- CN109709919A CN109709919A CN201811609332.4A CN201811609332A CN109709919A CN 109709919 A CN109709919 A CN 109709919A CN 201811609332 A CN201811609332 A CN 201811609332A CN 109709919 A CN109709919 A CN 109709919A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- sewage plant
- plant area
- failure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
The invention discloses a kind of sewage plant area operation management systems, it include: data Registration Module, data acquisition module, data processing module, Data Integration module, emergency preplan generation module, data processing module judges whether equipment is abnormal according to data comparison result for being compared the data data corresponding with data collecting module collected that data Registration Module records;Data Integration module is used for when data processing module judges that instrumented data is abnormal, and integrates failure and the faulty meter acquired for a period of time after occurring for the previous period with failure and faulty equipment data occur;Emergency preplan generation module is used to generate solution according to the module integrated data information of Data Integration.Using sewage plant area operation management system of the invention, have the advantages that improve sewage plant area equipment and instrument monitoring reliability.
Description
Technical field
The present invention relates to technical field of sewage, more particularly to a kind of sewage plant area operation management system.
Background technique
Sewage treatment plant is instructed according to Central Control Room to inlet pumping station, drum by automatically-monitored software monitors production run
The equipment such as blower, dehydration machine room are controlled, and in equipment running process parameters and historical data it is total by scene
Line reaches in server.The production of sewage plant, machinery, electrical, instrument, PLC device are many kinds of, maintenance and maintenance to equipment
It is more demanding.
Currently, that there are life cycles is longer for the equipment of sewage treatment plant's operation, equipment use for a long time will appear failure etc.
Problem.Instrument and equipment are monitored only by Automatic monitoring systems, reliability and validity are lower.
Summary of the invention
The object of the present invention is to provide a kind of sewage plant area operation management systems, have and improve sewage plant area equipment and instrument
The advantages of monitoring reliability.
To achieve the above object, the present invention provides following schemes:
A kind of sewage plant area operation management system, comprising:
Data Registration Module, the device data and instrumented data made an inventory when making an inspection tour sewage plant area for recording;
Data acquisition module, for obtaining the sewage plant area device data and instrumented data of data acquisition device acquisition;
Data processing module, the device data for recording the data Registration Module are adopted with the data acquisition module
The corresponding device data of collection is compared, and judges whether equipment is abnormal according to device data comparison result;Being also used to will
The instrumented data instrumented data corresponding with the data collecting module collected of the data Registration Module record is compared,
Judge whether instrument is abnormal according to instrumented data comparison result;
Data Integration module, for integrating failure when the data processing module judges that instrumented data is abnormal
The faulty meter data acquired for a period of time after occurring for the previous period with failure occur, while integrating failure instrument when failure occurs
The correlate meter data of process section where table;It is also used to when the data processing module judges that device data is abnormal,
It integrates failure and the faulty equipment data acquired for a period of time after occurring for the previous period with failure occurs;
Emergency preplan generation module, for generating solution according to the module integrated data information of the Data Integration.
Optionally, the equipment and instrumented data that the data Registration Module is made an inventory, comprising: water quality meter data cross the gift of money for a friend going on a journey
Table data, sewage plant equipment operating data, equipment electricity consumption data and maintenance of equipment data;
The sewage plant area equipment and instrumented data of the data collecting module collected, comprising: water quality meter data cross the gift of money for a friend going on a journey
Table data and sewage plant equipment operating data.
Optionally, the water quality meter data include: total into water COD, water inlet pH value, water inlet total phosphorus, water inlet
Nitrogen, water outlet COD, water outlet total phosphorus, water outlet total nitrogen, water outlet ammonia nitrogen and water outlet suspended solid;
The process instrument data include: reaction tank dissolved oxygen, reaction tank mixed genetic-neural network, disengaging water flow
Count value and liquid level count value;
The sewage plant equipment operating data includes: air blower and intake pump startup-shutdown state and running current, voltage;
The equipment electricity consumption data include: high-voltage metering cubicle electricity and photovoltaic metering cabinet electricity.
