CN109871961A - A kind of analysis method and system of middle pressure power-off event - Google Patents
A kind of analysis method and system of middle pressure power-off event Download PDFInfo
- Publication number
- CN109871961A CN109871961A CN201811639577.1A CN201811639577A CN109871961A CN 109871961 A CN109871961 A CN 109871961A CN 201811639577 A CN201811639577 A CN 201811639577A CN 109871961 A CN109871961 A CN 109871961A
- Authority
- CN
- China
- Prior art keywords
- outage
- power
- outage information
- distribution transformer
- event
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
A kind of analysis method and system of middle pressure power-off event, described method includes following steps: terminal reliability module obtains the first outage information set of target area by distribution automation system;The comprehensive module of client obtains the second outage information set of the target area by Production MIS, dispatching management information system and marketing management system;Matching module by the first outage information set with the second outage information set into comparing, to confirm whether the first outage information set coincide with the second outage information set, if misfitting, generate abnormality processing work order.Press the analysis method of power-off event that can found the abnormal situation in time by using in this, after analyzing and positioning problem, it is known that being that the equipment that distribution automation system is related to is failed to report, misrepresented deliberately or Production MIS, dispatching management information system and marketing management system have the case where artificially failing to report, misrepresenting deliberately.
Description
Technical field
The present invention relates to distribution O&M technical fields, and in particular to the analysis method and system of power-off event are pressed in one kind.
Background technique
Currently, power supply enterprise mainly relies on the interpretation of line outage event passes through reading from distribution automation system
The power-off event of distribution transformer and related operation data are judged.Distribution automation system be by measuring equipment,
Cable communication equipment uploads onto the server distribution transformer real-time running data end, due to measuring equipment and cable communication equipment
Stability problem, will cause the case where failing to report, misrepresenting deliberately.Obtain power supply enterprise can not by distribution automation system really
Power-off condition.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the shortcomings of the prior art, providing and pressing power-off event in one kind
Analysis method presses the analysis method of power-off event that can found the abnormal situation in time by using in this, after analyzing and positioning problem,
It is known that be that equipment is failed to report, misrepresented deliberately, or is artificially failed to report, misrepresented deliberately, convenient for we it is subsequent to exist the equipment failed to report, misrepresented deliberately into
Row maintenance optimizes management to there is the case where artificially failing to report, misrepresenting deliberately.Correspondingly, also mentioning point for pressing power-off event in one kind
Analysis system.
In order to solve the above technical problems, the present invention provides the analysis method for pressing power-off event in one kind, include the following steps:
Terminal reliability module obtains the first outage information set of target area by distribution automation system;
The comprehensive module of client passes through described in Production MIS, dispatching management information system and marketing management system acquisition
Second outage information set of target area;
Matching module by the first outage information set and the second outage information set into comparing, described in confirmation
Whether the first outage information set coincide with the second outage information set, if misfitting, generates abnormality processing work order.
In the analysis method of middle pressure power-off event provided by the invention, it is described " terminal reliability module by distribution from
It is from distribution automation that first outage information set of dynamicization system acquisition target area ", which includes: the terminal reliability module,
The power-off event in the distribution transformer of the target area whole day is read in system;The first outage information set includes institute
State the power-off event information of all distribution transformer whole days in target area.
In the analysis method of middle pressure power-off event provided by the invention, described " the comprehensive module of client passes through production pipe
Reason information system, dispatching management information system and marketing management system obtain the second outage information set of the target area " include:
The comprehensive module of client is to collect institute automatically from Production MIS, dispatching management information system and marketing management system
State the distribution transformer scheduled outage information or fault outage letter of target area whole day;The second outage information set includes institute
State the scheduled outage situation and fault outage situation of all distribution transformer whole days in target area.
