CN109709919A CN201811609332.4A CN201811609332A CN109709919A CN 109709919 A CN109709919 A CN 109709919A CN 201811609332 A CN201811609332 A CN 201811609332A CN 109709919 A CN109709919 A CN 109709919A
Authority
CN
China
Prior art keywords
data
module
sewage plant
plant area
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811609332.4A
Other languages
Chinese (zh)
Inventor
童飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quyang Sewage Treatment Plant Shanghai Chengdu Sewage Treatment Co Ltd
Original Assignee
Quyang Sewage Treatment Plant Shanghai Chengdu Sewage Treatment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quyang Sewage Treatment Plant Shanghai Chengdu Sewage Treatment Co Ltd filed Critical Quyang Sewage Treatment Plant Shanghai Chengdu Sewage Treatment Co Ltd
Priority to CN201811609332.4A priority Critical patent/CN109709919A/en
Publication of CN109709919A publication Critical patent/CN109709919A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention discloses a kind of sewage plant area operation management systems, it include: data Registration Module, data acquisition module, data processing module, Data Integration module, emergency preplan generation module, data processing module judges whether equipment is abnormal according to data comparison result for being compared the data data corresponding with data collecting module collected that data Registration Module records;Data Integration module is used for when data processing module judges that instrumented data is abnormal, and integrates failure and the faulty meter acquired for a period of time after occurring for the previous period with failure and faulty equipment data occur;Emergency preplan generation module is used to generate solution according to the module integrated data information of Data Integration.Using sewage plant area operation management system of the invention, have the advantages that improve sewage plant area equipment and instrument monitoring reliability.

