Prior art keywords
outage
power
outage information
distribution transformer
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811639577.1A
Other languages
Chinese (zh)
Inventor
许冠中
宁柏锋
钟宇欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd, Shenzhen Comtop Information Technology Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201811639577.1A priority Critical patent/CN109871961A/en
Publication of CN109871961A publication Critical patent/CN109871961A/en
Pending legal-status Critical Current

Links

Abstract

A kind of analysis method and system of middle pressure power-off event, described method includes following steps: terminal reliability module obtains the first outage information set of target area by distribution automation system;The comprehensive module of client obtains the second outage information set of the target area by Production MIS, dispatching management information system and marketing management system;Matching module by the first outage information set with the second outage information set into comparing, to confirm whether the first outage information set coincide with the second outage information set, if misfitting, generate abnormality processing work order.Press the analysis method of power-off event that can found the abnormal situation in time by using in this, after analyzing and positioning problem, it is known that being that the equipment that distribution automation system is related to is failed to report, misrepresented deliberately or Production MIS, dispatching management information system and marketing management system have the case where artificially failing to report, misrepresenting deliberately.

Description

A kind of analysis method and system of middle pressure power-off event
Technical field
The present invention relates to distribution O&M technical fields, and in particular to the analysis method and system of power-off event are pressed in one kind.
Background technique
Currently, power supply enterprise mainly relies on the interpretation of line outage event passes through reading from distribution automation system The power-off event of distribution transformer and related operation data are judged.Distribution automation system be by measuring equipment, Cable communication equipment uploads onto the server distribution transformer real-time running data end, due to measuring equipment and cable communication equipment Stability problem, will cause the case where failing to report, misrepresenting deliberately.Obtain power supply enterprise can not by distribution automation system really Power-off condition.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the shortcomings of the prior art, providing and pressing power-off event in one kind Analysis method presses the analysis method of power-off event that can found the abnormal situation in time by using in this, after analyzing and positioning problem, It is known that be that equipment is failed to report, misrepresented deliberately, or is artificially failed to report, misrepresented deliberately, convenient for we it is subsequent to exist the equipment failed to report, misrepresented deliberately into Row maintenance optimizes management to there is the case where artificially failing to report, misrepresenting deliberately.Correspondingly, also mentioning point for pressing power-off event in one kind Analysis system.
In order to solve the above technical problems, the present invention provides the analysis method for pressing power-off event in one kind, include the following steps:
Terminal reliability module obtains the first outage information set of target area by distribution automation system;
The comprehensive module of client passes through described in Production MIS, dispatching management information system and marketing management system acquisition Second outage information set of target area;
Matching module by the first outage information set and the second outage information set into comparing, described in confirmation Whether the first outage information set coincide with the second outage information set, if misfitting, generates abnormality processing work order.
In the analysis method of middle pressure power-off event provided by the invention, it is described " terminal reliability module by distribution from It is from distribution automation that first outage information set of dynamicization system acquisition target area ", which includes: the terminal reliability module, The power-off event in the distribution transformer of the target area whole day is read in system;The first outage information set includes institute State the power-off event information of all distribution transformer whole days in target area.
In the analysis method of middle pressure power-off event provided by the invention, described " the comprehensive module of client passes through production pipe Reason information system, dispatching management information system and marketing management system obtain the second outage information set of the target area " include: The comprehensive module of client is to collect institute automatically from Production MIS, dispatching management information system and marketing management system State the distribution transformer scheduled outage information or fault outage letter of target area whole day;The second outage information set includes institute State the scheduled outage situation and fault outage situation of all distribution transformer whole days in target area.
In the analysis method of middle pressure power-off event provided by the invention, described " matching module described first will have a power failure letter Breath set, into comparing, is believed with the second outage information set with confirming that the first outage information set has a power failure with described second Whether breath set coincide, if misfitting, generates abnormality processing work order " include:
The power failure thing of the distribution transformer all in the same period is filtered out from the first outage information set Part;
The distribution transformer of generation power-off event in the same period is grouped by power supply line, is obtained multiple First outage information subset;
The plan that the distribution transformer all in the same period is filtered out from the second outage information set stops Electric situation and fault outage situation;
The distribution transformer of generation scheduled outage or fault outage in the same period is divided by power supply line Group obtains multiple second outage information subsets;
It chooses from multiple first outage information subsets and multiple second outage information subsets corresponding to same The the first outage information subset and the second outage information subset of a power supply line are compared;Wherein, when described When the number of users difference that the distribution transformer that one outage information subset includes is related to the second outage information subset The distribution transformer that includes and number of users when differing by more than certain numerical value, alternatively, when the first outage information The corresponding institute for the time of power-off event including with the second outage information subset occurs for the distribution transformer that collection includes When stating the time phase difference of distribution transformer generation scheduled outage or fault outage more than certain numerical value, it is judged as that matching is abnormal and raw At abnormality processing work order, and by the abnormality processing work order be sent to the corresponding power supply line administrative area office.
