CN207727959U - Construction scaffold band iron formula rigid connecting tube - Google Patents

Construction scaffold band iron formula rigid connecting tube Download PDF

Info

Publication number
CN207727959U
CN207727959U CN201721698364.7U CN201721698364U CN207727959U CN 207727959 U CN207727959 U CN 207727959U CN 201721698364 U CN201721698364 U CN 201721698364U CN 207727959 U CN207727959 U CN 207727959U
Authority
CN
China
Prior art keywords
crossbar
band iron
steel pipe
building structure
construction scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721698364.7U
Other languages
Chinese (zh)
Inventor
戴栋栋
胡志友
徐华磊
魏敬荣
马建
范鑫
张磊
张为光
王伟松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bozhou Construction Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721698364.7U priority Critical patent/CN207727959U/en
Application granted granted Critical
Publication of CN207727959U publication Critical patent/CN207727959U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of construction scaffold band iron formula rigid connecting tubes, including:Band iron is in Z-shaped, and for being inserted into building structure, including first crossbar, vertical pole and the second crossbar being arranged in a mutually vertical manner, first crossbar and vertical pole are all embedded into building structure, are partly embedded into building structure in second crossbar;Steel pipe, one end are fixedly connected with band iron and support building structure to prevent construction scaffold flare deformation, and the other end is connected by right-angle coupler with upright bar in scaffold, to prevent construction scaffold introversion deformation;Wherein, the preformed hole passed through for screw rod is provided in second crossbar, it is provided with through-hole corresponding with preformed hole on the side wall of steel pipe, and is arranged with fastener outside steel pipe, screw rod passes through second crossbar, fastener and steel pipe and tightened by nut fixed band iron and steel pipe to be fixedly linked.The utility model combination Z-shaped band iron and steel pipe use, and are disposably arranged in place in shear wall, beam column alien invasion.

