CN105117984A - Data analysis-based power grid lean management system - Google Patents

Data analysis-based power grid lean management system Download PDF

Info

Publication number
CN105117984A
CN105117984A CN201510564680.4A CN201510564680A CN105117984A CN 105117984 A CN105117984 A CN 105117984A CN 201510564680 A CN201510564680 A CN 201510564680A CN 105117984 A CN105117984 A CN 105117984A
Authority
CN
China
Prior art keywords
data
analysis
module
equipment
power equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510564680.4A
Other languages
Chinese (zh)
Other versions
CN105117984B (en
Inventor
王文林
唐龙江
李阅
程金松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510564680.4A priority Critical patent/CN105117984B/en
Publication of CN105117984A publication Critical patent/CN105117984A/en
Application granted granted Critical
Publication of CN105117984B publication Critical patent/CN105117984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a data analysis-based power grid lean management system. The data analysis-based power grid lean management system includes power equipment, a data acquisition module matched with the power equipment, a distributed database connected with the data acquisition module, a data calculation and analysis module connected with the distributed database, an output control module connected with the distributed database and the data calculation and analysis module, and a mobile terminal connected with the output control module. With the data analysis-based power grid lean management system adopted, the problems of imperfection and irrationality of an existing power grid equipment operation management system can be solved. The data analysis-based power grid lean management system has the advantages of simple structure and easiness in implementation, and can be widely applied to the power grid equipment operation management system field.

