CN109812004A - A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction - Google Patents

A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction Download PDF

Info

Publication number
CN109812004A
CN109812004A CN201910063529.0A CN201910063529A CN109812004A CN 109812004 A CN109812004 A CN 109812004A CN 201910063529 A CN201910063529 A CN 201910063529A CN 109812004 A CN109812004 A CN 109812004A
Authority
CN
China
Prior art keywords
steel
sunpender
cushion block
reinforced concrete
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910063529.0A
Other languages
Chinese (zh)
Inventor
黎新锋
厍龙斌
梁义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910063529.0A priority Critical patent/CN109812004A/en
Publication of CN109812004A publication Critical patent/CN109812004A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of detachable hanging baskets and construction method for high-altitude steel reinforced concrete corridor construction, it is related to technical field of building construction, it is fixedly connected respectively with steel main beam and fashioned iron secondary beam by high-strength bolt including beams of concrete, the concrete girder is equipped with the second I-steel, and the left and right both ends of the second I-steel are respectively equipped with perforative first sunpender and the second sunpender;Dense mesh screen is equipped on the outside of first sunpender, inside is equipped with safety net.The present invention is construction is simple, safe and reliable using a kind of reversely hung Yong and by the operation platform of steel main beam and fashioned iron time beam stress;On the one hand it can be easily installed and remove using separable special-shaped cushion block, on the other hand solve the problems, such as that special-shaped cushion block falls off from the first sunpender and the second sunpender;Second I-steel of the invention can be therefore with good economic efficiency with recycling and reusing.