Description

A kind of sewage plant area operation management system
Technical field
The present invention relates to technical field of sewage, more particularly to a kind of sewage plant area operation management system.
Background technique
Sewage treatment plant is instructed according to Central Control Room to inlet pumping station, drum by automatically-monitored software monitors production run The equipment such as blower, dehydration machine room are controlled, and in equipment running process parameters and historical data it is total by scene Line reaches in server.The production of sewage plant, machinery, electrical, instrument, PLC device are many kinds of, maintenance and maintenance to equipment It is more demanding.
Currently, that there are life cycles is longer for the equipment of sewage treatment plant's operation, equipment use for a long time will appear failure etc. Problem.Instrument and equipment are monitored only by Automatic monitoring systems, reliability and validity are lower.
Summary of the invention
The object of the present invention is to provide a kind of sewage plant area operation management systems, have and improve sewage plant area equipment and instrument The advantages of monitoring reliability.
To achieve the above object, the present invention provides following schemes:
A kind of sewage plant area operation management system, comprising:
Data Registration Module, the device data and instrumented data made an inventory when making an inspection tour sewage plant area for recording;
Data acquisition module, for obtaining the sewage plant area device data and instrumented data of data acquisition device acquisition;
Data processing module, the device data for recording the data Registration Module are adopted with the data acquisition module The corresponding device data of collection is compared, and judges whether equipment is abnormal according to device data comparison result;Being also used to will The instrumented data instrumented data corresponding with the data collecting module collected of the data Registration Module record is compared, Judge whether instrument is abnormal according to instrumented data comparison result;
Data Integration module, for integrating failure when the data processing module judges that instrumented data is abnormal The faulty meter data acquired for a period of time after occurring for the previous period with failure occur, while integrating failure instrument when failure occurs The correlate meter data of process section where table;It is also used to when the data processing module judges that device data is abnormal, It integrates failure and the faulty equipment data acquired for a period of time after occurring for the previous period with failure occurs;
Emergency preplan generation module, for generating solution according to the module integrated data information of the Data Integration.
Optionally, the equipment and instrumented data that the data Registration Module is made an inventory, comprising: water quality meter data cross the gift of money for a friend going on a journey Table data, sewage plant equipment operating data, equipment electricity consumption data and maintenance of equipment data;
The sewage plant area equipment and instrumented data of the data collecting module collected, comprising: water quality meter data cross the gift of money for a friend going on a journey Table data and sewage plant equipment operating data.
Optionally, the water quality meter data include: total into water COD, water inlet pH value, water inlet total phosphorus, water inlet Nitrogen, water outlet COD, water outlet total phosphorus, water outlet total nitrogen, water outlet ammonia nitrogen and water outlet suspended solid;
The process instrument data include: reaction tank dissolved oxygen, reaction tank mixed genetic-neural network, disengaging water flow Count value and liquid level count value;
The sewage plant equipment operating data includes: air blower and intake pump startup-shutdown state and running current, voltage;
The equipment electricity consumption data include: high-voltage metering cubicle electricity and photovoltaic metering cabinet electricity.
Optionally, the emergency preplan generation module, comprising:
Technique adjustment information generating unit, for being occurred for the previous period according to the module integrated failure of the Data Integration The water quality meter data or process instrument data of the failure acquired for a period of time after occurring with failure and the Data Integration mould The water quality meter data of failure or the correlate meter data of process instrument place process section, generate instrument when the failure of block integration occurs Table technique adjustment information;
In-situ processing information generating unit, for being occurred for the previous period according to the module integrated failure of the Data Integration The air blower and water inlet Pump data of the failure acquired for a period of time after occurring with failure, generate in-situ processing information.
Optionally, sewage plant area operation management system, further includes:
Alarm module, the solution for being generated according to the emergency preplan generation module is sent to administrative department alarms Information.
Optionally, PLC control system controls the data acquisition device automatic collection.
Optionally, sewage plant area operation management system, further includes:
Polling module, for generating inspection scheme according to the action of patrol officer.
Optionally, the action of the patrol officer, comprising: the number of the equipment and instrument made an inventory when making an inspection tour sewage plant area According to.
Compared with prior art, the beneficial effects of the present invention are:
The present invention provides a kind of sewage plant area operation management system, data processing module is recorded according to data Registration Module Data and the data of data collecting module collected be compared, judge whether equipment and instrumentation is abnormal, it is different for occurring Normal equipment and instrument integrates failure and the faulty meter acquired for a period of time after occurring for the previous period with failure and equipment occurs Data, emergency preplan generation module generates solution according to the module integrated data information of Data Integration, have improve it is dirty The advantages of water factory's area's equipment and instrument monitoring reliability.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is sewage plant area operation management system structural relation figure in the embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of sewage plant area operation management systems, have and improve sewage plant area equipment and instrument The advantages of monitoring reliability.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
