CN109812025A - A kind of installation method improving blast funnace hot blast stove furnace shell splicing accuracy and speed - Google Patents

A kind of installation method improving blast funnace hot blast stove furnace shell splicing accuracy and speed Download PDF

Info

Publication number
CN109812025A
CN109812025A CN201910122225.7A CN201910122225A CN109812025A CN 109812025 A CN109812025 A CN 109812025A CN 201910122225 A CN201910122225 A CN 201910122225A CN 109812025 A CN109812025 A CN 109812025A
Authority
CN
China
Prior art keywords
furnace shell
steel plate
bar steel
fitting
assembly jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910122225.7A
Other languages
Chinese (zh)
Other versions
CN109812025B (en
Inventor
易万君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201910122225.7A priority Critical patent/CN109812025B/en
Publication of CN109812025A publication Critical patent/CN109812025A/en
Application granted granted Critical
Publication of CN109812025B publication Critical patent/CN109812025B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of installation methods for improving blast funnace hot blast stove furnace shell splicing accuracy and speed, and steps are as follows: the hangs muscle of fixed perforated bolt built-in fitting being rested on the suitable for reading of basic beam forms and is fixed;Perforated bolt built-in fitting is installed;Bar steel plate is installed on the outside of foundation beam, both ends are connect with perforated bolt embedded part bolt;Pressing plate muscle is added among bar steel plate;Furnace shell assembly when existing assembly jig is not able to satisfy, successively cuts off pressing plate muscle and bar steel plate because furnace shell radius substantially becomes smaller to vault in sequence;After the furnace shell assembly jig assembly dismounting on the outside of foundation beam will be mounted on, it is transferred to installation on the inside of foundation beam;Furnace shell assembly finishes, and removes billet and bar steel plate, may be reused.The present invention has the advantages that bearing capacity is high, deformation is small using beam type cast-in-place concrete assembly jig, and the direct-burried bar shaped built-in fitting that the installation horizontal accuracy of the detachable large-scale bar steel plate of assembly jig installation is more traditional greatly improves.