In the analysis method of middle pressure power-off event provided by the invention, described " matching module described first will have a power failure letter
Breath set, into comparing, is believed with the second outage information set with confirming that the first outage information set has a power failure with described second
Whether breath set coincide, if misfitting, generates abnormality processing work order " include:
The power failure thing of the distribution transformer all in the same period is filtered out from the first outage information set
Part;
The distribution transformer of generation power-off event in the same period is grouped by power supply line, is obtained multiple
First outage information subset;
The plan that the distribution transformer all in the same period is filtered out from the second outage information set stops
Electric situation and fault outage situation;
The distribution transformer of generation scheduled outage or fault outage in the same period is divided by power supply line
Group obtains multiple second outage information subsets;
It chooses from multiple first outage information subsets and multiple second outage information subsets corresponding to same
The the first outage information subset and the second outage information subset of a power supply line are compared;Wherein, when described
When the number of users difference that the distribution transformer that one outage information subset includes is related to the second outage information subset
The distribution transformer that includes and number of users when differing by more than certain numerical value, alternatively, when the first outage information
The corresponding institute for the time of power-off event including with the second outage information subset occurs for the distribution transformer that collection includes
When stating the time phase difference of distribution transformer generation scheduled outage or fault outage more than certain numerical value, it is judged as that matching is abnormal and raw
At abnormality processing work order, and by the abnormality processing work order be sent to the corresponding power supply line administrative area office.
It is provided by the invention it is middle pressure power-off event analysis method in, include when the first outage information subset described in
The distribution transformer that includes with the second outage information subset when the number of users difference that distribution transformer is related to and
When number of users differs by more than 2, alternatively, when the distribution transformer that the first outage information subset includes has a power failure
With the corresponding distribution transformer that the second outage information subset includes scheduled outage or failure occur for the time of event
When the time phase difference of power failure is more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and by the abnormality processing
Work order is sent to the administrative area office of the corresponding power supply line.
Correspondingly, the present invention also provides the analysis systems for pressing power-off event in one kind, comprising:
Terminal reliability module, connect with distribution automation system, for obtaining mesh by the distribution automation system
Mark the first outage information set in region;
The comprehensive module of client, connect with Production MIS, dispatching management information system and marketing management system respectively,
For obtaining the second of the target area by the Production MIS, dispatching management information system and marketing management system
Outage information set;
Matching module will be separately connected the terminal reliability module and the comprehensive module of client, be stopped with by described first
Power information set with the second outage information set into comparing, to confirm that the first outage information set is stopped with described second
Whether power information set coincide, if misfitting, generates abnormality processing work order.
In the analysis system of middle pressure power-off event provided by the invention, the terminal reliability module is used for automatic from distribution
The power-off event in the distribution transformer of the target area whole day is read in change system;The first outage information set includes
The power-off event information of all distribution transformer whole days in the target area.
In the analysis system of middle pressure power-off event provided by the invention, the comprehensive module of client is used for from production management
Automatically the distribution transformer plan of the target area whole day is collected in information system, dispatching management information system and marketing management system
Outage information or fault outage letter;The second outage information set includes all distribution transformers in the target area
The scheduled outage situation and fault outage situation of whole day.
In the analysis system of middle pressure power-off event provided by the invention, the matching module, which is used to have a power failure from described first, to be believed
The power-off event of the distribution transformer all in the same period is filtered out in breath set;It will have a power failure in the same period
The distribution transformer of event is grouped by power supply line, obtains multiple first outage information subsets;Stop from described second
The scheduled outage situation and fault outage situation of the distribution transformer all in the same period are filtered out in power information set;
The distribution transformer of generation scheduled outage or fault outage in the same period is grouped by power supply line, is obtained more
A second outage information subset;It is chosen from multiple first outage information subsets and multiple second outage information subsets
It is compared corresponding to the first outage information subset of the same power supply line and the second outage information subset;Its
In, stop when the number of users difference that the distribution transformer that the first outage information subset includes is related to described second
The distribution transformer that power information subset includes and number of users when differing by more than certain numerical value, alternatively, working as described first
The time that power-off event occurs for the distribution transformer that outage information subset includes includes with the second outage information subset
The corresponding distribution transformer when time phase difference of scheduled outage or fault outage occurs being more than certain numerical value, be judged as
With exception and abnormality processing work order is generated, and the abnormality processing work order is sent to the administrative area of the corresponding power supply line
Office.
In the analysis system of middle pressure power-off event provided by the invention, the matching module is used for when the first power failure letter
The institute for including with the second outage information subset when the number of users difference that the distribution transformer that breath subset includes is related to
State distribution transformer and number of users when differing by more than 2, alternatively, when what the first outage information subset included described matches
The corresponding distribution transformer that the time of power-off event occurs for piezoelectric transformer and the second outage information subset includes is sent out
When the time phase difference of raw scheduled outage or fault outage is more than 30 minutes, it is judged as matching exception and generates abnormality processing work order,
And the abnormality processing work order is sent to the administrative area office of the corresponding power supply line.