Fig. 1 is sewage plant area operation management system structural relation figure in the embodiment of the present invention, as shown in Figure 1, the present invention mentions The sewage plant area operation management system of confession, comprising:
A kind of sewage plant area operation management system characterized by comprising data Registration Module 1, data acquisition module 2, Data processing module 3, Data Integration module 4, emergency preplan generation module 5, alarm module 6 and polling module 7.
Data Registration Module 1 is used to record the device data and instrumented data made an inventory when making an inspection tour sewage plant area, comprising: water quality Instrumented data, process instrument data, sewage plant equipment operating data, equipment electricity consumption data and maintenance of equipment data.Data are adopted Collect module 2, for obtaining the sewage plant area device data and instrumented data of data acquisition device acquisition, comprising: water quality meter number According to, process instrument data and sewage plant equipment operating data, PLC control system controls data acquisition device automatic collection.
Water quality meter data include: into water COD, water inlet pH value, water inlet total phosphorus, water inlet total nitrogen, go out water chemistry need Oxygen amount, water outlet total phosphorus, water outlet total nitrogen, water outlet ammonia nitrogen and water outlet suspended solid.Process instrument data include: reaction tank dissolved oxygen, Reaction tank mixed genetic-neural network, disengaging water ga(u)ge numerical value and liquid level count value.Sewage plant equipment operating data includes: Air blower and intake pump startup-shutdown state and running current, voltage, frequency converter setting value and value of feedback, air blower guide vane opening, Oil temperature.Equipment electricity consumption data include: high-voltage metering cubicle electricity and photovoltaic metering cabinet electricity.The maintenance, repair state of equipment and Various operation notes carry out log-on operation by data Registration Module 1 by operation maintenance personnel in maintenance process.
Data processing module 3, device data and the data acquisition module for recording the data Registration Module The corresponding device data of acquisition is compared, and judges whether equipment is abnormal according to device data comparison result;It is also used to The instrumented data instrumented data corresponding with the data collecting module collected that the data Registration Module records is compared Compared with judging whether instrument is abnormal according to instrumented data comparison result.
Data Integration module 4, for integrating event when the data processing module 3 judges that instrumented data is abnormal The faulty meter data acquired for a period of time after occurring for the previous period with failure occur for barrier, while integrating failure when failure occurs The correlate meter data of process section where instrument;It is also used to judge that device data is abnormal in the data processing module When, it integrates failure and the faulty equipment data acquired for a period of time after occurring for the previous period with failure occurs.For example, when going out aquation When learning oxygen demand and occurring 0, first determine whether the water outlet ammonia nitrogen in same acquisition link road and water outlet total nitrogen etc. data whether be also 0, the terminal of acquisition link is detected if it is 0, further judges that the instrument operating status of COD is if not for 0 It is no in the maintenances state such as maintaining or repairing, do not handled first temporarily if in maintenance state, if being not at maintenance state Then start corresponding process, notice maintenance unit is handled.
Emergency preplan generation module 5, the data information for being integrated according to the Data Integration module 4 generate solution party Case.Emergency preplan generation module 5 includes: technique adjustment information generating unit and in-situ processing information generating unit.Technique adjustment Information generating unit, the failure for being integrated according to the Data Integration module 4 occur to occur with failure for the previous period latter The failure that the water quality meter data or process instrument data and Data Integration module 4 of the failure of section time acquisition are integrated occurs When water quality meter data of the failure or correlate meter data of process section where process instrument, generate instrument technique adjustment information. In-situ processing information generating unit, the failure for being integrated according to Data Integration module 4 occur to occur with failure for the previous period The air blower of the failure of a period of time acquisition and water inlet Pump data generate in-situ processing information afterwards.For example, as worked as reaction tank process When instrument dissolved oxygen numerical value is lower than preset value, notice process management personnel carry out technique adjustment;When intake pump cannot normal start-stop When machine, first notifies in-plant equipment personnel to carry out live preliminary treatment, carried out if it can not handle by service unit in plant The processing of live investigation, still can not repair process in the case where, further coordinate equipment manufacturer's Site Service, carried out for personnel Subsequent operation provides guidance and help.
Alarm module 6, the solution for being generated according to emergency preplan generation module 5 send alarm signal to administrative department Breath.Polling module 7, for generating inspection scheme according to the action of patrol officer, the action of patrol officer includes patrolling Data depending on the equipment and instrument made an inventory when sewage plant area.
Sewage plant area operation management system of the invention increases on the basis of monitor automatically to instrument and equipment Data Registration Module record makes an inspection tour the device data and instrumented data made an inventory when sewage plant area, by the data and inspection of automatic collection The data of member's registration are compared, and are deposited and are issued alarm when abnormal, can be improved the reliability of sewage plant area data acquisition and have Effect property.In addition, increasing emergency preplan generation module, realizes that emergency measure is remotely sent, can satisfy equipment fault and data are different The demand of normal overhaul plan personnel and the timely and effective communication of monitoring system.
Used herein a specific example illustrates the principle and implementation of the invention, and above embodiments are said It is bright to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, foundation Thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification is not It is interpreted as limitation of the present invention.