It is provided by the invention it is middle pressure power-off event analysis method in, include when the first outage information subset described in The distribution transformer that includes with the second outage information subset when the number of users difference that distribution transformer is related to and When number of users differs by more than 2, alternatively, when the distribution transformer that the first outage information subset includes has a power failure With the corresponding distribution transformer that the second outage information subset includes scheduled outage or failure occur for the time of event When the time phase difference of power failure is more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and by the abnormality processing Work order is sent to the administrative area office of the corresponding power supply line.
Correspondingly, the present invention also provides the analysis systems for pressing power-off event in one kind, comprising:
Terminal reliability module, connect with distribution automation system, for obtaining mesh by the distribution automation system Mark the first outage information set in region;
The comprehensive module of client, connect with Production MIS, dispatching management information system and marketing management system respectively, For obtaining the second of the target area by the Production MIS, dispatching management information system and marketing management system Outage information set;
Matching module will be separately connected the terminal reliability module and the comprehensive module of client, be stopped with by described first Power information set with the second outage information set into comparing, to confirm that the first outage information set is stopped with described second Whether power information set coincide, if misfitting, generates abnormality processing work order.
In the analysis system of middle pressure power-off event provided by the invention, the terminal reliability module is used for automatic from distribution The power-off event in the distribution transformer of the target area whole day is read in change system;The first outage information set includes The power-off event information of all distribution transformer whole days in the target area.
In the analysis system of middle pressure power-off event provided by the invention, the comprehensive module of client is used for from production management Automatically the distribution transformer plan of the target area whole day is collected in information system, dispatching management information system and marketing management system Outage information or fault outage letter;The second outage information set includes all distribution transformers in the target area The scheduled outage situation and fault outage situation of whole day.
In the analysis system of middle pressure power-off event provided by the invention, the matching module, which is used to have a power failure from described first, to be believed The power-off event of the distribution transformer all in the same period is filtered out in breath set;It will have a power failure in the same period The distribution transformer of event is grouped by power supply line, obtains multiple first outage information subsets;Stop from described second The scheduled outage situation and fault outage situation of the distribution transformer all in the same period are filtered out in power information set; The distribution transformer of generation scheduled outage or fault outage in the same period is grouped by power supply line, is obtained more A second outage information subset;It is chosen from multiple first outage information subsets and multiple second outage information subsets It is compared corresponding to the first outage information subset of the same power supply line and the second outage information subset;Its In, stop when the number of users difference that the distribution transformer that the first outage information subset includes is related to described second The distribution transformer that power information subset includes and number of users when differing by more than certain numerical value, alternatively, working as described first The time that power-off event occurs for the distribution transformer that outage information subset includes includes with the second outage information subset The corresponding distribution transformer when time phase difference of scheduled outage or fault outage occurs being more than certain numerical value, be judged as With exception and abnormality processing work order is generated, and the abnormality processing work order is sent to the administrative area of the corresponding power supply line Office.
In the analysis system of middle pressure power-off event provided by the invention, the matching module is used for when the first power failure letter The institute for including with the second outage information subset when the number of users difference that the distribution transformer that breath subset includes is related to State distribution transformer and number of users when differing by more than 2, alternatively, when what the first outage information subset included described matches The corresponding distribution transformer that the time of power-off event occurs for piezoelectric transformer and the second outage information subset includes is sent out When the time phase difference of raw scheduled outage or fault outage is more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, And the abnormality processing work order is sent to the administrative area office of the corresponding power supply line.
Compared with prior art, implementation is provided by the invention, has the following beneficial effects: the analysis side of middle pressure power-off event Method includes the following steps: that terminal reliability module obtains the first outage information collection of target area by distribution automation system It closes;The comprehensive module of client obtains the target by Production MIS, dispatching management information system and marketing management system The second outage information set in region;Matching module by the first outage information set and the second outage information set into It compares, to confirm whether the first outage information set coincide with the second outage information set, if misfitting, generates Abnormality processing work order.Press the analysis method of power-off event that can found the abnormal situation in time by using in this, analyzing and positioning is asked After topic, it is known that be the equipment that distribution automation system is related to fail to report, misrepresent deliberately or Production MIS, scheduling pipe There is the case where artificially failing to report, misrepresenting deliberately in reason system and marketing management system, convenient for our the subsequent equipment in the presence of failing to report, misrepresenting deliberately It carries out maintenance or optimizes management to there is the case where artificially failing to report, misrepresenting deliberately, so that subsequent distribution automation system is obtained, produced Management information system, dispatching management information system and marketing management system capacitation are enough more really to react power-off condition.
