CN109898773A - The soft patch construction of gypsum wall vitrified tile - Google Patents

The soft patch construction of gypsum wall vitrified tile Download PDF

Info

Publication number
CN109898773A
CN109898773A CN201910218907.8A CN201910218907A CN109898773A CN 109898773 A CN109898773 A CN 109898773A CN 201910218907 A CN201910218907 A CN 201910218907A CN 109898773 A CN109898773 A CN 109898773A
Authority
CN
China
Prior art keywords
vitrified tile
construction
patch
gypsum wall
vitrified
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910218907.8A
Other languages
Chinese (zh)
Inventor
梅红
许业勇
陆勤斌
邱立龙
周毅
朱绍凯
费勤波
黄业云
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Second Construction Engineering Co Ltd
Original Assignee
Anhui Second Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Second Construction Engineering Co Ltd filed Critical Anhui Second Construction Engineering Co Ltd
Priority to CN201910218907.8A priority Critical patent/CN109898773A/en
Publication of CN109898773A publication Critical patent/CN109898773A/en
Pending legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The present invention provides the soft patch constructions of gypsum wall vitrified tile; it is related to technical field of building construction, convenient construction of the present invention is structurally reasonable, simple process, constructs using this engineering method; it can reinforce each adhesive layer and paste performance, the hollowing rate for pasting vitrified tile on gypsum wall is effectively reduced;And it is not influenced by all many conditions such as regional climate.Engineering method of the invention does over again caused by can effectively solve due to hollowing by replacing traditional construction technique to paste on gypsum wall to vitrified tile, saves construction cost, have good market prospects.