Description

Construction scaffold band iron formula rigid connecting tube
Technical field
The utility model is related to the technical fields of construction site scaffold safety measure more particularly to a kind of building to apply Work scaffold band iron formula rigid connecting tube.
Background technology
With the continuous development of building trade, the construction volume of engineering project constantly increases, high-rise even high-rise building Increasing, building enclosure and job platform of the scaffold as construction, if reinforcing is not in place, damage sequence is general It is very serious.
Currently, the scaffold wall connecting piece that construction site uses is mostly embedded steel tube measure, it is arranged not in structural facades Just the problems such as spacing is arranged in the wall-connecting piece for, being unable to fully meet code requirement, secondary structure construction period is easy by premature removal, And be substantially and be embedded in structural edge with story height, cannot achieve step pitch control for the higher building of floor height meets specification It is required that secondary structure is more the phenomenon that dismounting by wall-connecting piece when constructing, there are prodigious security risks.
Invention content
The purpose of this utility model is to provide a kind of buildings simple in structure, can preventing construction scaffold deformation Construction scaffolding band iron formula rigid connecting tube.
To achieve the above object, a kind of construction scaffold of the utility model band iron formula rigid connecting tube is specific Technical solution is:
A kind of construction scaffold band iron formula rigid connecting tube, including:Band iron is in Z-shaped, for being inserted into building knot In structure, including the first crossbar, vertical pole and the second crossbar that are arranged in a mutually vertical manner, first crossbar and vertical pole are all embedded into building knot In structure, partly it is embedded into building structure in second crossbar;Steel pipe, one end be fixedly connected with band iron and support building structure to prevent Construction scaffold flare deformation, the other end are connected by right-angle coupler with upright bar in scaffold, to prevent construction foot hand Frame introversion deformation;Wherein, it is provided with the preformed hole passed through for screw rod in second crossbar, is provided on the side wall of steel pipe and preformed hole Corresponding through-hole, and fastener is arranged with outside steel pipe, screw rod passes through second crossbar, fastener and steel pipe and tightens fixation by nut Band iron and steel pipe to be fixedly linked.
Further, the length of a diameter of 35-45mm of band iron, vertical pole are 115-125mm, are all embedded into building structure The length of first crossbar be 75-85mm, the length of second crossbar is 215-225mm.
Further, in second crossbar setting there are two preformed hole, with second crossbar both ends close, far from vertical pole respectively away from From 80-85mm and 35-45mm.
Further, the internal diameter of preformed hole is 10-15mm.
The advantages of construction scaffold of the utility model band iron formula rigid connecting tube, is:
1) it uses Z-shaped band iron and steel pipe to be used in combination, convenient for materials, is easily worked, is easy to operate, stood outside structure Face is directly cut off after use, does not interfere secondary structure to construct, after cutting off without repairing, it is economical and practical, safe and reliable, no It needs to repair, ne-leakage risk, exterior wall all sites can be disposably arranged in place in shear wall, beam column alien invasion, can be maximum Degree meets wall-connecting piece density, spacing setting requirements;
2) step pitch and span covering for meeting scaffold require, and are not limited by building floor height, Z-shaped band iron is embedded into coagulation In the building structure of soil, construction scaffold flare deformation is prevented, by simply processing and easy operation, realization foot hand Connect the better stress of wall measure between frame and building structure, while can technically prevent to break rules and regulations to remove, reduce secondary repairing, control System lays spacing, has better safety, practicability and economy, is not take up the construction spaces such as secondary structure masonry, is not required to It reserving hole can be cost-effective and to be prevented because wall-connecting piece is pre- there is no rear secondary repairing is cut off on masonry The risk of leakage that box out is brought, moreover it is possible to prevent wall-connecting piece because interfering construction by violating the regulations the phenomenon that removing, avoid operating personnel with Meaning removes the phenomenon that wall-connecting piece, has ensured that frame body is safe to use;
3) steel pipe is fastened by right-angle coupler and steel pipe, and one end is mutually supported with building structure, can prevent construction foot Hand cradle introversion deformation, and the drawbacks of eliminate flexible drawknot, realize rigid drawknot.
Description of the drawings
Fig. 1 is the structural schematic diagram of the rigid connecting tube of the utility model;
Fig. 2 a are the vertical view of the band iron in the utility model;
Fig. 2 b are the structural schematic diagram of the band iron in the utility model.
Specific implementation mode
In order to be better understood by the purpose of this utility model, structure and function, below in conjunction with the accompanying drawings, to the utility model Construction scaffold does further detailed description with band iron formula rigid connecting tube.
As shown in Fig. 1 to Fig. 2 b, it is shown as the construction scaffold band iron formula rigid connecting tube of the utility model, is wrapped Band iron 3 and steel pipe 4 are included, band iron 3 is in Z-shaped, and for being inserted into building structure 1, one end and the band iron 3 of steel pipe 4 are fixedly connected on Together and building structure 1 is supported, the other end is connected with upright bar in scaffold 5 by right-angle coupler 6, is prevented by Z-shaped band iron 3 Construction scaffold flare deformation, steel pipe 4 are preferably the short steel pipes in this field, and building structure 1 is supported by steel pipe 4, The drawbacks of eliminating flexible drawknot realizes rigid drawknot, it is therefore prevented that construction scaffold introversion deformation.The utility model Component in structure alien invasion, is directly cut off after use, is not required to repair, ne-leakage risk, do not interfere secondary structure and its His construction operation avoids, in wall-connecting piece position reserving hole, reducing renewal expense, operating personnel being avoided arbitrarily to remove wall-connecting piece Phenomenon ensures that frame body is safe to use.
Further, include first crossbar 31, vertical pole 32 and the second crossbar 33 being arranged in a mutually vertical manner in the band iron of Z-shaped 3, Preferred first crossbar 31 and vertical pole 32 are all embedded into building structure 1 in the utility model, and part is pre-buried in second crossbar 33 Enter in building structure 1, the crossbar sections not being embedded into building structure 1 in second crossbar are overhanging section.Specifically, band iron The length of 3 a diameter of 35-45mm (preferably 40mm), vertical pole 32 are 115-125mm (preferably 120mm), are all embedded into building The length of first crossbar 31 in structure is 75-85mm (preferably 80mm), the length of second crossbar 33 be 215-225mm (preferably 220mm)。
Further, the preformed hole 34 passed through for screw rod is provided in second crossbar 33, be provided on the side wall of steel pipe 4 in advance It boxes out 34 corresponding through-holes, and is arranged with fastener outside steel pipe 4, screw rod 2 passes through second crossbar 33, fastener and steel pipe 4 and passes through Nut is tightened fixed band iron 3 and steel pipe 4 to be fixedly linked.Wherein, there are two preformed holes for setting preferably in second crossbar 33, in advance 34 internal diameter of boxing out is 10-15mm (preferably 13mm), with close 33 both ends of second crossbar distance 80- respectively far from vertical pole 85mm and 35-45mm, and 4 housing of steel pipe is provided with fastener identical with reserved hole number, in the resistant slide power of double fasteners On the basis of using Z-shaped band iron anchor into stress in concrete building structures, by forcing checking, more securely and reliably.
Further, one end of the steel pipe far from building structure 1 by right-angle coupler 6 with upright bar in scaffold is perpendicular sets It sets, right-angle coupler 6 tightens torsional moment between 45-60NM.
Below in conjunction with the accompanying drawings to the course of work of the construction scaffold band iron formula rigid connecting tube of the utility model It is described:
When installation operation, first the band iron of Z-shaped 3 is embedded into according to the precalculated position of drawing and scheme in building structure 1, Z-shaped band iron 3 is for preventing construction scaffold flare deformation;Steel pipe 4 passes through the outer of the band iron 3 of fastening bolt 2 and Z-shaped Section is stretched to be fixed together, one end and 1 phase of building structure of steel pipe 4 are held out against, by steel pipe 4 support building structure 1 to prevent The other end of only construction scaffold introversion deformation, steel pipe 4 is solid by upright bar 5 in right-angle coupler 6 and perpendicular scaffold Surely it links together.
The construction scaffold of the utility model band iron formula rigid connecting tube is combined using Z-shaped band iron and steel pipe It uses, convenient for materials, is easily worked, is easy to operate, setting position is directly cut off, no in structure alien invasion after use Interfere secondary structure construction, after cutting off without repairing, it is economical and practical, safe and reliable, be not required to repair, ne-leakage risk, exterior wall institute There is position can disposably be arranged in place in shear wall, beam column alien invasion, wall-connecting piece density, spacing can be met to the greatest extent Setting requirements;The step pitch and span covering for meeting scaffold require, and are not limited by building floor height, Z-shaped band iron is embedded into coagulation In the building structure of soil, construction scaffold flare deformation is prevented, by simply processing and easy operation, realization foot hand Connect the better stress of wall measure between frame and building structure, while can technically prevent to break rules and regulations to remove, reduce secondary repairing, control System lays spacing, has better safety, practicability and economy, is not take up the construction spaces such as secondary structure masonry, is not required to It reserving hole can be cost-effective and to be prevented because wall-connecting piece is pre- there is no rear secondary repairing is cut off on masonry The risk of leakage that box out is brought, moreover it is possible to prevent wall-connecting piece because interfering construction by violating the regulations the phenomenon that removing, avoid operating personnel with Meaning removes the phenomenon that wall-connecting piece, has ensured that frame body is safe to use;Steel pipe is fastened by right-angle coupler and steel pipe, and one end is tied with building Structure is mutually supported, and the drawbacks of capable of preventing construction scaffold introversion deformation, and eliminate flexible drawknot, realizes rigid drawing Knot.
The utility model is further described by specific embodiment above, it should be understood that, have here The description of body, should not be construed as the restriction to the spirit and scope of the utility model, and one of ordinary skilled in the art is readding The various modifications made to above-described embodiment after reader specification belong to the range that the utility model is protected.