Compared with prior art, implementation is provided by the invention, has the following beneficial effects: the analysis side of middle pressure power-off event
Method includes the following steps: that terminal reliability module obtains the first outage information collection of target area by distribution automation system
It closes;The comprehensive module of client obtains the target by Production MIS, dispatching management information system and marketing management system
The second outage information set in region;Matching module by the first outage information set and the second outage information set into
It compares, to confirm whether the first outage information set coincide with the second outage information set, if misfitting, generates
Abnormality processing work order.Press the analysis method of power-off event that can found the abnormal situation in time by using in this, analyzing and positioning is asked
After topic, it is known that be the equipment that distribution automation system is related to fail to report, misrepresent deliberately or Production MIS, scheduling pipe
There is the case where artificially failing to report, misrepresenting deliberately in reason system and marketing management system, convenient for our the subsequent equipment in the presence of failing to report, misrepresenting deliberately
It carries out maintenance or optimizes management to there is the case where artificially failing to report, misrepresenting deliberately, so that subsequent distribution automation system is obtained, produced
Management information system, dispatching management information system and marketing management system capacitation are enough more really to react power-off condition.
Detailed description of the invention
Fig. 1 is the flow chart of the analysis method for the middle pressure power-off event that embodiment one provides;
Fig. 2 is the block diagram of the analysis system for the middle pressure power-off event that embodiment two provides.
Specific embodiment
For a clearer understanding of the technical characteristics, objects and effects of the present invention, now control attached drawing is described in detail
A specific embodiment of the invention.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment one
The present embodiment provides the analysis methods that power-off event is pressed in one kind, include the following steps:
Step S1, terminal reliability module obtain the first outage information collection of target area by distribution automation system
It closes.
Specifically, " first power failure that terminal reliability module passes through distribution automation system acquisition target area
Information aggregate " includes: that the terminal reliability module is to read from distribution automation system in the target area whole day
The power-off event of distribution transformer;The first outage information set includes all distribution transformers in the target area
The power-off event information of whole day.
Step S2, the comprehensive module of client pass through Production MIS, dispatching management information system and marketing management system
Obtain the second outage information set of the target area.
Specifically, described, " the comprehensive module of client passes through Production MIS, dispatching management information system and marketing pipe
Reason system obtains the second outage information set of the target area " it include: the comprehensive module of the client is from production management
Automatically the distribution transformer plan of the target area whole day is collected in information system, dispatching management information system and marketing management system
Outage information or fault outage letter;The second outage information set includes all distribution transformers in the target area
The scheduled outage situation and fault outage situation of whole day.
Step S3, matching module by the first outage information set and the second outage information set into comparing, with
Confirm whether the first outage information set coincide with the second outage information set, if misfitting, generates exception
Science and engineering list.
Specifically, described " matching module by the first outage information set and the second outage information set into
It compares, to confirm whether the first outage information set coincide with the second outage information set, if misfitting, generates
Abnormality processing work order " includes:
Step S31 filters out the distribution transformer all in the same period from the first outage information set
Power-off event;
The distribution transformer of generation power-off event in the same period is grouped by step S32 by power supply line,
Obtain multiple first outage information subsets;
Step S33 filters out the distribution transformer all in the same period from the second outage information set
Scheduled outage situation and fault outage situation;
The distribution transformer that scheduled outage or fault outage occurs in the same period is pressed supply lines by step S34
Road is grouped, and obtains multiple second outage information subsets;
Step S35, the selection pair from multiple first outage information subsets and multiple second outage information subsets
It should be compared in the first outage information subset of the same power supply line and the second outage information subset;Wherein,
Have a power failure when the number of users difference that the distribution transformer that the first outage information subset includes is related to described second
The distribution transformer that information subset includes and number of users when differing by more than certain numerical value, alternatively, stopping when described first
The time of power-off event occurs for the distribution transformer that power information subset includes and the second outage information subset includes
When the time phase difference of scheduled outage or fault outage occurs for the corresponding distribution transformer more than certain numerical value, it is judged as matching
Exception simultaneously generates abnormality processing work order, and the abnormality processing work order is sent to the administrative area of the corresponding power supply line
Office.