Optionally, the emergency preplan generation module, comprising:
Technique adjustment information generating unit, for being occurred for the previous period according to the module integrated failure of the Data Integration
The water quality meter data or process instrument data of the failure acquired for a period of time after occurring with failure and the Data Integration mould
The water quality meter data of failure or the correlate meter data of process instrument place process section, generate instrument when the failure of block integration occurs
Table technique adjustment information;
In-situ processing information generating unit, for being occurred for the previous period according to the module integrated failure of the Data Integration
The air blower and water inlet Pump data of the failure acquired for a period of time after occurring with failure, generate in-situ processing information.
Optionally, sewage plant area operation management system, further includes:
Alarm module, the solution for being generated according to the emergency preplan generation module is sent to administrative department alarms
Information.
Optionally, PLC control system controls the data acquisition device automatic collection.
Optionally, sewage plant area operation management system, further includes:
Polling module, for generating inspection scheme according to the action of patrol officer.
Optionally, the action of the patrol officer, comprising: the number of the equipment and instrument made an inventory when making an inspection tour sewage plant area
According to.
Compared with prior art, the beneficial effects of the present invention are:
The present invention provides a kind of sewage plant area operation management system, data processing module is recorded according to data Registration Module
Data and the data of data collecting module collected be compared, judge whether equipment and instrumentation is abnormal, it is different for occurring
Normal equipment and instrument integrates failure and the faulty meter acquired for a period of time after occurring for the previous period with failure and equipment occurs
Data, emergency preplan generation module generates solution according to the module integrated data information of Data Integration, have improve it is dirty
The advantages of water factory's area's equipment and instrument monitoring reliability.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is sewage plant area operation management system structural relation figure in the embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of sewage plant area operation management systems, have and improve sewage plant area equipment and instrument
The advantages of monitoring reliability.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
Fig. 1 is sewage plant area operation management system structural relation figure in the embodiment of the present invention, as shown in Figure 1, the present invention mentions
The sewage plant area operation management system of confession, comprising:
A kind of sewage plant area operation management system characterized by comprising data Registration Module 1, data acquisition module 2,
Data processing module 3, Data Integration module 4, emergency preplan generation module 5, alarm module 6 and polling module 7.
Data Registration Module 1 is used to record the device data and instrumented data made an inventory when making an inspection tour sewage plant area, comprising: water quality
Instrumented data, process instrument data, sewage plant equipment operating data, equipment electricity consumption data and maintenance of equipment data.Data are adopted
Collect module 2, for obtaining the sewage plant area device data and instrumented data of data acquisition device acquisition, comprising: water quality meter number
According to, process instrument data and sewage plant equipment operating data, PLC control system controls data acquisition device automatic collection.
Water quality meter data include: into water COD, water inlet pH value, water inlet total phosphorus, water inlet total nitrogen, go out water chemistry need
Oxygen amount, water outlet total phosphorus, water outlet total nitrogen, water outlet ammonia nitrogen and water outlet suspended solid.Process instrument data include: reaction tank dissolved oxygen,
Reaction tank mixed genetic-neural network, disengaging water ga(u)ge numerical value and liquid level count value.Sewage plant equipment operating data includes:
Air blower and intake pump startup-shutdown state and running current, voltage, frequency converter setting value and value of feedback, air blower guide vane opening,
Oil temperature.Equipment electricity consumption data include: high-voltage metering cubicle electricity and photovoltaic metering cabinet electricity.The maintenance, repair state of equipment and
Various operation notes carry out log-on operation by data Registration Module 1 by operation maintenance personnel in maintenance process.