Claims (4)

1. a kind of construction scaffold band iron formula rigid connecting tube, which is characterized in that including:
Band iron (3) is in Z-shaped, for being inserted into building structure (1), including be arranged in a mutually vertical manner first crossbar (31), vertical pole (32) it is all embedded into building structure (1) with second crossbar (33), first crossbar (31) and vertical pole (32), second crossbar (33) Middle part is embedded into building structure (1);
Steel pipe (4), one end are fixedly connected with band iron (3) and support building structure (1) to prevent construction scaffold flare deformation, The other end is connected by right-angle coupler (6) with upright bar in scaffold (5), to prevent construction scaffold introversion deformation;
Wherein, the preformed hole (34) passed through for screw rod is provided in second crossbar (33), be provided on the side wall of steel pipe (4) in advance It boxes out (34) corresponding through-hole, and is arranged with fastener outside steel pipe (4), screw rod (2) passes through second crossbar (33), fastener and steel pipe (4) and by nut it tightens fixed band iron (3) and steel pipe (4) to be fixedly linked.
2. construction scaffold according to claim 1 band iron formula rigid connecting tube, which is characterized in that band iron (3) A diameter of 35-45mm, the length of vertical pole (32) is 115-125mm, the first crossbar being all embedded into building structure (1) (31) length is 75-85mm, and the length of second crossbar (33) is 215-225mm.
3. construction scaffold according to claim 1 band iron formula rigid connecting tube, which is characterized in that second crossbar (33) setting is there are two preformed hole on, with second crossbar (33) both ends close, far from vertical pole distance 80-85mm and 35- respectively 45mm。
4. construction scaffold according to claim 1 or 3 band iron formula rigid connecting tube, which is characterized in that reserved The internal diameter in hole (34) is 10-15mm.
CN201721698364.7U 2017-12-08 2017-12-08 Construction scaffold band iron formula rigid connecting tube Expired - Fee Related CN207727959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721698364.7U CN207727959U (en) 2017-12-08 2017-12-08 Construction scaffold band iron formula rigid connecting tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721698364.7U CN207727959U (en) 2017-12-08 2017-12-08 Construction scaffold band iron formula rigid connecting tube