It should be noted that the matching module is in daily morning 00:00 by the first outage information set and institute
The second outage information set is stated into comparison, the time span of " the same period " that is mentioned above is 30 minutes.
Preferably, in the step S35, when the distribution transformer that the first outage information subset includes is related to
Number of users difference when include with the second outage information subset the distribution transformer and number of users differ super
When crossing 2, alternatively, when time and the institute of power-off event occur for the distribution transformer that the first outage information subset includes
State the time phase difference that scheduled outage or fault outage occur for the corresponding distribution transformer that the second outage information subset includes
When more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and the abnormality processing work order is sent to correspondence
The power supply line administrative area office.
After the administrative area office receives the abnormality processing work order, for the measuring equipment of the corresponding power supply line
It is checked, checks whether the measuring equipment in the power supply line is problematic, if no problem, illustrate it is artificially to fail to report or wrong
Report, then need to optimize management to Production MIS, dispatching management information system and marketing management system, if problematic,
Then explanation is that equipment is failed to report, misrepresented deliberately, then repairs maintenance to problem device in time.
In conclusion compared with prior art, implementing the analysis method of middle pressure power-off event provided by the invention, having such as
Down the utility model has the advantages that pressing the analysis method of power-off event that can found the abnormal situation in time by using in this, analyzing and positioning problem
Afterwards, it is known that being that the equipment that distribution automation system is related to is failed to report, misrepresented deliberately or Production MIS, management and running
There is the case where artificially failing to report, misrepresenting deliberately in system and marketing management system, convenient for our subsequent equipment that presence is failed to report, is misrepresented deliberately into
Row maintenance optimizes management to there is the case where artificially failing to report, misrepresenting deliberately, so that subsequent distribution automation system obtains, produces pipe
Manage the enough more true reaction power-off conditions of information system, dispatching management information system and marketing management system capacitation.
Embodiment two
The present invention also provides power-off event analysis system is pressed in one kind, stop for implementing such as the middle pressure that embodiment one provides
Electric affair analytical method.Medium pressure power-off event analysis system include terminal reliability module, the comprehensive module of client and
With module.
The terminal reliability module, connect with distribution automation system, for being obtained by the distribution automation system
Take the first outage information set of target area;
The comprehensive module of client, respectively with Production MIS, dispatching management information system and marketing management system
Connection, for obtaining the target area by the Production MIS, dispatching management information system and marketing management system
The second outage information set;
The matching module will, the terminal reliability module and the comprehensive module of client are separately connected, with by described the
One outage information set and the second outage information set are into comparing, to confirm the first outage information set and described the
Whether two outage information set coincide, if misfitting, generate abnormality processing work order.
In the present embodiment, the terminal reliability module is used to read from distribution automation system in the target area
The power-off event of the distribution transformer of whole day;The first outage information set includes all distribution in the target area
The power-off event information of transformer whole day.
In the present embodiment, the comprehensive module of client is used for from Production MIS, dispatching management information system and battalion
Automatically the distribution transformer scheduled outage information or fault outage letter of the target area whole day are collected in pin management system;It is described
Second outage information set includes the scheduled outage situation and failure of all distribution transformer whole days in the target area
Power-off condition.
In the present embodiment, the matching module from the first outage information set for filtering out institute in the same period
The power-off event for the distribution transformer having;By the distribution transformer of the generation power-off event in the same period by power supply
Route is grouped, and obtains multiple first outage information subsets;The same period is filtered out from the second outage information set
The scheduled outage situation and fault outage situation of interior all distribution transformers;By the generation scheduled outage in the same period
Or the distribution transformer of fault outage is grouped by power supply line, obtains multiple second outage information subsets;From multiple
The institute for corresponding to the same power supply line is chosen in the first outage information subset and multiple second outage information subsets
It states the first outage information subset and the second outage information subset is compared;Wherein, when the first outage information subset
The distribution for including with the second outage information subset when the number of users difference that the distribution transformer for including is related to
Transformer and number of users when differing by more than certain numerical value, alternatively, when what the first outage information subset included described matches
The corresponding distribution transformer that the time of power-off event occurs for piezoelectric transformer and the second outage information subset includes is sent out
When the time phase difference of raw scheduled outage or fault outage is more than certain numerical value, it is judged as matching exception and generates exception science and engineering
Singly, and by the abnormality processing work order it is sent to the administrative area office of the corresponding power supply line.It should be noted that described
With module in daily morning 00:00 by the first outage information set and the second outage information set into comparing, on
The time span of " the same period " mentioned in text is 30 minutes.
