CN109853820A - A kind of furred ceiling and its installation method based on BIM - Google Patents
A kind of furred ceiling and its installation method based on BIM Download PDFInfo
- Publication number
- CN109853820A CN109853820A CN201910059316.0A CN201910059316A CN109853820A CN 109853820 A CN109853820 A CN 109853820A CN 201910059316 A CN201910059316 A CN 201910059316A CN 109853820 A CN109853820 A CN 109853820A
- Authority
- CN
- China
- Prior art keywords
- mounting rod
- installing pipe
- ceiling board
- furred ceiling
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of furred ceiling and its installation method based on BIM, is related to field of house buildings.The furred ceiling includes keel and ceiling board, and the surrounding of the upper surface of ceiling board is vertically arranged with mounting rod, and the lower end of keel is provided with the installing pipe for mounting rod grafting, and sticking department is provided on mounting rod, and sticking department is used to mounting rod being fixed on installing pipe.The present invention has the following advantages and effects: by utilizing the mounting means being plugged and fixed, instead of traditional glue bonding or rivet, so that the installation process of ceiling board is more easy and convenient, ceiling board is lifted always without worker, to significantly reduce the labor intensity of worker, achieve the effect that convenience is installed and used.
Description
Technical field
The present invention relates to field of house buildings, in particular to a kind of furred ceiling and its installation method based on BIM.
Background technique
Furred ceiling refers to that a kind of decoration of the top finishing of house living environment briefly just refers to the decoration of ceiling,
It is one of the pith of interior decoration.
Traditional furred ceiling needs first to install keel on roof when installing and using, and then needs manually to lift always and hang
Top plate recycles glue or rivet that ceiling board is fixed on keel.It is very inconvenient so as to cause the installation process of furred ceiling, need
It improves.
Summary of the invention
The object of the present invention is to provide a kind of furred ceiling and its installation method based on BIM has the effect conveniently installed and used
Fruit.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of furred ceiling based on BIM, packet
Keel and ceiling board are included, the surrounding of the upper surface of the ceiling board is vertically arranged with mounting rod, and the lower end of the keel is set
It is equipped with the installing pipe for the mounting rod grafting, sticking department is provided on the mounting rod, the sticking department is used for the peace
Dress bar is fixed on the installing pipe.
By using above-mentioned technical proposal, when installing above-mentioned furred ceiling, keel are fixed on roof first with bolt, and
So that one end with installing pipe is downward.Then ceiling board is held up, after so that the mounting rod on ceiling board is directed at installing pipe, is pushed
Ceiling board moves upwards, while mounting rod grafting installing pipe.Until the complete grafting installing pipe of mounting rod, and the lower end surface of installing pipe
Behind the upper surface for contradicting ceiling board, mounting rod is fixed in installing pipe using sticking department, to realize the installation of ceiling board.Most
After all ceiling boards are installed again afterwards, the installation of entire furred ceiling is completed.To utilize the mounting means being plugged and fixed, instead of
Traditional glue bonding or rivet are lifted always without worker and are hung so that the installation process of ceiling board is more easy and convenient
Top plate has achieved the effect that convenience is installed and used to significantly reduce the labor intensity of worker.
The further setting of the present invention are as follows: the sticking department includes a pair of elastic fastening hook being set on the mounting rod,
The inner wall of the installing pipe is provided with the card slot for elastic fastening hook upper end insertion.
By using above-mentioned technical proposal, when mounting rod grafting installing pipe, and when along the inner wall upward sliding of installing pipe,
Mounting rod drives elastic fastening hook to move synchronously, and when the complete grafting installing pipe of mounting rod, the upper end of elastic fastening hook is just right
Quasi- card slot, elastic fastening hook is automatically springed open and is embedded in card slot at this time, to realize the locking of sticking department.The structure letter of sticking department
It is clean, and can automatically spring open, the fixation of mounting rod and installing pipe is realized, so that the installation process of ceiling board is lighter
It is convenient.
The further setting of the present invention are as follows: the roof of the installing pipe is vertically arranged with wedge block, and the wedge block is by upper
Setting is in gradually-reducing shape under, and for being embedded between a pair of of elastic fastening hook.