Data processing module 3, device data and the data acquisition module for recording the data Registration Module
The corresponding device data of acquisition is compared, and judges whether equipment is abnormal according to device data comparison result;It is also used to
The instrumented data instrumented data corresponding with the data collecting module collected that the data Registration Module records is compared
Compared with judging whether instrument is abnormal according to instrumented data comparison result.
Data Integration module 4, for integrating event when the data processing module 3 judges that instrumented data is abnormal
The faulty meter data acquired for a period of time after occurring for the previous period with failure occur for barrier, while integrating failure when failure occurs
The correlate meter data of process section where instrument;It is also used to judge that device data is abnormal in the data processing module
When, it integrates failure and the faulty equipment data acquired for a period of time after occurring for the previous period with failure occurs.For example, when going out aquation
When learning oxygen demand and occurring 0, first determine whether the water outlet ammonia nitrogen in same acquisition link road and water outlet total nitrogen etc. data whether be also
0, the terminal of acquisition link is detected if it is 0, further judges that the instrument operating status of COD is if not for 0
It is no in the maintenances state such as maintaining or repairing, do not handled first temporarily if in maintenance state, if being not at maintenance state
Then start corresponding process, notice maintenance unit is handled.
Emergency preplan generation module 5, the data information for being integrated according to the Data Integration module 4 generate solution party
Case.Emergency preplan generation module 5 includes: technique adjustment information generating unit and in-situ processing information generating unit.Technique adjustment
Information generating unit, the failure for being integrated according to the Data Integration module 4 occur to occur with failure for the previous period latter
The failure that the water quality meter data or process instrument data and Data Integration module 4 of the failure of section time acquisition are integrated occurs
When water quality meter data of the failure or correlate meter data of process section where process instrument, generate instrument technique adjustment information.
In-situ processing information generating unit, the failure for being integrated according to Data Integration module 4 occur to occur with failure for the previous period
The air blower of the failure of a period of time acquisition and water inlet Pump data generate in-situ processing information afterwards.For example, as worked as reaction tank process
When instrument dissolved oxygen numerical value is lower than preset value, notice process management personnel carry out technique adjustment;When intake pump cannot normal start-stop
When machine, first notifies in-plant equipment personnel to carry out live preliminary treatment, carried out if it can not handle by service unit in plant
The processing of live investigation, still can not repair process in the case where, further coordinate equipment manufacturer's Site Service, carried out for personnel
Subsequent operation provides guidance and help.
Alarm module 6, the solution for being generated according to emergency preplan generation module 5 send alarm signal to administrative department
Breath.Polling module 7, for generating inspection scheme according to the action of patrol officer, the action of patrol officer includes patrolling
Data depending on the equipment and instrument made an inventory when sewage plant area.
Sewage plant area operation management system of the invention increases on the basis of monitor automatically to instrument and equipment
Data Registration Module record makes an inspection tour the device data and instrumented data made an inventory when sewage plant area, by the data and inspection of automatic collection
The data of member's registration are compared, and are deposited and are issued alarm when abnormal, can be improved the reliability of sewage plant area data acquisition and have
Effect property.In addition, increasing emergency preplan generation module, realizes that emergency measure is remotely sent, can satisfy equipment fault and data are different
The demand of normal overhaul plan personnel and the timely and effective communication of monitoring system.
Used herein a specific example illustrates the principle and implementation of the invention, and above embodiments are said
It is bright to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, foundation
Thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification is not
It is interpreted as limitation of the present invention.
Claims (8)
1. a kind of sewage plant area operation management system characterized by comprising
Data Registration Module, the device data and instrumented data made an inventory when making an inspection tour sewage plant area for recording;
Data acquisition module, for obtaining the sewage plant area device data and instrumented data of data acquisition device acquisition;
Data processing module, device data and the data collecting module collected for recording the data Registration Module
Corresponding device data is compared, and judges whether equipment is abnormal according to device data comparison result;Being also used to will be described
The instrumented data instrumented data corresponding with the data collecting module collected of data Registration Module record is compared, according to
Instrumented data comparison result judges whether instrument is abnormal;
Data Integration module, for integrating failure when the data processing module judges that instrumented data is abnormal
The faulty meter data acquired for a period of time after occurring for the previous period with failure, while integrating faulty meter institute when failure occurs
In the correlate meter data of process section;It is also used to when the data processing module judges that device data is abnormal, integrates
The faulty equipment data acquired for a period of time after occurring for the previous period with failure occur for failure;
Emergency preplan generation module, for generating solution according to the module integrated data information of the Data Integration.
2. sewage plant area according to claim 1 operation management system, which is characterized in that
The equipment and instrumented data that the data Registration Module is made an inventory, comprising: water quality meter data, process instrument data, sewage
Plant operation data, equipment electricity consumption data and maintenance of equipment data;
The sewage plant area equipment and instrumented data of the data collecting module collected, comprising: water quality meter data, process instrument number
According to sewage plant equipment operating data.
3. sewage plant area according to claim 2 operation management system, which is characterized in that
The water quality meter data include: into water COD, water inlet pH value, water inlet total phosphorus, water inlet total nitrogen, go out water chemistry need
Oxygen amount, water outlet total phosphorus, water outlet total nitrogen, water outlet ammonia nitrogen and water outlet suspended solid;
The process instrument data include: reaction tank dissolved oxygen, reaction tank mixed genetic-neural network, disengaging water ga(u)ge number
Value and liquid level count value;
The sewage plant equipment operating data includes: air blower and intake pump startup-shutdown state and running current, voltage;
The equipment electricity consumption data include: high-voltage metering cubicle electricity and photovoltaic metering cabinet electricity.
4. sewage plant area according to claim 3 operation management system, which is characterized in that the emergency preplan generates mould
Block, comprising:
Technique adjustment information generating unit, for according to the module integrated failure of the Data Integration occur for the previous period with therefore
The water quality meter data or process instrument data of the failure that barrier acquires for a period of time after occurring and the Data Integration module are whole
The water quality meter data of failure or the correlate meter data of process instrument place process section, generate instrument work when the failure of conjunction occurs
Skill adjustment information;
In-situ processing information generating unit, for according to the module integrated failure of the Data Integration occur for the previous period with therefore
The air blower and water inlet Pump data for the failure that barrier acquires for a period of time after occurring, generate in-situ processing information.
5. sewage plant area according to claim 1 operation management system, which is characterized in that sewage plant area operational management
System, further includes:
Alarm module, the solution for being generated according to the emergency preplan generation module send alarm signal to administrative department
Breath.
6. sewage plant area according to claim 1 operation management system, which is characterized in that described in PLC control system control
Data acquisition device automatic collection.
7. sewage plant area according to claim 1 operation management system, which is characterized in that sewage plant area operational management
System, further includes:
Polling module, for generating inspection scheme according to the action of patrol officer.
