CN204040400U - The solid indeformable man-made stone of a kind of field fabrication - Google Patents

The solid indeformable man-made stone of a kind of field fabrication Download PDF

Info

Publication number
CN204040400U
CN204040400U CN201420522444.7U CN201420522444U CN204040400U CN 204040400 U CN204040400 U CN 204040400U CN 201420522444 U CN201420522444 U CN 201420522444U CN 204040400 U CN204040400 U CN 204040400U
Authority
CN
China
Prior art keywords
man
made stone
crystal
solid
indeformable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420522444.7U
Other languages
Chinese (zh)
Inventor
喻诗维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420522444.7U priority Critical patent/CN204040400U/en
Application granted granted Critical
Publication of CN204040400U publication Critical patent/CN204040400U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the solid indeformable man-made stone of a kind of field fabrication, set gradually from bottom to up concrete base layer, for repair the clay layer of smooth waterproof concrete substrate surface hole and recess, artificial rock layers, carry out determining Mangnolia officinalis hole to artificial rock layers determine Mangnolia officinalis aperture layer, for carrying out impermeable process to man-made stone, improving the hardness of man-made stone and the crystallization stiffened confining bed of glossiness.Described to determine Mangnolia officinalis aperture layer minimum for one deck, is at most three layers.The solid indeformable man-made stone conjugation of the utility model field fabrication is better, cost is low, produce without temperature limiting saving production and construction period, can the seamless Loss reducing, not yielding of building in scene, long service life.

Description

The solid indeformable man-made stone of a kind of field fabrication
Technical field
The utility model relates to a kind of man-made stone, relates to the solid indeformable man-made stone of a kind of field fabrication specifically.
Background technology
The laying of ground man-made stone in the prior art be usually all by the artificial stone plate that makes in advance directly and cement floor with the use of; do like this and often there will be in conjunction with insecure, shaky, yielding problem; and different according to different man-made stone prices, cost is very high.Existing product production cycle and the drawback such as construction period is long and on construction link existing product loss is excessive.
Summary of the invention
For the defect of above-mentioned prior art, the utility model provides a kind of field fabrication solid indeformable man-made stone, to solve the problem in background technology.
For achieving the above object, technical solution adopted in the utility model is:
The solid indeformable man-made stone of a kind of field fabrication, set gradually from bottom to up concrete base layer, for repair the clay layer of smooth waterproof concrete substrate surface hole and recess, artificial rock layers, carry out determining Mangnolia officinalis hole to artificial rock layers determine Mangnolia officinalis aperture layer, for carrying out impermeable process to man-made stone, improving the hardness of man-made stone and the crystallization stiffened confining bed of glossiness.
As the improvement to technique scheme, described to determine Mangnolia officinalis aperture layer minimum for one deck, is at most three layers.
As the improvement to technique scheme, described crystallization stiffened confining bed is for adopting crystal powder or the gluey hardening agent of the molten class of silicon, animal hair pad is coordinated to carry out the crystallizing layer of crystal face process, or for adopting German MK31 or JSC crystal hardening accelerator to coordinate wool cotton to carry out the crystal stiffening layer of crystal stiffened process, or carry out the crystal confining bed of the process of crystal stiffened, high gloss process, impermeable process for liquid silicic acid salt compound cooperation wool cotton.
Compared with prior art, the beneficial effect acquired by the utility model is:
1, (combining with cement basic layer in the past must be bonding with clay for the close and firm that bonds between each Rotating fields of the man-made stone of field fabrication, if with cementitious will arch bridge, cracking, loosen, sometimes also can produce above phenomenon with clay is bonding, do not tackle the problem at its root with clay is bonding, present method can limit these problems), not yielding, long service life.
2, cost is low: former product cost is high, selling price is high, in the budget of Party A there higher (this price comprises the management fee of artificial and large Bao Fang of material, installation), and our present product bag is installed, packaging material material is then low many, considerably increases the competitiveness in market.
3, produce without temperature limiting: in the past production has to pass through HTHP, as long as just can operate at normal temperatures now, greatly facilitated production cycle and construction period thrifty.
4, can on-the-spot seamlessly to build: must can make product again by large-scale machinery equipment in the past, only need medium and small equipment just can make finished product now, and the product made than former product decrease better, simultaneously existing product construct at the scene in loss, cost is lower.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model; those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Embodiment one
As shown in Figure 1, the solid indeformable man-made stone of field fabrication of the present utility model, set gradually from bottom to up concrete base layer 1, for repair the clay layer 2 of smooth waterproof concrete substrate surface hole and recess, artificial rock layers 3, carry out determining Mangnolia officinalis hole to artificial rock layers 3 determine Mangnolia officinalis aperture layer 4, for carrying out impermeable process to man-made stone, improving the hardness of man-made stone and the crystallization stiffened confining bed 5 of glossiness.
Described to determine Mangnolia officinalis aperture layer 4 minimum for one deck, is at most three layers.
Described crystallization stiffened confining bed 5 is for adopting crystal powder or the gluey hardening agent of the molten class of silicon, animal hair pad is coordinated to carry out the crystallizing layer of crystal face process, or for adopting German MK31 or JSC crystal hardening accelerator to coordinate wool cotton to carry out the crystal stiffening layer of crystal stiffened process, or carry out the crystal confining bed of the process of crystal stiffened, high gloss process, impermeable process for liquid silicic acid salt compound cooperation wool cotton.
The technological process of the man-made stone of on-site customization is as follows:
(1) base treatment
Mat formation on-site customization man-made stone time, the moisture content of substrate concrete is no more than the requirement of 2mm lower than 9% and flatness error, solid, not dusting, without ghost, clean without spot, free from flaw.Meanwhile, also strictly comprehensively should detect and make the process of various specialty.Require as follows:
1. fluid concrete basic unit, concrete strength is necessary >=C25.
2. the detection of concrete base layer moisture content: concrete base layer is comprehensively detected with humidity electronic detector, moisture content lower than 9% time, just reach on-site customization man-made stone requirement of mating formation.
3. the check processing at leakiness and hollowing place: the mode complete detection of knocking concrete base layer range estimation and rubber hammer, finds that the place of leakiness and hollowing is all rooted out after ticking, cement mortar can be selected to carry out and repair.Cement mortar ensures that new mending concrete and former basic unit combine closely and can not have crack after repairing solidification.As there is crack again, after available portable cutting machine cuts crack, then in the crackle cut, fill with (man-made stone bonding agent is primary raw material) self-control repairing clay.
4. planeness detects and process: measure concrete base layer with 2m long ruler comprehensively, do in overproof place and clearly identify, with grinding apparatus, underproof place is polished afterwards, with (man-made stone bonding agent is primary raw material) self-control repairing clay, repairing is carried out to pocket smooth.
5. the entirety polishing of basic unit and the process of side seam; At the uniform velocity polish in the same way with grinding apparatus, controlling to reach after polishing under planeness prerequisite surface without quick sand exposes and solidifies solid cement surface; Can stay the seam of 3mm-8mm according to actual conditions for wall seam and shrinkage joint, fill with toning in seam after, clay is repaired in (man-made stone bonding agent is primary raw material) self-control.
(2) laying of lattice bar used
In order to the construction of the man-made stone color and shape that make on-site customization is more reasonable efficiently attractive in appearance, the man-made stone splicing of different colours and shape or different system can adopt dividing strip construction seamless spliced.
Dividing strip construction is seamless spliced;
1. base treatment up to standard after, by drawing size positions unwrapping wire, accurately lay plate dividing strip in unwrapping wire position, with bonding or nail surely fix dividing strip.
2. place by figure paper size width of mating formation before pavement material, width of mating formation generally relaxes about 5cm by the figure paper size of first bed board block dividing strip.
