CN110185262A CN201910513602.XA CN201910513602A CN110185262A CN 110185262 A CN110185262 A CN 110185262A CN 201910513602 A CN201910513602 A CN 201910513602A CN 110185262 A CN110185262 A CN 110185262A
Authority
CN
China
Prior art keywords
steel
nut
gasket
sunpender
steel sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910513602.XA
Other languages
Chinese (zh)
Inventor
厍龙斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910513602.XA priority Critical patent/CN110185262A/en
Publication of CN110185262A publication Critical patent/CN110185262A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/18Devices for suspending or anchoring form elements to girders placed in ceilings, e.g. hangers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of hanging platform peace dismantling device and application methods, belong to hanging platform technology field.The present invention includes gasket, nut, steel sleeve, sunpender and girder steel;The gasket is center open pore steel plate, and side ratio steel bushing pipe diameter is bigger, and the nut is mating with sunpender bar, and the steel sleeve is common steel tube, and internal diameter is twice of nut width, and the sunpender is round steel, aperture on the steel beam web plate, and steel sleeve described in aperture ratio is bigger;Sunpender both ends thread, segmentation group install hanger, from girder steel lower part, sequentially pass through girder steel, steel sleeve, gasket, nut is installed on gasket.The configuration of the present invention is simple, it is easily fabricated, it is practical, it is easy to operate, lot of materials and labour's investment can be reduced, is reduced costs.

Description

A kind of hanging platform peace dismantling device and application method
Technical field
The present invention relates to hanging platform technology fields, pacify dismantling device and use more specifically to a kind of hanging platform Method.
Background technique
With the fast development of construction industry, the raising of Building technology, more and more superelevation, large building engineering are not Disconnected to occur, high-altitude cast-in-place structural platform is more and more.But due to such component, span is larger to be in high-altitude, and component itself weight Amount is big, which is always the big weight difficult point for perplexing construction enterprises.Traditional console mode steel tube frame is not able to satisfy Steel reinforced concrete structure high-altitude and large span construction technology, safety coefficient is low, and steel pipe is great in constructing amount, and worker's amount of labour is big, due to Steel pipe itself load is larger, and ground cannot be met the requirements, and Construction of Steel Structure Platform Steel amount is big, at high cost, and peace tears difficulty open.
Summary of the invention
1, it to solve the problems, such as
It is not able to satisfy steel reinforced concrete structure high-altitude and large span construction technology for existing console mode steel tube frame, Safety coefficient is low, and steel pipe is great in constructing amount, and worker's amount of labour is big, and steel pipe itself load is larger, and ground cannot be met the requirements, steel construction The problems such as operation platform steel using amount is big, at high cost, and peace tears difficulty open, the present invention provides a kind of hanging platform peace dismantling device and uses Method, the apparatus structure is simple, it is practical, improve that construction efficiency, safety coefficient are high, reduce costs.
2, technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of hanging platform of the invention pacifies dismantling device, including gasket, nut, steel sleeve, sunpender and girder steel;The gasket For center open pore steel plate, side ratio steel bushing pipe diameter is bigger, and the nut is mating with sunpender bar, and the steel sleeve is ordinary steel Pipe, internal diameter are twice of nut width, and the sunpender is round steel, aperture on the steel beam web plate, and aperture ratio steel sleeve is bigger;It is described Sunpender both ends thread, segmentation group install hanger, from girder steel lower part, sequentially pass through girder steel, steel sleeve, gasket, install on gasket Good nut.
A kind of application method of hanging platform peace dismantling device of the invention, the steps include: to assemble several sets devices it Afterwards, the safeguard procedures such as safety net, template are installed, steel reinforced concrete beam bottom mother plate is formed;When removing, construct to cast-in-place structural At later, safeguard procedures are first removed, on cast-in-place structural platform, using wirerope binding in nut lower part, gasket is removed, passes through Steel sleeve and girder steel, decentralization to ground then block steel sleeve using concrete.
3, beneficial effect
Compared with the prior art, the invention has the benefit that
The configuration of the present invention is simple, it is easily fabricated, it is practical, it is easy to operate, lot of materials and labour's investment can be reduced, It reduces costs.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is using renderings of the invention.
In figure: 1, gasket;2, nut;3, steel sleeve;4, sunpender;5, girder steel.
Specific embodiment
The present invention is further described below with attached drawing combined with specific embodiments below:
Embodiment 1
If Fig. 1-2 shows, a kind of hanging platform of the present embodiment pacifies dismantling device, including gasket 1, nut 2, steel sleeve 3, sunpender 4 and girder steel 5, the gasket 1 is center open pore steel plate, and 3 diameter of side ratio steel sleeve is bigger, and the nut 2 threaded 4 is mating, The steel sleeve 3 is common steel tube, and internal diameter is twice of 2 width of nut, and the sunpender 4 is round steel, and carrying is able to satisfy hanging and requires, Aperture on 5 web of girder steel, aperture ratio steel sleeve 3 are bigger;The 4 both ends thread of sunpender, segmentation group installs hanger, from girder steel 5 lower parts sequentially pass through girder steel 5, steel sleeve 3, gasket 1, nut 2 are installed on gasket 1.
A kind of application method of hanging platform peace dismantling device of the present embodiment, the steps include: to assemble several sets device Later, the safeguard procedures such as safety net, template are installed, steel reinforced concrete beam bottom mother plate is formed;When removing, construct to cast-in-place structural After completion, safeguard procedures are first removed, on cast-in-place structural platform, using wirerope binding in 2 lower part of nut, remove gasket 1, By steel sleeve 3 and girder steel 5, decentralization to ground then blocks steel sleeve using concrete.Installation, demolishing process are simple, peace Entirely, cost reliably, is saved.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution Similar frame mode and embodiment, are within the scope of protection of the invention.

Claims (2)

1. a kind of hanging platform pacifies dismantling device, it is characterised in that: including gasket (1), nut (2), steel sleeve (3), sunpender (4) and Girder steel (5), the gasket (1) are center open pore steel plate, and side ratio steel sleeve (3) diameter is bigger, and the nut (2) is threaded (4) mating, the steel sleeve (3) is common steel tube, and internal diameter is nut (2) twice of width, and the sunpender (4) is round steel, described Aperture on girder steel (5) web, aperture ratio steel sleeve (3) are bigger;Sunpender (4) both ends thread, segmentation group installs hanger, from steel Beam (5) lower part sequentially passes through girder steel (5), steel sleeve (3), gasket (1), nut (2) is installed on gasket (1).
2. a kind of application method of hanging platform peace dismantling device according to claim 1, it is characterised in that: the steps include: After assembling several sets device, the safeguard procedures such as installation safety net, template form steel reinforced concrete beam bottom mother plate;It is tearing open Except when, to cast-in-place structural construction complete after, first remove safeguard procedures, on cast-in-place structural platform, using wirerope binding exist Nut (2) lower part is removed gasket (1), and by steel sleeve (3) and girder steel (5), decentralization to ground is then blocked using concrete Firmly steel sleeve.
CN201910513602.XA 2019-06-14 2019-06-14 A kind of hanging platform peace dismantling device and application method Pending CN110185262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910513602.XA CN110185262A (en) 2019-06-14 2019-06-14 A kind of hanging platform peace dismantling device and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910513602.XA CN110185262A (en) 2019-06-14 2019-06-14 A kind of hanging platform peace dismantling device and application method

Publications (1)

Publication Number Publication Date
CN110185262A true CN110185262A (en) 2019-08-30

Family

ID=67721797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910513602.XA Pending CN110185262A (en) 2019-06-14 2019-06-14 A kind of hanging platform peace dismantling device and application method

Country Status (1)

Country Link
CN (1) CN110185262A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3819143A (en) * 1968-11-04 1974-06-25 Hambro Structural Systems Ltd Formwork for concrete walls
CN205276860U (en) * 2015-12-25 2016-06-01 中国水利水电第八工程局有限公司 A template system that is used for two secondary structure at rail hang qu station to execute doing
CN106869492A (en) * 2015-12-13 2017-06-20 青岛星锐机械有限公司 A kind of across high-altitude truss mould plate
CN109812004A (en) * 2019-01-23 2019-05-28 中国十七冶集团有限公司 A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3819143A (en) * 1968-11-04 1974-06-25 Hambro Structural Systems Ltd Formwork for concrete walls
CN106869492A (en) * 2015-12-13 2017-06-20 青岛星锐机械有限公司 A kind of across high-altitude truss mould plate
CN205276860U (en) * 2015-12-25 2016-06-01 中国水利水电第八工程局有限公司 A template system that is used for two secondary structure at rail hang qu station to execute doing
CN109812004A (en) * 2019-01-23 2019-05-28 中国十七冶集团有限公司 A kind of detachable hanging basket and construction method for high-altitude steel reinforced concrete corridor construction

Similar Documents

Publication Publication Date Title
CN101200916B (en) Construction method of prestressed suspension type building structure
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN202787928U (en) Construction device for steel plate wall
CN204876547U (en) Big template system of APC shell structure
CN111677299A (en) Lifting device and method for steel bar truss floor support plate
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN102154990A (en) Electing method for side span overhang-middle span cable-stayed three-tower self-anchored type combination suspension bridge
CN110409318A (en) A kind of large span freely-supported steel reinforced concrete bondbeam assembling method
CN209293474U (en) A kind of support device that cantilevered structure falsework is shared with external scaffolding
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN106284103A (en) Steel reinforced concrete combination beam roof steel bar concrete high-altitude cantilever pouring construction method
CN202944998U (en) Attached installation and maintenance platform of calibrated tower crane
CN202658867U (en) Overhanging construction platform
CN110185262A (en) A kind of hanging platform peace dismantling device and application method
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN207244897U (en) A kind of underpinning structure for replacing underproof shear wall concrete
CN207062787U (en) Can Fast Installation remove maintenance construction platform
CN204960324U (en) Suspension type floor formwork support device
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN204081468U (en) A kind of shear-wall strengthening formwork structure
CN208981742U (en) A kind of builder's jack for housing construction
CN207209786U (en) The cast-in-place boom support monoblock type automatic disassembling device of falsework
CN207377096U (en) Overlength large girder scaffold building structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190830

RJ01 Rejection of invention patent application after publication