Description

A kind of detachable hanging basket and construction for high-altitude steel reinforced concrete corridor construction Method
Technical field
The present invention relates to technical field of building construction, more particularly, to a kind of for high-altitude steel reinforced concrete corridor construction Detachable hanging basket and construction method.
Background technique
At present when high-altitude long-span steel reinforced concrete structure corridor construction, set up the template of steel reinforced concrete girder, be from Full hall scaffold is set up as construction operation platform in ground, not only costly, long in time limit, and safety risks are also more.Cause This, solves the problems, such as how on high-altitude long-span steel reinforced concrete girder to set up template, just seems extremely urgent.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind to be used for high-altitude fashioned iron The detachable hanging basket and construction method of concrete corridor construction, on its effective solution high-altitude long-span steel reinforced concrete girder The problem of template high cost, long construction period, safety is set up, while reducing the investment of construction material and equipment.
To achieve the goals above, the technical scheme adopted by the invention is as follows: it is provided a kind of to be used for high-altitude fashioned iron coagulation The detachable hanging basket of native corridor construction, including beams of concrete are solid by high-strength bolt with steel main beam and fashioned iron secondary beam respectively Fixed connection, the concrete girder are equipped with the second I-steel, and the left and right both ends of the second I-steel are respectively equipped with perforative the One sunpender and the second sunpender;First sunpender and the second sunpender are successively arranged nut and abnormity close to the second I-steel one end and pad Block, and nut, special-shaped cushion block, channel steel, template are successively arranged far from the second I-steel one end;It is equipped on the outside of first sunpender close Mesh net, inside are equipped with safety net;Steel pipe is equipped between the channel steel and thick template;First sunpender and the second sunpender are located at Reinforcing bar is partially equipped between second I-steel and template;The fashioned iron secondary beam is equipped with short steel pipes, runs through in the short steel pipes There are the first sunpender, the second sunpender.
Preferably, the special-shaped cushion block includes being symmetrical arranged the first cushion block, the second cushion block, first cushion block and the second pad The middle position of block opens up semi-circular hole, and one end of the first cushion block and the second cushion block opens up rectangular channel, first cushion block with Second cushion block is adapted.
Preferably, the thickness of first cushion block and second cushion block is 10~20mm.
Preferably, the template with a thickness of 13~25mm.
Preferably, the nominal diameter of steel pipe is DN50 or DN65.
Preferably, the quantity of first sunpender and second sunpender is 6~10.
The invention also discloses a kind of construction method of detachable hanging basket for high-altitude steel reinforced concrete corridor construction, The following steps are included:
A, firstly, in beams of concrete pre-buried short steel pipes, and the second I-steel and fashioned iron secondary beam is respectively welded in upper and lower ends, Second I-steel and the fashioned iron secondary beam and short steel pipes contact position open up through-hole respectively;
B, then, the first sunpender and the second sunpender are placed individually into short steel pipes, distinguished close to the second I-steel one end Special-shaped cushion block is installed, and is tightened using nut;First sunpender and the second sunpender other end successively install channel steel, steel pipe, template, and It is fixedly connected using special-shaped cushion block with nut;
C, first sunpender and the second sunpender are passed through reinforcing bar respectively again to be fixedly connected with concrete walls;
D, finally, installing Dense mesh screen on the outside of first sunpender, safety net is installed in inside.
Compared with prior art, the present invention can obtain following technical effect: the present invention is using a kind of reversely hung Yong and by type The operation platform of steel girder and fashioned iron time beam stress, it is construction is simple, safe and reliable;Use separable special-shaped cushion block one side energy It is easily installed and removes, on the other hand solve the problems, such as that special-shaped cushion block falls off from the first sunpender and the second sunpender;The present invention The second I-steel can be therefore with good economic efficiency with recycling and reusing.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is A of the invention to partial enlarged view;
Fig. 3 is special-shaped cushion block structure schematic diagram of the invention.
Wherein, the 1, first I-steel, the 2, second I-steel, 3, channel steel, the 4, first sunpender, the 41, second sunpender, 5, reinforcing bar, 6, steel pipe, 7, template, 8, short steel pipes, 9, nut, 10, Dense mesh screen, 11, safety net, 12, fashioned iron secondary beam, 13, steel main beam, 14, High-strength bolt, 15, special-shaped cushion block, the 151, first cushion block, the 152, second cushion block.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment one
As shown in Figure 1-3, a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction, including beams of concrete It is fixedly connected respectively with steel main beam 13 and fashioned iron secondary beam 12 by high-strength bolt 14, the concrete girder 13 is equipped with the Two I-steel 2, the left and right both ends of second I-steel 2 are respectively equipped with perforative first sunpender 4 and the second sunpender 41;Described One sunpender 4 and the second sunpender 41 are successively arranged nut 9 and special-shaped cushion block 15 close to 2 one end of the second I-steel, and far from the second work 2 one end of word steel is successively arranged nut 9, special-shaped cushion block 15, channel steel 3, template 4;Dense mesh screen 10 is equipped on the outside of first sunpender 4, Inside is equipped with safety net 11;Steel pipe 6 is equipped between the channel steel 3 and template 7;The position of first sunpender 4 and the second sunpender 41 Reinforcing bar 5 is partially equipped between the second I-steel 2 and template 7;The fashioned iron secondary beam 12 is equipped with short steel pipes 8, the short steel Running through in pipe 8 has the first sunpender 4, the second sunpender 41.
Wherein: the abnormity cushion block 15 includes being symmetrical arranged the first cushion block 151, the second cushion block 152, first cushion block 151 and second the middle position of cushion block 152 open up semi-circular hole, and one end of the first cushion block 151 and the second cushion block 152 opens up square Shape slot, first cushion block 151 are adapted with the second cushion block 152;The thickness of first cushion block 151 and second cushion block 152 Degree is 10mm;The template 7 with a thickness of 13mm;6 nominal diameter of steel pipe is DN50;First sunpender 4 and described The quantity of second sunpender 41 is 6.
Embodiment two
As shown in Figure 1-3, a kind of construction method of the detachable hanging basket for high-altitude steel reinforced concrete corridor construction, packet Include following steps:
A, firstly, in beams of concrete pre-buried short steel pipes 8, and the second I-steel 2 and fashioned iron time is respectively welded in upper and lower ends Beam 12, second I-steel 2 and the fashioned iron secondary beam 12 and 8 contact position of short steel pipes open up through-hole respectively;
B, then, the first sunpender 4 and the second sunpender 41 are placed individually into short steel pipes 8, close to 2 one end of the second I-steel Special-shaped cushion block 15 is installed respectively, and is tightened using nut 9;First sunpender 4 and 41 other end of the second sunpender successively install channel steel 3, Steel pipe 6, template 7, and be fixedly connected using special-shaped cushion block 15 with nut 9;
C, first sunpender 4 and the second sunpender 41 are fixedly connected by reinforcing bar 5 with concrete walls respectively again;
D, finally, installing Dense mesh screen 10 on the outside of first sunpender 4, safety net 11 is installed in inside.
Obviously present invention specific implementation is not subject to the restrictions described above, as long as using method concept and skill of the invention The improvement for the various unsubstantialities that art scheme carries out, or not improved the conception and technical scheme of the invention are directly applied to it Its occasion, it is within the scope of the present invention.