Detailed description of the invention
Fig. 1 is the flow chart of the analysis method for the middle pressure power-off event that embodiment one provides;
Fig. 2 is the block diagram of the analysis system for the middle pressure power-off event that embodiment two provides.
Specific embodiment
For a clearer understanding of the technical characteristics, objects and effects of the present invention, now control attached drawing is described in detail A specific embodiment of the invention.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment one
The present embodiment provides the analysis methods that power-off event is pressed in one kind, include the following steps:
Step S1, terminal reliability module obtain the first outage information collection of target area by distribution automation system It closes.
Specifically, " first power failure that terminal reliability module passes through distribution automation system acquisition target area Information aggregate " includes: that the terminal reliability module is to read from distribution automation system in the target area whole day The power-off event of distribution transformer;The first outage information set includes all distribution transformers in the target area The power-off event information of whole day.
Step S2, the comprehensive module of client pass through Production MIS, dispatching management information system and marketing management system Obtain the second outage information set of the target area.
Specifically, described, " the comprehensive module of client passes through Production MIS, dispatching management information system and marketing pipe Reason system obtains the second outage information set of the target area " it include: the comprehensive module of the client is from production management Automatically the distribution transformer plan of the target area whole day is collected in information system, dispatching management information system and marketing management system Outage information or fault outage letter;The second outage information set includes all distribution transformers in the target area The scheduled outage situation and fault outage situation of whole day.
Step S3, matching module by the first outage information set and the second outage information set into comparing, with Confirm whether the first outage information set coincide with the second outage information set, if misfitting, generates exception Science and engineering list.
Specifically, described " matching module by the first outage information set and the second outage information set into It compares, to confirm whether the first outage information set coincide with the second outage information set, if misfitting, generates Abnormality processing work order " includes:
Step S31 filters out the distribution transformer all in the same period from the first outage information set Power-off event;
The distribution transformer of generation power-off event in the same period is grouped by step S32 by power supply line, Obtain multiple first outage information subsets;
Step S33 filters out the distribution transformer all in the same period from the second outage information set Scheduled outage situation and fault outage situation;
The distribution transformer that scheduled outage or fault outage occurs in the same period is pressed supply lines by step S34 Road is grouped, and obtains multiple second outage information subsets;
Step S35, the selection pair from multiple first outage information subsets and multiple second outage information subsets It should be compared in the first outage information subset of the same power supply line and the second outage information subset;Wherein, Have a power failure when the number of users difference that the distribution transformer that the first outage information subset includes is related to described second The distribution transformer that information subset includes and number of users when differing by more than certain numerical value, alternatively, stopping when described first The time of power-off event occurs for the distribution transformer that power information subset includes and the second outage information subset includes When the time phase difference of scheduled outage or fault outage occurs for the corresponding distribution transformer more than certain numerical value, it is judged as matching Exception simultaneously generates abnormality processing work order, and the abnormality processing work order is sent to the administrative area of the corresponding power supply line Office.
It should be noted that the matching module is in daily morning 00:00 by the first outage information set and institute The second outage information set is stated into comparison, the time span of " the same period " that is mentioned above is 30 minutes.
Preferably, in the step S35, when the distribution transformer that the first outage information subset includes is related to Number of users difference when include with the second outage information subset the distribution transformer and number of users differ super When crossing 2, alternatively, when time and the institute of power-off event occur for the distribution transformer that the first outage information subset includes State the time phase difference that scheduled outage or fault outage occur for the corresponding distribution transformer that the second outage information subset includes When more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and the abnormality processing work order is sent to correspondence The power supply line administrative area office.
After the administrative area office receives the abnormality processing work order, for the measuring equipment of the corresponding power supply line It is checked, checks whether the measuring equipment in the power supply line is problematic, if no problem, illustrate it is artificially to fail to report or wrong Report, then need to optimize management to Production MIS, dispatching management information system and marketing management system, if problematic, Then explanation is that equipment is failed to report, misrepresented deliberately, then repairs maintenance to problem device in time.
In conclusion compared with prior art, implementing the analysis method of middle pressure power-off event provided by the invention, having such as Down the utility model has the advantages that pressing the analysis method of power-off event that can found the abnormal situation in time by using in this, analyzing and positioning problem Afterwards, it is known that being that the equipment that distribution automation system is related to is failed to report, misrepresented deliberately or Production MIS, management and running There is the case where artificially failing to report, misrepresenting deliberately in system and marketing management system, convenient for our subsequent equipment that presence is failed to report, is misrepresented deliberately into Row maintenance optimizes management to there is the case where artificially failing to report, misrepresenting deliberately, so that subsequent distribution automation system obtains, produces pipe Manage the enough more true reaction power-off conditions of information system, dispatching management information system and marketing management system capacitation.