Publications (1)

Publication Number Publication Date
CN207727959U true CN207727959U (en) 2018-08-14

Family

ID=63097966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721698364.7U Expired - Fee Related CN207727959U (en) 2017-12-08 2017-12-08 Construction scaffold band iron formula rigid connecting tube

Country Status (1)

Country Link
CN (1) CN207727959U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821142A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Prefabricated structure outer frame drawknot structure and construction method
CN110821141A (en) * 2019-10-31 2020-02-21 上海建工七建集团有限公司 Scaffold wall connecting piece and using method thereof
CN111305544A (en) * 2020-03-30 2020-06-19 中国核工业中原建设有限公司 Height-adjustable who adheres to in construction beam's scaffold frame of encorbelmenting is wall device even
CN112252702A (en) * 2020-09-24 2021-01-22 中建四局第六建设有限公司 Outer frame wall connecting piece connecting method and device
CN115126213A (en) * 2022-08-17 2022-09-30 中国建筑第二工程局有限公司 Construction method for outer wall scaffold wall connecting piece without leaving hole

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821141A (en) * 2019-10-31 2020-02-21 上海建工七建集团有限公司 Scaffold wall connecting piece and using method thereof
CN110821142A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Prefabricated structure outer frame drawknot structure and construction method
CN111305544A (en) * 2020-03-30 2020-06-19 中国核工业中原建设有限公司 Height-adjustable who adheres to in construction beam's scaffold frame of encorbelmenting is wall device even
CN112252702A (en) * 2020-09-24 2021-01-22 中建四局第六建设有限公司 Outer frame wall connecting piece connecting method and device
CN115126213A (en) * 2022-08-17 2022-09-30 中国建筑第二工程局有限公司 Construction method for outer wall scaffold wall connecting piece without leaving hole

Similar Documents

Publication Publication Date Title
CN207727959U (en) Construction scaffold band iron formula rigid connecting tube
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
US6270057B1 (en) Reuseable multi-story building construction guardrail system
CN102444203A (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN210239103U (en) Novel scaffold wall connecting piece structure
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
CN104005556A (en) Shaped and fabricated formwork construction process used for shear wall at expansion and contraction joint
CN209211748U (en) A kind of structure node of assembled ceiling radiating system
CN202039590U (en) Steel pipe type scaffold wall connecting device
CN205955213U (en) Mortar stirring canopy can be had enough to meet need in job site
DE102017213613B4 (en) Method for producing a ceiling opening to be closed subsequently
CN202324680U (en) Protection device of elevator shaft
CN202689514U (en) Pull rod of external scaffold
CN201826545U (en) Safety fire protection system device for core tube construction of super high-rise building
CN203769341U (en) Anti-falling grating plate of steel platform
CN204435833U (en) Operation platform wall-attached supporting seat
CN210369867U (en) Overhanging type outer discharge frame protection device
CN207513146U (en) Shear wall outrigger drawknot structure
CN207846750U (en) Light steel concrete building block faced wall
ES2641790A1 (en) Integral system of reinforcement, disassembly and replacement of old brick facades with its procedure (Machine-translation by Google Translate, not legally binding)
KR20090126106A (en) Concrete column for fireproof
CN205935740U (en) Wooden structural floor slab equipment suspended ceiling system of existing building
CN204983716U (en) Shear force wall open type is faced frontier defense and is protected fastener
CN203961330U (en) Job site safe construction protective guard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190410

Address after: 233500 No. 666 Yaodu Avenue, Baocheng District, Bozhou City, Anhui Province

Patentee after: Bozhou Construction Co., Ltd.

Address before: 236800 Third Floor of Bozhou Construction Co., Ltd. in Lacquer Garden Road Traditional Chinese Medicine Industrial Park, Economic Development Zone of Baocheng District, Bozhou City, Anhui Province

Patentee before: Dai Dongdong

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180814

Termination date: 20191208