Claims (7)

1. a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction, including beams of concrete respectively with steel main beam It is fixedly connected with fashioned iron secondary beam by high-strength bolt, the concrete girder is equipped with the second I-steel, it is characterised in that: institute It states the left and right both ends of the second I-steel and is respectively equipped with perforative first sunpender and the second sunpender;First sunpender and the second sunpender Nut and special-shaped cushion block are successively arranged close to the second I-steel one end, and are successively arranged nut, different far from the second I-steel one end Shape cushion block, channel steel, template;Dense mesh screen is equipped on the outside of first sunpender, inside is equipped with safety net;The channel steel and thick template it Between be equipped with steel pipe;First sunpender and the second sunpender are partially equipped with reinforcing bar between the second I-steel and template;Institute It states fashioned iron secondary beam and is equipped with short steel pipes, running through in the short steel pipes has the first sunpender, the second sunpender.
2. a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction according to claim 1, feature Be: the abnormity cushion block includes being symmetrical arranged the first cushion block, the second cushion block, the interposition of first cushion block and the second cushion block It sets and opens up semi-circular hole, and one end of the first cushion block and the second cushion block opens up rectangular channel, first cushion block and the second cushion block phase Adaptation.
3. a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction according to claim 2, feature Be: the thickness of first cushion block and second cushion block is 10~20mm.
4. a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction according to claim 1, feature Be: the template with a thickness of 13~25mm.
5. a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction according to claim 1, feature Be: the nominal diameter of steel pipe is DN50 or DN65.
6. a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction according to claim 1, feature Be: the quantity of first sunpender and second sunpender is 6~10.
7. such as a kind of detachable hanging basket for high-altitude steel reinforced concrete corridor construction as claimed in any one of claims 1 to 6 Construction method, which comprises the following steps:
A, firstly, in beams of concrete pre-buried short steel pipes, and the second I-steel and fashioned iron secondary beam is respectively welded in upper and lower ends, described Second I-steel and the fashioned iron secondary beam and short steel pipes contact position open up through-hole respectively;
B, then, the first sunpender and the second sunpender are placed individually into short steel pipes, installed respectively close to the second I-steel one end Special-shaped cushion block, and tightened using nut;First sunpender and the second sunpender other end successively install channel steel, steel pipe, template, and use Special-shaped cushion block is fixedly connected with nut;
C, first sunpender and the second sunpender are passed through reinforcing bar respectively again to be fixedly connected with concrete walls;
D, finally, installing Dense mesh screen on the outside of first sunpender, safety net is installed in inside.
CN201910063529.0A 2019-01-23 2019-01-23 A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction Pending CN109812004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910063529.0A CN109812004A (en) 2019-01-23 2019-01-23 A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910063529.0A CN109812004A (en) 2019-01-23 2019-01-23 A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction

Publications (1)

Publication Number Publication Date
CN109812004A true CN109812004A (en) 2019-05-28

Family

ID=66603178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910063529.0A Pending CN109812004A (en) 2019-01-23 2019-01-23 A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction

Country Status (1)

Country Link
CN (1) CN109812004A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185262A (en) * 2019-06-14 2019-08-30 中国十七冶集团有限公司 A kind of hanging platform peace dismantling device and application method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1011375C2 (en) * 1999-02-23 2000-08-24 Sgb North Europ B V Maintenance staging frame for inside chimney stacks, has external guide wheels which prevent contact between staging frame and brickwork, during use.
CN1908335A (en) * 2005-08-02 2007-02-07 浙江耀江建设集团股份有限公司 Suspension holder construction method
EP1914359A1 (en) * 2006-10-16 2008-04-23 Ibmo International Ag Ceiling construction
CN101775896A (en) * 2010-02-11 2010-07-14 浙江大学 Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold
CN109025295A (en) * 2018-08-03 2018-12-18 中国十七冶集团有限公司 A kind of high-altitude long-span steel reinforced concrete corridor construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1011375C2 (en) * 1999-02-23 2000-08-24 Sgb North Europ B V Maintenance staging frame for inside chimney stacks, has external guide wheels which prevent contact between staging frame and brickwork, during use.
CN1908335A (en) * 2005-08-02 2007-02-07 浙江耀江建设集团股份有限公司 Suspension holder construction method
EP1914359A1 (en) * 2006-10-16 2008-04-23 Ibmo International Ag Ceiling construction
CN101775896A (en) * 2010-02-11 2010-07-14 浙江大学 Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold
CN109025295A (en) * 2018-08-03 2018-12-18 中国十七冶集团有限公司 A kind of high-altitude long-span steel reinforced concrete corridor construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185262A (en) * 2019-06-14 2019-08-30 中国十七冶集团有限公司 A kind of hanging platform peace dismantling device and application method

Similar Documents

Publication Publication Date Title
CN206144172U (en) Equipment standard platform of unloading of encorbelmenting
CN104947926B (en) Hard protection device for upper formwork system of inner barrel of core barrel and construction method of hard protection device
CN102900021B (en) Split mounting type bridge wet joint construction method
CN205501837U (en) Steel case roof beam becomes bridge welding simple platform
CN207727959U (en) Construction scaffold band iron formula rigid connecting tube
CN205012629U (en) Assembled modularization platform of unloading of encorbelmenting
CN204850414U (en) Shaped steel of encorbelmenting draws wire rope instrument formula anchor to one side
CN103556823A (en) Construction method with silo sliding formwork operating platform as top cover plate formwork supporting system
CN107524284A (en) A kind of regularization pylon protection system and installation method
CN108979131A (en) A kind of high-building construction steel form and operation frame integral hoisting stage apparatus
CN201420385Y (en) Overhanging type unloading platform for building construction
CN203583884U (en) Outer climbing frame follow-up type discharging platform
CN201786008U (en) Automatic follow-up unloading platform for outer climb frame
CN109812004A (en) A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction
CN203947756U (en) Exterior wall protective frame
CN201908429U (en) Assembly integral building overhanging discharging platform
CN201221194Y (en) Postposition pre-embedded type wall connecting components
CN202944998U (en) Attached installation and maintenance platform of calibrated tower crane
CN209244242U (en) A kind of fixed device of half tool-type U-bolt of the shaped steel suspension scaffolding
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN203640257U (en) Support of overhanging type scaffold
CN106836242B (en) Deep foundation pit anchor cable tensioning assembly type operation platform
CN203361605U (en) Anchor ring assembly
CN205591535U (en) Scaffold can be dismantled and is linked wall device
CN209081297U (en) A kind of bracing means of inclined fracture tower crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190528