Embodiment two
The present invention also provides power-off event analysis system is pressed in one kind, stop for implementing such as the middle pressure that embodiment one provides Electric affair analytical method.Medium pressure power-off event analysis system include terminal reliability module, the comprehensive module of client and With module.
The terminal reliability module, connect with distribution automation system, for being obtained by the distribution automation system Take the first outage information set of target area;
The comprehensive module of client, respectively with Production MIS, dispatching management information system and marketing management system Connection, for obtaining the target area by the Production MIS, dispatching management information system and marketing management system The second outage information set;
The matching module will, the terminal reliability module and the comprehensive module of client are separately connected, with by described the One outage information set and the second outage information set are into comparing, to confirm the first outage information set and described the Whether two outage information set coincide, if misfitting, generate abnormality processing work order.
In the present embodiment, the terminal reliability module is used to read from distribution automation system in the target area The power-off event of the distribution transformer of whole day;The first outage information set includes all distribution in the target area The power-off event information of transformer whole day.
In the present embodiment, the comprehensive module of client is used for from Production MIS, dispatching management information system and battalion Automatically the distribution transformer scheduled outage information or fault outage letter of the target area whole day are collected in pin management system;It is described Second outage information set includes the scheduled outage situation and failure of all distribution transformer whole days in the target area Power-off condition.
In the present embodiment, the matching module from the first outage information set for filtering out institute in the same period The power-off event for the distribution transformer having;By the distribution transformer of the generation power-off event in the same period by power supply Route is grouped, and obtains multiple first outage information subsets;The same period is filtered out from the second outage information set The scheduled outage situation and fault outage situation of interior all distribution transformers;By the generation scheduled outage in the same period Or the distribution transformer of fault outage is grouped by power supply line, obtains multiple second outage information subsets;From multiple The institute for corresponding to the same power supply line is chosen in the first outage information subset and multiple second outage information subsets It states the first outage information subset and the second outage information subset is compared;Wherein, when the first outage information subset The distribution for including with the second outage information subset when the number of users difference that the distribution transformer for including is related to Transformer and number of users when differing by more than certain numerical value, alternatively, when what the first outage information subset included described matches The corresponding distribution transformer that the time of power-off event occurs for piezoelectric transformer and the second outage information subset includes is sent out When the time phase difference of raw scheduled outage or fault outage is more than certain numerical value, it is judged as matching exception and generates exception science and engineering Singly, and by the abnormality processing work order it is sent to the administrative area office of the corresponding power supply line.It should be noted that described With module in daily morning 00:00 by the first outage information set and the second outage information set into comparing, on The time span of " the same period " mentioned in text is 30 minutes.
Preferably, the matching module is used to be related to when the distribution transformer that the first outage information subset includes Number of users difference when include with the second outage information subset the distribution transformer and number of users differ super When crossing 2, alternatively, when time and the institute of power-off event occur for the distribution transformer that the first outage information subset includes State the time phase difference that scheduled outage or fault outage occur for the corresponding distribution transformer that the second outage information subset includes When more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and the abnormality processing work order is sent to correspondence The power supply line administrative area office.
After the administrative area office receives the abnormality processing work order, for the measuring equipment of the corresponding power supply line It is checked, checks whether the measuring equipment in the power supply line is problematic, if no problem, illustrate it is artificially to fail to report or wrong Report, then need to optimize management to Production MIS, dispatching management information system and marketing management system, if problematic, Then explanation is that equipment is failed to report, misrepresented deliberately, then repairs maintenance to problem device in time.
In conclusion compared with prior art, implementing the analysis system of middle pressure power-off event provided by the invention, having such as Down the utility model has the advantages that pressing the analysis system of power-off event that can found the abnormal situation in time by using in this, analyzing and positioning problem Afterwards, it is known that being that the equipment that distribution automation system is related to is failed to report, misrepresented deliberately or Production MIS, management and running There is the case where artificially failing to report, misrepresenting deliberately in system and marketing management system, convenient for our subsequent equipment that presence is failed to report, is misrepresented deliberately into Row maintenance optimizes management to there is the case where artificially failing to report, misrepresenting deliberately, so that subsequent distribution automation system obtains, produces pipe Manage the enough more true reaction power-off conditions of information system, dispatching management information system and marketing management system capacitation.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, within these are all belonged to the scope of protection of the present invention.

