CN109164752A - A kind of electronic hang tag system and electronic hang tag method - Google Patents

A kind of electronic hang tag system and electronic hang tag method Download PDF

Info

Publication number
CN109164752A
CN109164752A CN201811046523.4A CN201811046523A CN109164752A CN 109164752 A CN109164752 A CN 109164752A CN 201811046523 A CN201811046523 A CN 201811046523A CN 109164752 A CN109164752 A CN 109164752A
Authority
CN
China
Prior art keywords
equipment
work
serviceman
identification code
hang tag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811046523.4A
Other languages
Chinese (zh)
Inventor
刘列喜
丁理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Xinxing Ductile Iron Pipes Co Ltd
Original Assignee
Wuhu Xinxing Ductile Iron Pipes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Xinxing Ductile Iron Pipes Co Ltd filed Critical Wuhu Xinxing Ductile Iron Pipes Co Ltd
Priority to CN201811046523.4A priority Critical patent/CN109164752A/en
Publication of CN109164752A publication Critical patent/CN109164752A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/058Safety, monitoring
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F9/00Indicating arrangements for variable information in which the information is built-up on a support by selection or combination of individual elements
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/14Plc safety
    • G05B2219/14005Alarm

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Theoretical Computer Science (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

The present invention is suitable for the listed technical field of equipment, provides a kind of electronic hang tag system, which includes: the card reader set on workshop, card reader and PLC controller communication connection, the electric machine controller and display communication connection of PLC controller and equipment;The identification code read is sent to PLC controller for the identification code on read work card by card reader;When serviceman is on duty, PLC controller locks faulty equipment out of service, when serviceman is laid off, is unlocked to the equipment of locking;Display, the operating status of each equipment of real-time display, comprising: in operation, out of service, breakdown maintenance.Synchronized update shows the operating status of each equipment in workshop on display in the present invention, solves the problems, such as that the replacement of device name board is not in time in dislodging operation board mode;When equipment is when carrying out breakdown maintenance, maintenance of equipment is locked, equipment operation work cannot operate equipment, ensure that equipment and the safety of serviceman.

Description

A kind of electronic hang tag system and electronic hang tag method
Technical field
It is listed technical field the invention belongs to equipment, provides a kind of electronic hang tag system and electronic hang tag method.
Background technique
Country's post operation is using operation board (irony device name board) mode of seting out now, when equipment is currently running, hangs Operation board is hung, when overhaul of the equipments, extracts operation board, suspension maintenance board, and manual record dislodging board records, when being executed the set stream Journey, there are many loopholes, such as: record is faked, operation board is extractd not in time, overhauls board hangs not in time, it is most important that sets Standby to extract operation board, equipment equally can star operation, can not effectively play safety interlocking effect.
Summary of the invention
The embodiment of the invention provides a kind of electronic hang tag system, synchronized update shows each equipment in workshop on display Operating status, and when carrying out breakdown maintenance, maintenance of equipment is locked, ensure that equipment and the safety of serviceman.
The invention is realized in this way a kind of electronic hang tag system, the system include:
Card reader set on workshop, card reader and PLC controller communication connection, the motor control of PLC controller and equipment Device and display communication connection;
The identification code read is sent to PLC controller for the identification code on read work card by card reader;
When serviceman is on duty, PLC controller locks faulty equipment out of service, works as serviceman When being laid off, the equipment of locking is unlocked;
Display, the operating status of each equipment of real-time display, comprising: in operation, out of service, breakdown maintenance.
The invention is realized in this way a kind of electronic hang tag method based on electronic hang tag system, this method includes as follows Step:
PLC controller switches the working condition of identification code, and the corresponding work post of job card is identified based on identification code;
If work post is serviceman, and in the state that is on duty, then whether out of service faulty equipment is detected, if examining Survey result be it is yes, then lock faulty equipment;
If work post serviceman, and in the state of being laid off, then the equipment of locking is unlocked.
Further, when faulty equipment is not out of service, then warning not out of service is issued, has stopped transporting in faulty equipment After row, faulty equipment is locked.
Further, if work post is equipment operation work, and in the state that is on duty, then started for unlocked equipment Operation;
If work post is equipment operation work, and in the state of being laid off, then detects whether unlocked equipment is in stoppage in transit state, If testing result be it is no, issue warning not out of service.
Further, identify that the corresponding work post of job card specifically comprises the following steps: based on identification code
Read the numerical value on identification code middle finger fixed number position;
Base specifies the numerical value in numerical digit come to determine work post, the work post include: serviceman and equipment operation work.
Electronic hang tag system and electronic hang tag method provided by the invention has the following beneficial effects:
1. on display in simultaneous display workshop each equipment operating status, the switching of equipment running status is updated on year-on-year basis Display solves the problems, such as that the replacement of irony device name board is not in time in dislodging operation board mode;
2. controller locks maintenance of equipment when equipment is when carrying out breakdown maintenance, equipment operation work cannot be to setting It is standby to be operated, it ensure that equipment and the safety of serviceman.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of electronic hang tag system provided in an embodiment of the present invention;
Fig. 2 provides electronic hang tag method flow diagram for the embodiment of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Fig. 1 is that the structural schematic diagram of electronic hang tag system provided in an embodiment of the present invention is only illustrated in for ease of description The relevant part of the embodiment of the present invention.
The system includes:
Card reader set on workshop, card reader and PLC controller communication connection, the motor control of PLC controller and equipment Device and display communication connection;
The identification code read is sent to PLC controller for the identification code on read work card by card reader;
When serviceman is on duty, PLC controller locks faulty equipment out of service, works as serviceman When being laid off, the equipment of locking is unlocked;
Display, the operating status of each equipment of real-time display, comprising: in operation, out of service, breakdown maintenance.
Fig. 2 is the electronic hang tag method flow diagram provided in an embodiment of the present invention based on electronic hang tag system, this method packet Include following steps:
The working condition of PLC controller switch signs code, and the corresponding work post of job card is identified based on identification code;
Work post includes serviceman and equipment operation work, and serviceman is for repairing faulty equipment, equipment Operative employee, for operating equipment, starting, stopping including equipment, the debugging of operating parameter identify job card based on identification code Corresponding work post, including the following two kinds mode, the first, the corresponding work of identification code is searched based on identification code-work post mapping table Kind, second, the corresponding work post of job card is identified based on the N bit digital mark in identification code, such as take on identification code Second value, for equipment operation work, is 2 if numerical value, is then serviceman, identification code 0144 corresponds to if numerical value is 1 Equipment operation work, identification code 0244 correspond to serviceman.
Working condition includes: the state of being on duty and laid-off state, such as in reader before read work card, the job card The working condition of work number mark identification code be to be on duty state, then after reader reads the job card, PLC controller is by the work The working condition for making the work number identification code blocked is switched to laid-off state, which is extended to card reading next time.
If work post is serviceman, and in the state that is on duty, then whether out of service detects faulty equipment;If inspection Survey result be it is yes, then lock faulty equipment,
If testing result be it is no, issue warning not out of service and then lock failure after faulty equipment is out of service Equipment.
If work post serviceman, and in the state of being laid off, then the equipment of locking is unlocked.
In embodiments of the present invention, if work post is equipment operation work, and in the state that is on duty, then it is directed to unlocked equipment Carry out start-up operation;
If work post is equipment operation work, and in the state of being laid off, then detects whether unlocked equipment is in stoppage in transit state, If testing result be it is no, issue warning not out of service.
Electronic hang tag system and electronic hang tag method provided by the invention has the following beneficial effects:
1. on display in simultaneous display workshop each equipment operating status, the switching of equipment running status is updated on year-on-year basis Display solves the problems, such as that the replacement of irony device name board is not in time in dislodging operation board mode;
2. controller locks maintenance of equipment when equipment is when carrying out breakdown maintenance, equipment operation work cannot be to setting It is standby to be operated, it ensure that equipment and the safety of serviceman.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (5)

1. a kind of electronic hang tag system, which is characterized in that the system comprises:
The electric machine controller of card reader set on workshop, card reader and PLC controller communication connection, PLC controller and equipment and Display communication connection;
The identification code read is sent to PLC controller for the identification code on read work card by card reader;
When serviceman is on duty, PLC controller locks faulty equipment out of service, when serviceman is laid off When, the equipment of locking is unlocked;
Display, the operating status of each equipment of real-time display, comprising: in operation, out of service, breakdown maintenance.
2. a kind of electronic hang tag method based on electronic hang tag system described in claim 1, which is characterized in that the method includes Following steps:
PLC controller switches the working condition of identification code, and the corresponding work post of job card is identified based on identification code;
If work post is serviceman, and in the state that is on duty, then whether out of service faulty equipment is detected, if detection is tied Fruit be it is yes, then lock faulty equipment;
If work post serviceman, and in the state of being laid off, then the equipment of locking is unlocked.
3. electronic hang tag method as claimed in claim 2, which is characterized in that faulty equipment is not out of service, then issues and do not stop Only operation warning locks faulty equipment after faulty equipment is out of service.
4. electronic hang tag method as claimed in claim 2 or claim 3, which is characterized in that if work post is equipment operation work, and in upper Hilllock state then carries out start-up operation for unlocked equipment;
If work post is equipment operation work, and in the state of being laid off, then detects whether unlocked equipment is in stoppage in transit state, if inspection Survey result be it is no, then issue warning not out of service.
5. electronic hang tag method as claimed in claim 2, which is characterized in that identify the corresponding work of job card based on identification code Kind specifically comprises the following steps:
Read the numerical value on identification code middle finger fixed number position;
Base specifies the numerical value in numerical digit come to determine work post, the work post include: serviceman and equipment operation work.
CN201811046523.4A 2018-09-08 2018-09-08 A kind of electronic hang tag system and electronic hang tag method Pending CN109164752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811046523.4A CN109164752A (en) 2018-09-08 2018-09-08 A kind of electronic hang tag system and electronic hang tag method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811046523.4A CN109164752A (en) 2018-09-08 2018-09-08 A kind of electronic hang tag system and electronic hang tag method

Publications (1)

Publication Number Publication Date
CN109164752A true CN109164752A (en) 2019-01-08

Family

ID=64894360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811046523.4A Pending CN109164752A (en) 2018-09-08 2018-09-08 A kind of electronic hang tag system and electronic hang tag method

Country Status (1)

Country Link
CN (1) CN109164752A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104281127A (en) * 2014-09-16 2015-01-14 鞍山市海汇自动化有限公司 Intelligent operation board hanging plate system and use method
CN105279419A (en) * 2014-07-12 2016-01-27 鞍钢股份有限公司 Intrinsic safety type electronic operation plate system
KR20160112085A (en) * 2015-03-17 2016-09-28 엔텍월드(주) The Local Control Panel With Function of locking Circuit Breaker Switch
CN106611452A (en) * 2015-10-23 2017-05-03 珠海优特电力科技股份有限公司 Maintenance isolation latching system and method
CN107895218A (en) * 2017-09-28 2018-04-10 浙江盛达物联科技股份有限公司 Personnel and equipment management system in bearing manufacture process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105279419A (en) * 2014-07-12 2016-01-27 鞍钢股份有限公司 Intrinsic safety type electronic operation plate system
CN104281127A (en) * 2014-09-16 2015-01-14 鞍山市海汇自动化有限公司 Intelligent operation board hanging plate system and use method
KR20160112085A (en) * 2015-03-17 2016-09-28 엔텍월드(주) The Local Control Panel With Function of locking Circuit Breaker Switch
CN106611452A (en) * 2015-10-23 2017-05-03 珠海优特电力科技股份有限公司 Maintenance isolation latching system and method
CN107895218A (en) * 2017-09-28 2018-04-10 浙江盛达物联科技股份有限公司 Personnel and equipment management system in bearing manufacture process

Similar Documents

Publication Publication Date Title
US9111466B2 (en) Efficient access to connectivity information using cable identification
CN101789596B (en) Automatic detection method of power grid failure
CN106470929B (en) Maintenance system for lift facility
CN105303713A (en) Key management box
CN104038373A (en) Information early warning and self repairing system and method
CN102130508A (en) Wireless network-based substation grounding wire intelligent management system
CN108320235A (en) A kind of management system for monitoring
CN204256483U (en) A kind of textile manufacturing automated management system
CN203707645U (en) Temporary grounding wire hanging information monitoring device in substation operation site
CN105872065A (en) Real-time monitoring method and device and monitoring cloud platform
CN104346869A (en) Status early warning method and status early warning device for TAM (Technology Acceptance Model) equipment
CN109164752A (en) A kind of electronic hang tag system and electronic hang tag method
CN204835312U (en) Earth connection intelligent management system
CN208538175U (en) A kind of flow management and control system of work ticket
CN106464356A (en) Method, device and system for detecting rogue optical network unit
CN109447195A (en) A kind of method for inspecting based on 3-D scanning
CN106652528B (en) A kind of microcosmic traffic signal control data quality determining method and system
CN110675540B (en) Lock management method and device for equipment maintenance and intelligent electronic lock
CN116960753A (en) Electric power screen cabinet
CN205486197U (en) Authority distributed laboratory management system based on RFID recognition technology
CN105279537A (en) System and method for detecting hanging of ground wires for transformer station
CN201975861U (en) Wireless-network-based intelligent management system for grounding wire of transformer station
CN104038387B (en) Line detecting method on frame-type switch business board
CN208043973U (en) Alternating current-direct current mixed running surveys note alarm device in DC circuit system
CN201946856U (en) Network cable jumper based on RFID

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190108