By using above-mentioned technical proposal, when a pair of of elastic fastening hook moves upwards, wedge block is gradually embedded a pair of of elasticity
In gap between grab.And with the gradually movement of elastic fastening hook, under the action of wedge block, so that the two of elastic fastening hook
End is gradually flared out, and compresses installation inside pipe wall.Until when in elastic fastening hook insertion card slot, using wedge block by elastic fastening hook
Upper end be pressed in card slot, to increase the stability and firmness of elastic fastening hook, increase the stabilization of ceiling board
Property.
The further setting of the present invention are as follows: the sticking department includes the first card for being set to the elasticity of the mounting rod side wall
Tooth, the installation inside pipe wall are provided with the second latch, and the first latching tooth is mutually twisted with second latch;First card
The mounting rod side wall is fixed in the side of tooth, and the other side is tilted down setting, and the inclined direction of second latch
It is opposite with the inclined direction of the first latching tooth.
By using above-mentioned technical proposal, when mounting rod grafting installing pipe, and when along the inner wall upward sliding of installing pipe,
Mounting rod drives first latching tooth to move synchronously, and the second latch presses first latching tooth and elastic deformation occurs.When mounting rod is complete
When grafting installing pipe, first latching tooth is flicked and is mutually twisted with the second latch.Due to the inclination side of first latching tooth and the second latch
To on the contrary, and first latching tooth be tilted down shape setting so that mounting rod can only upward sliding and be unable to slide downward,
Ceiling board is contradicted further through installing pipe, limitation mounting rod continues up, and being locked for mounting rod is realized, to realize lock
Determine the locking in portion.Sticking department it is simple for structure, and can lock automatically, so that the installation process of ceiling board is lighter
It is convenient.
The further setting of the present invention are as follows: the bottom wall of the installing pipe is provided with the compression bullet contradicted for the mounting rod
Spring.
By using above-mentioned technical proposal, when mounting rod is along installation inside pipe wall upward sliding, mounting rod presses compression
Spring-compressed, when the complete grafting installing pipe of mounting rod, first latching tooth is mutually twisted with the second latch, at this time holddown spring itself
Screen resilience apply downward active force to first latching tooth so that first latching tooth can be stronger is snapped at the second card
Tooth.To increase the connective stability and firmness of mounting rod and installing pipe, the stabilization of ceiling board is further increased
Property.
The further setting of the present invention are as follows: the holddown spring is taper, and is in gradually-reducing shape setting from top to bottom.
By using above-mentioned technical proposal, because volute spring can reduce compressing area, and volute spring is each
The diameter of a pitch is all different, therefore can provide certain space for the flexible of itself, is prolonged its service life.
The further setting of the present invention are as follows: the surrounding outer wall of the ceiling board is provided with interconnected dovetail groove, and
And the dovetail groove on the inconsistent side wall of the two neighboring ceiling board collectively forms limiting slot, sliding in the limiting slot
It is plugged with positive stop strip.
By using above-mentioned technical proposal, when adjacent two pieces of ceiling boards after the installation is completed, the dovetail of two ceiling board side walls
The notch position of slot aligns, and constitutes the limiting slot that a both ends are big, centre is small.Positive stop strip is taken out at this time and is embedded limited
Position slot, two ceiling boards are linked together using positive stop strip, thus increase the connective stability between two ceiling boards with
And firmness, extend the tightness and service life of entire furred ceiling.
It is a further object of the present invention to provide a kind of installation methods of furred ceiling based on BIM, with what is conveniently installed and used
Effect.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of furred ceiling based on BIM
Installation method has used above-mentioned furred ceiling, has included the following steps:
S1 installs keel, using bolt by keel installation on roof, and guarantees that the lower end of keel is in horizontality;
S2 installs ceiling board, the mounting rod on ceiling board is inserted into the installing pipe of keel lower end, and will be installed by sticking department
Bar is fixed on installing pipe;
S3, ceiling board are fixed, and positive stop strip is inserted into limiting slot, realizes the fixation of ceiling board.
By using above-mentioned technical proposal, which is succinctly used, and work progress is convenient and efficient, so that
The installation process of ceiling board is more easy and convenient, has achieved the effect that convenience is installed and used.
The further setting of the present invention are as follows: further include following steps:
S4, jointing inject gap filler in the gap between two neighboring ceiling board, then will with flexible cloth
The gap filler of gap and ceiling surface is cleaned.