Claims (10)

1. pressing the analysis method of power-off event in one kind, which comprises the steps of:
Terminal reliability module obtains the first outage information set of target area by distribution automation system;
The comprehensive module of client obtains the target by Production MIS, dispatching management information system and marketing management system The second outage information set in region;
Matching module by the first outage information set with the second outage information set into comparing, to confirm described first Whether outage information set coincide with the second outage information set, if misfitting, generates abnormality processing work order.
2. the analysis method of middle pressure power-off event according to claim 1, which is characterized in that " the terminal reliability Module obtains the first outage information set of target area by distribution automation system " it include: the terminal reliability module It is the power-off event read from distribution automation system in the distribution transformer of the target area whole day;Described first has a power failure Information aggregate includes the power-off event information of all distribution transformer whole days in the target area.
3. the analysis method of middle pressure power-off event according to claim 2, which is characterized in that described " client is comprehensive Module is had a power failure by second that Production MIS, dispatching management information system and marketing management system obtain the target area Information aggregate " includes: that the comprehensive module of the client is from Production MIS, dispatching management information system and marketing management system Automatically the distribution transformer scheduled outage information or fault outage letter of the target area whole day are collected in system;Described second has a power failure Information aggregate includes the scheduled outage situation and fault outage situation of all distribution transformer whole days in the target area.
4. the analysis method of middle pressure power-off event according to claim 3, which is characterized in that " the matching module general The first outage information set and the second outage information set into comparing, with confirm the first outage information set with Whether the second outage information set coincide, if misfitting, generates abnormality processing work order " include:
The power-off event of the distribution transformer all in the same period is filtered out from the first outage information set;
The distribution transformer of generation power-off event in the same period is grouped by power supply line, obtains multiple first Outage information subset;
The scheduled outage feelings of the distribution transformer all in the same period are filtered out from the second outage information set Condition and fault outage situation;
The distribution transformer of generation scheduled outage or fault outage in the same period is grouped by power supply line, is obtained To multiple second outage information subsets;
It is chosen from multiple first outage information subsets and multiple second outage information subsets and corresponds to the same confession The the first outage information subset and the second outage information subset of electric line are compared;Wherein, when described first stops Include with the second outage information subset when the number of users difference that the distribution transformer that power information subset includes is related to The distribution transformer and number of users when differing by more than certain numerical value, alternatively, working as the first outage information subset packet The distribution transformer that contains the time of power-off event occurs and the second outage information subset includes it is corresponding described in match When the time phase difference of scheduled outage or fault outage occurs for piezoelectric transformer more than certain numerical value, it is judged as matching exception and generates different Work order is often handled, and the abnormality processing work order is sent to the administrative area office of the corresponding power supply line.
5. the analysis method of middle pressure power-off event according to claim 4, which is characterized in that when first outage information Include with the second outage information subset when the number of users difference that the distribution transformer that subset includes is related to is described Distribution transformer and number of users when differing by more than 2, alternatively, the distribution for including when the first outage information subset The corresponding distribution transformer that the time of power-off event occurs for transformer and the second outage information subset includes occurs When the time phase difference of scheduled outage or fault outage is more than 30 minutes, it is judged as matching exception and generates abnormality processing work order, and The abnormality processing work order is sent to the administrative area office of the corresponding power supply line.