8. sewage plant area according to claim 7 operation management system, which is characterized in that in the work of the patrol officer
Hold, comprising: the data of the equipment and instrument made an inventory when making an inspection tour sewage plant area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811609332.4A CN109709919A (en) | 2018-12-27 | 2018-12-27 | A kind of sewage plant area operation management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811609332.4A CN109709919A (en) | 2018-12-27 | 2018-12-27 | A kind of sewage plant area operation management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109709919A true CN109709919A (en) | 2019-05-03 |
Family
ID=66258609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811609332.4A Pending CN109709919A (en) | 2018-12-27 | 2018-12-27 | A kind of sewage plant area operation management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109709919A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111847533A (en) * | 2020-05-25 | 2020-10-30 | 安徽普偌森环保科技有限公司 | Integrated domestic sewage treatment engineering management system |
CN113666457A (en) * | 2021-08-31 | 2021-11-19 | 重庆夏软科技有限公司 | Water purification optimization system and method based on water quality monitoring |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050004313A (en) * | 2003-06-27 | 2005-01-12 | 주식회사 동아산전 | Central control system and method of daewoo nutrients removal vessels |
CN103546536A (en) * | 2013-08-28 | 2014-01-29 | 北京清控人居环境研究院有限公司 | Internet of things system of sewage treatment plant |
CN104914823A (en) * | 2015-04-20 | 2015-09-16 | 上海城投污水处理有限公司石洞口污水处理厂 | Operation and maintenance time efficiency management method facing sewage plant |
-
2018
- 2018-12-27 CN CN201811609332.4A patent/CN109709919A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050004313A (en) * | 2003-06-27 | 2005-01-12 | 주식회사 동아산전 | Central control system and method of daewoo nutrients removal vessels |
CN103546536A (en) * | 2013-08-28 | 2014-01-29 | 北京清控人居环境研究院有限公司 | Internet of things system of sewage treatment plant |
CN104914823A (en) * | 2015-04-20 | 2015-09-16 | 上海城投污水处理有限公司石洞口污水处理厂 | Operation and maintenance time efficiency management method facing sewage plant |
Non-Patent Citations (2)
Title |
---|
廖德志: "机电设备状态监测技术在污水处理厂的应用", 《建筑工程技术与设计》 * |
高健源: "在线监测系统在污水处理的应用分析", 《建筑工程技术与设计》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111847533A (en) * | 2020-05-25 | 2020-10-30 | 安徽普偌森环保科技有限公司 | Integrated domestic sewage treatment engineering management system |
CN113666457A (en) * | 2021-08-31 | 2021-11-19 | 重庆夏软科技有限公司 | Water purification optimization system and method based on water quality monitoring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107357243B (en) | Sewage treatment system based on high in clouds data monitoring | |
CN105809255A (en) | IoT-based heat-engine plantrotary machine health management method and system | |
US20110130982A1 (en) | Monitoring System for Power Grid Distributed Power Generation Devices | |
CN110531656A (en) | A kind of monitoring system and method for Hydropower Unit performance | |
CN110336379B (en) | Transformer substation online monitoring system based on Internet of things and terminal equipment | |
CN103823433A (en) | Method for realizing relay protection equipment on-line monitoring by use of communication process analysis | |
CN108010305B (en) | Self-diagnosis method for data acquisition fault of integrated energy management platform | |
CN202886956U (en) | Power-generator performance monitoring system based on similarity principle | |
CN109599948A (en) | Power regulation integral system intelligent alarm method | |
CN109709919A (en) | A kind of sewage plant area operation management system | |
CN108710099A (en) | Capacitance type potential transformer monitoring alarm method and system | |
CN106972636A (en) | A kind of intelligent grid detection platform based on cloud computing | |
CN109299797A (en) | A kind of environmental protection equipment operating status online monitoring and management system and monitoring and managing method | |
CN208588936U (en) | A kind of monitoring system in waste water processing | |
CN108732444A (en) | Intelligent substation protects equipment running status apparatus for evaluating and maintenance decision method | |
CN110690699A (en) | Transformer substation intelligent detection system based on ubiquitous power Internet of things | |
CN114781933A (en) | Electromechanical device monitoring and management system and method | |
CN109581115B (en) | Power distribution network low-voltage diagnosis system and diagnosis method | |
CN115049297A (en) | Wisdom sewage factory operating system | |
CN103888300B (en) | Network failure analysis system and method in Web service system | |
CN105932773B (en) | A kind of intelligent charging electricity anti-theft system | |
CN204883304U (en) | A environment thing networking systems that is used for river to gush quality of water administering control | |
CN114660412A (en) | Electric energy quality monitoring system based on intelligent electric energy meter and monitoring method thereof | |
CN208314557U (en) | Mobile terminal is used in power plant's maintenance | |
CN113848843A (en) | Self-diagnosis analysis system based on intelligent optimization energy-saving system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190503 |
|
RJ01 | Rejection of invention patent application after publication |