Preferably, the matching module is used to be related to when the distribution transformer that the first outage information subset includes
Number of users difference when include with the second outage information subset the distribution transformer and number of users differ super
When crossing 2, alternatively, when time and the institute of power-off event occur for the distribution transformer that the first outage information subset includes
State the time phase difference that scheduled outage or fault outage occur for the corresponding distribution transformer that the second outage information subset includes
When more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and the abnormality processing work order is sent to correspondence
The power supply line administrative area office.
After the administrative area office receives the abnormality processing work order, for the measuring equipment of the corresponding power supply line
It is checked, checks whether the measuring equipment in the power supply line is problematic, if no problem, illustrate it is artificially to fail to report or wrong
Report, then need to optimize management to Production MIS, dispatching management information system and marketing management system, if problematic,
Then explanation is that equipment is failed to report, misrepresented deliberately, then repairs maintenance to problem device in time.
In conclusion compared with prior art, implementing the analysis system of middle pressure power-off event provided by the invention, having such as
Down the utility model has the advantages that pressing the analysis system of power-off event that can found the abnormal situation in time by using in this, analyzing and positioning problem
Afterwards, it is known that being that the equipment that distribution automation system is related to is failed to report, misrepresented deliberately or Production MIS, management and running
There is the case where artificially failing to report, misrepresenting deliberately in system and marketing management system, convenient for our subsequent equipment that presence is failed to report, is misrepresented deliberately into
Row maintenance optimizes management to there is the case where artificially failing to report, misrepresenting deliberately, so that subsequent distribution automation system obtains, produces pipe
Manage the enough more true reaction power-off conditions of information system, dispatching management information system and marketing management system capacitation.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific
Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art
Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much
Form, within these are all belonged to the scope of protection of the present invention.
Claims (10)
1. pressing the analysis method of power-off event in one kind, which comprises the steps of:
Terminal reliability module obtains the first outage information set of target area by distribution automation system;
The comprehensive module of client obtains the target by Production MIS, dispatching management information system and marketing management system
The second outage information set in region;
Matching module by the first outage information set with the second outage information set into comparing, to confirm described first
Whether outage information set coincide with the second outage information set, if misfitting, generates abnormality processing work order.
2. the analysis method of middle pressure power-off event according to claim 1, which is characterized in that " the terminal reliability
Module obtains the first outage information set of target area by distribution automation system " it include: the terminal reliability module
It is the power-off event read from distribution automation system in the distribution transformer of the target area whole day;Described first has a power failure
Information aggregate includes the power-off event information of all distribution transformer whole days in the target area.
3. the analysis method of middle pressure power-off event according to claim 2, which is characterized in that described " client is comprehensive
Module is had a power failure by second that Production MIS, dispatching management information system and marketing management system obtain the target area
Information aggregate " includes: that the comprehensive module of the client is from Production MIS, dispatching management information system and marketing management system
Automatically the distribution transformer scheduled outage information or fault outage letter of the target area whole day are collected in system;Described second has a power failure
Information aggregate includes the scheduled outage situation and fault outage situation of all distribution transformer whole days in the target area.
