CN203856170U - Non-deforming quartz stone manufactured on site - Google Patents

Non-deforming quartz stone manufactured on site Download PDF

Info

Publication number
CN203856170U
CN203856170U CN201420119611.3U CN201420119611U CN203856170U CN 203856170 U CN203856170 U CN 203856170U CN 201420119611 U CN201420119611 U CN 201420119611U CN 203856170 U CN203856170 U CN 203856170U
Authority
CN
China
Prior art keywords
quartz
layer
quartz stone
deforming
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420119611.3U
Other languages
Chinese (zh)
Inventor
喻诗维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420119611.3U priority Critical patent/CN203856170U/en
Application granted granted Critical
Publication of CN203856170U publication Critical patent/CN203856170U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a non-deforming quartz stone manufactured on site. The non-deforming quartz stone comprises a quartz stone layer, a filler layer used for filling holes and concave parts in the surface of the quartz stone layer, a crystallizing layer used for improving the surface gloss of the quartz stone, a nano protective agent layer used for performing anti-seepage treatment on the quartz stone, and a crystal hardening agent layer which are sequentially arranged from bottom to top, wherein the crystal hardening agent layer is used for hardening the quartz stone. Compared with the prior art, the non-deforming quartz stone has the advantages of 1, higher combination degree; 2, low cost; 3 no temperature limitation in production; 4, casting in place; 5 low deformation possibility and long service life.

Description

The indeformable quartz of a kind of field fabrication
Technical field
The utility model relates to a kind of quartz, is specially the indeformable quartz of a kind of field fabrication.
Background technology
The laying of ground quartz stone is in the prior art all that the quartz slate of making in advance is direct conventionally and cement floor is used in conjunction with; do like this and often there will be in conjunction with insecure, yielding problem; and different according to different quartz prices, cost is very high.
Utility model content
The technical problem that the utility model solves has been to provide the indeformable quartz of a kind of field fabrication to solve the problem in background technology.
The technical problem that the utility model solves realizes by the following technical solutions:
The indeformable quartz of field fabrication, comprises setting gradually from top to bottom: quartz layer, for the packing layer of filled stone diamond stone layer surface hole defect and recess, for improving the crystallizing layer of quartz surface gloss, for quartz being carried out to the nano protecting agent layer of impermeable processing and for quartz being carried out to the crystal hardening accelerator layer of stiffened processing.
Beneficial effect of the present utility model is:
1, between each layer of structure of quartz of field fabrication, boning close and firm (in the past must be bonding with clay with cement basic layer combination, if with cementitious will arch bridge, cracking, loosening, sometimes with clay is bonding, also can produce above phenomenon, with clay is bonding, not tackle the problem at its root, present method can be limit these problems), not yielding, long service life.
2, cost is low: the selling price of our product was at more than 300 yuan one square in the past, general more than 600 yuan one square of the budget (this price comprises the management fee of the artificial and large Bao Fang of material, installation) in Party A there, our present product bag install and material also with regard to 200 more points, in Party A's a budget budget to one square of 300 polylith money (this price comprises the management fee of the artificial and large Bao Fang of material, installation).
3, produce without temperature limiting: producing in the past must be through the HTHP of 90-110 °, now as long as just can operate at 5-10 °.
4, can cast in situs: must just can make product by large-scale machinery equipment in the past, and only need now medium and small equipment just can make finished product, and the product of making be better than former product, cost is lower.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach object and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
The indeformable quartz of a kind of field fabrication as shown in Figure 1, comprises setting gradually from top to bottom: quartz layer 5, for the packing layer 4 of filled stone diamond stone layer 5 surface hole defect and recess, for improving the crystallizing layer 3 of quartz surface gloss, for quartz being carried out to the nano protecting agent layer 2 of impermeable processing and for quartz being carried out to the crystal hardening accelerator layer 1 of stiffened processing.
In use, shaping structures of the present utility model is realized by following steps:
(1) base treatment: after concrete arrival intensity, brush water-repellent paint at concrete surface and carry out waterproofing course.After waterproofing course is carried out; Again by unsaturated-resin by special messenger with scraping scrubbing brush on ground, during brush, consistent, the weight of direction is appropriate, brush line is even, without omitting, increases bonding force.
(2) dividing strip lays: in order to make the construction handing-over energy of cast-in-site quartz different color straight attractive in appearance, colour changing is coordinated naturally, and the handing-over of different colours or different system quartz can adopt seamless spliced and dividing strip splicing.
1, quality specifications: the whole lattice effect that embodies quartz battery limits and channel region of energy, requires smooth straight, transition nature.
2, control method
1) seamless spliced: before a, paving quartz, by placing by illustrated dimensions the width control line of mating formation, control line generally amplifies 5~10cm by the illustrated dimensions live width of first bed board piece.B, quartz to be cast solidify while carrying out next plate laying, then carry out accurate unwrapping wire by illustrated dimensions, use quartz cutting machine after the straight incision in snap the line position, then cut the edge strip of 5~10cm, are convenient to carry out the handing-over construction of next plate.Straight line error ≯ 2mm when c, the cutting of quartz splicing seams, the joint-cutting degree of depth 7~10mm is advisable, and after (must be greater than quartz thickness) cutting, should carry out removing surface, requires without collapsing limit, pollution-free.2) dividing strip splicing base treatment smooth after, by drawing size positions unwrapping wire, in unwrapping wire position, lay dividing strip bracing wire calibration, with AB glue, fix.
(3) stir material paving: the organic formula additive of 1, building quartz by production, add again inorganic pigment, again the material such as quartz sand, silica dioxide granule, silicate compound, aluminic acid compound that configures adding successively of ratio and do quartz is placed in agitator, after stirring, can take the circumstances into consideration to add C12H10N2O4S curing compound (can use normal temperature cure agent under normal temperature condition) to stir (mixing time time 3~to 5 minutes).2, the quartz material being stirred is carried in material distributing machine, the quartz material that is conveyed into the material distributing machine that paves is arranged in to job site in time, the strict thick end of cloth of controlling, advise the thick end for after completing 7~to 15mm be advisable (concrete thickness can be laid as requested), in the cloth that paves, note planeness, guaranteed rear planeness 1.5~to 2.5mm.3, on the quartz layer of cast honest material, can adopt quartz rammer compacter to tamp pressing to quartz layer, in compacting applanation process, must be responsible for compounding practice by special operating personnel: (1), control compacted thickness; (2), repair the compacting of underproof place and corner less than place, guarantee smooth, closely knit.
(4) fixed thick: after quartz solidifies completely, to use diamond disk to coordinate machine for renewing stone to carry out surely thick.Use diamond disk, coordinating quartz to increase the weight of retreading machine, that quartz is carried out to front and back is evenly calmly thick, increasing the weight of the fixed thick distance in the each front and back of retreading machine is 1.5~2.5m, fixed thick approximately 2~3 times of same panel region, in process, needing constantly a large amount of feedwater after surely, completing after surely thick and need unnecessary water to siphon away with high power vacuum cleaner.
(5) tonifying Qi hole: complete after surely thick quartz, quartz surface course is carried out to filler, perforations adding: 1, by formula rate, by doing the additive of the organic formula of quartz, the quartz sand of doing quartz, organic toner, silicate compound, aluminic acid compound, be configured to inserts (or cloud stone glue add toner be configured to inserts), according to the situation of quartz surface suction, fill uniformly, make quartz surface course without hole.
(6) maintenance: the quartz layer after fixed thick filler need carry out maintenance, curing time, is determined according to temperature at that time and on-the-spot actual conditions.
(7) polishing:
1, corase grind: use respectively the special-purpose quartz water mill of 100,150,300 objects sheet, coordinate quartz retreading machine to roughly grind, in corase grind process, confluent is large, per pass abrasive disc has ground rear thorough water suction, and in machine bruting process, machine left-right and front-back waves, walk the polishing of well word, polishing speed is evenly controlled according to quartz surface course polishing situation, must not change arbitrarily mill line speed, in order to avoid cause local dent out-of-flatness and leak mill on-the-spot.2, fine grinding: roughly ground the rear special-purpose quartz water mill of 500,800, the 1000 objects sheet that uses respectively, coordinated quartz retreading machine to carry out fine grinding, carrying out the middle-size and small-size portable Moore machine finishing of fine grinding process wall limit, lived the tiny positions such as limit.And polishing process is the same with corase grind.After quartz fine grinding completes, quartz surface course starts to have the low light level to occur.3 fine grindings: use respectively the special-purpose quartz water mill of 2000,3000 objects sheet to carry out polishing to quartz surface course.In polishing process, strictly by grinding turn, undertaken, control speed and the time of polishing well, overall process should have special messenger's follow-up investigations, controls the polishing quality at the tiny positions such as wall limit, post limit well.Refined rear quartz surfacing, without polishing scratch, texture is even, fine and smooth, color and luster is consistent, and has certain glossiness.
(8) after completing, fine grinding should adopt vacuum cleaner to make an overall screening quartz, after meeting the requirements on inspection, can carry out confining bed construction, carry out crystal face processing: 1, adopt village minister or JSC crystal powder, and coordinate 3M animal hair pad to carry out crystal face processing, make quartz surface form one deck crystallizing layer.2, protection antiseepage: after waiting quartz to parch, adopt nano protecting agent to carry out the impermeable processing of ground stone material, quartz surface oil-stain-preventing enhancing from top to bottom after using, sheet material keeps quartz to have respiratory (exclusive rain lotus effect that Here it is) from down to up.Effectively prevent that the generation of the illnesss such as rust staining, water spots from appearring in stone material, and extend the application life of stone material.3, crystal stiffened: after waiting the curing time of protection antiseepage to finish, adopt German MK31 or JSC crystal hardening accelerator to coordinate hundred bright wool cottons to carry out 3~4 times crystal stiffeneds and process, make the hardness of stone material improve more than three times.
More than show and described basic principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that in above-described embodiment and manual, describes just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (1)

1. the indeformable quartz of field fabrication, is characterized in that: comprise setting gradually from top to bottom: quartz layer, for the packing layer of filled stone diamond stone layer surface hole defect and recess, for improving the crystallizing layer of quartz surface gloss, for quartz being carried out to the nano protecting agent layer of impermeable processing and for quartz being carried out to the crystal hardening accelerator layer of stiffened processing.
CN201420119611.3U 2014-03-18 2014-03-18 Non-deforming quartz stone manufactured on site Expired - Fee Related CN203856170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420119611.3U CN203856170U (en) 2014-03-18 2014-03-18 Non-deforming quartz stone manufactured on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420119611.3U CN203856170U (en) 2014-03-18 2014-03-18 Non-deforming quartz stone manufactured on site

Publications (1)

Publication Number Publication Date
CN203856170U true CN203856170U (en) 2014-10-01

Family

ID=51606032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420119611.3U Expired - Fee Related CN203856170U (en) 2014-03-18 2014-03-18 Non-deforming quartz stone manufactured on site

Country Status (1)

Country Link
CN (1) CN203856170U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563507A (en) * 2014-12-11 2015-04-29 内蒙古兴泰建设集团有限公司 Novel cast-in-place waterstone ground surface layer construction method
CN106977149A (en) * 2017-04-26 2017-07-25 费宏伟 A kind of rectangular slab of stone formula modelled after an antique and its preparation technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563507A (en) * 2014-12-11 2015-04-29 内蒙古兴泰建设集团有限公司 Novel cast-in-place waterstone ground surface layer construction method
CN104563507B (en) * 2014-12-11 2016-08-24 内蒙古兴泰建设集团有限公司 A kind of cast in site terrazzo floor surface construction method
CN106977149A (en) * 2017-04-26 2017-07-25 费宏伟 A kind of rectangular slab of stone formula modelled after an antique and its preparation technology

Similar Documents

Publication Publication Date Title
CN106320272A (en) Construction method for bare concrete protective agent for downstream dam surface of roller compacted concrete dam
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN105587102A (en) Construction method of wet-on-wet paving type high abrasion resistance terrace
CN110424204A (en) Large Square pavement construction method based on BIM technology
CN104929365B (en) Refuse of refuse burning generating plant discharging platform combined type surface construction technology
CN204728160U (en) The ecological granitic plaster road surface of a kind of crack resistence
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN203856170U (en) Non-deforming quartz stone manufactured on site
CN111946021A (en) High belite sulphoaluminate cement non-partition crystal grindstone ground construction method
CN205840248U (en) A kind of cast-type concrete abrasion-resistant ground
CN103835205A (en) Construction method for road edge stone sliding mode
CN105088914B (en) A kind of prefabricated and installation method of cobble pattern prefabricated board
CN110409600A (en) Unit-combination type cesspool construction method
CN106477993A (en) Water-proof concrete and its construction method containing FS102 waterproof compacting agent
CN103470044A (en) Construction method capable of controlling cracks in concrete floor
CN105822068B (en) Ultralong thin walled concrete walls under hot environment pour and maintenance process
CN202492858U (en) Concrete wear-resistant cover plate
CN103572786A (en) Pile head joint waterproof processing device and construction method thereof
CN104389295B (en) The construction method of roller compacted asphalt concrete core
CN102587543B (en) Building shading cast-in-place concrete lattice wall and construction method thereof
CN214144540U (en) Novel ground grindstone structural system
CN204040400U (en) The solid indeformable man-made stone of a kind of field fabrication
CN202509663U (en) Construction sun-shading cast-in-place concrete shadow wall
CN107901215A (en) A kind of preparation method of multicolour pattern terrazzo floor brick
CN212801116U (en) A shakeout device for concrete paving road surface

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Yu Shiwei

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141001

Termination date: 20170318

CF01 Termination of patent right due to non-payment of annual fee