Description

A kind of installation method improving blast funnace hot blast stove furnace shell splicing accuracy and speed
Technical field
The present invention relates to technical field of civil engineering, more particularly to a kind of raising blast funnace hot blast stove furnace shell splicing accuracy and The installation method of speed.
Background technique
Traditional blast funnace hot blast stove furnace shell assembly jig mainly has two kinds of shapes of steel assembly jig and cast-in-place concrete assembly jig Formula.Assembly jig needed for newly-built blast funnace hot blast stove on-site consolidation generally uses cast-in-place plank frame.
But plank frame concrete assembly jig pours that area is big, thickness is usually partially thin that (thickness increases to concrete Consumption influences big), therefore board-like concrete assembly jig concrete consumption is not only larger, effect is not ideal enough, and furnace shell is assembled Stage is easy to happen fracture, influences furnace shell splicing accuracy, " rice " shape large-sized direct-burried item of traditional board-like concrete assembly jig Shape built-in fitting length is long, and installation level precision is not high.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of raising blast funnace hot blast stove furnace shell splicing accuracy and speed Installation method has the advantages that bearing capacity is high, deformation is small using beam type cast-in-place concrete assembly jig, and assembly jig is installed detachable The direct-burried bar shaped built-in fitting that the installation horizontal accuracy of large-scale bar steel plate is more traditional greatly improves.
The technical solution adopted by the present invention to solve the technical problems is: it is assembled to provide a kind of raising blast funnace hot blast stove furnace shell The installation method of accuracy and speed, comprising the following steps:
(a) the basic beam forms and adjusting template absolute altitude suitable for reading of hot-blast stove assembly jig concrete foundation beam are installed;
(b) hangs muscle for being used to fix perforated bolt built-in fitting is rested on into the suitable for reading of basic beam forms and fixed;
(c) perforated bolt built-in fitting is installed on the inside of basic beam forms and is connected with hangs muscle, and is worn in the upper end of hangs muscle Bolt and nut can accurately adjust the installed height mark of perforated bolt built-in fitting by rotating nuts;
(d) in the casting process of concrete foundation beam and annular girder, reserved joint bar is uniformly inserted on foundation beam surface;
(e) the bar shaped steel that the section for connecting furnace shell assembly jig is in " rice " font is set on the outside of concrete foundation beam Plate is bolted between the both ends of the bar steel plate and corresponding perforated bolt built-in fitting;
(f) pressing plate muscle is added among bar steel plate, bar steel plate is pushed down and aligned, and the levelness of bar steel plate reaches furnace After shell splicing accuracy requires, pressing plate muscle is mutually welded with corresponding reserved joint bar;
(g) assembly of progress furnace shell, assembly to vault, because furnace shell radius substantially becomes smaller, when existing assembly jig is not able to satisfy, Pressing plate muscle and bar steel plate are successively cut off in sequence;
(h) after the furnace shell assembly jig assembly dismounting on the outside of concrete foundation beam will be mounted on, it is transferred to concrete foundation Installation on the inside of beam, erection sequence are detailed in above-mentioned step (e) and step (f);
(i) furnace shell assembly finishes, and removes bar steel plate, may be reused.
As a kind of supplement, billet is installed to increase bearing area on the downside of the both ends of bar steel plate in step (e).
The utility model has the advantages that the present invention relates to a kind of installation method for improving blast funnace hot blast stove furnace shell splicing accuracy and speed, compared with Traditional board-like concrete assembly jig, beam type assembly jig concreting amount largely reduce;The ironware of the assembly jig is by traditional " rice " font pre-embedded steel slab is changed to bolted detachable member, and steel using amount reduces half, and may be reused;It is new assembled The bar steel plate horizontal accuracy of platform is high, is conducive to furnace shell quick-assembling, construction consumptive material is greatly decreased, assembly jig installation accuracy is high, Tool-type steel member can be recycled, and furnace shell assembly jig construction cost can reduce by 60% or more compared with traditional method.
Detailed description of the invention
Fig. 1 is built-in fitting arrangement schematic diagram of the invention;
Fig. 2 is installation of embedded parts local overlooking schematic diagram of the invention;
Fig. 3 is installation of embedded parts partial schematic sectional view of the invention;
Fig. 4 is a kind of scheme of installation of bar steel plate of the invention.
Diagram: 1, basic beam forms;2, hangs muscle;3, perforated bolt built-in fitting;4, bolt and nut;5, reserved joint bar;6, item Shape steel plate;7, billet;8, pressing plate muscle.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
As shown in Figs 1-4, embodiments of the present invention are related to a kind of raising blast funnace hot blast stove furnace shell splicing accuracy and speed Installation method, comprising the following steps:
(a) the basic beam forms 1 and adjusting template absolute altitude suitable for reading of hot-blast stove assembly jig concrete foundation beam are installed;
(b) hangs muscle 2 for being used to fix perforated bolt built-in fitting 3 is rested on into the suitable for reading of basic beam forms 1 and fixed;
(c) perforated bolt built-in fitting 3 is installed on the inside of basic beam forms 1 and is connected with hangs muscle 2, and in the upper end of hangs muscle 2 Bolt and nut 4 is worn, the installed height mark of perforated bolt built-in fitting 3 can be accurately adjusted by rotating nuts 4;
(d) in the casting process of concrete foundation beam and annular girder, reserved joint bar 5 is uniformly inserted on foundation beam surface;
(e) bar steel plate that the section for connecting furnace shell assembly jig is in " rice " font is set on the outside of concrete foundation beam 6, it is bolted between the both ends of the bar steel plate 6 and corresponding perforated bolt built-in fitting 3;
(f) pressing plate muscle 8 is added among bar steel plate 6, bar steel plate 6 is pushed down and aligned, the levelness of bar steel plate 6 reaches After being required to furnace shell splicing accuracy, pressing plate muscle 8 is mutually welded with corresponding reserved joint bar 5;
(g) assembly of progress furnace shell, assembly to vault, because furnace shell radius substantially becomes smaller, when existing assembly jig is not able to satisfy, Pressing plate muscle 8 and bar steel plate 6 are successively cut off in sequence;
(h) after removing the furnace shell assembly jig assembly for being mounted on 1 outside of concrete foundation beam, it is transferred to concrete foundation It is installed on the inside of beam 1, erection sequence is detailed in above-mentioned step (e) and step (f);
(i) furnace shell assembly finishes, and removes bar steel plate 6, may be reused.
Wherein, billet 7 is installed to increase bearing area on the downside of the both ends of bar steel plate 6 in step (e), if installation Billet 7 then is required to remove billet 7 in step (g) and step (i).
The present invention has the advantages that bearing capacity is high, deformation is small using beam type cast-in-place concrete assembly jig, assembly jig installation The direct-burried bar shaped built-in fitting that the installation horizontal accuracy of detachable large size bar steel plate is more traditional greatly improves.