6. pressing the analysis system of power-off event in one kind characterized by comprising
Terminal reliability module, connect with distribution automation system, for obtaining target area by the distribution automation system The first outage information set in domain;
The comprehensive module of client, connect with Production MIS, dispatching management information system and marketing management system respectively, is used for Obtain the target area by the Production MIS, dispatching management information system and marketing management system second has a power failure Information aggregate;
Matching module will be separately connected the terminal reliability module and the comprehensive module of client, be believed with described first has a power failure Breath set, into comparing, is believed with the second outage information set with confirming that the first outage information set has a power failure with described second Whether breath set coincide, if misfitting, generates abnormality processing work order.
7. the analysis system of middle pressure power-off event according to claim 6, which is characterized in that the terminal reliability module For reading the power-off event in the distribution transformer of the target area whole day from distribution automation system;Described first stops Power information set includes the power-off event information of all distribution transformer whole days in the target area.
8. the analysis system of middle pressure power-off event according to claim 7, which is characterized in that the comprehensive module of client For collecting the target area whole day automatically from Production MIS, dispatching management information system and marketing management system Distribution transformer scheduled outage information or fault outage letter;The second outage information set includes the institute in the target area The scheduled outage situation and fault outage situation of some distribution transformer whole days.
9. it is according to claim 8 it is middle pressure power-off event analysis system, which is characterized in that the matching module be used for from The power-off event of the distribution transformer all in the same period is filtered out in the first outage information set;It will be with for the moment The distribution transformer of generation power-off event in section is grouped by power supply line, obtains multiple first outage information Collection;The scheduled outage situation of the distribution transformer all in the same period is filtered out from the second outage information set With fault outage situation;The distribution transformer that scheduled outage or fault outage occurs in the same period is pressed into power supply line It is grouped, obtains multiple second outage information subsets;Stop from multiple first outage information subsets and multiple described second The the first outage information subset and second outage information for corresponding to the same power supply line are chosen in power information subset Subset is compared;Wherein, the number of users being related to when the distribution transformer that the first outage information subset includes is not The distribution transformer that includes with the second outage information subset simultaneously and number of users when differing by more than certain numerical value, Alternatively, when the time that power-off event occurs for the distribution transformer that the first outage information subset includes stops with described second It is more than certain that scheduled outage or the time phase difference of fault outage, which occur, for the corresponding distribution transformer that power information subset includes When numerical value, it is judged as matching exception and generates abnormality processing work order, and the abnormality processing work order is sent to corresponding described The administrative area office of power supply line.
10. the analysis method of middle pressure power-off event according to claim 9, which is characterized in that the matching module is used for Have a power failure when the number of users difference that the distribution transformer that the first outage information subset includes is related to described second The distribution transformer that information subset includes and number of users when differing by more than 2, alternatively, working as first outage information The time for the distribution transformer generation power-off event that subset includes and the second outage information subset include corresponding When the time phase difference of the distribution transformer generation scheduled outage or fault outage is more than 30 minutes, it is judged as that matching is abnormal and raw At abnormality processing work order, and by the abnormality processing work order be sent to the corresponding power supply line administrative area office.
CN201811639577.1A 2018-12-29 2018-12-29 A kind of analysis method and system of middle pressure power-off event Pending CN109871961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811639577.1A CN109871961A (en) 2018-12-29 2018-12-29 A kind of analysis method and system of middle pressure power-off event