By using above-mentioned technical proposal, after jointing is handled, the cohesive force between ceiling board can be improved and prevent
Anti-cracking function is seeped, and influences the service life of ceiling board after can preventing hydrone from penetrating into furred ceiling back.And gap filler
With certain flexibility, and then the slight shift of ceiling board can be resisted, prevent ceiling board from deforming or falling off, further extend
The service life of ceiling board.
In conclusion the invention has the following advantages:
1. by using the mounting means being plugged and fixed, instead of traditional glue bonding or rivet, so that the peace of ceiling board
Dress process is more easy and convenient, lifts ceiling board always without worker, to significantly reduce the labor intensity of worker, reaches
The effect that convenience is installed and used is arrived;
2. it is succinct by setting structure, and sticking department that can be self-locking, realize the fixation of mounting rod and installing pipe, so that
The installation process of ceiling board is more easy and convenient;
3. two ceiling boards are linked together, by the cooperation of setting positive stop strip and limiting slot to increase two furred ceilings
Connective stability and firmness between plate extend the tightness and service life of entire furred ceiling;
4. realizing the installation of ceiling board by the way that succinct installation method is arranged, having achieved the effect that convenience is installed and used.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment 1;
Fig. 2 is the keel of embodiment 1 and the connection relationship diagram of ceiling board;
Fig. 3 is the connection relationship diagram of the ceiling board of embodiment 1;
Fig. 4 is the partial enlarged view at the A in Fig. 2 of embodiment 1;
Fig. 5 is the mounting rod of embodiment 2 and the connection relationship diagram of installing pipe.
Appended drawing reference: 1, keel;2, ceiling board;21, dovetail groove;22, limiting slot;23, positive stop strip;3, mounting rod;4, pacify
Tubulature;41, card slot;42, wedge block;43, the second latch;44, holddown spring;5, sticking department;51, elastic fastening hook;52, the first card
Tooth.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1: as shown in Figure 1 and Figure 2, a kind of furred ceiling based on BIM, including keel 1 and ceiling board 2.Ceiling board 2
Upper surface be provided with multiple mounting rods 3, multiple mounting rods 3 are distributed in the surrounding of ceiling board 2, and the lower end setting of keel 1
There is the installing pipe 4 for 3 grafting of mounting rod.Sticking department 5 is additionally provided on mounting rod 3, sticking department 5 is for mounting rod 3 to be fixed on
Installing pipe 4.
When installing above-mentioned furred ceiling, keel 1 downward, and are fixed on by one end by keel 1 with installing pipe 4 using bolt
On roof, while the lower end surface of keel 1 is smoothed, and using the lower end of horizontal ruler measurement keel 1, so that under keel 1
End is in horizontality.
Then ceiling board 2 is held up again, after so that the mounting rod 3 on ceiling board 2 is directed at installing pipe 4, pushes ceiling board 2 upward
It moves, at this time 3 grafting installing pipe 4 of mounting rod, and along the inner wall upward sliding of installing pipe 4.
Until the complete grafting installing pipe 4 of mounting rod 3, and behind the upper surface of the lower end surface conflict ceiling board 2 of installing pipe 4, then
Mounting rod 3 is fixed in installing pipe 4 using sticking department 5, realization mounting rod 3 is locked with installing pipe 4, hangs to realize
The installation of top plate 2.
Finally other ceiling board 2 is taken out again, and after all ceiling boards 2 are installed one by one, be can be completed entire
The installation of furred ceiling.And when all ceiling boards 2 install, the surrounding outer wall of ceiling board 2 is mutually contradicted.
As shown in figure 3, the surrounding outer wall of ceiling board 2 is provided with interconnected dovetail groove 21, and two neighboring hang
Dovetail groove 21 on the inconsistent side wall of top plate 2 collectively forms limiting slot 22.The both ends of limiting slot 22 are big and intermediate small, and limit
Sliding is plugged with positive stop strip 23 in the slot 22 of position, and the outer wall of positive stop strip 23 is pressed in the inner wall of limiting slot 22.
When installing two adjacent ceiling boards 2, the notch position of the dovetail groove 21 of two 2 side walls of ceiling board is opposite
Standard, and constitute the limiting slot 22 that a both ends are big, centre is small.Positive stop strip 23 is inserted into limiting slot 22 at this time, and pushes limit
Item 23 is along 22 inner wall slid inward of limiting slot, until realizing two neighboring hang after positive stop strip 23 is completely embedded into limiting slot 22
Top plate 2 is connected and fixed.