Claims (2)

1. a kind of installation method for improving blast funnace hot blast stove furnace shell splicing accuracy and speed, which comprises the following steps:
(a) the basic beam forms (1) and adjusting template absolute altitude suitable for reading of hot-blast stove assembly jig concrete foundation beam are installed;
(b) hangs muscle (2) for being used to fix perforated bolt built-in fitting (3) is rested on into the suitable for reading of basic beam forms (1) and fixed;
(c) perforated bolt built-in fitting (3) are installed on the inside of basic beam forms (1) and are connected with hangs muscle (2), and in hangs muscle (2) Bolt and nut (4) are worn in upper end, and the installed height mark of perforated bolt built-in fitting (3) can be accurately adjusted by rotating nuts (4);
(d) in the casting process of concrete foundation beam and annular girder, reserved joint bar (5) are uniformly inserted on foundation beam surface;
(e) bar steel plate (6) that the section for connecting furnace shell assembly jig is in " rice " font is set on the outside of concrete foundation beam, It is bolted between the both ends of the bar steel plate (6) and corresponding perforated bolt built-in fitting (3);
(f) pressing plate muscle (8) are added among bar steel plate (6), bar steel plate (6) is pushed down and aligned, the level of bar steel plate (6) After degree reaches furnace shell splicing accuracy requirement, pressing plate muscle (8) is mutually welded with corresponding reserved joint bar (5);
(g) assembly of progress furnace shell, assembly to vault, because furnace shell radius substantially becomes smaller, when existing assembly jig is not able to satisfy, according to Sequence successively cuts off pressing plate muscle (8) and bar steel plate (6);
(h) it after the furnace shell assembly jig assembly dismounting on the outside of concrete foundation beam will be mounted on, is transferred in concrete foundation beam Side installation, erection sequence are detailed in above-mentioned step (e) and step (f);
(i) furnace shell assembly finishes, and removes bar steel plate (6), may be reused.
2. the installation method according to claim 1 for improving blast funnace hot blast stove furnace shell splicing accuracy and speed, feature exist In: billet (7) is installed to increase bearing area on the downside of the both ends of bar steel plate (6) in step (e).
CN201910122225.7A 2019-02-19 2019-02-19 Installation method for improving assembling precision and speed of blast furnace hot blast stove shell Active CN109812025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910122225.7A CN109812025B (en) 2019-02-19 2019-02-19 Installation method for improving assembling precision and speed of blast furnace hot blast stove shell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910122225.7A CN109812025B (en) 2019-02-19 2019-02-19 Installation method for improving assembling precision and speed of blast furnace hot blast stove shell

Publications (2)

Publication Number Publication Date
CN109812025A true CN109812025A (en) 2019-05-28
CN109812025B CN109812025B (en) 2021-02-09

Family

ID=66606771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910122225.7A Active CN109812025B (en) 2019-02-19 2019-02-19 Installation method for improving assembling precision and speed of blast furnace hot blast stove shell