Claims (8)

1. a kind of sewage plant area operation management system characterized by comprising
Data Registration Module, the device data and instrumented data made an inventory when making an inspection tour sewage plant area for recording;
Data acquisition module, for obtaining the sewage plant area device data and instrumented data of data acquisition device acquisition;
Data processing module, device data and the data collecting module collected for recording the data Registration Module Corresponding device data is compared, and judges whether equipment is abnormal according to device data comparison result;Being also used to will be described The instrumented data instrumented data corresponding with the data collecting module collected of data Registration Module record is compared, according to Instrumented data comparison result judges whether instrument is abnormal;
Data Integration module, for integrating failure when the data processing module judges that instrumented data is abnormal The faulty meter data acquired for a period of time after occurring for the previous period with failure, while integrating faulty meter institute when failure occurs In the correlate meter data of process section;It is also used to when the data processing module judges that device data is abnormal, integrates The faulty equipment data acquired for a period of time after occurring for the previous period with failure occur for failure;
Emergency preplan generation module, for generating solution according to the module integrated data information of the Data Integration.
2. sewage plant area according to claim 1 operation management system, which is characterized in that
The equipment and instrumented data that the data Registration Module is made an inventory, comprising: water quality meter data, process instrument data, sewage Plant operation data, equipment electricity consumption data and maintenance of equipment data;
The sewage plant area equipment and instrumented data of the data collecting module collected, comprising: water quality meter data, process instrument number According to sewage plant equipment operating data.
3. sewage plant area according to claim 2 operation management system, which is characterized in that
The water quality meter data include: into water COD, water inlet pH value, water inlet total phosphorus, water inlet total nitrogen, go out water chemistry need Oxygen amount, water outlet total phosphorus, water outlet total nitrogen, water outlet ammonia nitrogen and water outlet suspended solid;
The process instrument data include: reaction tank dissolved oxygen, reaction tank mixed genetic-neural network, disengaging water ga(u)ge number Value and liquid level count value;
The sewage plant equipment operating data includes: air blower and intake pump startup-shutdown state and running current, voltage;
The equipment electricity consumption data include: high-voltage metering cubicle electricity and photovoltaic metering cabinet electricity.
4. sewage plant area according to claim 3 operation management system, which is characterized in that the emergency preplan generates mould Block, comprising:
Technique adjustment information generating unit, for according to the module integrated failure of the Data Integration occur for the previous period with therefore The water quality meter data or process instrument data of the failure that barrier acquires for a period of time after occurring and the Data Integration module are whole The water quality meter data of failure or the correlate meter data of process instrument place process section, generate instrument work when the failure of conjunction occurs Skill adjustment information;
In-situ processing information generating unit, for according to the module integrated failure of the Data Integration occur for the previous period with therefore The air blower and water inlet Pump data for the failure that barrier acquires for a period of time after occurring, generate in-situ processing information.
5. sewage plant area according to claim 1 operation management system, which is characterized in that sewage plant area operational management System, further includes:
Alarm module, the solution for being generated according to the emergency preplan generation module send alarm signal to administrative department Breath.
6. sewage plant area according to claim 1 operation management system, which is characterized in that described in PLC control system control Data acquisition device automatic collection.
7. sewage plant area according to claim 1 operation management system, which is characterized in that sewage plant area operational management System, further includes:
Polling module, for generating inspection scheme according to the action of patrol officer.
8. sewage plant area according to claim 7 operation management system, which is characterized in that in the work of the patrol officer Hold, comprising: the data of the equipment and instrument made an inventory when making an inspection tour sewage plant area.
CN201811609332.4A 2018-12-27 2018-12-27 A kind of sewage plant area operation management system Pending CN109709919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811609332.4A CN109709919A (en) 2018-12-27 2018-12-27 A kind of sewage plant area operation management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811609332.4A CN109709919A (en) 2018-12-27 2018-12-27 A kind of sewage plant area operation management system

Publications (1)

Publication Number Publication Date
CN109709919A true CN109709919A (en) 2019-05-03

Family

ID=66258609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811609332.4A Pending CN109709919A (en) 2018-12-27 2018-12-27 A kind of sewage plant area operation management system

Country Status (1)

Country Link
CN (1) CN109709919A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111847533A (en) * 2020-05-25 2020-10-30 安徽普偌森环保科技有限公司 Integrated domestic sewage treatment engineering management system
CN113666457A (en) * 2021-08-31 2021-11-19 重庆夏软科技有限公司 Water purification optimization system and method based on water quality monitoring

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050004313A (en) * 2003-06-27 2005-01-12 주식회사 동아산전 Central control system and method of daewoo nutrients removal vessels
CN103546536A (en) * 2013-08-28 2014-01-29 北京清控人居环境研究院有限公司 Internet of things system of sewage treatment plant
CN104914823A (en) * 2015-04-20 2015-09-16 上海城投污水处理有限公司石洞口污水处理厂 Operation and maintenance time efficiency management method facing sewage plant

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050004313A (en) * 2003-06-27 2005-01-12 주식회사 동아산전 Central control system and method of daewoo nutrients removal vessels
CN103546536A (en) * 2013-08-28 2014-01-29 北京清控人居环境研究院有限公司 Internet of things system of sewage treatment plant
CN104914823A (en) * 2015-04-20 2015-09-16 上海城投污水处理有限公司石洞口污水处理厂 Operation and maintenance time efficiency management method facing sewage plant

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
廖德志: "机电设备状态监测技术在污水处理厂的应用", 《建筑工程技术与设计》 *
高健源: "在线监测系统在污水处理的应用分析", 《建筑工程技术与设计》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111847533A (en) * 2020-05-25 2020-10-30 安徽普偌森环保科技有限公司 Integrated domestic sewage treatment engineering management system
CN113666457A (en) * 2021-08-31 2021-11-19 重庆夏软科技有限公司 Water purification optimization system and method based on water quality monitoring

Similar Documents

Publication Publication Date Title
CN107357243B (en) Sewage treatment system based on high in clouds data monitoring
CN105809255A (en) IoT-based heat-engine plantrotary machine health management method and system
US20110130982A1 (en) Monitoring System for Power Grid Distributed Power Generation Devices
CN110531656A (en) A kind of monitoring system and method for Hydropower Unit performance
CN110336379B (en) Transformer substation online monitoring system based on Internet of things and terminal equipment
CN103823433A (en) Method for realizing relay protection equipment on-line monitoring by use of communication process analysis
CN108010305B (en) Self-diagnosis method for data acquisition fault of integrated energy management platform
CN202886956U (en) Power-generator performance monitoring system based on similarity principle
CN109599948A (en) Power regulation integral system intelligent alarm method
CN109709919A (en) A kind of sewage plant area operation management system
CN108710099A (en) Capacitance type potential transformer monitoring alarm method and system
CN106972636A (en) A kind of intelligent grid detection platform based on cloud computing
CN109299797A (en) A kind of environmental protection equipment operating status online monitoring and management system and monitoring and managing method
CN208588936U (en) A kind of monitoring system in waste water processing
CN108732444A (en) Intelligent substation protects equipment running status apparatus for evaluating and maintenance decision method
CN110690699A (en) Transformer substation intelligent detection system based on ubiquitous power Internet of things
CN114781933A (en) Electromechanical device monitoring and management system and method
CN109581115B (en) Power distribution network low-voltage diagnosis system and diagnosis method
CN115049297A (en) Wisdom sewage factory operating system
CN103888300B (en) Network failure analysis system and method in Web service system
CN105932773B (en) A kind of intelligent charging electricity anti-theft system
CN204883304U (en) A environment thing networking systems that is used for river to gush quality of water administering control
CN114660412A (en) Electric energy quality monitoring system based on intelligent electric energy meter and monitoring method thereof
CN208314557U (en) Mobile terminal is used in power plant's maintenance
CN113848843A (en) Self-diagnosis analysis system based on intelligent optimization energy-saving system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503

RJ01 Rejection of invention patent application after publication