Description

The soft patch construction of gypsum wall vitrified tile
Technical field
The present invention relates to technical field of building construction, and in particular to the soft patch construction of gypsum wall vitrified tile.
Background technique
Since the wall that gypsum block is built has, safety, comfortable, speed of application is fast, environmentally friendly, not easy to crack, cost performance is high Etc. multiple advantages, use it is more and more wider;And vitrified tile due to its performance it is stable, it is beautiful in colour it is soft, without obvious color difference, simultaneously With extraordinary cycling processability, for now more universal ornament materials.Using traditional cement mortar on gypsum wall It pastes vitrified tile and is not able to satisfy quality requirement, each viscous glutinous layer is viscous to be sticked ineffective, and hollowing phenomenon is excessive;Therefore a kind of stone is proposed The soft patch construction of cream wall vitrified tile, it is believed that its application prospect will be very wide.
Summary of the invention
The object of the present invention is to provide a kind of soft patch constructions of gypsum wall vitrified tile, traditional construction technique can be replaced to exist Vitrified tile is pasted on gypsum wall, is done over again caused by can effectively solve due to hollowing, construction cost is saved, is had very Good market prospects.
In order to achieve the above object, the present invention is achieved by the following technical programs:
The soft patch construction of gypsum wall vitrified tile, the following steps carried out including sequence:
(A) preparation of construction: configuring necessary construction equipment and carries out the preparation of construction equipment, mounting material, carries out construction Protection work, carry out construction site temporary power, illumination work, and coordinate the work of personnel associated therewith;
(B) base treatment: spraying or artificial hacking processing are carried out on gypsum coat of plaster metope, continues sprinkling maintenance 3 days; Brush cement-based waterproof layer one time again conserves 3 days;One of hot-galvanized steel silk screen is pasted on wall plucking layer;And expanded using band Hot-galvanized steel silk screen is fixed in base by the plastics anchor bar of head, and in wire rope net surface brush layer cement sand pulp;
(C) plate-laying, snap the line: carrying out walltile typesetting in conjunction with drawing, specifies the quantity and gap size of vitrified tile, and flat Ink fountain snap the line is carried out on whole metope;
(D) brick, brush gum are selected: the vitrified tile back side chosen is cleaned out, and one layer of gum is brushed at the back side of vitrified tile;
(E) edge patch vitrified tile: after maintenance, prepare patch block in snap the line lattice;Binder is mixed into paste, uniformly Gently being tapped when being applied on the inside of vitrified tile, and operating with rubber hammer makes vitrified tile and binder be close-coupled at the wall handled well On face;
(F) face brick jointing: before jointing, it is necessary to the crack dust at place of wall is blowed, will stitch in dust clean out; Jointing agent is tuned into magma, then mortar is pressed into seam with scraper plate;
(G) wiping seam, cleaning surface: after edge patch vitrified tile is completed a period of time, vitrified tile Superficial Foreign Body is shoveled with tool Except vitrified tile surface is being scrubbed with clear water.
Further, in step D, gum brushing need to brushing in formal soft patch for first 1 day.
Further, in step E, paste binder need to be finished in 1 hour.
Compared with prior art, the invention has the benefit that
1, convenient construction of the present invention is structurally reasonable, simple process, is constructed using this engineering method, can reinforce each adhesive layer viscosity Can, the hollowing rate that vitrified tile is pasted on gypsum wall is effectively reduced.
2, the present invention is not influenced by all many conditions such as regional climate.
3, engineering method of the invention, can be effective by replacing traditional construction technique to paste on gypsum wall to vitrified tile Solution due to hollowing caused by do over again, save construction cost, have good market prospects.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it is therefore apparent that the accompanying drawings in the following description is only this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is schematic perspective view of the invention;
Fig. 2 is base treatment sectional view of the invention;
Fig. 3 is that vitrified tile of the invention pastes sectional view;
Fig. 4 is vitrified tile jointing sectional view of the invention;
Figure label explanation:
1, gypsum wall;2, plucking and steel wire surface layer;3, mortar levelling layer;4, bonding agent;5, gum.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention, Technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is the present invention one Divide embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of creative work.
In conjunction with attached Fig. 1 to Fig. 4, the present invention is further described:
The soft patch construction of gypsum wall vitrified tile, the following steps carried out including sequence:
(A) preparation of construction: configuring necessary construction equipment and carries out the preparation of construction equipment, mounting material, carries out construction Protection work, carry out construction site temporary power, illumination work, and coordinate the work of personnel associated therewith;
(B) base treatment: spraying or artificial hacking processing are carried out on gypsum coat of plaster metope, continues sprinkling maintenance 3 days; Brush cement-based waterproof layer one time again conserves 3 days;One of hot-galvanized steel silk screen is pasted on wall plucking layer;And expanded using band Hot-galvanized steel silk screen is fixed in base by the plastics anchor bar of head;
Plate-laying, snap the line: walltile typesetting is carried out in conjunction with drawing, specifies the quantity and gap size of vitrified tile, and smooth Metope on carry out ink fountain snap the line;
It selects brick, brush gum: the vitrified tile back side chosen is cleaned out, and one layer of gum is brushed at the back side of vitrified tile;