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811639577.1A CN109871961A (en) 2018-12-29 2018-12-29 A kind of analysis method and system of middle pressure power-off event

Publications (1)

Publication Number Publication Date
CN109871961A true CN109871961A (en) 2019-06-11

Family

ID=66917427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811639577.1A Pending CN109871961A (en) 2018-12-29 2018-12-29 A kind of analysis method and system of middle pressure power-off event

Country Status (1)

Country Link
CN (1) CN109871961A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111813825A (en) * 2020-06-02 2020-10-23 国网江西省电力有限公司电力科学研究院 Distribution transformer outlet power failure event missing report automatic detection method and system

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120296482A1 (en) * 2009-10-23 2012-11-22 Viridity Energy, Inc. Methods, apparatus and systems for managing energy assets
CN103532745A (en) * 2013-09-25 2014-01-22 国家电网公司 Metering online monitoring system based on power user power consumption information acquisition system
US20140085105A1 (en) * 2012-09-21 2014-03-27 Silver Spring Networks, Inc. Power Outage Notification and Determination
CN103901317A (en) * 2012-12-24 2014-07-02 天津市电力公司 Power distribution fault studying and judging method based on multisystem collaboration
CN104200399A (en) * 2014-09-05 2014-12-10 国家电网公司 Zoning evaluation based power distribution network running condition real-time monitoring method
CN104881729A (en) * 2015-04-23 2015-09-02 中国南方电网有限责任公司 Electric power marketing system power failure information processing method, and electric power marketing system power failure information processing system
US20150332181A1 (en) * 2014-05-13 2015-11-19 VWS (UK) Limited Water Purification Unit
CN105207121A (en) * 2015-09-23 2015-12-30 国家电网公司 Power distribution network fault emergency maintenance method based on topology analysis
CN105354762A (en) * 2015-11-11 2016-02-24 国网山东省电力公司电力科学研究院 Work order identification and distribution system and method of electricity customer service business
CN106845782A (en) * 2016-12-23 2017-06-13 国网浙江省电力公司台州供电公司 Distribution big data intelligent analysis method
CN107680368A (en) * 2017-09-06 2018-02-09 国网辽宁省电力有限公司 A kind of metering device on-line monitoring and intelligent diagnosing method based on gathered data
CN107832854A (en) * 2017-09-06 2018-03-23 广东电网有限责任公司佛山供电局 A kind of method and system of distribution network failure repairing progress msg management
CN108647328A (en) * 2018-05-11 2018-10-12 国网安徽省电力有限公司淮南供电公司 Reliability power-off event acquires integrity analysis and method for automatically completing
CN108805296A (en) * 2018-04-25 2018-11-13 广州供电局有限公司 The monitoring method and monitoring device of measuring equipment abnormality
CN109063217A (en) * 2018-10-29 2018-12-21 广州供电局有限公司 Work order classification method, device and its relevant device in Electric Power Marketing System