Country Status (1)

Country Link
CN (1) CN109812025B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2338047A1 (en) * 1973-07-26 1975-03-06 G Sojusny I Projektirowaniju M Blast-furnace casting-shop structure - with additional lower carrier ring set on frame pillars
US4064616A (en) * 1975-10-02 1977-12-27 Sankyu Inc. Method for constructing a blast furnace
CN201343543Y (en) * 2009-02-20 2009-11-11 中冶实久建设有限公司 Movable hanging scaffold for installing hot blast furnace
CN201605791U (en) * 2009-12-07 2010-10-13 天津二十冶建设有限公司 Platform used for furnace shell assembly
CN103801921A (en) * 2012-11-14 2014-05-21 五冶集团上海有限公司 Kiln shell mounting method for vertical shaft kiln
CN104959741A (en) * 2015-07-08 2015-10-07 中国十七冶集团有限公司 Detachable assembling platform and furnace shell welding alignment method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2338047A1 (en) * 1973-07-26 1975-03-06 G Sojusny I Projektirowaniju M Blast-furnace casting-shop structure - with additional lower carrier ring set on frame pillars
US4064616A (en) * 1975-10-02 1977-12-27 Sankyu Inc. Method for constructing a blast furnace
CN201343543Y (en) * 2009-02-20 2009-11-11 中冶实久建设有限公司 Movable hanging scaffold for installing hot blast furnace
CN201605791U (en) * 2009-12-07 2010-10-13 天津二十冶建设有限公司 Platform used for furnace shell assembly
CN103801921A (en) * 2012-11-14 2014-05-21 五冶集团上海有限公司 Kiln shell mounting method for vertical shaft kiln
CN104959741A (en) * 2015-07-08 2015-10-07 中国十七冶集团有限公司 Detachable assembling platform and furnace shell welding alignment method

Also Published As

Publication number Publication date
CN109812025B (en) 2021-02-09

Similar Documents

Publication Publication Date Title
CN206646813U (en) Template system for pouring concrete column
CN208702197U (en) A kind of big displacement integral jacking Compact Mounts
CN206308654U (en) Prefabricated assembled railing
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN201738250U (en) Arch culvert and arch ring steel die trolley
CN100480398C (en) Self-hoisting construction method and furnace top crane for general overhaul of blast furnace
CN106759457A (en) The installation method of cantilever design high-accuracy built-in fitting
CN102564135A (en) Construction method for repairing refractory material on top of heating furnace
CN101294443A (en) High altitude platform mounting method
CN101255773A (en) H-shaped steel for electrified railroad contact network pillar as well as preparation technique thereof
CN107988924A (en) A kind of steel based on re-building of old bridge-mixed composite beam bridge system transform system and conversion method
CN108571166A (en) A kind of deformation joint formwork construction method
CN214657263U (en) Adjustable post-cast strip power transmission device of prestressing force
CN109812025A (en) A kind of installation method improving blast funnace hot blast stove furnace shell splicing accuracy and speed
CN102733406A (en) Railway construction method of solid concrete roadbed in large-size industrial plant
CN101368372A (en) Bearing support
CN103938755A (en) Shock insulation structure for under-shaft hanging type transfer girders, and construction method of shock insulation structure
CN110453916A (en) By the arc beam construction method of adjustable arc beams regularization formwork erecting structure
CN105350719A (en) Large span post-pouring belt early-dismantled mould additionally installed temporary constructional column construction method
CN113339055B (en) Filling body pouring and curing device and using method thereof
CN107460879A (en) A kind of fixed structure of flare template
CN104015261B (en) Combined, scalable prefabricated concrete element built-in fitting positions loose tool and construction technology thereof
CN207633235U (en) A kind of mixed composite beam bridge system transform system of the steel-based on re-building of old bridge
CN202787992U (en) Constructional column top concrete pouring structure
CN105569070B (en) The method for pouring large-size concrete beam column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant