CN107895218A - Personnel and equipment management system in bearing manufacture process - Google Patents
Personnel and equipment management system in bearing manufacture process Download PDFInfo
- Publication number
- CN107895218A CN107895218A CN201710897628.XA CN201710897628A CN107895218A CN 107895218 A CN107895218 A CN 107895218A CN 201710897628 A CN201710897628 A CN 201710897628A CN 107895218 A CN107895218 A CN 107895218A
- Authority
- CN
- China
- Prior art keywords
- information
- management
- equipment
- personnel
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 62
- 238000000034 method Methods 0.000 title claims abstract description 37
- 230000008569 process Effects 0.000 title claims abstract description 36
- 238000007689 inspection Methods 0.000 claims description 34
- 238000012545 processing Methods 0.000 claims description 18
- 238000012544 monitoring process Methods 0.000 claims description 17
- 230000007257 malfunction Effects 0.000 claims description 5
- 230000002776 aggregation Effects 0.000 claims description 3
- 238000004220 aggregation Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 92
- 238000005516 engineering process Methods 0.000 abstract description 8
- 238000012790 confirmation Methods 0.000 abstract description 4
- 238000012423 maintenance Methods 0.000 description 8
- 230000008439 repair process Effects 0.000 description 6
- 238000012552 review Methods 0.000 description 4
- 238000003860 storage Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 230000002159 abnormal effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000012356 Product development Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000015654 memory Effects 0.000 description 1
- 238000003012 network analysis Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000002407 reforming Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 230000035899 viability Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Data Mining & Analysis (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The invention discloses the personnel in bearing manufacture process and equipment management system, mainly it is made up of the hardware components needed for this project and software section, hardware includes intelligent data terminal, server, PC management ends, mobile terminal, live electronic board, ID cards etc., software includes PC management end system, intelligent data terminal system and server platform processes system etc., and software and hardware combining is formed to personnel and the equipment management system of bearing mnanufacture eventually through technology of Internet of things.The registration of a people one card one is carried out associate using technology of Internet of things, is both needed to be operated in confirmation of swiping the card every time, thus achieves the binding of people and thing, realize the IT application in management to associate.Administrative staff can grasp the operation information of all devices in real time by system, and it is managed, so as to realize the IT application in management to corporate device.
Description
Technical field
The present invention relates to the management system of bearing mnanufacture industry, particularly relates to the bearing manufacture process based on technology of Internet of things
In personnel and equipment management system.
Background technology
The development starting of domestic bearing industry is more early, after especially reforming and opening up to the outside world, from the yield and system of bearing,
China turns into is only second to the Production of bearing big country of the world of day virtue, but from product development ability, product quality level and production
Also it is not Production of bearing also there is larger gap between the Production of bearing state of China and foreign countries from the point of view of manufacturing management level
Power.Current domestic bearing enterprise is faced with huge viability test:1. requirement of the client for the quality and cost of product is more next
It is higher.2. for Bearing Manufacturing Enterprise to the period that transition and upgrade must be realized by two change depth integrations, this is also wanting for epoch
Ask." internet+" 3. of Chinese Government and " made in China 2025 " manufactures intelligent green the weight as sustainable and healthy development
Want approach.
For current domestic Bearing Manufacturing Enterprise still based on medium and small micro- enterprise, number of the enterprise accounts for national ratio more than 90%,
Yield accounts for more than the 70% of national total output.But it is limited to the competitiveness deficiency of itself, and it is intelligent certainly production equipment occur
The low situation of dynamicization degree, for conventional way of enhancing production capacities, typically or using relative low price is set up it can reach production
Required precision but the method for the relatively low equipment of automaticity.Company lacks to the scientific and effective information system management of production equipment,
It is on the increase with the quantity of production equipment, difficult, supervision hardly possible that the management to equipment is implemented, the frequency of equipment inspection and time are difficult to
Perform on request, the hysteresis of device management information, cause administrative staff to be reduced for the degree of control of all devices.Overwhelming majority enterprise
The production equipment management information of industry is with hand-kept and manual input system, and information content is larger, extensive management, easily causes non-
Production hour wastes, and also increases the operating cost of equipment.The automaticity of equipment is relatively low, certainly will cause the increasing of operating personnel
More, conventional personnel management methods obviously can not also realize the comprehensive management to personnel.
The content of the invention
It is existing its object is to overcome the invention provides the personnel in a kind of bearing manufacture process and equipment management system
Intelligence degree existing for technology is low and extensive management caused by low production efficiency the defects of.
Technical scheme is as follows:
Personnel and equipment management system in bearing manufacture process, including server, PC management ends, intelligent data terminal,
Live electronic board, mobile terminal and ID cards, wherein:
PC management ends:The Web for being provided with PC management end systems or directly being opened by browser into system platform is managed
End is managed, is respectively used to typing personal management information and device management information, and for the specific personnel in personal management information
Corresponding equipment operation authority is set, and the device management information includes the point inspection item information of equipment;Above-mentioned typing and setting
Information is issued to server process and preserved;
ID cards:Store the personal information of a certain specific personnel and corresponding equipment operation authority;
Intelligent data terminal:Intelligent data terminal system is installed, operation information and inspection information for collecting device,
ID card informations are read, carry out malfunction monitoring and lock or unlock relevant device;Intelligent data terminal can be by above- mentioned information simultaneously
Reach server process;
Server:Server platform processing system is installed, by the typing of PC management ends and the information set and intelligent number
The information uploaded according to terminal is counted, aggregation process, generates statistical graph, and the statistical graph of generation is respectively sent to
PC management ends, intelligent data terminal, live electronic board and mobile terminal.
Further, the intelligent data terminal includes main control module, monitoring of equipment module, touch control display and reading
Card device, intelligent data terminal system is installed in the main control module;The monitoring of equipment module includes being used to monitor correlation
The sensor of equipment operation information and inspection information;The card reader is used to read the information in ID cards.
Further, the device management information includes production line information, facility information, inspection information, relevant device pair
Service data of the maintaining unit information and equipment answered in normal work.
Further, the personal management information includes company information, department information, post information and identity information.
Further, the server is in information server, data server, application server and backup server
One or more.
Further, the PC management ends are desktop computer or notebook, quantity as needed for one or more, and
Pass through the wireless or access in radio internet of things of the invention built.
From the above-mentioned description of this invention, compared to the prior art, the invention has the advantages that:Pass through the present invention
Bearing mnanufacture personnel and equipment management system, using technology of Internet of things to associate carry out a people one card one registration, every time
It is both needed to that in confirmation of swiping the card subsequent operation could be carried out, thus achieves the binding of people and thing, administrative staff can be real-time by system
Personal information is managed and checked, controls the working condition of personnel and real-time performance, the just-in-time of implementation process management and intellectuality,
The IT application in management to associate is realized, reduces the management difficulty of administrative staff, improves the operating efficiency of operating personnel,
So as to eventually reduce the personal management cost of company.Make all production equipment and intelligent data terminal using technology of Internet of things
Bound, equipment is monitored and controlled by intelligent data terminal and sensor, and gather and upload data in real time.Pipe
Reason personnel can grasp the operation information of all devices in real time by system, and it is managed, so as to realize to corporate device
IT application in management, realize intellectuality and the just-in-time of Technical innova- tion, reduce the management difficulty to production equipment.Simultaneously
Administrative staff are managed collectively by system to equipment, can clearly check the state of equipment, and adjustment in time as needed,
Ensure being smoothed out for manufacturing schedule, lifting means utilization rate, play reduction energy consumption, improve the purpose of production efficiency and production capacity,
The final equipment control for reducing production process and operating cost.In addition, system also sets up equipment operation authority, those without authority can not
Carry out next step operation, thus avoid because the maloperation of personnel and easily caused by the generation of security incident and equipment fault,
Ensure that the security of production process, while by the operation monitoring to equipment and failure monitoring, in device fails and
When equipment is locked, effectively avoid equipment fault operation to equipment belt come secondary damage.So as to reduce equipment indirectly
Maintenance cost, ensure that the security of production process, ensured the personal safety of operating personnel, while also improve equipment
Production efficiency.So the implementation of the present invention has significant economic benefit and social benefit.
Brief description of the drawings
Fig. 1 is personnel and equipment management system network basic framework figure in bearing manufacture process.
Fig. 2 is the personnel management system flow chart in bearing manufacture process.
Fig. 3 is the equipment management system flow chart in bearing manufacture process.
Embodiment
Illustrate the embodiment of the present invention with reference to the accompanying drawings.
Personnel and equipment management system in bearing manufacture process, hardware include intelligent data terminal, wire/wireless local
Network, server, PC management ends, mobile terminal, live electronic board, ID cards, each production equipment on production line etc., software kit
PC management end system, intelligent data terminal system and server platform processes system etc. are included, will be soft eventually through technology of Internet of things
Combination of hardware forms personnel and the equipment management system of bearing mnanufacture.Live electronic board is mainly used in showing that PC management ends issue
The data uploaded with intelligent data terminal via the statistical graph information after server process, quantity can be according to demand 1 or
More than one, administrative staff and operating personnel are facilitated to be checked at the scene.Mobile terminal includes smart mobile phone, flat board, PDA
Deng, quantity is unlimited, be mainly used in displaying via the statistical graph information after server process, facilitate personnel to check all kinds of letters in time
Breath.ID card internal memories contain the personal information of a certain specific personnel and equipment operation authority corresponding to the specific personnel.
Fig. 1 is the basic network framework of patent system of the present invention, is mainly built as the hardware components needed for this project
Internet of things.Mainly including but not limited to PC management ends, server, intelligent data terminal, live electronic board, movement are whole
End, router, interchanger and fire wall etc. form.Fig. 2 is the achievable personnel management system flow chart of patent of the present invention, Fig. 3
For the equipment management system flow chart of patent of the present invention, with reference to shown in Fig. 2-3, the specific workflow and function of all parts are such as
Under:
PC management ends are the computer of manager works, and it be desktop computer or notebook, special or dual-purpose all can, it is several
Amount can be 1 or more than 1 as needed, and can by the Wireless/wired internet of things that build of the access present invention, in it
The PC management ends system software of the present invention is installed or the web administration end into system platform is directly opened by browser.By
This, administrative staff can in any place that can access this internet of things, by computer log in management end software system or
Directly web administration end is logged in browser the facility information and running status of company are operated and managed, not only facilitated but also clever
It is living.
Administrative staff by PC management end typing personal management information, including company information, department information, post information,
Identity information etc..Can perform newly-built, editor respectively, delete and the operation such as export, can assigner employee number, the corresponding work of a people
Number, ID cards are provided according to job number.Administrative staff set equipment operation authority according to the specific post of corresponding personnel, can be configured
With the operation such as editor, be configured according to the department of personnel, post, the operation that need to perform etc., subsequently because post, responsibility changes can
Modified in edit item.PC management ends by the personal management information and equipment operation authority information of administrative staff's typing, under
It is sent to server and intelligent data terminal.Administrative staff manage end system and can also check to be swiped the card according to personnel and remembered by PC simultaneously
Chart of the information of record after network analysis is handled, the working condition and performance of personnel are controlled in real time, is carried out according to demand in time
Adjustment.
Administrative staff pass through PC management end recording device management informations, including production line information, facility information, point inspection item letter
The service data of maintaining unit information and equipment in normal work corresponding to breath, relevant device.And typing may be selected
Facility information combination settings are easy to the overall management of administrative staff into production line.According to the different type of equipment, set different
And the point inspection item information corresponding with equipment, personnel easy to operation examine item one by onechecking according to the point of setting.Can be to conventional dimension
Repair unit information and carry out typing and management, facilitate the statistics of maintenance record.Information above can all carry out it is newly-built, edit, delete, leading
Go out and the operation such as check.The information of administrative staff's typing is issued to server by PC management ends, while also the reception server collects
The information that is fed back to after processing is simultaneously shown, including operation information of an inspection record, maintenance record, equipment etc..
Administrative staff can be checked the information of intelligent data terminal collection by PC management ends and via raw after server process
Into all kinds of statistical graphs, including the point of single device or production line inspection record, review one's lessons by oneself record, send repair record etc. information, together
When can real-time monitoring equipment and production line operation information, including open/shut down, debug, processing, be standby, maintenance, productive temp,
The information such as yield, facilitate administrative staff's real time inspection and grasp manufacturing schedule.
Server includes information server, data server, application server, backup server etc., is not limited to the above
Several servers, matched according to the real needs of implementation, quantity can be 1 or more than 1 server.Mainly to information sum
According to statistics, analysis, processing and storage, and be connected by interchanger, fire wall and router with PC management ends.
Server platform processing system is installed on server, server by PC management ends issue with intelligent data terminal
The information of biography such as is counted, analyzed, being collected at the processing, while is generated and different be easy to management and system that operating personnel check respectively
Count chart, while according to demand by different charts be respectively sent to PC management ends, intelligent data terminal, live electronic board,
Mobile terminal etc. is shown, and convenient management and operating personnel check.Administrative staff can also by PC management ends statistics with
The mode of chart exports.It is above-mentioned check or derived data message mainly including personnel swipe the card record, point inspection record, maintenance
Record, equipment operation information and malfunction monitoring record etc..Administrative staff can control the work shape of personnel according to above- mentioned information
The running situation of state and equipment, realize just-in-time and the intellectuality of management.
Intelligent data terminal:Intelligent data terminal system is installed, for collecting device operation information and inspection information, reading
ID card informations are taken, carry out malfunction monitoring and lock or unlock relevant device;Intelligent data terminal can upload above- mentioned information simultaneously
To server process;
Intelligent data terminal includes main control module, monitoring of equipment module, touch control display, card reader and data, services
Device etc., intelligent data terminal system is installed in the main control module;The monitoring of equipment module includes being used to monitor correlation
The sensor of equipment operation information;The card reader is used to read the information in ID cards;The touch control display is used to show phase
Close information;The data server is carrying out the backup of related data.Intelligent data terminal, which primarily serves to run equipment, to be believed
The functions such as collection, malfunction monitoring, upload and reception, storage and the displaying of breath and inspection information, and there is certain equipment control
System power, can be locked or unlocked to equipment according to setting requirements.In addition, it can also be reading ID card informations.Quantity root
It can be 1 or more than 1 according to needs, the side for being typically placed at production equipment facilitates operating personnel to be operated.
Before operating personnel start shooting to production equipment, starting point inspection need to be first carried out, is set by PC management ends and is issued to intelligence
The item to be checked shown in data terminal carries out an inspection.Point inspection is unlocked by then intelligent data terminal to equipment, and operating personnel can open
Machine produces.Point inspection process finds have not by Xiang Zexu first to not handled by item, reviews one's lessons by oneself or send and repaiies, weight after being disposed
New point inspection.Intelligent data terminal system records inspection information and repair message etc. automatically, preserves and the processing that uploads onto the server.
Intelligent data terminal is acquired by sensor to the operation information of equipment, including equipment is opened/shut down, equipment fortune
The information such as row, failure situation and production yields, beat, and uploaded onto the server processing by Wireless/wired network.Intelligent number
Operating equipment is monitored with fault monitoring system according to the main control module of terminal, the operation letter of real-time collecting device
Cease and its service data with equipment in normal work is compared.In equipment normal operation, intelligent data terminal is led to
The operation information that sensor monitors collecting device in real time is crossed, upload onto the server processing immediately, and feeds back to PC management ends, is easy to
Administrative staff check.In equipment operating data exception, intelligent data terminal will be locked to equipment and shut down processing, operation
Personnel are handled equipment fault, are reviewed one's lessons by oneself or are sent and repair, and production can be turned back on by being disposed.Intelligent data terminal collection,
Record information and the processing that uploads onto the server.
All operations of the operating personnel to equipment all need to carry out certification of swiping the card by intelligent data terminal, according to PC management ends
The authority that system is set performs corresponding operation, and lack of competence is inoperable, including debugs, processes, repair etc. and operating, and personnel swipe the card
Next step operation can be carried out after confirmation.The personal management information that intelligent data terminal issues according to PC management ends, system are automatic
It is confirmed whether to pass through checking:
A. possessing the system of operating right can be identified through, and intelligent data terminal is unlocked to equipment, and operating personnel can
Carry out follow-up operation.
B. the system without operating right can not be identified through, and intelligent data terminal continues to lock equipment, lack of competence
Personnel will be unable to carry out follow-up operation.
The generation of Employee Security accident and equipment fault caused by personnel's maloperation can be thus avoided, ensures production
Safe and orderly progress.
Intelligent data terminal is responsible for being acquired personnel's card using information, including charge time, personnel identity, opens/shut down
The information such as time, response time, yield batch, it is uploaded to clothes by the information record of collection and by wire/radio network thereafter
Be engaged in device preserve, after system combination, processing, analysis generate chart PC management ends, site intelligent data terminal, mobile terminal and
Shown in live electronic board, so as to realize personal information management.
Intelligent data terminal is acquired by card reader to each record of swiping the card of operating personnel, except personnel's essential information
Outside, in addition to open/downtime, shut down the information such as reason, process yield, the data clothes in record storage to intelligent data terminal
Device be engaged in back up, while all information are uploaded onto the server storage.
The idiographic flow of the personnel management system of the present invention is as follows:
Administrative staff by PC management end typing personal management information, including company information, department information, post information,
Identity information etc..Administrative staff set equipment operation authority according to the specific post of corresponding personnel.PC management ends are by administrative staff
Typing and the personal management information and equipment operation authority information set, are issued to server and intelligent data terminal.
Assigner employee number, the corresponding job number of a people, ID cards are provided according to job number.All operations of the operating personnel to equipment
All need to carry out certification of swiping the card, system automatically confirms that whether pass through checking:
A. possessing the system of operating right can be identified through, and intelligent data terminal is unlocked to equipment, and operating personnel can
Carry out follow-up operation.
B. the system without operating right confirms non-mistake, and intelligent data terminal continues to lock equipment, lack of competence personnel
It will be unable to carry out follow-up operation.
Operating personnel swipe the card confirmation after can carry out next step operation.Avoid the employee caused by operating personnel's maloperation
Security incident and the generation of equipment fault, ensure the orderly progress of production safety.
Intelligent data terminal is responsible for being acquired personnel's card using information, including charge time, personnel identity, opens/shut down
The information such as time, response time, yield batch, it is uploaded to clothes by the information record of collection and by wire/radio network thereafter
Be engaged in device preserve, after system combination, processing, analysis generate chart PC management ends, site intelligent data terminal, mobile terminal and
Shown in live electronic board, so as to realize personal information management.
The idiographic flow of the equipment management system of the present invention is as follows:
Administrative staff pass through PC management end recording device management informations, including production line information, facility information, point inspection item letter
The service data of maintaining unit information and equipment in normal work corresponding to breath, relevant device.And typing may be selected
Facility information combination settings are easy to the overall management of administrative staff into production line.According to the different type of equipment, set different
And the point inspection item information corresponding with equipment, personnel easy to operation examine item one by onechecking according to the point of setting.PC management ends will manage
The information of reason personnel's typing is issued to server and intelligent data terminal.
Operating personnel need to first carry out starting point inspection to production equipment start, set by PC management ends and be issued to intelligent data
The item information to be checked shown in terminal carries out an inspection.Point inspection is unlocked by then intelligent data terminal to equipment, and operating personnel can open
Machine produces.Point inspection process finds have not by Xiang Zexu first to not handled by item, reviews one's lessons by oneself or send and repaiies, weight after being disposed
New point inspection.Intelligent data terminal system records inspection information, equipment operation information, abnormal data information etc. automatically, preserve and on
Reach server process.
In equipment normal operation, intelligent data terminal monitors the operation of collecting device by sensing in real time with control device
Information, upload onto the server processing immediately, and feeds back to PC management ends, is easy to administrative staff to check.Intelligent data terminal carries
Fault monitoring system is monitored to operating equipment, and when data exception problem occurs in equipment, intelligent data terminal will be right
Equipment is locked and shuts down processing, and operating personnel are handled equipment fault, is reviewed one's lessons by oneself or is sent and repaiies, and being disposed can be again
Start production.Intelligent data terminal can be automatically by inspection information, maintenance record, the operation information of equipment, abnormal data information etc.
Upload onto the server processing.
Administrative staff can be checked the information of intelligent data terminal collection by PC management ends and via raw after server process
Into all kinds of statistical graphs, including the point of single device or production line inspection record, review one's lessons by oneself record, send repair record etc. information, together
When can real-time monitoring equipment and production line operation information, including open/shut down, debug, processing, be standby, maintenance, productive temp,
The information such as yield, facilitate administrative staff's real time inspection and grasp manufacturing schedule.Also fed back simultaneously after the reception server aggregation process
The information returned simultaneously is shown, including inspection record, maintenance record, operation information etc. of equipment.
The embodiment of the present invention is above are only, but the design concept of the present invention is not limited thereto, it is all to utilize this
Conceive the change that unsubstantiality is carried out to the present invention, belong to invade the behavior of the scope of the present invention.
Claims (6)
1. personnel and equipment management system in bearing manufacture process, it is characterised in that:Including server, PC management ends, intelligence
Data terminal, live electronic board, mobile terminal and ID cards, wherein:
PC management ends:PC management end systems are installed or the web administration end into system platform is directly opened by browser,
Typing personal management information and device management information are respectively used to, and phase is set for the specific personnel in personal management information
The equipment operation authority answered, the device management information include the point inspection item information of equipment;Under above-mentioned typing and the information set
It is sent to server process and preserves;
ID cards:Store the personal information of a certain specific personnel and corresponding equipment operation authority;
Intelligent data terminal:Intelligent data terminal system is installed, operation information and inspection information, reading for collecting device
ID card informations, carry out malfunction monitoring and lock or unlock relevant device;Above- mentioned information can be uploaded to by intelligent data terminal simultaneously
Server process;
Server:Server platform processing system is installed, the typing of PC management ends and the information set and intelligent data is whole
The information that end uploads is counted, aggregation process, generates statistical graph, and the statistical graph of generation is respectively sent into PC pipes
Manage end, intelligent data terminal, live electronic board and mobile terminal.
2. personnel and equipment management system in bearing manufacture process according to claim 1, it is characterised in that:The intelligence
Energy data terminal includes main control module, monitoring of equipment module, touch control display and card reader, pacifies in the main control module
Equipped with intelligent data terminal system;The monitoring of equipment module includes being used to monitor relevant device operation information and inspection information
Sensor;The card reader is used to read the information in ID cards.
3. personnel and equipment management system in bearing manufacture process according to claim 1, it is characterised in that:It is described to set
Standby management information is also including maintaining unit information and equipment corresponding to production line information, facility information, relevant device normal
Service data during work.
4. personnel and equipment management system in bearing manufacture process according to claim 1, it is characterised in that:The people
Member's management information includes company information, department information, post information and identity information.
5. personnel and equipment management system in bearing manufacture process according to claim 1, it is characterised in that:The clothes
Business device is the one or more in information server, data server, application server and backup server.
6. personnel and equipment management system in bearing manufacture process according to claim 1, it is characterised in that:The PC
Management end is desktop computer or notebook, and quantity passes through wireless or access in radio sheet as needed for one or more
Invent the internet of things of structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710897628.XA CN107895218A (en) | 2017-09-28 | 2017-09-28 | Personnel and equipment management system in bearing manufacture process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710897628.XA CN107895218A (en) | 2017-09-28 | 2017-09-28 | Personnel and equipment management system in bearing manufacture process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107895218A true CN107895218A (en) | 2018-04-10 |
Family
ID=61802795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710897628.XA Pending CN107895218A (en) | 2017-09-28 | 2017-09-28 | Personnel and equipment management system in bearing manufacture process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107895218A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109086893A (en) * | 2018-06-27 | 2018-12-25 | 经纬软信科技无锡有限公司 | Equipment management quick response system |
CN109164752A (en) * | 2018-09-08 | 2019-01-08 | 芜湖新兴铸管有限责任公司 | A kind of electronic hang tag system and electronic hang tag method |
CN110175816A (en) * | 2019-05-09 | 2019-08-27 | 江苏南高智能装备创新中心有限公司 | A kind of industrial equipment management system based on mobile terminal app |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104091224A (en) * | 2014-06-10 | 2014-10-08 | 东莞市麦蒂科技有限公司 | System and method for real-time acquisition and analysis of production line data |
CN104811500A (en) * | 2015-05-19 | 2015-07-29 | 苏州易信安工业技术有限公司 | Equipment control method, device and system |
CN204856196U (en) * | 2015-09-07 | 2015-12-09 | 捷姆轴承集团有限公司 | Intelligent production line process control system of bearing thing networking |
CN106502219A (en) * | 2015-09-07 | 2017-03-15 | 捷姆轴承集团有限公司 | A kind of bearing Internet of Things intelligence fabrication line process control system |
-
2017
- 2017-09-28 CN CN201710897628.XA patent/CN107895218A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104091224A (en) * | 2014-06-10 | 2014-10-08 | 东莞市麦蒂科技有限公司 | System and method for real-time acquisition and analysis of production line data |
CN104811500A (en) * | 2015-05-19 | 2015-07-29 | 苏州易信安工业技术有限公司 | Equipment control method, device and system |
CN204856196U (en) * | 2015-09-07 | 2015-12-09 | 捷姆轴承集团有限公司 | Intelligent production line process control system of bearing thing networking |
CN106502219A (en) * | 2015-09-07 | 2017-03-15 | 捷姆轴承集团有限公司 | A kind of bearing Internet of Things intelligence fabrication line process control system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109086893A (en) * | 2018-06-27 | 2018-12-25 | 经纬软信科技无锡有限公司 | Equipment management quick response system |
CN109086893B (en) * | 2018-06-27 | 2021-11-16 | 北京经纬纺机新技术有限公司 | Equipment management quick response system |
CN109164752A (en) * | 2018-09-08 | 2019-01-08 | 芜湖新兴铸管有限责任公司 | A kind of electronic hang tag system and electronic hang tag method |
CN110175816A (en) * | 2019-05-09 | 2019-08-27 | 江苏南高智能装备创新中心有限公司 | A kind of industrial equipment management system based on mobile terminal app |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106408192B (en) | A kind of preparation equipment running state monitoring system and method | |
CN206921161U (en) | It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination | |
CN106557991B (en) | Voltage monitoring data platform | |
US10116165B2 (en) | Powergrid operation and supervision system | |
CN103020780B (en) | A kind of special equipment detects and Maintenance Management System and method thereof | |
CN104361445B (en) | Labour's real-time management system and management method | |
CN106200602A (en) | A kind of based on Internet of Things and the industry preparation equipment moving monitoring system of cloud and method | |
CN105430091A (en) | Cloud storage based remote equipment health management method and system using same | |
US20230267715A1 (en) | Algorithm evaluation system and test method for performance test of person and certificate verification device | |
CN109343395A (en) | A kind of abnormality detection system and method for nuclear power plant DCS operation log | |
CN107895218A (en) | Personnel and equipment management system in bearing manufacture process | |
CN111612646A (en) | Networked intelligent secondary operation and maintenance system | |
CN107153903A (en) | A kind of rural power grids circuit high-low pressure equipment operation management system | |
CN112330062A (en) | Enterprise production running state supervision and early warning system based on electricity, water and gas consumption | |
CN107666148A (en) | Line fault analysis method based on distribution transforming power cut signal | |
CN107831738A (en) | The cutter and production planning management system of bearing mnanufacture | |
CN116500981A (en) | Intelligent factory production system and method based on industrial Internet | |
CN109542091A (en) | A kind of excavator breakdown maintenance and reliability data management system and its application | |
CN112596469A (en) | Monitoring control system applied to industrial numerical control production equipment | |
CN107705507A (en) | Bearing mnanufacture alarm and call management system and its method based on technology of Internet of things | |
CN106933726A (en) | A kind of data traceability and real-time monitoring and managing system | |
CN110674534A (en) | Remote quality detection technology based on Internet of things electronic evidence chain | |
CN110674204A (en) | Management and control system for realizing forced compliance of pharmaceutical production process of medicine enterprises based on informatization | |
CN112862242A (en) | A production overall process acceptance tool for transformer substation capital construction engineering | |
CN204231378U (en) | Electric power system snap information repair based on condition of component and service system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180410 |
|
RJ01 | Rejection of invention patent application after publication |