Edge patch vitrified tile: after maintenance, prepare patch block in snap the line lattice;Binder is mixed into paste, is uniformly applied Gently being tapped when being put on the inside of vitrified tile, and operating with rubber hammer makes vitrified tile and binder be close-coupled at the metope handled well On;
Face brick jointing: before jointing, it is necessary to the crack dust at place of wall is blowed, will stitch in dust clean out;It will Jointing agent is tuned into magma, and then mortar is pressed into seam with scraper plate;
Wiping seam, cleaning surface: after edge patch vitrified tile is completed a period of time, vitrified tile Superficial Foreign Body is rooted out with tool Vitrified tile surface is scrubbed with clear water.
Preferably, in step D, gum brushing need to formal soft patch on the day before brush.
Preferably, in step E, paste binder need to be finished in two hours.
Preparation of construction: 1) to guarantee construction quality, construction personnel will be familiar with construction drawing in advance, understand construction content, ripe Know the related national standard atlas of the soft patch of gypsum wall vitrified tile and related specification, acceptance criteria.
2) it configures necessary construction equipment and carries out the preparation of construction equipment, mounting material, carry out the protection that construction terminates Work carries out construction site temporary power, illumination work, and coordinates the work of personnel associated therewith;
3) title in the place of production and manufacturer that determine good material, the quality testing card for the material for wanting relevant department to provide are collected Bright book, product description.Knowing material performance parameter, shape, etc. require.Report Supervision Organization is checked and accepted on the basis of self-test qualification After qualification, it can be used in engineering.
4) it is confided a technological secret by technical staff to site operation personnel before the soft patch construction of gypsum wall vitrified tile, thus more Good control quality, reaches code requirement.
Base treatment: 1) on gypsum coat of plaster metope, use 1 (cement): 1 (middle sand): 0.15 (801 glue) is added water and stirred Spraying or artificial hacking processing are carried out, plucking is with a thickness of 0.5mm or so.Continue sprinkling maintenance 3 days, then brushes 1.5 solid cement bases and prevent It water layer one time, conserves 3 days.
2) hair pulling treatment: pasting diameter 1-1.2mm on wall plucking layer, and mesh is the hot-galvanized steel silk screen of 1cm or so Together;And the plastics anchor bar (long 80mm, spacing 300mm~400mm) with enlarged footing is used, hot-galvanized steel silk screen is fixed (every square meter is not less than 10, and edge can suitably encrypt, and steel wire is smooth docile).
Preferably, diameter 1-1.2mm, the necessary face of the hot-galvanized steel silk screen that mesh is 1cm or so is smoothly neat, firm in structure Uniformly, the service life is high, and overall performance is good, and having certain flexibility, Corrosion Protection is up to state standards simultaneously.
3) steel wire is installed: being got blisters a powder 8mm thickness 1:2.5 cement screedn in wire rope net surface, flatness error is less than 3mm, water seasoning.
Row brick, lattice, snap the line: 1) vitrified tile construction before allow be familiar with Revit software technical staff combine drawing specification into Row walltile typesetting, the quantity of substantially clear vitrified tile, gap size.
2) individual typesetting is carried out to the corner of complicated shape when the typesetting of Revit software.Ensure worker in formal construction There is clear understanding for how vitrified tile cuts splicing.
3) ink fountain snap the line is carried out according to the drawing after Revit software typesetting on smooth metope, determines that wiring is upright clear Vitrified tile sized divisions are illustrated for Chu.
4) horizontal line determines snap the line point using ground level elevation line as benchmark line vertical line with vertical line and vitrified tile specification Lattice.
It selects brick, brush gum: gum liquid material is poured into bucket, be slowly added into feed powder, powder proportion is 1:1.5.Use motor It can brush after stirring evenly no powder agglomates, be finished in two hours behind Kaifeng.
Vitrified tile is not required to soak in advance, and basal plane is not required to drench and cleans out the vitrified tile back side, it is clean after in vitreous Brush one layer of gum in the back side of brick.
Gum brushing need to brushing in formal soft patch for first 1 day.So that the performance of pasting of itself reaches best.
The gum that this method uses, it is necessary to select the qualified products for having enterprise's production of production qualification.Vitrified tile is necessary Performance is stable, color is correct, without obvious color difference, while having good cycling processability, it is not possible to losing fangle.
Inlay furring brick: 1) after metope is dry, snap the line lattice prepares patch block, through market consultation, selects qualified vitrified tile viscous Tie agent;
Preferably, after above-mentioned base treatment conserves, room temperature of the metope at 23 ± 2 DEG C, humid control 50 ± 3% In the case of dry 4-6 hour, metope moisture content≤6% at this time, the adhesive force of metope is preferable, then carries out the edge of vitrified tile and paste.
Preferably, after the step of above-mentioned metope is 4-6 hours dry, metope is handled using dustless grinding machine, is made it have suitable Suitable roughness and intensity, roughness requirements misplace < 3mm, then repaired with epoxy resin mortar it is smooth, with this realize metope it is dry and Work is flattened, while reducing hollowing problem when vitrified tile edge pastes, greatly reduces the hollowing rate of the soft patch of vitrified tile.
2) binder is mixed into paste, be uniformly applied on the inside of vitrified tile, thickness 8-6mm is advisable.The side of attention when stickup Just, gently being tapped with rubber hammer is close-coupled at vitrified tile and binder on the metope handled well.
3) paste binder need to be finished in 2 hours.The vitrified tile that each paving finishes must use cross clip, It is dead to stitch phenomena such as different with gap width to prevent gap too small.
Face brick jointing: jointing is carried out with jointing agent, jointing agent consistency is evaporated son and provoked not fall with jointing to be advisable.It, must before jointing The dust at place of must cracking to wall is blowed, will stitch in dust clean out.
Gap cleaning, is tuned into magma for jointing agent, then mortar is pressed into seam with scraper plate.Vitrified tile seam crossing is used and glass Change brick same color or white jointing agent wiping is embedding closely knit.
Jointing is carried out with specific purpose tool, horizontal joint is first hooked and hooks perps again.
Wiping seam, cleaning surface: 1) will be after edge patch vitrified tile completes certain flowing water paragraph, with tool by vitrified tile Superficial Foreign Body It roots out and is being scrubbed vitrified tile surface with clear water.
2) it is wiped clean at jointing using staple.
In the specific implementation, tapestry brick construction quality tolerance:
Economic and Efficiency Analysis of the invention: conventional method is pasted metope vitrified tile (with reference to cost), and rough 20 yuan of bottom painting/ m2, paste 45 yuan/m of vitrified tile2, 15 yuan/m of fee of material2, 90 yuan/m of vitrified tile2;170 yuan/m of Amount in Total2.After actually posting, vitreous Brick hollowing falls off no practicability.Removing labour cost adds rubbish to transport outward 15 yuan/m2.Using after this engineering method, brush cement-based waterproof layer 30 yuan/m2, 35 yuan/m of powder adhesive layer2, 15 yuan/m of metal lathing2, 5 yuan/m of brushing gum2, paste 45 yuan/m of vitrified tile2, vitrified tile 90 Member/m2, 220 yuan/m of Amount in Total2.Relative to conventional method, this engineering method cost increases by 220 yuan/m2- 170 yuan/m2=50 Member/m2, but may insure vitrified tile not hollowing, the above price is flat cost, is free of administration fee.
Social benefit analysis of the invention: the common quality defect of the soft patch of gypsum wall vitrified tile is more, management difficulty is larger, such as Fruit is done over again, and the progress and capital investment of this engineering are directly influenced.Indoor vitrified tile usage amount beautiful and generous is increasing, passes through Effective measures improve quality, are conducive to the development of enterprise itself.The gypsum wall and associated materials of the soft patch of vitrified tile belong to Novel environment-friendlymaterial material preferably develops green energy conservation construction by the control of effective quality convenient for the later period;And after tapestry brick construction, By checking monolithic hollowing area≤2%, patch block quality is substantially increased.
The present invention has application to Anhui Architectural Sci. Research & Design Inst.'s building detection mansion projects construction area 27829.23m2, using excellent effect after the soft patch construction of gypsum wall vitrified tile, work progress is without bad phenomenon, and sticking effect Well.
The present invention is handled by gypsum coat of plaster metope, carrying out spraying or artificial hacking.Brushing cement-based waterproof again Layer one time, to obstruct gypsum wall water imbibition;The present invention on wall plucking layer by pasting hot-galvanized steel silk screen together.And Hot-galvanized steel silk screen is fixed using the plastics anchor bar with enlarged footing, construction of leveling blanket is then carried out, to improve wall Flatness and stability;By the present invention in that with vitrified tile adhesive special, by improve binder flexibility and caking property from And reduce the influence of metope shrinkage stress bring;It can effectively prevent from cracking, anti-dropout;The present invention is existed by pasting the previous day One layer of gum is brushed at the back side of vitrified tile, and gum brushing need to brush in advance, improves the adhesive property of vitrified tile.The present invention passes through The treatment measures of process above can effectively prevent the appearance especially hollowing phenomenon of vitrified tile common quality defect, and design is reasonable, It has good market prospects.
Techniques well known is partly belonged to it should be noted that not elaborating in the present invention, or can be directly from market Upper buying obtains, and those skilled in the art do not need to make the creative labor and can be obtained, and specific connection type is in ability Have in domain or daily life and be extremely widely applied, and will not be described here in detail.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on the figure or Positional relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the present invention, the meaning of " plurality " is at least two, such as two, three It is a etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect It connects, is also possible to be electrically connected;It can be directly connected, can also can be in two elements indirectly connected through an intermediary The interaction relationship of the connection in portion or two elements, unless otherwise restricted clearly.For those of ordinary skill in the art For, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
In the present invention unless specifically defined or limited otherwise, fisrt feature in the second feature " on " or " down " can be with It is that the first and second features directly contact or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature exists Second feature " on ", " top " and " above " but fisrt feature be directly above or diagonally above the second feature, or be merely representative of First feature horizontal height is higher than second feature.Fisrt feature can be under the second feature " below ", " below " and " below " One feature is directly under or diagonally below the second feature, or is merely representative of first feature horizontal height less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not It must be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be in office It can be combined in any suitable manner in one or more embodiment or examples.In addition, without conflicting with each other, the skill of this field Art personnel can tie the feature of different embodiments or examples described in this specification and different embodiments or examples It closes and combines.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned Embodiment is changed, modifies, replacement and variant.

Claims (3)

1. the soft patch construction of gypsum wall vitrified tile, which is characterized in that the following steps carried out including sequence:
(A) preparation of construction: configuring necessary construction equipment and carries out the preparation of construction equipment, mounting material, carries out the guarantor of construction Nurse makees, and carries out construction site temporary power, illumination work, and coordinate the work of personnel associated therewith;
(B) base treatment: spraying or artificial hacking processing are carried out on gypsum coat of plaster metope, continues sprinkling maintenance 3 days;It brushes again It cement-based waterproof layer one time, conserves 3 days;One of hot-galvanized steel silk screen is pasted on wall plucking layer;And using with enlarged footing Hot-galvanized steel silk screen is fixed in base by plastics anchor bar, and in wire rope net surface brush layer cement sand pulp;
(C) plate-laying, snap the line: walltile typesetting is carried out in conjunction with drawing, specifies the quantity and gap size of vitrified tile, and smooth Ink fountain snap the line is carried out on metope;
(D) brick, brush gum are selected: the vitrified tile back side chosen is cleaned out, and one layer of gum is brushed at the back side of vitrified tile;
(E) edge patch vitrified tile: after maintenance, prepare patch block in snap the line lattice;Binder is mixed into paste, is uniformly smeared On the inside of vitrified tile, and gently being tapped when operation with rubber hammer makes vitrified tile and binder be close-coupled at the metope handled well On;
(F) face brick jointing: before jointing, it is necessary to the crack dust at place of wall is blowed, will stitch in dust clean out;It will hook Seam agent is tuned into magma, and then mortar is pressed into seam with scraper plate;
(G) wiping seam, cleaning surface: after edge patch vitrified tile is completed a period of time, vitrified tile Superficial Foreign Body is rooted out with tool Vitrified tile surface is scrubbed with clear water.
2. the soft patch construction of gypsum wall vitrified tile according to claim 1, it is characterised in that: in step D, gum Brush need to brushing in formal soft patch for first 1 day.
3. the soft patch construction of gypsum wall vitrified tile according to claim 1, it is characterised in that: in step E, paste Object binder need to be finished in 1 hour.
CN201910218907.8A 2019-03-21 2019-03-21 The soft patch construction of gypsum wall vitrified tile Pending CN109898773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910218907.8A CN109898773A (en) 2019-03-21 2019-03-21 The soft patch construction of gypsum wall vitrified tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910218907.8A CN109898773A (en) 2019-03-21 2019-03-21 The soft patch construction of gypsum wall vitrified tile

Publications (1)

Publication Number Publication Date
CN109898773A true CN109898773A (en) 2019-06-18

Family

ID=66953765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910218907.8A Pending CN109898773A (en) 2019-03-21 2019-03-21 The soft patch construction of gypsum wall vitrified tile

Country Status (1)

Country Link
CN (1) CN109898773A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379394A (en) * 2020-03-26 2020-07-07 卜范柱 Ceramic tile or marble dry-bonding method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2592742Y (en) * 2002-12-06 2003-12-17 张学贵 Hanging-mounted external-wall vitreous brick composite wall
RU95711U1 (en) * 2010-03-12 2010-07-10 Равиль Абдуллович Тулумбаев DECORATIVE TILES
CN102383507A (en) * 2011-08-30 2012-03-21 中国建筑装饰集团有限公司 Light steel keel and plasterboard vitrified tile decoration wall and method for constructing same
CN103758313A (en) * 2011-12-31 2014-04-30 常熟古建园林建设集团有限公司 Construction method of decorative face bricks on outer wall
CN204691150U (en) * 2015-06-19 2015-10-07 东易日盛家居装饰集团股份有限公司 A kind of face brick metope leveling structure
CN107338934A (en) * 2017-08-10 2017-11-10 深圳市建艺装饰集团股份有限公司 A kind of metope vitrified tile pastes the construction method of skeleton
CN107473705A (en) * 2017-09-19 2017-12-15 常州朋悦纺织品有限公司 A kind of vitrified tile and preparation method thereof
CN207194343U (en) * 2017-07-31 2018-04-06 深圳市建筑装饰(集团)有限公司 The tapestry brick paving structure of autoclave aerated concrete building block exterior wall
CN108753211A (en) * 2018-06-22 2018-11-06 苏州金螳螂建筑装饰股份有限公司 Fall off the glue and preparation method thereof of repairing, application for finishing material hollowing
CN108797929A (en) * 2018-05-31 2018-11-13 中联世纪建设集团有限公司 Ecological stone material construction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2592742Y (en) * 2002-12-06 2003-12-17 张学贵 Hanging-mounted external-wall vitreous brick composite wall
RU95711U1 (en) * 2010-03-12 2010-07-10 Равиль Абдуллович Тулумбаев DECORATIVE TILES
CN102383507A (en) * 2011-08-30 2012-03-21 中国建筑装饰集团有限公司 Light steel keel and plasterboard vitrified tile decoration wall and method for constructing same
CN103758313A (en) * 2011-12-31 2014-04-30 常熟古建园林建设集团有限公司 Construction method of decorative face bricks on outer wall
CN204691150U (en) * 2015-06-19 2015-10-07 东易日盛家居装饰集团股份有限公司 A kind of face brick metope leveling structure
CN207194343U (en) * 2017-07-31 2018-04-06 深圳市建筑装饰(集团)有限公司 The tapestry brick paving structure of autoclave aerated concrete building block exterior wall
CN107338934A (en) * 2017-08-10 2017-11-10 深圳市建艺装饰集团股份有限公司 A kind of metope vitrified tile pastes the construction method of skeleton
CN107473705A (en) * 2017-09-19 2017-12-15 常州朋悦纺织品有限公司 A kind of vitrified tile and preparation method thereof
CN108797929A (en) * 2018-05-31 2018-11-13 中联世纪建设集团有限公司 Ecological stone material construction
CN108753211A (en) * 2018-06-22 2018-11-06 苏州金螳螂建筑装饰股份有限公司 Fall off the glue and preparation method thereof of repairing, application for finishing material hollowing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴壮等: "在EPS外墙保温系统基层上使用背涂胶工艺粘贴玻化砖施工工艺", 《居业》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379394A (en) * 2020-03-26 2020-07-07 卜范柱 Ceramic tile or marble dry-bonding method

Similar Documents

Publication Publication Date Title
CN106284929B (en) A kind of anti-hollowing edge patch construction method of furring tile
CN101565997A (en) Construction method for large-area irregular floor tile
CN103321442A (en) Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface
CN201198641Y (en) External heat insulation decorative machining structure body
CN107268946A (en) A kind of color sand epoxy self-leveling construction technology
CN102828600A (en) Method for laying floor artificial stones
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
CN109025136A (en) Glue for tile pastes tapestry brick construction method between more boiled water rooms
CN109898773A (en) The soft patch construction of gypsum wall vitrified tile
CN102786275B (en) Cement-based infiltration crystalline waterproof material
CN102888959B (en) A kind of dry powder and mortar External Wall carries out the method for constructing
CN105178547A (en) Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof
CN207420088U (en) A kind of detachable combination cornice for facade rebuilding construction
CN107574936B (en) A kind of heat preserving exterior wall construction technology
CN108558305A (en) The inorganic tile gap filler and preparation method thereof of squeezing and coating construction
CN108360782A (en) A kind of method of wall tile
CN112211364A (en) Adhesive type inner wall brick structure and pasting construction method
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN106638214B (en) A kind of the colored road surface surface layer and its paving method of antiskid
CN109826325A (en) A kind of anti-seepage construction method of architectural engineering
CN205025042U (en) Big unit pottery sheet metal back of body kiss -coating bonds and constructs
CN209178760U (en) A kind of prefabrication type synthetic court surface layer
CN207535063U (en) A kind of mixing plant scraper for being conducive to protection mixing arm
CN110318522A (en) A kind of quick paving structure of compound ceramic tile
CN107435425A (en) A kind of toilet resin glue wet combining construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618

RJ01 Rejection of invention patent application after publication