As shown in figure 4, sticking department 5 includes a pair of of elastic fastening hook 51, a pair of of elastic fastening hook 51 is set to 3 upper surface of mounting rod
Two sides.The inner wall of installing pipe 4 is provided with the card slot 41 for the insertion of 51 upper end of elastic fastening hook, and roof is provided with wedge block
42.Wedge block 42 is in gradually-reducing shape setting from top to bottom, and for being embedded between a pair of of elastic fastening hook 51.
When 3 grafting installing pipe 4 of mounting rod, and when along the inner wall upward sliding of installing pipe 4, mounting rod 3 drives elastic card
Hook 51 moves synchronously, while wedge block 42 is gradually embedded in the gap between a pair of of elastic fastening hook 51, and with elastic fastening hook
The both ends of 51 gradually movement, the two sidewalls driving elastic fastening hook 51 of wedge block 42 are gradually flared out, and are compressed in installing pipe 4
Wall.
When 3 complete grafting installing pipe 4 of mounting rod, the upper end of elastic fastening hook 51 is narrowly focused towards card slot 41, at this time elastic card
Hook 51 is automatically springed open and is embedded in card slot 41.Simultaneously under the action of wedge block 42, the upper end of elastic fastening hook 51 is pressed in card
In slot 41, to realize the locking of sticking department 5, i.e. completion mounting rod 3 and installing pipe 4 is locked.
Embodiment 2: as shown in figure 5, a kind of furred ceiling based on BIM, the difference with embodiment are: sticking department 5 includes setting
It is placed in the first latching tooth 52 of the elasticity of 3 side wall of mounting rod, 4 inner wall of installing pipe is provided with the second latch 43.The bottom wall of installing pipe 4 is also
It is provided with the holddown spring 44 of taper, and holddown spring 44 is in gradually-reducing shape setting from top to bottom.
As shown in figure 5, in the present embodiment, 3 side wall of mounting rod is fixed in the side of first latching tooth 52, the other side it is inclined to
Lower setting.4 inner wall of installing pipe is fixed in the side of second latch 43, and the other side is inclined to be set up, and first latching tooth 52
It is mutually twisted with the second latch 43.
When 3 grafting installing pipe 4 of mounting rod, and when along the inner wall upward sliding of installing pipe 4, the upper end of mounting rod 3 is pressed
Holddown spring 44 compresses.At the same time, mounting rod 3 drives first latching tooth 52 to move synchronously, and the second latch 43 presses first
Elastic deformation occurs for latch 52.
When 3 complete grafting installing pipe 4 of mounting rod, first latching tooth 52 is flicked and is mutually twisted with the second latch 43.At this time
Ceiling board 2 is contradicted by installing pipe 4, limitation mounting rod 3 continues up, while utilizing the screen resilience of holddown spring 44 itself
Apply downward active force to first latching tooth 52 so that first latching tooth 52 it is stronger be snapped at the second latch 43.To real
The locking of existing sticking department 5, i.e. completion mounting rod 3 are locked with installing pipe 4.
Embodiment 3: a kind of installation method of the furred ceiling based on BIM has used above-mentioned furred ceiling, has included the following steps:
S1 is installed keel 1, keel 1 is installed on roof using bolt, and guarantee that the lower end of keel 1 is in horizontality;
S2 installs ceiling board 2, the mounting rod 3 on ceiling board 2 is inserted into the installing pipe 4 of 1 lower end of keel, and passes through sticking department 5
Mounting rod 3 is fixed on installing pipe 4;
S3, ceiling board 2 is fixed, and positive stop strip 23 is inserted into limiting slot 22, realizes the fixation of ceiling board 2;
S4, jointing inject gap filler in the gap between two neighboring ceiling board 2, then with flexible cloth by gap and furred ceiling
The gap filler on 2 surface of plate is wiped.
Specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
It can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as in this hair
All by the protection of Patent Law in bright scope of the claims.
Claims (9)
1. a kind of furred ceiling based on BIM, including keel (1) and ceiling board (2), it is characterised in that: the ceiling board (2) it is upper
The surrounding of end face is vertically arranged with mounting rod (3), and the lower end of the keel (1) is provided with for the mounting rod (3) grafting
Installing pipe (4) is provided with sticking department (5) on the mounting rod (3), and the sticking department (5) is used for the mounting rod (3) are fixed
In the installing pipe (4).