Description

A kind of based on the electrical network lean management system under data analysis
Technical field
The present invention relates to grid equipment operation field, particularly relate to a kind of based on the electrical network lean management system under data analysis.
Background technology
Along with the deployment that State Grid Corporation of China's " three collection five are large " works, the construction of schedule information system is gradually improved, and makes to propose higher requirement to the analysis of grid equipment operation situation.But by the restriction that the Technical Architecture of its original application system and data store, cannot realize the various analytical models of electrical network or analysis result barely satisfactory.This just forces us to need to run new thinking, new technology, start with from the specification to electric network data assets, standard, quality and safety, utilize the advanced technology such as data mining, data analysis, build model of analyzing and researching flexibly, accurately and efficiently, thus realize studying the analysis and assessment of electrical network all devices operation situation.But these work are extremely loaded down with trivial details and complicated processes, need to carry out demonstration repeatedly in each business and sport technique segment.Therefore, we need to carry out research demonstration in the early stage of system Construction to its realize target, have ensured carrying out smoothly of later stage system Construction.
, summary of the invention
The object of this invention is to provide a kind of based on the electrical network lean management system under data analysis, solve perfect not, the rational problem of existing grid equipment operation management system.
The technical solution adopted for the present invention to solve the technical problems is: a kind of based on the electrical network lean management system under data analysis, comprise power equipment, with the data acquisition module that power equipment is suitable, the distributed data base be connected with data acquisition module, the data computation analysis module be connected with distributed data base, with the output control module that distributed data base, data computation analysis module are connected, and the mobile terminal that output control module connects;
Data acquisition module comprises grid topology data acquisition system, the equipment information collection device be connected with power equipment, and with the real-time video monitoring equipment that power equipment is suitable, device is dialled in the fault record be connected on power equipment; Equipment information collection device is used for the open and close signal of the current value of Real-time Collection power equipment, magnitude of voltage and power equipment switch, and is transferred to distributed data base; Real-time video monitoring equipment is used for real-time monitoring electrical equipment, and will form video data real-time Transmission to distributed data base; Grid topology data acquisition system is used for the grid topology data in pickup area, and sends to distributed data base; Fault wave recording device, the data of power equipment electric parameters and state change process information before and after occurring for record trouble, and data are sent to distributed data base in real time;
Data computation analysis module for reading the data in distributed data base, and carries out real-time or calculated off-line analysis;
Output control module is for reading the data in the Calculation results of data computation analysis module and distributed data base;
Mobile terminal for receive output control module export data, simultaneously by about power equipment dispatching log, scheduling operation recording input distributed data base in.
Preferably, data acquisition module comprises the large data extraction tool, traditional E TL instrument and the ESB ESB that increase income.
Preferably, data computation analysis module comprises power grid security analysis and assessment module in equipment general level of the health analysis module, voltage control approach analysis module, scheduling disciplines fractional analysis module and region.
Equipment general level of the health analysis module is used for carrying out in real time or calculated off-line analysis the section load factor of switch uncharged time of the reason of the switch of power equipment point position, power equipment, power equipment, electrical equipment fault rate, relay protection device state and maintenance reason by reading the data in distributed data base, and analysis result is transferred to output control module;
Voltage control approach analysis module is for reading current value and the magnitude of voltage of the power equipment in distributed data base, and based on same time end face, under different dimensions, realize carrying out in real time or calculated off-line analysis electrical network 10kV in region and above busbar voltage, voltage fluctuation, idle input/margin capacity, statistics voltage change ratio, and send to output control module to carry out alarm record;
Scheduling disciplines fractional analysis module is used for by the dispatching log of reading in distributed data base, scheduling operation recording, video data, carry out in real time or calculated off-line analysis dispatching order contents norm degree, operation order and repair ticket implementation status qualification rate, plan and actual execution time deviation, implementation status delay reason, the service arrangement of power equipment, power failure plan, and Calculation results is sent to output control module;
The power grid security analysis and assessment module information read in distributed data base in region, to power grid heavy-load or transship out-of-limit element, operation of power networks state, electrical network N-1 scan fault, circuit or main transformer load factor and can transmission capacity, in region network load rate, mains supply ability, grid supply quality, mains supply reliability, reactive compensation capacity sensitivity carry out in real time or calculated off-line analysis, and analysis result sent to output control module.
Beneficial effect of the present invention: solve the restriction because the Technical Architecture of traditional application system, data storage, data management, analysis module imperfection bring, the standardized management of research electric network data assets, build flexible, accurate and efficient computation analysis module, thus the transformation realized from " passive type discovery " to the service management pattern of " active analysis ", for management and running and operations staff provide abundant analysis means, simultaneously for the aid decision making of operating personnel provides feature richness, grid equipment operation management system rational in infrastructure.
Below with reference to drawings and Examples, the present invention is described in detail.
Accompanying drawing explanation
Fig. 1 is structured flowchart of the present invention.
Embodiment
Embodiment, as shown in Figure 1 a kind of based on the electrical network lean management system under data analysis, comprise power equipment 1, with the data acquisition module 2 that power equipment 1 is suitable, the distributed data base 3 be connected with data acquisition module 2, the data computation analysis module 4 be connected with distributed data base 3, with the output control module 5 that distributed data base 3, data computation analysis module 4 are connected, and the mobile terminal 6 that output control module 5 connects;
Data acquisition module 2 comprises grid topology data acquisition system 7, the equipment information collection device 8 be connected with power equipment 1, and with the real-time video monitoring equipment 9 that power equipment 1 is suitable, device 10 is dialled in the fault record be connected on power equipment 1; Equipment information collection device 8 for the open and close signal of the current value of Real-time Collection power equipment 1, magnitude of voltage and power equipment switch, and is transferred to distributed data base 3; Real-time video monitoring equipment 9 for real-time monitoring electrical equipment 1, and by formed video data real-time Transmission to distributed data base 3; Grid topology data acquisition system 7 for the grid topology data in pickup area, and sends to distributed data base 3; The data of power equipment 1 electric parameters and state change process information before and after fault wave recording device 10 occurs for record trouble, and data are sent to distributed data base 3 in real time;
Data computation analysis module 4 for reading the data in distributed data base 3, and carries out real-time or calculated off-line analysis;
Output control module 5 is for reading the data in the Calculation results of data computation analysis module 4 and distributed data base 3;
Mobile terminal 6 for receive output control module 5 export data, simultaneously by about power equipment 1 dispatching log, scheduling operation recording input distributed data base 3 in.
Data acquisition module 1 is provided with the large data extraction tool, traditional E TL instrument and the ESB ESB that increase income.
Data computation analysis module 4 comprises power grid security analysis and assessment module 14 in equipment general level of the health analysis module 11, voltage control approach analysis module 12, scheduling disciplines fractional analysis module 13 and region;
All power equipments for area power grid carry out health assessment and research and analyse, and carry out considering of various dimensions, thus set up the analytical model of area power grid equipment health assessment, provide data supporting to the fine-grained management of regional grid equipment by several aspect.Equipment general level of the health analysis module 11 is for the data by reading in distributed data base 3; the section load factor of switch uncharged time of the reason of the switch point position of power equipment 1, power equipment 1, power equipment 1, power equipment 1 failure rate, relay protection device state and maintenance reason are carried out in real time or calculated off-line analysis, and analysis result is transferred to output control module 5.
Voltage control approach analysis module 12 is for reading current value and the magnitude of voltage of the power equipment 1 in distributed data base, and based on same time end face, under different dimensions (as region, electric pressure etc.), realize carrying out in real time or calculated off-line analysis electrical network 10kV in region and above busbar voltage, voltage fluctuation, idle input/margin capacity, statistics voltage change ratio, and send to output control module 5 to carry out alarm record.
According to the code requirement of scheduling operation process, need to use necessary technological means, text conversion is carried out to whole scheduling operation recording, data analysis can be carried out to the standard term of operation order content, personnel, word and the tone, find out problem in operating process, thus the quantitative analysis realized standardization professional skill and examination, improve the overall professional skill of management and running personnel.Scheduling disciplines fractional analysis module 13 is for by reading dispatching log in distributed data base 3, scheduling operation recording, video data, carry out in real time or calculated off-line analysis dispatching order contents norm degree, operation order and repair ticket implementation status qualification rate, plan and actual execution time deviation, implementation status delay reason, the service arrangement of power equipment 2, power failure plan, and Calculation results is sent to output control module 5.
Along with the growing interest to power grid security, need to build various power grid security analysis and assessment model, to enrich analysis and assessment means, find out common problem, auxiliary strategy is provided to analysis result, thus Improvement and perfection is carried out targetedly in management, improve the ladder of management of scheduling decision personnel and operations staff.Power grid security analysis and assessment module 14 data message read in distributed data base 3 in region, to power grid heavy-load or transship out-of-limit element, operation of power networks state, electrical network N-1 scan fault, circuit or main transformer load factor and can transmission capacity, in region network load rate, mains supply ability, grid supply quality, mains supply reliability, reactive compensation capacity sensitivity carry out in real time or calculated off-line analysis, and analysis result sent to output control module 5.

Claims (3)

1. one kind based on the electrical network lean management system under data analysis, it is characterized in that: comprise power equipment (1), with the data acquisition module (2) that power equipment (1) is suitable, the distributed data base (3) be connected with data acquisition module (2), the data computation analysis module (4) be connected with distributed data base (3), with the output control module (5) that distributed data base (3), data computation analysis module (4) are connected, and the mobile terminal (6) that output control module (5) connects;
Data acquisition module (2) comprises grid topology data acquisition system (7), the equipment information collection device (8) be connected with power equipment (1), with the real-time video monitoring equipment (9) that power equipment (1) is suitable, device (10) is dialled in the fault record be connected on power equipment (1); Equipment information collection device (8) for the open and close signal of the current value of Real-time Collection power equipment (1), magnitude of voltage and power equipment switch, and is transferred to distributed data base (3); Real-time video monitoring equipment (9) for real-time monitoring electrical equipment (1), and by formed video data real-time Transmission to distributed data base (3); Grid topology data acquisition system (7) for the grid topology data in pickup area, and sends to distributed data base (3); The data of power equipment (1) electric parameters and state change process information before and after fault wave recording device (10) occurs for record trouble, and data are sent in real time distributed data base (3);
Data computation analysis module (4) for reading the data in distributed data base (3), and carries out real-time or calculated off-line analysis;
Output control module (5) is for reading the data in the Calculation results of data computation analysis module (4) and distributed data base (3);
The data that mobile terminal (6) exports for receiving output control module (5), simultaneously will about in the dispatching log of power equipment (1), scheduling operation recording input distributed data base (3).
2. according to claim 1 based on the electrical network lean management system under data analysis, it is characterized in that: data acquisition module (1) is provided with the large data extraction tool, traditional E TL instrument and the ESB ESB that increase income.
3. according to claim 1 and 2 based on the electrical network lean management system under data analysis, it is characterized in that: data computation analysis module (4) comprises power grid security analysis and assessment module (14) in equipment general level of the health analysis module (11), voltage control approach analysis module (12), scheduling disciplines fractional analysis module (13) and region;
Equipment general level of the health analysis module (11) is for the data by reading in distributed data base (3), the section load factor of switch uncharged time of the reason of the switch point position of power equipment (1), power equipment (1), power equipment (1), electrical equipment fault rate, relay protection device state and maintenance reason are carried out in real time or calculated off-line analysis, and analysis result is transferred to output control module (5);
Voltage control approach analysis module (12) is for reading current value and the magnitude of voltage of the power equipment (1) in distributed data base, and based on same time end face, under different dimensions, realize carrying out in real time or calculated off-line analysis electrical network 10kV in region and above busbar voltage, voltage fluctuation, idle input/margin capacity, statistics voltage change ratio, and send to output control module (5) to carry out alarm record;
Scheduling disciplines fractional analysis module (13) is for by reading dispatching log in distributed data base (3), scheduling operation recording, video data, ordering to scheduling, contents norm degree, operation order and repair ticket implementation status qualification rate, plan and actual execution time deviation, implementation status postpone reason, the service arrangement of power equipment (2), power failure plan carry out in real time or calculated off-line analysis, and Calculation results sent to output control module (5);
Power grid security analysis and assessment module (14) data message read in distributed data base (3) in region, to power grid heavy-load or transship out-of-limit element, operation of power networks state, electrical network N-1 scan fault, circuit or main transformer load factor and can transmission capacity, in region network load rate, mains supply ability, grid supply quality, mains supply reliability, reactive compensation capacity sensitivity carry out in real time or calculated off-line analysis, and analysis result sent to output control module (5).
CN201510564680.4A 2015-09-07 2015-09-07 A kind of power grid lean management system based under data analysis Active CN105117984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510564680.4A CN105117984B (en) 2015-09-07 2015-09-07 A kind of power grid lean management system based under data analysis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510564680.4A CN105117984B (en) 2015-09-07 2015-09-07 A kind of power grid lean management system based under data analysis

Publications (2)

Publication Number Publication Date
CN105117984A true CN105117984A (en) 2015-12-02
CN105117984B CN105117984B (en) 2018-08-31

Family

ID=54665959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510564680.4A Active CN105117984B (en) 2015-09-07 2015-09-07 A kind of power grid lean management system based under data analysis

Country Status (1)

Country Link
CN (1) CN105117984B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105760429A (en) * 2016-01-29 2016-07-13 厦门亿力吉奥信息科技有限公司 Power grid equipment data check method and system thereof
CN105891677A (en) * 2016-04-12 2016-08-24 国网浙江杭州市富阳区供电公司 Power grid fault detection system based on power grid big data quality standardization
CN106909598A (en) * 2016-07-01 2017-06-30 阿里巴巴集团控股有限公司 It is a kind of to ensure processing method, the apparatus and system for calculating data consistency
CN108109075A (en) * 2017-12-04 2018-06-01 广东电网有限责任公司电力科学研究院 A kind of off-line calculation platform based on distributed computing technology
CN111259009A (en) * 2020-01-13 2020-06-09 深圳维格智数科技有限公司 Flexible multidimensional database type cloud dimension table processing method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202888962U (en) * 2012-09-29 2013-04-17 上海市电力公司 Intelligentized unified management system for electric power video monitoring
CN103383769A (en) * 2012-05-04 2013-11-06 山西省电力公司阳泉供电公司 Grid fault hidden danger management analytical method and system
CN204231561U (en) * 2014-12-09 2015-03-25 国家电网公司 Based on the power network video monitoring intelligent analyzing and alarming system of regulation and control integration
CN104753178A (en) * 2015-04-16 2015-07-01 河南行知专利服务有限公司 Power grid fault handling system
CN104751305A (en) * 2015-04-28 2015-07-01 国网上海市电力公司 Trouble analysis and repair-based intelligent interaction system and control method thereof
CN204557562U (en) * 2015-04-28 2015-08-12 德州职业技术学院 Distribution network information management system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103383769A (en) * 2012-05-04 2013-11-06 山西省电力公司阳泉供电公司 Grid fault hidden danger management analytical method and system
CN202888962U (en) * 2012-09-29 2013-04-17 上海市电力公司 Intelligentized unified management system for electric power video monitoring
CN204231561U (en) * 2014-12-09 2015-03-25 国家电网公司 Based on the power network video monitoring intelligent analyzing and alarming system of regulation and control integration
CN104753178A (en) * 2015-04-16 2015-07-01 河南行知专利服务有限公司 Power grid fault handling system
CN104751305A (en) * 2015-04-28 2015-07-01 国网上海市电力公司 Trouble analysis and repair-based intelligent interaction system and control method thereof
CN204557562U (en) * 2015-04-28 2015-08-12 德州职业技术学院 Distribution network information management system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
叶水勇 等: "智能故障监测终端系统的架构及功能", 《电力与能源》 *
唐龙江 等: "黄山供电公司台区线损精细化管理系统", 《电力信息化》 *
王金丽 等: "中低压配电网统一数据采集与监控系统设计和实现", 《电力系统自动化》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105760429A (en) * 2016-01-29 2016-07-13 厦门亿力吉奥信息科技有限公司 Power grid equipment data check method and system thereof
CN105760429B (en) * 2016-01-29 2019-02-26 厦门亿力吉奥信息科技有限公司 Grid equipment data verification method and its system
CN105891677A (en) * 2016-04-12 2016-08-24 国网浙江杭州市富阳区供电公司 Power grid fault detection system based on power grid big data quality standardization
CN106909598A (en) * 2016-07-01 2017-06-30 阿里巴巴集团控股有限公司 It is a kind of to ensure processing method, the apparatus and system for calculating data consistency
CN108109075A (en) * 2017-12-04 2018-06-01 广东电网有限责任公司电力科学研究院 A kind of off-line calculation platform based on distributed computing technology
CN111259009A (en) * 2020-01-13 2020-06-09 深圳维格智数科技有限公司 Flexible multidimensional database type cloud dimension table processing method and system

Also Published As

Publication number Publication date
CN105117984B (en) 2018-08-31

Similar Documents

Publication Publication Date Title
CN106971351B (en) The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN105117984A (en) Data analysis-based power grid lean management system
CN108767851B (en) Intelligent operation command method and system for operation and maintenance of transformer substation
CN105022874A (en) Digital simulation automatic modeling method and system for power distribution network
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN104933631A (en) Power distribution network operation online analysis and evaluation system
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN103683511A (en) Method and system for processing fault of integrated monitoring platform based on power distribution network
CN109949178B (en) Method for judging and complementing power failure event of medium-voltage distribution network based on support vector machine
CN110401692A (en) A kind of automatic Acceptance Test System of supervisory control of substation information integral and method
CN108054719B (en) Intelligent substation networked secondary circuit modeling method and fault diagnosis method
CN103905275A (en) Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN104360835A (en) Automatic sequential control operation ticket generation method based on topologic mode
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN106094495B (en) The test method of intelligent electronic equipment of transformer substation timing tracking accuracy and punctual precision
CN102707195A (en) Oscilloscope fault analysis platform and establishment method thereof
CN113344364B (en) Power failure plan risk analysis method and device, electronic equipment and storage medium
CN112713594B (en) Micro-grid simulation control system
CN104112183B (en) The intelligent scheduling model management system and management method of intelligent substation plug and play
CN103279520A (en) Power substation secondary system failure reconnaissance method
CN105072056A (en) Switch automatic inspection system and inspection method thereof
CN111062825A (en) Low-voltage fault diagnosis and rapid power restoration method based on mobile App
CN104483564A (en) Recording device and recording method for fault data of power measuring automatic terminal
CN111062191A (en) Operation ticket generation method and device for power grid
CN112256922B (en) Method and system for quickly identifying faults and power failure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 245000 No. 55 East Mount Huangshan Road, Tunxi District, Anhui, Huangshan City

Co-patentee after: State Grid Corporation

Patentee after: Huangshan Power Supply Company of State Grid Anhui Electric Power Company

Address before: 100032 No. 86, Xicheng District, Beijing, Chang'an Avenue

Co-patentee before: Huangshan Power Supply Company of State Grid Anhui Electric Power Company

Patentee before: State Grid Corporation

CP03 Change of name, title or address