3. until first pouring into a mould after the man-made stone solidification of plate, before carrying out next plate laying, carry out accurate snap the line by figure paper size, with cutting machine after the straight incision in snap the line position, reject the man-made stone of about the 5cm relaxed, be convenient to the splicing pavement construction carrying out next plate.(accurate as far as possible when material splicing cutting, depth of cut reaches basic unit and to be advisable or the degree of depth is advisable at 5-10mm, and cutting profile is applied portable edge polisher and simply polished, to avoid collapsing limit and later stage soil pick-up impact is attractive in appearance).
4. directly carry out the casting and constructing of next plate.
(3) stir material to mat formation:
1. by produce seamless build man-made stone resinae formula mixture or silicate compound, aluminated compound be bonding agent, alternative adds the gluey hardening agent of the molten class of high activity silicon.First use Solid inorganic pigment, again by configuring the silica-based particle of the various making artificial stones of ratio, diamond dust, calcium powder, aluminium powder, the raw material such as marble powder and granite powder, cobble, multicolored sand, shell, flint be placed in agitator, after first solid feed and Solid inorganic pigment stir, then add bonding agent and can take the circumstances into consideration to add C12H10N2O4S curing compound (normal temperature cure agent can be used under normal temperature condition) and stir (mixing time is at 3-5 minute).
2. before artificial stone material of mating formation, need in the basic unit handled well, even spread resinae formula mixture is the clay layer repairing smooth waterproof concrete substrate surface hole and recess.During coating, required direction is consistent, weight appropriate, and brush line is even, without omitting.Strict with ratio requirement batching, control brushing thickness well, can artificial stone material be laid when primary coat is clamminess.
3. being transported in by the artificial stone material be stirred paves in material distributing machine, the artificial stone material being conveyed into the material distributing machine that paves is arranged in job site in time, strict control fabric thickness, suggest thickness is advisable (concrete thickness can be laid as requested) for 5-25mm after completing, while the cloth that paves, note planeness, guaranteed that rear planeness is in 1.5-3mm.
4. in the artificial rock layers that seamless cast is good, man-made stone compacting troweling kind equipment can be adopted to carry out compacting troweling to artificial rock layers, in compacting troweling process, compounding practice must be responsible for by special operating personnel: 1., control compacted depth; 2., repair underproof place and corner compacting less than place, guarantee smooth, closely knit.3., the number of times of compacting troweling, closely knit smooth for standard to estimate.4., this operation needs the maintenance carrying out about 1-4 days after completing.
(4) fixed thick, perforations adding
First time is fixed thick: after man-made stone solidifies completely, uses diamond disk to coordinate machine for renewing stone to carry out surely thick.Use the diamond disk of low mill number, coordinating man-made stone to increase the weight of retreading machine, to carry out front and back to man-made stone evenly fixed thick, not only can water mill but also can dry grind in calmly thicker than journey, completes the unnecessary water of surely thick rear needs or dust high power vacuum cleaner siphons away.
Perforations adding for the first time: by formula rate, by doing the resinae formula mixture of man-made stone or silicate compound, aluminated compound is that the powder of detailed catalogue number in bonding agent formula adds organic pigment, curing compound is configured to inserts and is painted on surely thick good man-made stone, need anyhow play evenly during brushing, each place is brushed to completely, has filled up all pores.
Second time is fixed thick: after man-made stone first time perforations adding solidifies completely, use diamond disk to coordinate machine for renewing stone to carry out again fixed thick.The diamond disk of low mill number in using, coordinating man-made stone to increase the weight of retreading machine, to carry out front and back to man-made stone evenly fixed thick, surely afterwards not only can water mill but also can dry grind in process, completes the unnecessary water of surely thick rear needs or bisque high power vacuum cleaner siphons away.
Second time perforations adding: by formula rate, by doing the resinae formula mixture of man-made stone or silicate compound, aluminated compound is bonding agent, the powder with the detailed catalogue number in formula, organic toner, curing compound are configured to inserts and are painted on surely thick good man-made stone, need anyhow play evenly during brushing, each place is brushed to completely, has filled up all pores.
Third time is fixed thick: after man-made stone solidifies completely, uses diamond disk to coordinate machine for renewing stone to carry out again fixed thick.Use the diamond disk of high mill number, coordinating man-made stone to increase the weight of retreading machine, to carry out front and back to man-made stone evenly fixed thick, not only can water mill but also can dry grind in surely rear process, completes the unnecessary water of surely thick rear needs or bisque high power vacuum cleaner siphons away.
Perforations adding for the third time: by formula rate, by doing the resinae formula mixture of man-made stone or silicate compound, aluminated compound is bonding agent, the powder with the detailed catalogue number in formula, organic toner, curing compound are configured to inserts and are painted on surely thick good man-made stone, need anyhow play evenly during brushing, each place is brushed to completely, has filled up all pores.
Need and requirement according to client, can carry out once, secondary or determine Mangnolia officinalis hole three times.
(5), crystal face stiffened process: can confining bed construction be carried out after polishing completes after checking and meeting the requirements, carry out crystal face process:
1. adopt crystal powder or the gluey hardening agent of the molten class of silicon, and coordinate animal hair pad to carry out crystal face process, make man-made stone surface form one deck crystallizing layer.
2. crystal stiffened: adopt German MK31 or JSC crystal hardening accelerator to coordinate wool cotton to carry out the process of crystal stiffened.
3. adopt liquid silicic acid salt compound to coordinate wool cotton to process further, greatly improve hardness and the glossiness of man-made stone after process, and have very strong impermeable effect, can prevent man-made stone from occurring the generation of the illness such as rust staining, water spots, and extend the application life of stone material.
(6) shrinkage joint, parting seam packing
1. adopt resilient flexibility resin glue to carry out sealing for gap or stainless steel strip etc. carries out process attractive in appearance, is constructed by professional.
2. check before the process of shrinkage joint, the foreign material such as the dust in rejecting, seam, with stitching both sides snap the line after vacuum cleaner exhaustion, paste paper adhesive tape comprehensively
3. prepare the flexible resin glue of man-made stone solid colour, with the filler rifle encapsulating of specialty, notice during encapsulating that drag velocity ensures compactness and the surface finish of encapsulating, must not adhere on the man-made stone outside paper glue, ensure the aesthetic property of seam.
4. seam is wide should with 3 ~ 6mm, and the degree of depth 7 ~ 15mm is advisable, and width is consistent, clear straight.
5. the shrinkage joint size of cast in situs man-made stone and position, with cement basic layer shrinkage joint, consistent or width 5-8m stays 5--6mm shrinkage joint.

Claims (3)

1. the solid indeformable man-made stone of field fabrication, is characterized in that: this man-made stone set gradually from bottom to up concrete base layer, for repair the clay layer of smooth waterproof concrete substrate surface hole and recess, artificial rock layers, carry out determining Mangnolia officinalis hole to artificial rock layers determine Mangnolia officinalis aperture layer, for carrying out impermeable process to man-made stone, improving the hardness of man-made stone and the crystallization stiffened confining bed of glossiness.
2. the solid indeformable man-made stone of field fabrication according to claim 1, is characterized in that: described to determine Mangnolia officinalis aperture layer minimum for one deck, is at most three layers.
3. the solid indeformable man-made stone of field fabrication according to claim 1 and 2, it is characterized in that: described crystallization stiffened confining bed is employing crystal powder or the gluey hardening agent of the molten class of silicon, coordinates animal hair pad to carry out the crystallizing layer of crystal face process, or for adopting German MK31 or JSC crystal hardening accelerator to coordinate wool cotton to carry out the crystal stiffening layer of crystal stiffened process, or carry out the crystal confining bed of the process of crystal stiffened, high gloss process, impermeable process for liquid silicic acid salt compound cooperation wool cotton.
CN201420522444.7U 2014-09-12 2014-09-12 The solid indeformable man-made stone of a kind of field fabrication Expired - Fee Related CN204040400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420522444.7U CN204040400U (en) 2014-09-12 2014-09-12 The solid indeformable man-made stone of a kind of field fabrication

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420522444.7U CN204040400U (en) 2014-09-12 2014-09-12 The solid indeformable man-made stone of a kind of field fabrication

Publications (1)

Publication Number Publication Date
CN204040400U true CN204040400U (en) 2014-12-24

Family

ID=52241083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420522444.7U Expired - Fee Related CN204040400U (en) 2014-09-12 2014-09-12 The solid indeformable man-made stone of a kind of field fabrication

Country Status (1)

Country Link
CN (1) CN204040400U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642217A (en) * 2017-08-28 2018-01-30 北京宝莲纳新材料技术有限公司 Efficient seamless stone level ground construction technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642217A (en) * 2017-08-28 2018-01-30 北京宝莲纳新材料技术有限公司 Efficient seamless stone level ground construction technology

Similar Documents

Publication Publication Date Title
CN105587102A (en) Construction method of wet-on-wet paving type high abrasion resistance terrace
CN106401144A (en) Construction technology for addition type wear resisting concrete ground
CN106836815A (en) Large area diamond dust floor structure plate and surface layer one-off construction method
CN109826396A (en) A kind of construction method of A grades of fire prevention artistic floors
CN102828600A (en) Method for laying floor artificial stones
CN108640612A (en) A kind of polishing concrete decoration terrace
CN109138354A (en) Inorganic grinding stone terrace
CN102493626A (en) Method for manufacturing epoxy colored-stone terrace
CN107130766A (en) One kind crystallization envelope seamless stone floor construction method of glaze
CN113738082A (en) Epoxy terrazzo wet-paving process
CN106121188A (en) Large area is seamless overall ground and construction method thereof
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN109680904A (en) Reconciliation Self-leveling construction method
CN106150032A (en) A kind of construction method of the type high-wear-resistant alloy terrace that paves
CN111946021A (en) High belite sulphoaluminate cement non-partition crystal grindstone ground construction method
CN205840248U (en) A kind of cast-type concrete abrasion-resistant ground
CN104153535A (en) Method for splicing and laying flexible hinged face brick units
CN204040400U (en) The solid indeformable man-made stone of a kind of field fabrication
CN103774696A (en) Construction process of cement-based permeable-crystallization type waterproof material
CN105178562A (en) Inorganic crystal grindstone integrated terrace system and construction process thereof
CN208776593U (en) A kind of polishing concrete decoration terrace
CN202492858U (en) Concrete wear-resistant cover plate
CN210597982U (en) Composite copper plate structure with back bolt on floor
CN111962348A (en) Concrete floor construction process
CN203856170U (en) Non-deforming quartz stone manufactured on site

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20170912

CF01 Termination of patent right due to non-payment of annual fee