2. a kind of furred ceiling based on BIM according to claim 1, it is characterised in that: the sticking department (5) sets including a pair
The elastic fastening hook (51) being placed on the mounting rod (3), the inner wall of the installing pipe (4) are provided with for the elastic fastening hook (51)
The card slot (41) of upper end insertion.
3. a kind of furred ceiling based on BIM according to claim 2, it is characterised in that: the roof of the installing pipe (4) is vertical
It is provided with wedge block (42), the wedge block (42) is in gradually-reducing shape setting from top to bottom, and for being embedded at a pair of of elastic fastening hook
(51) between.
4. a kind of furred ceiling based on BIM according to claim 1, it is characterised in that: the sticking department (5) includes being set to
The first latching tooth (52) of the elasticity of mounting rod (3) side wall, installing pipe (4) inner wall are provided with the second latch (43), institute
First latching tooth (52) is stated to be mutually twisted with second latch (43);
The mounting rod (3) side wall is fixed in the side of the first latching tooth (52), and the other side is tilted down setting, and institute
The inclined direction for stating the second latch (43) is opposite with the inclined direction of the first latching tooth (52).
5. a kind of furred ceiling based on BIM according to claim 4, it is characterised in that: the bottom wall of the installing pipe (4) is arranged
There is the holddown spring (44) contradicted for the mounting rod (3).
6. a kind of furred ceiling based on BIM according to claim 5, it is characterised in that: the holddown spring (44) is taper,
And it is in gradually-reducing shape setting from top to bottom.
7. a kind of furred ceiling based on BIM according to claim 1, it is characterised in that: the surrounding outer wall of the ceiling board (2)
It is provided with interconnected dovetail groove (21), and the swallow on the inconsistent side wall of the two neighboring ceiling board (2)
Stern notch (21) collectively forms limiting slot (22), and sliding is plugged with positive stop strip (23) in the limiting slot (22).
8. a kind of installation method of the furred ceiling based on BIM, has used above-mentioned furred ceiling, characterized by the following steps:
S1 is installed keel (1), keel (1) is installed on roof using bolt, and guarantees that the lower end of keel (1) is in level
State;
S2 is installed ceiling board (2), and the installing pipe (4) of mounting rod (3) insertion keel (1) lower end on ceiling board (2) is interior, and
Mounting rod (3) is fixed on installing pipe (4) by sticking department (5);
S3, ceiling board (2) is fixed, by positive stop strip (23) insertion limiting slot (22), realizes the fixation of ceiling board (2).
9. a kind of installation method of furred ceiling based on BIM according to claim 8, it is characterised in that: further include walking as follows
It is rapid:
Gap filler is injected in the gap between two neighboring ceiling board (2), then by gap and is hung with flexible cloth by S4, jointing
The gap filler on top plate (2) surface is cleaned.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910059316.0A CN109853820A (en) | 2019-01-22 | 2019-01-22 | A kind of furred ceiling and its installation method based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910059316.0A CN109853820A (en) | 2019-01-22 | 2019-01-22 | A kind of furred ceiling and its installation method based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109853820A true CN109853820A (en) | 2019-06-07 |
Family
ID=66895647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910059316.0A Pending CN109853820A (en) | 2019-01-22 | 2019-01-22 | A kind of furred ceiling and its installation method based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109853820A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211339A (en) * | 2020-10-20 | 2021-01-12 | 福建中设工程咨询有限公司 | Prefabricated assembly type suspended ceiling structure and construction method |
CN112459338A (en) * | 2020-12-02 | 2021-03-09 | 天津阳光力天装饰科技集团有限公司 | Suspended ceiling structure of light steel keel and mounting method |
CN113152860A (en) * | 2021-04-13 | 2021-07-23 | 中建一局集团第二建筑有限公司 | Ceiling installation method based on bim |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB894082A (en) * | 1957-05-04 | 1962-04-18 | Matthew Forkin | Improvements in the construction of wall, ceiling and like surfaces |
WO2001090586A2 (en) * | 2000-05-25 | 2001-11-29 | Chui King Wah | Front access strip for holding boards |
CN103790286A (en) * | 2012-10-30 | 2014-05-14 | 林恕如 | Connector |
CN105822036A (en) * | 2016-04-07 | 2016-08-03 | 嘉兴美斯克电气科技有限公司 | Simple plug-in type suspended ceiling structure |
CN205444631U (en) * | 2016-04-07 | 2016-08-10 | 嘉兴美斯克电气科技有限公司 | Suspended ceiling structure |
CN206467851U (en) * | 2017-01-25 | 2017-09-05 | 山西凯得森建筑科技有限公司 | A kind of wooden aluminium composite curtain wall of fast disassembly type |
CN108331234A (en) * | 2018-01-24 | 2018-07-27 | 江苏南通三建建筑装饰有限公司 | A kind of modularization assembled ceiling structure |
-
2019
- 2019-01-22 CN CN201910059316.0A patent/CN109853820A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB894082A (en) * | 1957-05-04 | 1962-04-18 | Matthew Forkin | Improvements in the construction of wall, ceiling and like surfaces |
WO2001090586A2 (en) * | 2000-05-25 | 2001-11-29 | Chui King Wah | Front access strip for holding boards |
CN103790286A (en) * | 2012-10-30 | 2014-05-14 | 林恕如 | Connector |
CN105822036A (en) * | 2016-04-07 | 2016-08-03 | 嘉兴美斯克电气科技有限公司 | Simple plug-in type suspended ceiling structure |
CN205444631U (en) * | 2016-04-07 | 2016-08-10 | 嘉兴美斯克电气科技有限公司 | Suspended ceiling structure |
CN206467851U (en) * | 2017-01-25 | 2017-09-05 | 山西凯得森建筑科技有限公司 | A kind of wooden aluminium composite curtain wall of fast disassembly type |
CN108331234A (en) * | 2018-01-24 | 2018-07-27 | 江苏南通三建建筑装饰有限公司 | A kind of modularization assembled ceiling structure |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211339A (en) * | 2020-10-20 | 2021-01-12 | 福建中设工程咨询有限公司 | Prefabricated assembly type suspended ceiling structure and construction method |
CN112211339B (en) * | 2020-10-20 | 2021-11-09 | 福建中设工程咨询有限公司 | Prefabricated assembly type suspended ceiling structure and construction method |
CN112459338A (en) * | 2020-12-02 | 2021-03-09 | 天津阳光力天装饰科技集团有限公司 | Suspended ceiling structure of light steel keel and mounting method |
CN113152860A (en) * | 2021-04-13 | 2021-07-23 | 中建一局集团第二建筑有限公司 | Ceiling installation method based on bim |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109853820A (en) | A kind of furred ceiling and its installation method based on BIM | |
CN210597835U (en) | Vertical installation component of furred ceiling decorative board | |
KR20080026074A (en) | T-bar hanger/l-bar hanager/clip bar hanger for ceiling closing | |
CN111576712B (en) | Ceiling board mounting structure and ceiling board paving method with same | |
CN208168003U (en) | Deformation joint decoration installing structure in large public building room | |
CN113530071B (en) | Assembled simple suspended ceiling mounting structure | |
CN103741927B (en) | A kind of floor board mounting structure | |
CN207211609U (en) | A kind of impact resistance composite stone material mounting structure | |
CN211286483U (en) | Fixed buckle of multiple spot, decoration material and fixed subassembly of decoration material | |
KR101324770B1 (en) | panel assembly for ceiling and wall | |
CN214614968U (en) | Quick installation interlude fossil fragments formula pendant | |
CN214272772U (en) | Practice thrift novel dry-hanging frame in space | |
JP6764208B1 (en) | Metal fittings for the back legs of tiles | |
CN207228536U (en) | A kind of dry-hanging installation structure for vertical faces of stone materials | |
CN216920949U (en) | A coupling assembling for connecting main joist and decorative board | |
CN206636029U (en) | A kind of horizontal card plug-in unit | |
KR20210073136A (en) | A coupling device for race way | |
JP2010144435A (en) | Fixing structure of stile for vestibule | |
CN215398103U (en) | Mounting fastener and guide rail assembly for vehicle curtain | |
CN204781542U (en) | Smallpox keel structure | |
CN210563165U (en) | Dry-hanging wall brick connecting sleeve | |
CN215253878U (en) | Light steel keel gypsum board suspended ceiling | |
CN213741782U (en) | Porcelain plate dry-hanging structure and dry-hanging porcelain plate curtain wall | |
CN211008367U (en) | Inorganic fiber cloth-based fireproof curtain surface | |
CN209556895U (en) | A kind of zigzag Buddha's warrior attendant net tent and its mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190607 |