CN107191681A - Spray piping para-seismic support is fixed in a kind of ball-type truss building - Google Patents
Spray piping para-seismic support is fixed in a kind of ball-type truss building Download PDFInfo
- Publication number
- CN107191681A CN107191681A CN201710409153.5A CN201710409153A CN107191681A CN 107191681 A CN107191681 A CN 107191681A CN 201710409153 A CN201710409153 A CN 201710409153A CN 107191681 A CN107191681 A CN 107191681A
- Authority
- CN
- China
- Prior art keywords
- channel
- section steel
- suspension rod
- vertical suspension
- ball
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/10—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
- F16L3/11—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing and hanging from a pendant
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/01—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets for supporting or guiding the pipes, cables or protective tubing, between relatively movable points, e.g. movable channels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16S—CONSTRUCTIONAL ELEMENTS IN GENERAL; STRUCTURES BUILT-UP FROM SUCH ELEMENTS, IN GENERAL
- F16S3/00—Elongated members, e.g. profiled members; Assemblies thereof; Gratings or grilles
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The invention discloses fix spray piping para-seismic support in a kind of ball-type truss building, it includes the first vertical suspension rod, second vertical suspension rod, first channel-section steel, second channel-section steel and tube bank, the top of first vertical suspension rod and the second vertical suspension rod is connected with the frame ball on truss, the two ends of first channel-section steel are connected by fixing device with the first vertical suspension rod and the second vertical suspension rod respectively, one end of second channel-section steel is fixedly linked with the first channel-section steel, the other end of second channel-section steel extends towards the direction away from the first channel-section steel, and second channel-section steel be located at the first channel-section steel lower section, tube bank is installed on the side wall of the second channel-section steel.Therefore, compared with prior art, setting height(from bottom) of the invention will not can adjust the setting height(from bottom) of spray piping the too high and later stage, and such available energy fast and effectively puts out big fire, substantially reduces loss.
Description
Technical field
The present invention relates to para-seismic support field, and in particular to fixes spray piping antidetonation branch in a kind of ball-type truss building
Frame.
Background technology
The end drainpipe of spray piping, i.e. fire-fighting spraying fire prevention system.It is the important composition of fire-fighting spraying fire prevention system
One of part, is generally used in combination with main conduit and spray head.In common building, for fixing the anti-of spray piping
Shake support very universal, but in large span space ball-type truss building (such as factory building), the antidetonation of existing spray piping
Often install too high of support and height can not be adjusted, or even spray piping is directly erected on spherical truss, due to ball-type truss
Height it is universal very high, when occurring fire, it is that water is difficult fast and effectively to put out big fire that spray piping, which sprays, and therefore, having must
A kind of new technical scheme is proposed to solve these problems.
The content of the invention
The present invention proposes to fix spray piping para-seismic support in a kind of ball-type truss building, solves prior art and often install
It is too high and the problem of height can not be adjusted.
To achieve these goals, the technical proposal of the invention is realized in this way:It is fixed in a kind of ball-type truss building
Spray piping para-seismic support, including the first vertical suspension rod, the second vertical suspension rod, the first channel-section steel, the second channel-section steel and tube bank, institute
The top for stating the first vertical suspension rod and the second vertical suspension rod is connected with the frame ball on truss, the two ends of first channel-section steel
Be connected respectively by fixing device with the described first vertical suspension rod and the second vertical suspension rod, one end of second channel-section steel with it is described
First channel-section steel is fixedly linked, and the other end of second channel-section steel extends towards the direction away from first channel-section steel, and described second
Channel-section steel is located at the lower section of first channel-section steel, and the tube bank is installed on the side wall of second channel-section steel.
It is preferred that, the fixing device includes connecting portion and channel-section steel end supporting part, the connecting portion and the channel-section steel
End supporting part is fixedly linked, and the connecting portion distinguishes detachable company with the described first vertical suspension rod or the second vertical suspension rod
Connect.
It is preferred that, the connecting portion includes first clamping plate, second clamping plate and bolt, the first clamping plate and second clamping plate
Both side ends corresponding position offer screw respectively, the first clamping plate is connected with the second clamping plate by bolt.
It is preferred that, channel-section steel end supporting part is in the first clamping plate, and the second clamping plate is erected with described first
Also it is connected respectively by nailing to suspension rod or the second vertical suspension rod.
It is preferred that, channel-section steel end supporting part includes support groove, and the bottom of the support groove offers the first screwed hole,
The both side ends of first channel-section steel offer the second screwed hole, and the end of the support groove and first channel-section steel passes through bolt
It is flexibly connected.
It is preferred that, the one end of second channel-section steel away from first channel-section steel is provided with channel-section steel end cap.
Compared with prior art, present invention tool has the advantage that:
Fixed in ball-type truss building proposed by the present invention in spray piping para-seismic support, the first vertical suspension rod and second
The vertical top of suspension rod is connected with the frame ball on truss, and the two ends of the first channel-section steel pass through fixing device and the first vertical lifting respectively
Bar and the second vertical suspension rod are connected, and one end of the second channel-section steel is fixedly linked with the first channel-section steel, and the other end of the second channel-section steel is towards remote
The direction extension of first channel-section steel, and the second channel-section steel is located at the lower section of the first channel-section steel, tube bank is installed on the side wall of the second channel-section steel.The
One vertical suspension rod, the second vertical suspension rod and the second channel-section steel are all vertically installed, and are restrained and be arranged on the second channel-section steel, tube bank
It is that it is too high that such spray piping would not be installed for fixing spray piping, and it is perpendicular first by adjusting the first channel-section steel
To the installation site of the installation site on suspension rod and the second vertical suspension rod and tube bank on the second channel-section steel, later stage spray can be adjusted
The setting height(from bottom) in shower pipe road.Therefore, compared with prior art, setting height(from bottom) of the invention will not can adjust spray in the too high and later stage
The setting height(from bottom) of pipeline, such available energy fast and effectively puts out big fire, substantially reduces loss.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is front view of the invention;
Fig. 2 is the structural representation of fixing device 6 in Fig. 1.
In figure:The vertical suspension rods of 1- first, the vertical suspension rods of 2- second, the channel-section steels of 3- first, the channel-section steels of 4- second, 5- tube banks, 6- is solid
Determine device, 7- channel-section steel end caps, 8- right-angle connectors, 61- connecting portions, 62- channel-section steels end supporting part.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not paid
Embodiment, belongs to the scope of protection of the invention.
As shown in figure 1, spray piping para-seismic support is fixed in a kind of ball-type truss building proposed by the present invention, including the
One vertical suspension rod 1, the second vertical suspension rod 2, the first channel-section steel 3, the second channel-section steel 4 and tube bank 5, the first vertical suspension rod 1 and second are erected
It is connected to the top of suspension rod 2 with the frame ball on truss, the two ends of the first channel-section steel 3 are vertical by fixing device 6 and first respectively
Suspension rod 1 is connected with the second vertical suspension rod 2, and one end of the second channel-section steel 4 is fixedly linked with the first channel-section steel 3, the other end of the second channel-section steel 4
Extend towards the direction away from the first channel-section steel 3, the second channel-section steel 4 is parallel with the first vertical suspension rod 1, and the second channel-section steel 4 is located at the first groove
The lower section of steel 3, tube bank 5 is installed on the side wall of the second channel-section steel 4.First vertical suspension rod 1, the second vertical groove of suspension rod 2 and second
Steel 4 is all vertically installed, and is restrained 5 and be arranged on the second channel-section steel 4, and tube bank 5 is, for fixing spray piping, so to spray
It is too high that pipeline would not be installed, and by adjusting 5 installation site on the second channel-section steel 4 of tube bank, can adjust later stage spray
The setting height(from bottom) of pipeline.
As shown in Fig. 2 in the present embodiment, fixing device 6 includes connecting portion 61 and channel-section steel end supporting part 62, connecting portion
61 are fixedly linked with channel-section steel end supporting part 62, and the vertical suspension rod 2 of the vertical suspension rod 1 or the second of connecting portion 61 and first is detachable respectively
Formula is connected.So by adjusting installation site of first channel-section steel 3 on the first vertical suspension rod 2 of vertical suspension rod 1 and second, it can adjust
The setting height(from bottom) of whole later stage spray piping.
As shown in Fig. 2 in the present embodiment, connecting portion 61 includes first clamping plate, second clamping plate and bolt, first clamping plate and
The both side ends corresponding position of second clamping plate offers screw respectively, and first clamping plate is connected with second clamping plate by bolt.Tightly
Fixing device 6 can be fixed on the first vertical suspension rod 2 of vertical suspension rod 1 and second by fixing bolt, first clamping plate with second clamping plate
Optional position, so that the setting height(from bottom) with regard to the first channel-section steel 3 can be adjusted.
As shown in Fig. 2 in the present embodiment, channel-section steel end supporting part 62 is in first clamping plate, and second clamping plate is erected with first
Also it is connected respectively by nailing (not shown) to the vertical suspension rod 2 of suspension rod 1 or the second.So can be further by the first channel-section steel
3 are fixed on suitable height.
As shown in Fig. 2 in the present embodiment, channel-section steel end supporting part 62 includes support groove, and the bottom of support groove offers the
One screwed hole, the both side ends of the first channel-section steel 3 offer the second screwed hole, and the end of support groove and the first channel-section steel 3 passes through bolt
It is flexibly connected.So fastening bolt, can fix the first channel-section steel 3 extremely, during dismounting, it is only necessary to screw out bolt with fixing device 6
.
As shown in figure 1, in the present embodiment, the one end of the second channel-section steel 4 away from the first channel-section steel 3 is provided with channel-section steel end cap 7.Channel-section steel
The effect of end cap 7 is applied not only to prevent the termination of the first channel-section steel 3 and the second channel-section steel 4 from aoxidizing, also avoid install when scratch workman and
Dust-proof effect.
As shown in figure 1, in the present embodiment, the surface of the first channel-section steel 3 and the second channel-section steel 4 is coated with one layer of zinc coat, zinc coat
It can prevent the first channel-section steel 3 and the second channel-section steel 4 from being got rusty after permanent use.Several Thiourea Derivatives on Zinc Plate Surface scribbles fire retardant.Fire retardant can
To have the fire retardant in multiple choices, the present embodiment for halogen-free organic phosphorus-nitrogen expansibility flame-proof agent.So when occurring fire,
During high polymer burning containing this based flame retardant, surface can form one layer of uniform porous carbonaceous froth bed, and the froth bed can be with
Heat-insulated, oxygen barrier, suppression cigarette, and molten drop can be prevented, with good fire-retardant and suppression hood.
These are only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.
Claims (6)
1. fix spray piping para-seismic support in a kind of ball-type truss building, it is characterised in that including the first vertical suspension rod
(1), the second vertical suspension rod (2), the first channel-section steel (3), the second channel-section steel (4) and tube bank (5), the first vertical suspension rod (1) and
The top of the second vertical suspension rod (2) is connected with the frame ball on truss, and the two ends of first channel-section steel (3) are respectively by solid
Determine device (6) with the described first vertical suspension rod (1) and the second vertical suspension rod (2) to be connected, one end of second channel-section steel (4) and institute
State the first channel-section steel (3) to be fixedly linked, the other end of second channel-section steel (4) extends towards the direction away from first channel-section steel (3),
And second channel-section steel (4) is located at the lower section of first channel-section steel (3), the tube bank (5) is installed on second channel-section steel (4)
On the wall of side.
2. fix spray piping para-seismic support in ball-type truss building according to claim 1, it is characterised in that:It is described
Fixing device (6) includes connecting portion (61) and channel-section steel end supporting part (62), the connecting portion (61) and the channel-section steel end
Supporting part (62) is fixedly linked, and the connecting portion (61) respectively can with the described first vertical suspension rod (1) or the second vertical suspension rod (2)
It is detachably connected with.
3. fix spray piping para-seismic support in ball-type truss building according to claim 2, it is characterised in that:It is described
Connecting portion (61) includes first clamping plate, second clamping plate and bolt, and the both side ends of the first clamping plate and second clamping plate are corresponding
Screw is offered at position respectively, the first clamping plate is connected with the second clamping plate by bolt.
4. fix spray piping para-seismic support in ball-type truss building according to claim 3, it is characterised in that:It is described
Channel-section steel end supporting part (62) is in the first clamping plate, the second clamping plate and the described first vertical suspension rod (1) or second
Vertical suspension rod (2) is also connected by nailing respectively.
5. fix spray piping para-seismic support in ball-type truss building according to claim 2, it is characterised in that:It is described
Channel-section steel end supporting part (62) includes support groove, and the bottom of the support groove offers the first screwed hole, first channel-section steel (3)
Both side ends offer the second screwed hole, the support groove is flexibly connected with the end of first channel-section steel (3) by bolt.
6. fixing spray piping para-seismic support in the ball-type truss building according to claim 1-5 any one, it is special
Levy and be:The one end of second channel-section steel (4) away from first channel-section steel (3) is provided with channel-section steel end cap (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710409153.5A CN107191681A (en) | 2017-06-02 | 2017-06-02 | Spray piping para-seismic support is fixed in a kind of ball-type truss building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710409153.5A CN107191681A (en) | 2017-06-02 | 2017-06-02 | Spray piping para-seismic support is fixed in a kind of ball-type truss building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107191681A true CN107191681A (en) | 2017-09-22 |
Family
ID=59876441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710409153.5A Pending CN107191681A (en) | 2017-06-02 | 2017-06-02 | Spray piping para-seismic support is fixed in a kind of ball-type truss building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107191681A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108105476A (en) * | 2017-12-13 | 2018-06-01 | 中国二十冶集团有限公司 | Siphon drainage pipe is across the pre- anti-rock fixing means of grid structure |
CN109915446A (en) * | 2018-07-03 | 2019-06-21 | 苏州华固建筑配套工程有限公司 | A kind of holder combination |
CN112523353A (en) * | 2020-12-29 | 2021-03-19 | 安徽金和鑫钢结构有限公司 | Energy-conserving fire prevention steel construction of green building |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2630551Y (en) * | 2003-05-21 | 2004-08-04 | 王沧洲 | Double-pipe clamping seat structure |
CN2931892Y (en) * | 2006-07-26 | 2007-08-08 | 李向明 | Pipe connecting fastener |
EP2416042A2 (en) * | 2010-08-03 | 2012-02-08 | Zurecon AG | Adjustable hanging device |
CN202790955U (en) * | 2012-09-26 | 2013-03-13 | 中电装备恩翼帕瓦(山东)高压开关有限公司 | Hoisting support |
CN202790959U (en) * | 2012-08-13 | 2013-03-13 | 东风设计研究院有限公司 | Steel pipe truss structure based on aloft lateral support |
CN205261036U (en) * | 2015-12-18 | 2016-05-25 | 上海建工二建集团有限公司 | Combination formula bearing support in truss |
CN206206803U (en) * | 2016-08-30 | 2017-05-31 | 苏州金螳螂建筑装饰股份有限公司 | Multi-specialized electromechanical tube road collection is into arranging system in furred ceiling |
-
2017
- 2017-06-02 CN CN201710409153.5A patent/CN107191681A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2630551Y (en) * | 2003-05-21 | 2004-08-04 | 王沧洲 | Double-pipe clamping seat structure |
CN2931892Y (en) * | 2006-07-26 | 2007-08-08 | 李向明 | Pipe connecting fastener |
EP2416042A2 (en) * | 2010-08-03 | 2012-02-08 | Zurecon AG | Adjustable hanging device |
CN202790959U (en) * | 2012-08-13 | 2013-03-13 | 东风设计研究院有限公司 | Steel pipe truss structure based on aloft lateral support |
CN202790955U (en) * | 2012-09-26 | 2013-03-13 | 中电装备恩翼帕瓦(山东)高压开关有限公司 | Hoisting support |
CN205261036U (en) * | 2015-12-18 | 2016-05-25 | 上海建工二建集团有限公司 | Combination formula bearing support in truss |
CN206206803U (en) * | 2016-08-30 | 2017-05-31 | 苏州金螳螂建筑装饰股份有限公司 | Multi-specialized electromechanical tube road collection is into arranging system in furred ceiling |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108105476A (en) * | 2017-12-13 | 2018-06-01 | 中国二十冶集团有限公司 | Siphon drainage pipe is across the pre- anti-rock fixing means of grid structure |
CN109915446A (en) * | 2018-07-03 | 2019-06-21 | 苏州华固建筑配套工程有限公司 | A kind of holder combination |
CN109915446B (en) * | 2018-07-03 | 2024-05-14 | 苏州华固建筑配套工程有限公司 | Support combination |
CN112523353A (en) * | 2020-12-29 | 2021-03-19 | 安徽金和鑫钢结构有限公司 | Energy-conserving fire prevention steel construction of green building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107191681A (en) | Spray piping para-seismic support is fixed in a kind of ball-type truss building | |
CN107327633A (en) | It is a kind of to be used for the segmental timbering of fixed -piping in underground pipe gallery | |
CN110639153A (en) | Fire-fighting spraying system of PP and PE stereoscopic warehouse | |
CN107178659A (en) | A kind of segmental timbering for being used to be fixed on pipeline on vertical I-steel | |
CN107165909A (en) | A kind of fixed structure of the standpipe adjacent with vertical steel construction | |
CN211714552U (en) | Hanging basket for curtain wall installation | |
CN107166098A (en) | A kind of para-seismic support mounting structure of wall-through hole both sides | |
CN205532717U (en) | Tunnel guard gate anti -overturning device and tunnel guard gate system | |
CN108223924A (en) | A kind of assembled vertical shaft air hose combined bracket | |
CN208831894U (en) | A kind of metallic conduit bracket for structural steelwork construction | |
CN107327634A (en) | A kind of para-seismic support built for large span space ball-type truss | |
CN107143700A (en) | A kind of para-seismic support for being used to fix utilidor and non-utilidor | |
CN218248240U (en) | Assembly structure of fire-fighting spray device at top of stereoscopic warehouse | |
CN105442873A (en) | Lightweight steel structure awning of gas station | |
CN207279037U (en) | A kind of fixation anti-shake stent of overlength spray tube | |
CN216526514U (en) | High altitude observation equipment supports steel construction | |
CN213484368U (en) | Portal type support tool for fixing pipeline | |
CN213143821U (en) | Connecting structure for building outer wall inserted rod type cleaning support | |
JPH09276436A (en) | Wind-out piping supporting structure for sprinkler fire-fighting equipment | |
CN219840363U (en) | Fixed disk buckle type scaffold upright post in component | |
CN107171257A (en) | A kind of flame retardant type assembled anti-knock support of cable testing bridge | |
CN213782767U (en) | Novel hanging bracket structure for fixing SKA embedded nuts | |
CN107101045A (en) | A kind of four-way for fixed riser supports anti-rock support | |
DE843560C (en) | Fire and condensation-proof overall arrangement for roof stand house connections with house connection fuse | |
CN205476567U (en) | Pass on girder steel and prevent guardrail bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170922 |