4. the analysis method of middle pressure power-off event according to claim 3, which is characterized in that " the matching module general
The first outage information set and the second outage information set into comparing, with confirm the first outage information set with
Whether the second outage information set coincide, if misfitting, generates abnormality processing work order " include:
The power-off event of the distribution transformer all in the same period is filtered out from the first outage information set;
The distribution transformer of generation power-off event in the same period is grouped by power supply line, obtains multiple first
Outage information subset;
The scheduled outage feelings of the distribution transformer all in the same period are filtered out from the second outage information set
Condition and fault outage situation;
The distribution transformer of generation scheduled outage or fault outage in the same period is grouped by power supply line, is obtained
To multiple second outage information subsets;
It is chosen from multiple first outage information subsets and multiple second outage information subsets and corresponds to the same confession
The the first outage information subset and the second outage information subset of electric line are compared;Wherein, when described first stops
Include with the second outage information subset when the number of users difference that the distribution transformer that power information subset includes is related to
The distribution transformer and number of users when differing by more than certain numerical value, alternatively, working as the first outage information subset packet
The distribution transformer that contains the time of power-off event occurs and the second outage information subset includes it is corresponding described in match
When the time phase difference of scheduled outage or fault outage occurs for piezoelectric transformer more than certain numerical value, it is judged as matching exception and generates different
Work order is often handled, and the abnormality processing work order is sent to the administrative area office of the corresponding power supply line.
5. the analysis method of middle pressure power-off event according to claim 4, which is characterized in that when first outage information
Include with the second outage information subset when the number of users difference that the distribution transformer that subset includes is related to is described
Distribution transformer and number of users when differing by more than 2, alternatively, the distribution for including when the first outage information subset
The corresponding distribution transformer that the time of power-off event occurs for transformer and the second outage information subset includes occurs
When the time phase difference of scheduled outage or fault outage is more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and
The abnormality processing work order is sent to the administrative area office of the corresponding power supply line.
6. pressing the analysis system of power-off event in one kind characterized by comprising
Terminal reliability module, connect with distribution automation system, for obtaining target area by the distribution automation system
The first outage information set in domain;
The comprehensive module of client, connect with Production MIS, dispatching management information system and marketing management system respectively, is used for
Obtain the target area by the Production MIS, dispatching management information system and marketing management system second has a power failure
Information aggregate;
Matching module will be separately connected the terminal reliability module and the comprehensive module of client, be believed with described first has a power failure
Breath set, into comparing, is believed with the second outage information set with confirming that the first outage information set has a power failure with described second
Whether breath set coincide, if misfitting, generates abnormality processing work order.
7. the analysis system of middle pressure power-off event according to claim 6, which is characterized in that the terminal reliability module
For reading the power-off event in the distribution transformer of the target area whole day from distribution automation system;Described first stops
Power information set includes the power-off event information of all distribution transformer whole days in the target area.
8. the analysis system of middle pressure power-off event according to claim 7, which is characterized in that the comprehensive module of client
For collecting the target area whole day automatically from Production MIS, dispatching management information system and marketing management system
Distribution transformer scheduled outage information or fault outage letter;The second outage information set includes the institute in the target area
The scheduled outage situation and fault outage situation of some distribution transformer whole days.
9. it is according to claim 8 it is middle pressure power-off event analysis system, which is characterized in that the matching module be used for from
The power-off event of the distribution transformer all in the same period is filtered out in the first outage information set;It will be with for the moment
The distribution transformer of generation power-off event in section is grouped by power supply line, obtains multiple first outage information
Collection;The scheduled outage situation of the distribution transformer all in the same period is filtered out from the second outage information set
With fault outage situation;The distribution transformer that scheduled outage or fault outage occurs in the same period is pressed into power supply line
It is grouped, obtains multiple second outage information subsets;Stop from multiple first outage information subsets and multiple described second
The the first outage information subset and second outage information for corresponding to the same power supply line are chosen in power information subset
Subset is compared;Wherein, the number of users being related to when the distribution transformer that the first outage information subset includes is not
The distribution transformer that includes with the second outage information subset simultaneously and number of users when differing by more than certain numerical value,
Alternatively, when the time that power-off event occurs for the distribution transformer that the first outage information subset includes stops with described second
It is more than certain that scheduled outage or the time phase difference of fault outage, which occur, for the corresponding distribution transformer that power information subset includes
When numerical value, it is judged as matching exception and generates abnormality processing work order, and the abnormality processing work order is sent to corresponding described
The administrative area office of power supply line.
10. the analysis method of middle pressure power-off event according to claim 9, which is characterized in that the matching module is used for
Have a power failure when the number of users difference that the distribution transformer that the first outage information subset includes is related to described second
The distribution transformer that information subset includes and number of users when differing by more than 2, alternatively, working as first outage information
The time for the distribution transformer generation power-off event that subset includes and the second outage information subset include corresponding
When the time phase difference of the distribution transformer generation scheduled outage or fault outage is more than 30 minutes, it is judged as that matching is abnormal and raw
At abnormality processing work order, and by the abnormality processing work order be sent to the corresponding power supply line administrative area office.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811639577.1A CN109871961A (en) | 2018-12-29 | 2018-12-29 | A kind of analysis method and system of middle pressure power-off event |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811639577.1A CN109871961A (en) | 2018-12-29 | 2018-12-29 | A kind of analysis method and system of middle pressure power-off event |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109871961A true CN109871961A (en) | 2019-06-11 |
Family
ID=66917427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811639577.1A Pending CN109871961A (en) | 2018-12-29 | 2018-12-29 | A kind of analysis method and system of middle pressure power-off event |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109871961A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111813825A (en) * | 2020-06-02 | 2020-10-23 | 国网江西省电力有限公司电力科学研究院 | Distribution transformer outlet power failure event missing report automatic detection method and system |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120296482A1 (en) * | 2009-10-23 | 2012-11-22 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
CN103532745A (en) * | 2013-09-25 | 2014-01-22 | 国家电网公司 | Metering online monitoring system based on power user power consumption information acquisition system |
US20140085105A1 (en) * | 2012-09-21 | 2014-03-27 | Silver Spring Networks, Inc. | Power Outage Notification and Determination |
CN103901317A (en) * | 2012-12-24 | 2014-07-02 | 天津市电力公司 | Power distribution fault studying and judging method based on multisystem collaboration |
CN104200399A (en) * | 2014-09-05 | 2014-12-10 | 国家电网公司 | Zoning evaluation based power distribution network running condition real-time monitoring method |
CN104881729A (en) * | 2015-04-23 | 2015-09-02 | 中国南方电网有限责任公司 | Electric power marketing system power failure information processing method, and electric power marketing system power failure information processing system |
US20150332181A1 (en) * | 2014-05-13 | 2015-11-19 | VWS (UK) Limited | Water Purification Unit |
CN105207121A (en) * | 2015-09-23 | 2015-12-30 | 国家电网公司 | Power distribution network fault emergency maintenance method based on topology analysis |
CN105354762A (en) * | 2015-11-11 | 2016-02-24 | 国网山东省电力公司电力科学研究院 | Work order identification and distribution system and method of electricity customer service business |
CN106845782A (en) * | 2016-12-23 | 2017-06-13 | 国网浙江省电力公司台州供电公司 | Distribution big data intelligent analysis method |
CN107680368A (en) * | 2017-09-06 | 2018-02-09 | 国网辽宁省电力有限公司 | A kind of metering device on-line monitoring and intelligent diagnosing method based on gathered data |
CN107832854A (en) * | 2017-09-06 | 2018-03-23 | 广东电网有限责任公司佛山供电局 | A kind of method and system of distribution network failure repairing progress msg management |
CN108647328A (en) * | 2018-05-11 | 2018-10-12 | 国网安徽省电力有限公司淮南供电公司 | Reliability power-off event acquires integrity analysis and method for automatically completing |
CN108805296A (en) * | 2018-04-25 | 2018-11-13 | 广州供电局有限公司 | The monitoring method and monitoring device of measuring equipment abnormality |
CN109063217A (en) * | 2018-10-29 | 2018-12-21 | 广州供电局有限公司 | Work order classification method, device and its relevant device in Electric Power Marketing System |
-
2018
- 2018-12-29 CN CN201811639577.1A patent/CN109871961A/en active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120296482A1 (en) * | 2009-10-23 | 2012-11-22 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
US20140085105A1 (en) * | 2012-09-21 | 2014-03-27 | Silver Spring Networks, Inc. | Power Outage Notification and Determination |
CN103901317A (en) * | 2012-12-24 | 2014-07-02 | 天津市电力公司 | Power distribution fault studying and judging method based on multisystem collaboration |
CN103532745A (en) * | 2013-09-25 | 2014-01-22 | 国家电网公司 | Metering online monitoring system based on power user power consumption information acquisition system |