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120296482A1 (en) * 2009-10-23 2012-11-22 Viridity Energy, Inc. Methods, apparatus and systems for managing energy assets
US20140085105A1 (en) * 2012-09-21 2014-03-27 Silver Spring Networks, Inc. Power Outage Notification and Determination
CN103901317A (en) * 2012-12-24 2014-07-02 天津市电力公司 Power distribution fault studying and judging method based on multisystem collaboration
CN103532745A (en) * 2013-09-25 2014-01-22 国家电网公司 Metering online monitoring system based on power user power consumption information acquisition system
US20150332181A1 (en) * 2014-05-13 2015-11-19 VWS (UK) Limited Water Purification Unit
CN104200399A (en) * 2014-09-05 2014-12-10 国家电网公司 Zoning evaluation based power distribution network running condition real-time monitoring method
CN104881729A (en) * 2015-04-23 2015-09-02 中国南方电网有限责任公司 Electric power marketing system power failure information processing method, and electric power marketing system power failure information processing system
CN105207121A (en) * 2015-09-23 2015-12-30 国家电网公司 Power distribution network fault emergency maintenance method based on topology analysis
CN105354762A (en) * 2015-11-11 2016-02-24 国网山东省电力公司电力科学研究院 Work order identification and distribution system and method of electricity customer service business
CN106845782A (en) * 2016-12-23 2017-06-13 国网浙江省电力公司台州供电公司 Distribution big data intelligent analysis method
CN107680368A (en) * 2017-09-06 2018-02-09 国网辽宁省电力有限公司 A kind of metering device on-line monitoring and intelligent diagnosing method based on gathered data
CN107832854A (en) * 2017-09-06 2018-03-23 广东电网有限责任公司佛山供电局 A kind of method and system of distribution network failure repairing progress msg management
CN108805296A (en) * 2018-04-25 2018-11-13 广州供电局有限公司 The monitoring method and monitoring device of measuring equipment abnormality
CN108647328A (en) * 2018-05-11 2018-10-12 国网安徽省电力有限公司淮南供电公司 Reliability power-off event acquires integrity analysis and method for automatically completing
CN109063217A (en) * 2018-10-29 2018-12-21 广州供电局有限公司 Work order classification method, device and its relevant device in Electric Power Marketing System

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111813825A (en) * 2020-06-02 2020-10-23 国网江西省电力有限公司电力科学研究院 Distribution transformer outlet power failure event missing report automatic detection method and system
CN111813825B (en) * 2020-06-02 2023-03-14 国网江西省电力有限公司电力科学研究院 Distribution transformer outlet power failure event missing report automatic detection method and system

Similar Documents

Publication Publication Date Title
JP5452613B2 (en) Power grid supply interruption and failure status management
CN103264717B (en) A kind of track traffic synthetic monitoring and scheduling is worked in coordination with and O&M information system
CN108647328B (en) Reliability power failure event acquisition integrity analysis and automatic completion method
CN108010305B (en) Self-diagnosis method for data acquisition fault of integrated energy management platform
CN106026405A (en) Relay protection on-line monitoring and analyzing system based on EMS system
CN108710099A (en) Capacitance type potential transformer monitoring alarm method and system
CN107168197A (en) Intelligent grid secondary device remote-control method
CN102333007A (en) On-line Web service quality monitoring system and method
CN109409536B (en) Method and system for processing asset information of communication unit by acquisition system master station
CN104063761A (en) SCADA data development system based on smart grid
CN117035513A (en) Intelligent monitoring and management system and method for energy operation of intelligent industrial park
KR102402653B1 (en) AI-based SCADA system and operating method thereof
CN109871961A (en) A kind of analysis method and system of middle pressure power-off event
CN108123544A (en) For the power failure check method of supply line
CN101800739B (en) Service-oriented loose coupling information exchange system and method
CN109492134B (en) Method and system for processing asset information of communication unit by concentrator end
CN110232792A (en) Intelligent alarm technology and auxiliary operation method based on SCADA system
CN105117984A (en) Data analysis-based power grid lean management system
CN112731062B (en) Method for diagnosing low-voltage user power failure by utilizing telecommunication terminal equipment
CN112085231A (en) Rapid response method for accident information of power dispatching control center
CN107895218A (en) Personnel and equipment management system in bearing manufacture process
EP1062482B1 (en) Unit for the bidirectional detection and transmission of data via modern communication networks
CN109658318A (en) Control system and method is stared in a kind of construction based on monitor of the railway signal automatically
CN109709919A (en) A kind of sewage plant area operation management system
CN103226793A (en) Combination method and system of electrical equipment state monitoring grid model data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination