CN107435425A - A kind of toilet resin glue wet combining construction method - Google Patents
A kind of toilet resin glue wet combining construction method Download PDFInfo
- Publication number
- CN107435425A CN107435425A CN201710639561.XA CN201710639561A CN107435425A CN 107435425 A CN107435425 A CN 107435425A CN 201710639561 A CN201710639561 A CN 201710639561A CN 107435425 A CN107435425 A CN 107435425A
- Authority
- CN
- China
- Prior art keywords
- stone material
- brick
- somebody
- resin glue
- glue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/0215—Flooring or floor layers composed of a number of similar elements specially adapted for being adhesively fixed to an underlayer; Fastening means therefor; Fixing by means of plastics materials hardening after application
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/08—Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/182—Underlayers coated with adhesive or mortar to receive the flooring
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
- E04F15/186—Underlayers covered with a mesh or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention relates to a kind of toilet resin glue wet combining construction method, this method concretely comprises the following steps:(1)Engineering technology, which tells somebody what one's real intentions are, deepens unwrapping wire tells somebody what one's real intentions are;(2)Base layer construction is told somebody what one's real intentions are;(3)Material is processed;(4)The configuration of in-site installation materials and apparatus;(5)Wet combining is constructed.The advantage of the invention is that:(1)Time and labour saving;(2)Mortar is reduced, is stacked simple;(3)Anti-pollution, acid and alkali-resistance, corrosion-resistant, not accumulation of salt in the surface soil discoloration, bonding strength are high;(4)The load of floor is reduced, increases the solidification intensity on ground;(5)Sealing closing is closely knit;(6)Service life is grown.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of construction method of toilet resin glue wet combining.
Background technology
Toilet elder generation Pipe installing at present, empty closure is hung, it is levelling to do waterproof, water test, protective layer is done, then backfill lightweight and mix
Solidifying soil, waterproof, dry rear water test are done, mortar cover is done, finally pastes stone material filleting;Sewage easily slowly oozes from the sealing of stone material
Penetrate into, fill concrete is done well by sewage pollution, bottom waterproof, and sewage is not arranged, and is taken care of the pence, and the time is grown, and is caused
The more aobvious sternness of environmental problem.
Present stone material dry suspending chip is connected with stone material, due to each decoration corporation confide a technological secret not in time, it is lack of standardization, without one
Individual unified national regulation, construction reference, workmen does not have lifelong system, and technical problem be present;Metope base layer construction is put down
Whole degree does not reach requirement, and rectification not in time, causes the difficulty of construction in later period to increase;Stone material connects the chip of accessory, different in size,
A small number of chip lengths do not reach requirement, also need welding to lengthen at the scene;Cloud stone glue, AB glue and the chip of back face of stone connect,
Neither one unified construction technical standard, the connection solidification construction of back face of stone, height is low, of all kinds, makes a lot of variety
's;There is a small amount of construction, accessory chip is arranged on the following of angle bar, force transfer, and chip will bear how many times of endurance i.e.
Pulling force downward vertically;What is more important, and a small number of chips are long because connecting, and are fixed with angle bar, screw cannot be used, directly
On angle bar chip is fixed with glue;Also many work order location specifications replace dried hanging hang structure glue with cloud stone glue, slacked off in ignoring
Material reducing, cost is reduced, seeks quick construction conveniently, stone material dry suspending glue is often substituted with cloud stone glue, causes great potential safety hazard,
These irrational constructions, many time bombs are suspended on just as on our peripheries, head, very big potential safety hazard be present.
For above the defects of and the problem of of presence, my invention's resin glue paste ground stone, brick, from surface layer control,
Waterproof is controlled layer by layer, and successfully solving the defects of toilet constructs weak point.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of construction method of toilet resin glue stone material wet combining, Neng Goujin
Row commercialization is constructed, and shortens the duration, reduces workmen, increases stone material bonding strength, avoids polluting caused by blowdown careless omission.
In order to solve the above technical problems, the technical scheme is that:A kind of construction method of toilet resin glue wet combining,
Its innovative point is:Carry out engineering technology to tell somebody what one's real intentions are, deepen unwrapping wire and tell somebody what one's real intentions are, base layer construction is told somebody what one's real intentions are, and strict unified stone material and brick add
Work requirement, associated materials prepare, and live wet combining is carried out using resin glue.
Further, the wet combining technique concretely comprises the following steps:
a)Engineering technology, which tells somebody what one's real intentions are, deepens unwrapping wire tells somebody what one's real intentions are:
1st, engineering early stage, the kind of stone material, brick is determined according to Design Requirement Drawing;
2nd, horizontal line, the axial line that engineering unwrapping wire must be handed over according to drawing requirement, proprietor, teams and groups of organizing construction of project management department, depth
Change personnel live unwrapping wire together, determines the completion upper thread of stone material, brick, upper thread is completed by stone material, according to the thickness of drawing requirement stone material
Degree, the completion upper thread of mortar cover after the basic unit's backfill lightweight concrete and closed-water test of stone material and brick is calculated downwards, it is necessary to
By drawing slope requirement or code requirement 0.5%, it is important to consider bottom row's stone material, the size of brick;
3rd, deepen typesetting designer, complete upper thread according to drawing and live stone material, the decoration of brick and carry out typesetting, while to consider
Threshold stone positions, and zero brick width of corner can not be less than the 1/3 of specification brick width, and consider decorative effect, divide on typesetting figure
Required block number and size are not marked, necessary forces location when particularly flowing specific size and the in-depth of glass degree of position, are paid attention to
Stone material periphery finished surface size adds several mm to prevent to stitch towards day;
4th, in-depth typesetting figure drawing to transfer to project administration technical staff audit, the figure be stone material and brick processing, process tell somebody what one's real intentions are,
Construction, check and accept and terminate the foundation checked and accepted;
b)Base layer construction is told somebody what one's real intentions are:One of waterproof before fill concrete can be subtracted, other base layer constructions are constant, fill concrete solidification
Afterwards, it is necessary to do one of waterproof, after acceptance(check), do mortar cover by slope requirement, surface layer troweling terminates, humidity after 24 hours
Maintenance;
c)Stone material, brick processing:
1st, the stone material cutting, brick, according to in-depth typesetting figure, try to arrange in place, see effect, it is underproof to be handled or directly
Change, back side waterproof, which can be done, to be done;
2nd, all stone material and brick surfaces must be unified size to bottom thickness, and thickness can not have an error, uniform sizes standard,
Brick is processed well than stone material;
3rd, packaging must concentrate bag by the bid section of in-depth typesetting figure, an aspect, a room, a plane, a moulding
Fill, document is posted in packaging, the in-depth plan of the block number of stone material and brick processing, size and diminution is enclosed, so as to from the packaging
It is known that the position of installation;
4th, scene is transported to, arranges to be transported to close to the position of installation as far as possible, in order to avoid repeatedly carry, collision fracture;
5th, stone material transports to scene, needs the time of several days, stone material substantially dry, stone material to be directly put into installation according to stone material numbering
Position;
d)The configuration of in-site installation materials and apparatus:Stone material or brick, rubber hammer, brush, one-shot injector, sanitary cup, ring
Oxygen resin glue, curing agent, accelerator, glass fiber reticular cloth, roller, brush, putty knife, blade of carving knife, scraper plate, Plastic Drum, plastics
Water bottle, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, kind oxidation color, mill base, color essence,
All pigment and color, it is necessary to be dissolved in resin glue;
e)Stone material wet combining work progress
1st, etc. after ground solidification is completely dried, floor-dust is first cleaned out, particularly convex pimple, it is necessary to even out or grind
It is flat;
2nd, the control line and separator bar of stone material or brick are put on ground according to typesetting figure;
3rd, resin glue is allocated;
4th, the resin glue configured is directly poured on ground, or scraped in the uniform can in ground, glue can also be scraped in stone material or
The back side of brick;
5th, and then stone material or brick by number, put up, gently knocked on stone material with hammer, the glue of sealing is emerged, stone
Material or brick are paved, if stone material or brickwork joint mouth resin glue less than, it is necessary to timely processing glue, by that analogy, spread therefore, wrapping
Including the end processing of stone material or brick will settle at one go;
6th, during resin solidification, beginning intensity is not high, is easy to clear up unnecessary resin material with blade;
7th, etc. clean mirror is made in polishing after solidification in 1-2 days is dried;Vitrified tile is not required to be surface-treated because surface is smooth:Minute surface is done in polishing,
During paving construction, every sealing glassine paper auxiliary construction, sealing is struck off, unnecessary resin separates, and is cleared up in time after solidification.
Further, during the step e allotments resin glue, layer of glass fiber fabric or two can be added before ground stone paving
Layer glass-fiber-fabric, increase the waterproof effect on ground.
Further, during the step e allotments resin glue, according to temperature plus 1% -4% curing agent, 1%-4% promotes
Agent, the color of glue used can be prepared first, but curing agent, accelerator can not match somebody with somebody, and take 100g resin glues to be put into once in proportion
Property cup in, inhale 3g curing agent with one-shot injector and put into and stirred in cup, then inhale 3g accelerator with one-shot injector and put into
Stir and terminate in cup, it is now with the current when with glue, control and solidified at 15 minutes or so as far as possible.
The advantage of the invention is that:
1st, settle at one go, need not fetch water maintenance after terminating, reduce scene it is artificial, the time is saved, beneficial to the duration in advance;
2nd, the mortar material at scene is reduced, transport and scene are stacked up and down;
3rd, performance:Anti-pollution, acid and alkali-resistance, corrosion-resistant, not accumulation of salt in the surface soil discoloration, bonding strength are high;
4th, the load of floor is reduced, increases the solidification intensity on ground;
5th, the stone material of this technique patch, the closing of periphery sealing are closely knit, and toilet blowdown will not penetrate into ground, free from extraneous odour;
6th, the stone material and brick of this technique patch, sealing closing in periphery is closely knit, increases the protective layer of stone material and brick, controls stone material and brick
Water suction, surface layer is not pulverized easily, ftractureed, dilatancy, is not easy to be influenceed by surface humidity, good decorating effect, safe operating life
It is long.
Embodiment
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this
It is bright to be limited among described scope of embodiments.
A kind of toilet resin glue stone material wet combining technique in the present invention, specifically includes following step:
The first step, engineering technology, which tells somebody what one's real intentions are, deepens unwrapping wire tells somebody what one's real intentions are:
1st, engineering early stage, the kind of stone material, brick is determined according to Design Requirement Drawing;
2nd, horizontal line, the axial line that engineering unwrapping wire must be handed over according to drawing requirement, proprietor, teams and groups of organizing construction of project management department, depth
Change personnel live unwrapping wire together, determines the completion upper thread of stone material, brick, upper thread is completed by stone material, according to the thickness of drawing requirement stone material
Degree, the completion upper thread of mortar cover after the basic unit's backfill lightweight concrete and closed-water test of stone material and brick is calculated downwards, it is necessary to
By drawing slope requirement or code requirement 0.5%, it is important to consider bottom row's stone material, the size of brick;
3rd, deepen typesetting designer, complete upper thread according to drawing and live stone material, the decoration of brick and carry out typesetting, while to consider
Threshold stone positions, and zero brick width of corner can not be less than the 1/3 of specification brick width, and consider decorative effect, divide on typesetting figure
Required block number and size are not marked, necessary forces location when particularly flowing specific size and the in-depth of glass degree of position, are paid attention to
Stone material periphery finished surface size adds several mm to prevent to stitch towards day;
4th, in-depth typesetting figure drawing to transfer to project administration technical staff audit, the figure be stone material and brick processing, process tell somebody what one's real intentions are,
Construction, check and accept and terminate the foundation checked and accepted;
Second step, base layer construction are told somebody what one's real intentions are:One of waterproof before fill concrete can be subtracted, other base layer constructions are constant, backfill coagulation
After soil solidification, it is necessary to do one of waterproof, after acceptance(check), do mortar cover by slope requirement, surface layer troweling terminates, 24 hours
Humidity is maintained afterwards;
3rd step, stone material, brick processing:
1st, the stone material cutting, brick, according to in-depth typesetting figure, try to arrange in place, see effect, it is underproof to be handled or directly
Change, back side waterproof, which can be done, to be done;
2nd, all stone material and brick surfaces must be unified size to bottom thickness, and thickness can not have an error, uniform sizes standard,
Brick is processed well than stone material;
3rd, packaging must concentrate bag by the bid section of in-depth typesetting figure, an aspect, a room, a plane, a moulding
Fill, document is posted in packaging, the in-depth plan of the block number of stone material and brick processing, size and diminution is enclosed, so as to from the packaging
It is known that the position of installation;
4th, scene is transported to, arranges to be transported to close to the position of installation as far as possible, in order to avoid repeatedly carry, collision fracture;
5th, stone material transports to scene, needs the time of several days, stone material substantially dry, stone material to be directly put into installation according to stone material numbering
Position;
4th step, the configuration of in-site installation materials and apparatus:Stone material or brick, rubber hammer, brush, one-shot injector, disposable cup
Son, epoxide-resin glue, curing agent, accelerator, glass fiber reticular cloth, roller, brush, putty knife, blade of carving knife, scraper plate, Plastic Drum,
Plastic water bottle, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, kind oxidation color, mill base,
Color essence, all pigment and color, it is necessary to be dissolved in resin glue;
5th step, wet combining work progress:
1st, etc. after ground solidification is completely dried, floor-dust is first cleaned out, particularly convex pimple, it is necessary to even out or grind
It is flat;
2nd, the control line and separator bar of stone material are put on ground according to typesetting figure;
3rd, before ground stone paving layer of glass fiber fabric or two layers of glass-fiber-fabric, the waterproof effect for increasing ground can be added to be added according to temperature
1% -4% curing agent, 1%-4% accelerator, the color of glue glue used can be prepared first, but curing agent, accelerator can not match somebody with somebody;
Take 100g resin glues to be put into disposable cup in proportion, put into cup and stirred with one-shot injector suction 3g curing agent, then
Inhaled 3g accelerator with one-shot injector and put into stir in cup and terminated, it is now with the current when with glue, control as far as possible at 15 minutes
Left and right solidifies;
4th, the resin glue configured is directly poured on ground, or scraped in the uniform can in ground, glue can also be scraped in stone material or
The back side of brick;
5th, and then stone material or brick by number, put up, gently knocked on stone material with hammer, the glue of sealing is emerged, stone
Material or brick are paved, if stone material or brickwork joint mouth resin glue less than, it is necessary to timely processing glue, by that analogy, spread therefore, wrapping
Including the end processing of stone material or brick will settle at one go;
6th, during resin solidification, beginning intensity is not high, is easy to clear up unnecessary resin material with blade;
7th, etc. clean mirror is made in polishing after solidification in 1-2 days is dried;Vitrified tile is not required to be surface-treated because surface is smooth:Minute surface is done in polishing,
During paving construction, every sealing glassine paper auxiliary construction, sealing is struck off, unnecessary resin separates, and is cleared up in time after solidification.
Construction method in above-described embodiment, every square metre of paving of stone material is 1.5-2.5Kg with resin glue amount, and material is accurate
After getting ready, worker's paving 30-60 blocks per hour;
Every square metre of paving of brick, resin glue dosage are 1.5-3Kg, after material preparation, worker's paving 40-60 blocks per hour.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, in above-described embodiment and specification
Description merely illustrates the principles of the invention, and without departing from the spirit and scope of the present invention, the present invention also has various
Changes and improvements, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by institute
Attached claims and its equivalent circle.
Claims (3)
1. a kind of toilet resin glue wet combining construction method, this method is used for the construction of toilet stone material, brick, vitrified tile, and it is special
Sign is:Carry out engineering technology to tell somebody what one's real intentions are, deepen unwrapping wire and tell somebody what one's real intentions are, base layer construction is told somebody what one's real intentions are, and strictly unified processing request, prepares related material
Material carries out the wet combining of live stone material, brick, vitrified tile using resin glue, concretely comprises the following steps:
a)Engineering technology, which tells somebody what one's real intentions are, deepens unwrapping wire tells somebody what one's real intentions are:
1st, engineering early stage, the kind of stone material, brick is determined according to Design Requirement Drawing;
2nd, horizontal line, the axial line that engineering unwrapping wire must be handed over according to drawing requirement, proprietor, teams and groups of organizing construction of project management department, depth
Change personnel live unwrapping wire together, determines the completion upper thread of stone material, brick, upper thread is completed by stone material, according to the thickness of drawing requirement stone material
Degree, the completion upper thread of mortar cover after the basic unit's backfill lightweight concrete and closed-water test of stone material and brick is calculated downwards, it is necessary to
By drawing slope requirement or code requirement 0.5%, it is important to consider bottom row's stone material, the size of brick;
3rd, deepen typesetting designer, complete upper thread according to drawing and live stone material, the decoration of brick and carry out typesetting, while to consider
Threshold stone positions, and zero brick width of corner can not be less than the 1/3 of specification brick width, and consider decorative effect, divide on typesetting figure
Required block number and size are not marked, necessary forces location when particularly flowing specific size and the in-depth of glass degree of position, are paid attention to
Stone material periphery finished surface size adds several mm to prevent to stitch towards day;
4th, in-depth typesetting figure drawing to transfer to project administration technical staff audit, the figure be stone material and brick processing, process tell somebody what one's real intentions are,
Construction, check and accept and terminate the foundation checked and accepted;
b)Base layer construction is told somebody what one's real intentions are:One of waterproof before fill concrete can be subtracted, other base layer constructions are constant, fill concrete solidification
Afterwards, it is necessary to do one of waterproof, after acceptance(check), do mortar cover by slope requirement, surface layer troweling terminates, humidity after 24 hours
Maintenance;
c)Stone material, brick processing:
1st, the stone material cutting, brick, according to in-depth typesetting figure, try to arrange in place, see effect, it is underproof to be handled or directly
Change, back side waterproof, which can be done, to be done;
2nd, all stone material and brick surfaces must be unified size to bottom thickness, and thickness can not have an error, uniform sizes standard,
Brick is processed well than stone material;
3rd, packaging must concentrate bag by the bid section of in-depth typesetting figure, an aspect, a room, a plane, a moulding
Fill, document is posted in packaging, the in-depth plan of the block number of stone material and brick processing, size and diminution is enclosed, so as to from the packaging
It is known that the position of installation;
4th, scene is transported to, arranges to be transported to close to the position of installation as far as possible, in order to avoid repeatedly carry, collision fracture;
5th, stone material transports to scene, needs the time of several days, stone material substantially dry, stone material to be directly put into installation according to stone material numbering
Position;
d)The configuration of in-site installation materials and apparatus:Stone material or brick, rubber hammer, brush, one-shot injector, sanitary cup, ring
Oxygen resin glue, curing agent, accelerator, glass fiber reticular cloth, roller, brush, putty knife, blade of carving knife, scraper plate, Plastic Drum, plastics
Water bottle, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, kind oxidation color, mill base, color essence,
All pigment and color, it is necessary to be dissolved in resin glue;
e)Stone material wet combining work progress
1st, etc. after ground solidification is completely dried, floor-dust is first cleaned out, particularly convex pimple, it is necessary to even out or grind
It is flat;
2nd, the control line and separator bar of stone material or brick are put on ground according to typesetting figure;
3rd, resin glue is allocated;
4th, the resin glue configured is directly poured on ground, or scraped in the uniform can in ground, glue can also be scraped in stone material or
The back side of brick;
5th, and then stone material or brick by number, put up, gently knocked on stone material with hammer, the glue of sealing is emerged, stone
Material or brick are paved, if stone material or brickwork joint mouth resin glue less than, it is necessary to timely processing glue, by that analogy, spread therefore, wrapping
Including the end processing of stone material or brick will settle at one go;
6th, during resin solidification, beginning intensity is not high, is easy to clear up unnecessary resin material with blade;
7th, etc. clean mirror is made in polishing after solidification in 1-2 days is dried;Vitrified tile is not required to be surface-treated because surface is smooth:Minute surface is done in polishing,
During paving construction, every sealing glassine paper auxiliary construction, sealing is struck off, unnecessary resin separates, and is cleared up in time after solidification.
2. toilet according to claim 1 uses resin glue wet combining construction method, it is characterised in that:The step e is adjusted
During resin glue, layer of glass fiber fabric or two layers of glass-fiber-fabric can be added before ground stone paving, increase the waterproof effect on ground.
3. toilet according to claim 1 uses resin glue wet combining construction method, it is characterised in that:The step e is adjusted
During resin glue, according to temperature plus 1% -4% curing agent, 1%-4% accelerator, the color of glue used can be prepared first, but
It is that curing agent, accelerator can not match somebody with somebody;Take 100g resin glues to be put into disposable cup in proportion, inhale 3g curing agent with one-shot injector
Put into cup and stir, then inhaled 3g accelerator with one-shot injector and put into stir in cup and terminated, when with glue, now matched somebody with somebody
It is current, control and solidified at 15 minutes or so as far as possible.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710639561.XA CN107435425A (en) | 2017-07-31 | 2017-07-31 | A kind of toilet resin glue wet combining construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710639561.XA CN107435425A (en) | 2017-07-31 | 2017-07-31 | A kind of toilet resin glue wet combining construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107435425A true CN107435425A (en) | 2017-12-05 |
Family
ID=60461382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710639561.XA Pending CN107435425A (en) | 2017-07-31 | 2017-07-31 | A kind of toilet resin glue wet combining construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107435425A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114575550A (en) * | 2022-03-23 | 2022-06-03 | 安徽三建工程有限公司 | Wet pasting process for floor tiles in kitchens and bathrooms |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008057119A (en) * | 2006-08-29 | 2008-03-13 | Jdc Corp | Waterproof construction method for concrete floor slab for road bridge |
JP2011106176A (en) * | 2009-11-18 | 2011-06-02 | Kawasaki Heavy Ind Ltd | Method for waterproofing and waterproof structure of upper surface of concrete floor slab, and fiber plate |
CN102505831A (en) * | 2011-12-22 | 2012-06-20 | 深圳市深装总装饰工程工业有限公司 | Construction method for paving plasters on ground and manmade stone |
CN105569238A (en) * | 2015-12-24 | 2016-05-11 | 曹颖 | Construction method for infusion of AB glue and resin glue for curtain wall stone dry-hanging process |
CN105666704A (en) * | 2016-01-17 | 2016-06-15 | 曹颖 | Construction method for rapidly connecting stones through epoxy resin adhesive |
-
2017
- 2017-07-31 CN CN201710639561.XA patent/CN107435425A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008057119A (en) * | 2006-08-29 | 2008-03-13 | Jdc Corp | Waterproof construction method for concrete floor slab for road bridge |
JP2011106176A (en) * | 2009-11-18 | 2011-06-02 | Kawasaki Heavy Ind Ltd | Method for waterproofing and waterproof structure of upper surface of concrete floor slab, and fiber plate |
CN102505831A (en) * | 2011-12-22 | 2012-06-20 | 深圳市深装总装饰工程工业有限公司 | Construction method for paving plasters on ground and manmade stone |
CN105569238A (en) * | 2015-12-24 | 2016-05-11 | 曹颖 | Construction method for infusion of AB glue and resin glue for curtain wall stone dry-hanging process |
CN105666704A (en) * | 2016-01-17 | 2016-06-15 | 曹颖 | Construction method for rapidly connecting stones through epoxy resin adhesive |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114575550A (en) * | 2022-03-23 | 2022-06-03 | 安徽三建工程有限公司 | Wet pasting process for floor tiles in kitchens and bathrooms |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672684B (en) | A kind of construction method for repairing ground stone hollowing | |
CN108086113A (en) | A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area | |
CN110144790A (en) | A kind of construction method of water permeable concrete | |
CN101457581A (en) | Construction method for auto-flowing floor | |
CN104120855A (en) | Construction method for paving ground tile floor | |
CN108947433B (en) | Preparation method of gypsum-based self-leveling floor material | |
CN108412093A (en) | A kind of Modern Landscape decoration loam wall and its construction method | |
CN106088493A (en) | A kind of pin key connects mounting structure and the construction thereof of prefabricated bench | |
CN103953181B (en) | Cement flooring breakage method for repairing and constructing | |
CN109826456A (en) | Mortar curing process | |
CN110219443A (en) | Machinery whitewashing plastering construction method | |
CN107435425A (en) | A kind of toilet resin glue wet combining construction method | |
CN207420088U (en) | A kind of detachable combination cornice for facade rebuilding construction | |
CN105569238A (en) | Construction method for infusion of AB glue and resin glue for curtain wall stone dry-hanging process | |
CN102888959B (en) | A kind of dry powder and mortar External Wall carries out the method for constructing | |
CN204282784U (en) | A kind of face brick filleting compression tool | |
CN205012344U (en) | High steep overflow surface slipform | |
CN106278065A (en) | Imitative stone decoration element and production method thereof | |
CN107574936A (en) | A kind of heat preserving exterior wall construction technology | |
CN205000655U (en) | But cyclic utilization's multi -functional split heads | |
CN215368500U (en) | Flame-retardant anti-cracking extruded polystyrene foam heat-insulation terrace | |
CN205840190U (en) | A kind of pin key connects the mounting structure of prefabricated bench | |
CN203856170U (en) | Non-deforming quartz stone manufactured on site | |
CN107938907A (en) | A kind of inclined roof exempts from formwork construction method | |
CN104295102B (en) | The construction method of steel form fire wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171205 |
|
WD01 | Invention patent application deemed withdrawn after publication |