US20150332181A1 (en) * | 2014-05-13 | 2015-11-19 | VWS (UK) Limited | Water Purification Unit |
CN104200399A (en) * | 2014-09-05 | 2014-12-10 | 国家电网公司 | Zoning evaluation based power distribution network running condition real-time monitoring method |
CN104881729A (en) * | 2015-04-23 | 2015-09-02 | 中国南方电网有限责任公司 | Electric power marketing system power failure information processing method, and electric power marketing system power failure information processing system |
CN105207121A (en) * | 2015-09-23 | 2015-12-30 | 国家电网公司 | Power distribution network fault emergency maintenance method based on topology analysis |
CN105354762A (en) * | 2015-11-11 | 2016-02-24 | 国网山东省电力公司电力科学研究院 | Work order identification and distribution system and method of electricity customer service business |
CN106845782A (en) * | 2016-12-23 | 2017-06-13 | 国网浙江省电力公司台州供电公司 | Distribution big data intelligent analysis method |
CN107680368A (en) * | 2017-09-06 | 2018-02-09 | 国网辽宁省电力有限公司 | A kind of metering device on-line monitoring and intelligent diagnosing method based on gathered data |
CN107832854A (en) * | 2017-09-06 | 2018-03-23 | 广东电网有限责任公司佛山供电局 | A kind of method and system of distribution network failure repairing progress msg management |
CN108805296A (en) * | 2018-04-25 | 2018-11-13 | 广州供电局有限公司 | The monitoring method and monitoring device of measuring equipment abnormality |
CN108647328A (en) * | 2018-05-11 | 2018-10-12 | 国网安徽省电力有限公司淮南供电公司 | Reliability power-off event acquires integrity analysis and method for automatically completing |
CN109063217A (en) * | 2018-10-29 | 2018-12-21 | 广州供电局有限公司 | Work order classification method, device and its relevant device in Electric Power Marketing System |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111813825A (en) * | 2020-06-02 | 2020-10-23 | 国网江西省电力有限公司电力科学研究院 | Distribution transformer outlet power failure event missing report automatic detection method and system |
CN111813825B (en) * | 2020-06-02 | 2023-03-14 | 国网江西省电力有限公司电力科学研究院 | Distribution transformer outlet power failure event missing report automatic detection method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5452613B2 (en) | Power grid supply interruption and failure status management | |
CN103264717B (en) | A kind of track traffic synthetic monitoring and scheduling is worked in coordination with and O&M information system | |
CN108647328B (en) | Reliability power failure event acquisition integrity analysis and automatic completion method | |
CN108010305B (en) | Self-diagnosis method for data acquisition fault of integrated energy management platform | |
CN106026405A (en) | Relay protection on-line monitoring and analyzing system based on EMS system | |
CN108710099A (en) | Capacitance type potential transformer monitoring alarm method and system | |
CN107168197A (en) | Intelligent grid secondary device remote-control method | |
CN102333007A (en) | On-line Web service quality monitoring system and method | |
CN109409536B (en) | Method and system for processing asset information of communication unit by acquisition system master station | |
CN104063761A (en) | SCADA data development system based on smart grid | |
CN117035513A (en) | Intelligent monitoring and management system and method for energy operation of intelligent industrial park | |
KR102402653B1 (en) | AI-based SCADA system and operating method thereof | |
CN109871961A (en) | A kind of analysis method and system of middle pressure power-off event | |
CN108123544A (en) | For the power failure check method of supply line | |
CN101800739B (en) | Service-oriented loose coupling information exchange system and method | |
CN109492134B (en) | Method and system for processing asset information of communication unit by concentrator end | |
CN110232792A (en) | Intelligent alarm technology and auxiliary operation method based on SCADA system | |
CN105117984A (en) | Data analysis-based power grid lean management system | |
CN112731062B (en) | Method for diagnosing low-voltage user power failure by utilizing telecommunication terminal equipment | |
CN112085231A (en) | Rapid response method for accident information of power dispatching control center | |
CN107895218A (en) | Personnel and equipment management system in bearing manufacture process | |
EP1062482B1 (en) | Unit for the bidirectional detection and transmission of data via modern communication networks | |
CN109658318A (en) | Control system and method is stared in a kind of construction based on monitor of the railway signal automatically | |
CN109709919A (en) | A kind of sewage plant area operation management system | |
CN103226793A (en) | Combination method and system of electrical equipment state monitoring grid model data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |