pass through adjustable connection Part is connect with the pair of first guide rail;The adjustable connecting components and at least one described third guide rail are in such a way that bolt is through It is fixedly connected;The adjustable connecting components and the pair of first guide rail have multiple fixed points, will be described in such a way that bolt is through Adjustable connecting components are fixed on one in the multiple fixed point.
35. holder combination as claimed in claim 34, which is characterized in that the pair of first guide rail passes through a pair of of pedestal and hung down Directly it is fixed on the lower section of a horizontal plane.
36. holder combination as claimed in claim 34, which is characterized in that including one or more a few font saddle connectors, By one or more in the pair of first guide rail, at least one described second guide rail and at least one described third guide rail It is horizontally fixed on the side of a vertical plane.
37. holder combination as claimed in claim 34, which is characterized in that including anti-fall connector, the anti-fall connector quilt Be placed on the position that first guide rail is connect with second guide rail, and be also secured to first guide rail with it is described On second guide rail.
38. holder combination as claimed in claim 37, which is characterized in that the anti-fall connector includes through for bolt Anti-fall screw hole is provided with anti-fall support tube in the anti-fall screw hole.
39. holder combination as claimed in claim 34, which is characterized in that first slot of at least a pair of first guide rail Guide rail reinforcer, including guide rail reinforcer interconnecting piece and guide rail reinforcer support portion are provided in mouthful;The guide rail reinforcer connects Socket part is fixedly connected with the inner wall in first notch, and the guide rail reinforcer is fixed in first notch;It is described Guide rail reinforcer support portion supports the shape of first notch using hard material.
40. a kind of holder combination, including the first guide rail and the second guide rail,
First guide rail uses U-shaped groove structure, including the first guide wall and the first notch, is provided in first guide wall At least one set of first guide rail mounting hole, arranges along first rail length direction;
Second guide rail uses U-lag mechanism, including the second guide wall and the second notch, is provided in second guide wall At least one set of second guide rail mounting hole, arranges along second rail length direction;
It is characterized in that, wherein one end of second guide rail is placed in first notch, and by at least one set One or more of first guide rail mounting hole be aligned with the one or more at least one set of second guide rail mounting hole by Bolt is to wearing, so that first guide rail is fixedly connected with second guide rail.
41. holder combination as claimed in claim 40, which is characterized in that further include guide supporting set;The guide supporting set Including the first support sleeve arm and the second support sleeve arm;The first support sleeve arm and the second support sleeve arm respectively include one Or multiple support sleeve fixation holes, respectively with one or more of at least one set of first guide rail mounting hole described in (i), and (ii) One or more alignment at least one set of second guide rail mounting hole, and by bolt to wearing, so that described first be supported Set arm and the second support sleeve arm are separately fixed in first guide wall and second guide wall.
42. holder combination as claimed in claim 41, which is characterized in that the first support sleeve arm and second support sleeve Arm respectively further comprises one or more support sleeve adjustable ports, respectively with one at least one set of first guide rail mounting hole described in (i) It is a or multiple, and one or more alignment in (ii) described at least one set of second guide rail mounting hole, and by bolt to wearing, from And the first support sleeve arm and the second support sleeve arm are separately fixed at first guide wall and second guide rail On wall;The support sleeve adjustable port includes adjustable port long side and adjustable port short side, and the adjustable port short side allows bolt closely It passes through, the adjustable port long side allows bolt to move along the adjustable port long side.
43. the holder combination as described in any one of claim 40-42, which is characterized in that including mating bolt and mating spiral shell Mother, when the mating bolt is tightened in installation, the matching nut not transfer;The matching nut is previously positioned at described first Guide rail mounting hole and second guide rail mounting hole are located at the inside in notch, for receiving the mating bolt.
44. the holder combination as described in claim 41 or 42, which is characterized in that first guide wall and second guide rail Wall includes the symmetrical guiding cheekn in two sides and the guide rail bottom wall for connecting the symmetrical guiding cheekn in two sides;First guide rail Guiding cheekn of the wall with second guide wall in the same side is fixedly connected by the guide supporting set.
45. the holder combination as described in claim 41 or 42, which is characterized in that the first support sleeve arm and second described The edge of support set arm is provided with support sleeve in-flanges;The outer edge quilt cover of first guide wall and second guide wall Within the support sleeve in-flanges.
46. the holder combination as described in claim 41 or 42, which is characterized in that the guide supporting set uses L-type structure, institute It states the first support sleeve arm and the second support sleeve arm is mutually right angle.
47. holder combination as claimed in claim 42, which is characterized in that the support sleeve fixation hole is using round, the branch Support set adjustable port uses oblong.
CN201910108945.8A 2018-07-03 2019-02-03 Support combination Active CN109915446B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN202410381336.0A CN118208471A (en) 2018-07-03 2019-02-03 Support combination
CN202410601581.8A CN118482082A (en) 2018-07-03 2019-02-03 Support combination
CN202410601498.0A CN118482080A (en) 2018-07-03 2019-02-03 Support combination
CN202410601508.0A CN118482081A (en) 2018-07-03 2019-02-03 Support combination

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201821049507 2018-07-03
CN2018210495076 2018-07-03
CN201821046477 2018-07-03
CN2018210464773 2018-07-03

Related Child Applications (4)

Application Number Title Priority Date Filing Date
CN202410601508.0A Division CN118482081A (en) 2018-07-03 2019-02-03 Support combination
CN202410601581.8A Division CN118482082A (en) 2018-07-03 2019-02-03 Support combination
CN202410601498.0A Division CN118482080A (en) 2018-07-03 2019-02-03 Support combination
CN202410381336.0A Division CN118208471A (en) 2018-07-03 2019-02-03 Support combination

Publications (2)

Publication Number Publication Date
CN109915446A true CN109915446A (en) 2019-06-21
CN109915446B CN109915446B (en) 2024-05-14

Family

ID=66961473

Family Applications (6)

Application Number Title Priority Date Filing Date
CN201910108945.8A Active CN109915446B (en) 2018-07-03 2019-02-03 Support combination
CN202410601498.0A Pending CN118482080A (en) 2018-07-03 2019-02-03 Support combination
CN202410381336.0A Pending CN118208471A (en) 2018-07-03 2019-02-03 Support combination
CN202410601508.0A Pending CN118482081A (en) 2018-07-03 2019-02-03 Support combination
CN201920188098.6U Active CN210127662U (en) 2018-07-03 2019-02-03 Support combination
CN202410601581.8A Pending CN118482082A (en) 2018-07-03 2019-02-03 Support combination

Family Applications After (5)

Application Number Title Priority Date Filing Date
CN202410601498.0A Pending CN118482080A (en) 2018-07-03 2019-02-03 Support combination
CN202410381336.0A Pending CN118208471A (en) 2018-07-03 2019-02-03 Support combination
CN202410601508.0A Pending CN118482081A (en) 2018-07-03 2019-02-03 Support combination
CN201920188098.6U Active CN210127662U (en) 2018-07-03 2019-02-03 Support combination
CN202410601581.8A Pending CN118482082A (en) 2018-07-03 2019-02-03 Support combination

Country Status (1)

Country Link
CN (6) CN109915446B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111671322A (en) * 2020-06-22 2020-09-18 广东美的厨房电器制造有限公司 Baking oven
CN112196871A (en) * 2020-10-30 2021-01-08 苏州辰品之家金属科技有限公司 Nut structure of finished product support and hanger

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915446B (en) * 2018-07-03 2024-05-14 苏州华固建筑配套工程有限公司 Support combination

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5065556A (en) * 1990-05-15 1991-11-19 Westinghouse Electric Corp. Space dividing partition system having an electrical raceway
CN103438282A (en) * 2013-06-14 2013-12-11 镇江奇佩支吊架有限公司 Assembling integrated support hanger and connecting pieces thereof
CN204962039U (en) * 2015-09-14 2016-01-13 北京三磊建筑设计有限公司 A pipeline gallows
CN107191681A (en) * 2017-06-02 2017-09-22 安徽奥睿德科技发展有限公司 Spray piping para-seismic support is fixed in a kind of ball-type truss building
CN207080792U (en) * 2017-08-15 2018-03-09 深圳市雅昌科技股份有限公司 A kind of tension takes off segmental timbering
CN107956931A (en) * 2017-12-27 2018-04-24 华之耀(苏州)金属科技有限公司 Indoor environment pipeline hanger
CN207349578U (en) * 2017-09-16 2018-05-11 上海市浦东新区建设(集团)有限公司 A kind of pipeline layout stent
CN207421528U (en) * 2017-11-20 2018-05-29 黑龙江日甲生科技有限公司 A kind of fire protection pipeline assembled suspension and support
CN210127662U (en) * 2018-07-03 2020-03-06 苏州华固建筑配套工程有限公司 Support combination

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5065556A (en) * 1990-05-15 1991-11-19 Westinghouse Electric Corp. Space dividing partition system having an electrical raceway
CN103438282A (en) * 2013-06-14 2013-12-11 镇江奇佩支吊架有限公司 Assembling integrated support hanger and connecting pieces thereof
CN204962039U (en) * 2015-09-14 2016-01-13 北京三磊建筑设计有限公司 A pipeline gallows
CN107191681A (en) * 2017-06-02 2017-09-22 安徽奥睿德科技发展有限公司 Spray piping para-seismic support is fixed in a kind of ball-type truss building
CN207080792U (en) * 2017-08-15 2018-03-09 深圳市雅昌科技股份有限公司 A kind of tension takes off segmental timbering
CN207349578U (en) * 2017-09-16 2018-05-11 上海市浦东新区建设(集团)有限公司 A kind of pipeline layout stent
CN207421528U (en) * 2017-11-20 2018-05-29 黑龙江日甲生科技有限公司 A kind of fire protection pipeline assembled suspension and support
CN107956931A (en) * 2017-12-27 2018-04-24 华之耀(苏州)金属科技有限公司 Indoor environment pipeline hanger
CN210127662U (en) * 2018-07-03 2020-03-06 苏州华固建筑配套工程有限公司 Support combination

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111671322A (en) * 2020-06-22 2020-09-18 广东美的厨房电器制造有限公司 Baking oven
CN112196871A (en) * 2020-10-30 2021-01-08 苏州辰品之家金属科技有限公司 Nut structure of finished product support and hanger

Also Published As

Publication number Publication date
CN118482081A (en) 2024-08-13
CN118208471A (en) 2024-06-18
CN118482082A (en) 2024-08-13
CN109915446B (en) 2024-05-14
CN118482080A (en) 2024-08-13
CN210127662U (en) 2020-03-06

Similar Documents

Publication Publication Date Title
CN109915446A (en) A kind of holder combination
US5412843A (en) Hinge connector
CN208417748U (en) A kind of connector for adjustable installing bracket
CN209130471U (en) A kind of antidetonation suspension and support
CN204899252U (en) Built -in fitting accuracy control regulator
CN209709597U (en) A kind of assembled cable bearer
CN111335618A (en) Drawknot system of assembled suspension scaffold
CN215806835U (en) Be applied to support of a finished product gallows
CN207774658U (en) A kind of elevator tower crane standard knot wall-attached frame
CN209026316U (en) A kind of telescopic boom holder device
CN209025317U (en) Shear force wall reinforcing steel bar positioning device
CN208074278U (en) A kind of assembled vertical shaft air hose combined bracket
CN113529571B (en) Positioning device for rhombic wire-separating pipe cable saddle of short-tower cable-stayed bridge
CN108223924A (en) A kind of assembled vertical shaft air hose combined bracket
CN109138163A (en) A kind of clamping plate type support of the aluminium alloy hub type joint net frame based on channel steel
CN209653166U (en) Locating fastener and frame shear wall locating structure
CN207844937U (en) A kind of novel elevator system for depending on tower crane
CN210421443U (en) Non-welding flat plate fixing embedded part
CN209458488U (en) Centrosymmetric oblique pull frame-type fixes device
CN213144987U (en) Plane fastener for fixing sound barrier keel on screen frame
CN109519606A (en) Centrosymmetric oblique pull frame-type fixes device
CN212114634U (en) Bus bridge
CN218861871U (en) Horizontal large-span does not have stand arc glass curtain wall system
CN221590372U (en) Three hole basket of flowers bolt fixed knot of attached type cantilever frame constructs
CN215301836U (en) Steel bar greenhouse frame connecting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant