CN109779380A CN201910063497.4A CN201910063497A CN109779380A CN 109779380 A CN109779380 A CN 109779380A CN 201910063497 A CN201910063497 A CN 201910063497A CN 109779380 A CN109779380 A CN 109779380A
Authority
CN
China
Prior art keywords
arm
cross
tower
steel tower
helicopter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910063497.4A
Other languages
Chinese (zh)
Inventor
王霖
程隽瀚
石涛
黄晓尧
吴尧成
丁鹏杰
胡慧君
李佳琪
纪芯燕
鲍庆
吴建军
王弋
叶建云
彭立新
段福平
岑建明
钟林海
陈哲
蔡勇
李少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SGCC GENERAL AVIATION Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
Original Assignee
SGCC GENERAL AVIATION Co Ltd
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SGCC GENERAL AVIATION Co Ltd, State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Zhejiang Electric Power Transmission and Transforming Engineering Co filed Critical SGCC GENERAL AVIATION Co Ltd
Priority to CN201910063497.4A priority Critical patent/CN109779380A/en
Publication of CN109779380A publication Critical patent/CN109779380A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of helicopter, laterally docking assembles the quick tightening device of angle steel tower and its group tower method, is related to Overhead Transmission Line Construction field.Helicopter Forming framework sky angle steel tower of power transmission line, for helicopter when lifting angle steel tower cross-arm, due to helicopter hovering limited time in place, how reducing the hovering activity duration of helicopter and fast implementing cross-arm becomes difficult point in place.The present invention includes screw rod, the rotatable only cantilever for being connected to screw rod left end, the round nut with wind screwed in from the right end of screw rod, in helicopter cross-arm, quick tightening device insertion cross-arm main material bolt hole and steel tower tower body main material bolt hole, then cocked 90 degree of only cantilever, rotate wind tightening, it is quick in place on steel tower tower body to have conveniently realized steel tower cross-arm, the helicopter hovering activity duration can be effectively reduced.

Description

Laterally docking assembles the quick tightening device of angle steel tower and group tower method to helicopter
Technical field
The present invention relates to Overhead Transmission Line Construction field more particularly to helicopter, laterally docking assembling angle steel tower is quickly received Tight device and its group tower method.
Background technique
Currently, facing overhead transmission line Large scale construction, helicopter, which has become, solves the extreme construction difficult problem of engineering construction, The important selection of the outstanding problems such as response environment protection, construction safety, duration pressure promotes helicopter to build in overhead transmission line If strengthened research in is very necessary.State Grid Corporation of China has carried out helicopter in overhead transmission line demonstration project in recent years The exploration and experiment work of construction, and phasic results are achieved, have the technology and substance for promoting helicopter strengthened research Basis.
Helicopter Forming framework sky angle steel tower of power transmission line, cross-arm lifting is quickly difficult point in place.Helicopter angle steel tower When cross-arm, due to helicopter hovering limited time in place, the hovering activity duration for how reducing helicopter is simultaneously quickly real Existing cross-arm becomes difficult point in place.
Summary of the invention
The technical problem to be solved in the present invention and the technical assignment of proposition are to be improved and improved to prior art, The helicopter laterally quick tightening device of docking assembling angle steel tower and its group tower method are provided, to reduce the helicopter hovering activity duration And fast implement cross-arm it is in place for the purpose of.For this purpose, the present invention takes following technical scheme.
Laterally docking assembles the quick tightening device of angle steel tower to helicopter, including screw rod, stops cantilever, top cover and with wind Round nut, the only rotatable left end for being connected to screw rod of cantilever, the round nut is screwed in from the right end of screw rod, described Top cover be placed on the only screw position between cantilever and round nut, only cantilever stretch after and screw rod be in same axis, it is described The cross-arm main material bolt hole and steel tower tower body main material bolt that only cantilever and screw rod can have the inserted angle steel tower in gap laterally to dock Hole.It is postponed in place in use, steel tower cross-arm is hung in helicopter, operator moves toward straightening cantilever is stopped, and is allowed to be in same with screw rod On one straight line, only cantilever and screw rod are successively then inserted into cross-arm main material bolt hole and steel tower tower body main material bolt hole, then wearing Cross after only cantilever is pulled and is turn 90 degrees, push top cover to advance by wind rotating nuts, tighten steel tower tower body coupling part and cross Main material is carried on a shoulder pole, after tightening, only cantilever, cross-arm main material and steel tower tower body coupling part is successively adjacent is affixed, have conveniently realized steel tower Cross-arm is quick in place on steel tower tower body, can effectively reduce the helicopter hovering activity duration.
As further improving and supplementing to above-mentioned technical proposal, the invention also includes following additional technical features.
The only cantilever is circular bar shape, and diameter is less than or equal to outer screw diameter, is only connected between cantilever and screw rod by rivet It connects.It is convenient to realize by rivet and be rotatably connected, only cantilever diameter is less than or equal to outer screw diameter, convenient for across cross-arm main material Bolt hole and steel tower tower body main material bolt hole.
The left end of the screw rod is equipped with flat connection, is only upper and lower perforative link slot among the right end of cantilever, and Only cantilever front and rear sides at link slot are cut flat with, and when connection, the flat connection insertion of screw rod stops in the link slot of cantilever, rivet Front and back is to through connection.Connection structure is simple and reliable, is easy to use rivet.
The right end of the only cantilever is planar end surface, and the left end of the only cantilever is circular arc chamfering.In cross-arm main material and After the tightening of steel tower tower body main material, only the planar end surface of cantilever connecting pin can effectively realize the rotation stop limit of only cantilever, prevent only cantilever The use that topples over and can be reduced only cantilever material is rotated, left end circular arc chamfering helps to hold safety when contact.
The wind includes handle and rocker arm, and the left end of handle is equipped with screw thread, uses after the through-hole of rocker arm upper end Acorn nut fastening, rocker arm lower end and round nut are welded to connect.Connection structure is simple and reliable, reduces manufacture difficulty, reduces Manufacturing cost.
Helicopter laterally docks the group tower method of the assembling quick tightening device of angle steel tower, comprising the following steps:
1) pre-process to steel tower cross-arm: the oblique material of one group of cross-arm by plane on steel tower cross-arm and lower plane close to tower body side is used Iron wire is bound respectively in cross-arm main material, and is connected cross-arm main material by the oblique material of cross-arm and consolidated far from the spiro keyhole position of tower body side It is fixed;
2) steel tower cross-arm is hung: when helicopter hanger steel tower cross-arm, cross-arm lift posture should with the horizontal plane angle of depression in 5~ 10 ° of angles, i.e. cross arm end should be 5~10 ° lower than cross-arm root;
3) steel tower cross-arm lower plane is carried out in place: two of helicopter steel tower cross-arm steel tower cross-arm lower plane in place first Cross-arm main material, concrete operation step is that two cross-arm main materials of cross-arm lower plane are inserted on the inside of tower bodies, in place close to tower body main material Spiro keyhole position, while plane angle steel being avoided to touch with tower body;
4) steel tower cross-arm is quickly tightened in place: rapidly will be under tower section in place by quick tightening device by high altitude operation personnel on tower Two, plane point tightenings in place, helicopter remains floating state in this process;
5) steel tower cross-arm rotation is promoted: after steel tower cross-arm lower plane penetrates quick tightening device and tightens fixation, as axis, directly The machine of liter is slowly lifted up the steel tower cross-arm of lifting, makes on steel tower cross-arm on the inside of plane cross-arm main material insertion tower body;
6) plane is in place on steel tower cross-arm: after on steel tower cross-arm on the inside of two cross-arm main materials insertion tower body of plane, close to tower Body main material spiro keyhole position in place, by high altitude operation personnel on tower by quick tightening device rapidly by plane two in tower section in place A point tightening in place, helicopter remains floating state in this process;
7) helicopter, which breaks off relations, mends dress bolt: after plane is completed in place and tightened with quick tightening device on steel tower cross-arm, by ground Face commanding issues to helicopter pilot and instructs, and helicopter, which breaks off relations, returns to landing point, then, by high altitude operation personnel on tower After with regard to concatenating 3-5 bolt at site, removes quick tightening device and mend remaining tower material bolt of dress.
The quick precise and reliable of operating method can substantially reduce operation difficulty, promote service speed, reduce helicopter hovering and make The industry time.
Step 4) and 6) in, quick tightening device penetrates steel tower tower body main material bolt hole and cross-arm main material spiral shell on the outside of the tower body Then keyhole rotates the only cantilever of quick tightening device, when only cantilever is in 90 ° of angles with quick tightening device screw rod and consolidates Afterwards, it is rotated clockwise by the wind of quick tightening device, round nut is made to push top cover tightening steel tower tower body main material and cross-arm Main material spacing, until steel tower tower body main material is mutually abutted with cross-arm main material.Tighten it is simple to operate, securely and reliably.
The utility model has the advantages that quickly tightening device structure is simple, and it is easy to operate, steel tower cross-arm has been conveniently realized in steel tower tower body On it is quick in place, greatly improve operating efficiency, the helicopter hovering activity duration can be effectively reduced, improve the peace of operation Full property and reliability.
Detailed description of the invention
Fig. 1 is quickly tightening device schematic view of the front view of the invention.
Fig. 2 is quickly tightening device present invention looks up structural representation of the invention.
Fig. 3 is quickly tightening device insertion cross-arm main material bolt hole and steel tower tower body main material bolt hole schematic diagram of the invention.
Fig. 4 is the only cocked 90 degree of schematic diagrames of cantilever of quickly tightening device of the invention.
Fig. 5 is the tightening operation chart of quickly tightening device of the invention.
Fig. 6 is the status diagram after quickly tightening device tightening of the invention.
Fig. 7 is the floor map before steel tower cross-arm pretreatment of the present invention.
Fig. 8 is the pretreated floor map of steel tower cross-arm of the present invention.
Fig. 9 is helicopter hanger steel tower cross-arm schematic diagram of the present invention.
Figure 10 is steel tower cross-arm lower plane schematic diagram in place of the present invention.
Figure 11 is that steel tower cross-arm rotation of the present invention promotes schematic diagram.
Figure 12 is that plane is in place and helicopter unhook schematic diagram on steel tower cross-arm of the present invention.
In figure: the quick tightening device of 1-;2- steel tower cross-arm;3- helicopter;4- tower body main material;5-;101- screw rod;102- stops Cantilever;103- top cover;104- round nut;105- rocker arm;106- handle;107- acorn nut;201- cross-arm main material;202- cross-arm Oblique material;203- cross arm end;204- cross-arm root.
Specific embodiment
Technical solution of the present invention is described in further detail below in conjunction with Figure of description.
As shown in figures 1 to 6, helicopter laterally docking assembling the quick tightening device of angle steel tower, including screw rod 101, only cantilever 102, top cover 103 and the round nut 104 with wind, the only rotatable left end for being connected to screw rod 101 of cantilever 102, round nut 104 screw in from the right end of screw rod 101, and top cover 103 is placed on only 101 position of screw rod between cantilever 102 and round nut 104, only hangs After arm 102 stretches and screw rod 101 is in same axis, and only cantilever 102 and screw rod 101 can have the inserted angle steel tower in gap lateral 4 bolt hole of 201 bolt hole of cross-arm main material and steel tower tower body main material of docking.
It is rotatably connected to easily realize, only cantilever 102 is circular bar shape, and diameter is less than or equal to 101 outer diameter of screw rod, only Pass through rivet interlacement between cantilever 102 and screw rod 101.It is convenient to realize by rivet and be rotatably connected, only 102 diameter of cantilever Less than or equal to 101 outer diameter of screw rod, convenient for across 4 bolt hole of 201 bolt hole of cross-arm main material and steel tower tower body main material.
For the ease of using rivet interlacement, the left end of screw rod 101 is equipped with flat connection, only among the right end of cantilever 102 For upper and lower perforative link slot, and only 102 front and rear sides of cantilever at link slot are cut flat with, when connection, the flat connection of screw rod 101 Portion's insertion stops in the link slot of cantilever 102, to through connection before and after rivet.Connection structure is simple and reliable, is easy to use rivet.
In order to prevent rotating again for only cantilever 102, only cantilever 4 after cross-arm main material 201 and the tightening of steel tower tower body main material 102 right end is planar end surface, and only the left end of cantilever 102 is circular arc chamfering.After cross-arm main material 201 and the tightening of steel tower tower body main material 4, only the planar end surface of 102 connecting pin of cantilever can effectively realize only cantilever 102 rotation stop limit, prevent only cantilever 102 rotate Topple over and can be reduced the use of only 102 material of cantilever, left end circular arc chamfering helps to hold safety when contact.
In order to simplify structure, wind includes handle 106 and rocker arm 105, and the left end of handle 106 is equipped with screw thread, across shaking It is fastened after the through-hole of 105 upper end of arm with acorn nut 107,105 lower end of rocker arm and round nut 104 are welded to connect.Connection structure letter It is single reliable, manufacture difficulty is reduced, manufacturing cost is reduced.
Helicopter laterally docks the group tower method of the assembling quick tightening device of angle steel tower, comprising the following steps:
1 pair of steel tower cross-arm 2 pre-processes: as Figure 7-8, by plane on steel tower cross-arm 2 and lower plane close to tower body side The oblique material 202 of one group of cross-arm is bound in cross-arm main material 201 respectively with iron wire, and connects cross-arm main material 201 by the oblique material 202 of cross-arm Spiro keyhole position far from tower body side is fixed;
2 pairs of steel tower cross-arms 2 are hung: as shown in figure 9, cross-arm lifts posture Ying Yushui when helicopter 3 hangs steel tower cross-arm 2 The plane angle of depression is in 10 ° of angles, i.e. cross arm end 203 should be 204 low 10 ° than cross-arm root;
3 pairs of 2 lower planes of steel tower cross-arm carry out in place: as shown in Figure 10, it is horizontal that helicopter 3 lifts the steel tower in place first of steel tower cross-arm 2 Two cross-arm main materials 201 of 2 lower planes are carried on a shoulder pole, concrete operation step is that two cross-arm main materials 201 of cross-arm lower plane are inserted into tower body Inside, the spiro keyhole position in place close to tower body main material 4, while plane angle steel being avoided to touch with tower body;
The quickly tightening in place of 4 steel tower cross-arm 2: by high altitude operation personnel on tower by quick tightening device 1 rapidly by tower section in place Lower plane two point tightenings in place, helicopter 3 remains floating state in this process;
The rotation of 5 steel tower cross-arms 2 is promoted: as shown in figure 11,2 lower plane of steel tower cross-arm penetrates quick tightening device 1 and tightens fixation Afterwards, as axis, helicopter 3 is slowly lifted up the steel tower cross-arm 2 of lifting, inserts plane cross-arm main material 201 on steel tower cross-arm 2 Enter on the inside of tower body;
Plane is in place on 6 steel tower cross-arms 2: as shown in figure 12, when two cross-arm main materials 201 of plane on steel tower cross-arm 2 are inserted into tower After on the inside of body, the spiro keyhole position in place close to tower body main material 4 is rapid by quick tightening device 1 by high altitude operation personnel on tower By two, plane in tower section in place point tightenings in place, helicopter 3 remains floating state in this process;
7 helicopters 3, which break off relations, mends dress bolt: after plane completes in place and tightening with quick tightening device 1 on steel tower cross-arm 2, by Ground control personnel issue to 3 driver of helicopter and instruct, and helicopter 3, which breaks off relations, returns to landing point, then, by high altitude operation on tower Personnel remove quick tightening device 1 and mend remaining tower material bolt of dress after with regard to concatenating 5 bolts at site.
The quick precise and reliable of operating method can substantially reduce operation difficulty, promote service speed, reduce helicopter 3 and hover Activity duration.
In step 4 and 6, as seen in figures 3-6, quick tightening device 1 penetrates 4 bolt hole of steel tower tower body main material on the outside of tower body With 201 bolt hole of cross-arm main material, the only cantilever 102 of quick tightening device 1 is then rotated, when only cantilever 102 and quickly tightening dress 1 screw rod 101 is set in 90 ° of angles and after consolidating, is rotated clockwise by the wind of quick tightening device 1, pushes away round nut 104 Dynamic top cover 103 tightens steel tower tower body main material 4 and 201 spacing of cross-arm main material, until 201 phase of steel tower tower body main material 4 and cross-arm main material It abuts.Tighten simple to operate, securely and reliably, it is quick in place on steel tower tower body to have conveniently realized steel tower cross-arm 2, energy Helicopter 3 is enough effectively reduced to hover the activity duration.
Laterally the quick tightening device of docking assembling angle steel tower and its group tower method are these to helicopter shown in figure 1 above -12 The specific embodiment of invention has embodied present invention substantive distinguishing features outstanding and marked improvement, can be according to actual use It needs, under the inspiration of the present invention, the equivalent modifications of shape, structure etc. is carried out to it, in the protection scope of this programme Column.

Claims (7)

1. laterally docking assembles the quick tightening device of angle steel tower to helicopter, it is characterised in that: including screw rod (101), stop cantilever (102), top cover (103) and the round nut (104) with wind, cantilever (102) are rotatable to be connected to screw rod for described stopping (101) left end, the round nut (104) are screwed in from the right end of screw rod (101), and the top cover (103) is placed on only cantilever (102) screw rod (101) position between round nut (104), after only cantilever (102) stretches and screw rod (101) is in same axis Line, the cross-arm main material (201) that only cantilever (102) and screw rod (101) can have the inserted angle steel tower in gap laterally to dock Bolt hole and steel tower tower body main material (4) bolt hole.
2. laterally docking assembles the quick tightening device of angle steel tower to helicopter according to claim 1, it is characterised in that: described Only cantilever (102) be circular bar shape, diameter is less than or equal to screw rod (101) outer diameter, only logical between cantilever (102) and screw rod (101) Cross rivet interlacement.
3. laterally docking assembles the quick tightening device of angle steel tower to helicopter according to claim 2, it is characterised in that: described The left end of screw rod (101) be equipped with flat connection, be upper and lower perforative link slot among the right end of only cantilever (102), and even Only cantilever (102) front and rear sides at access slot are cut flat with, and when connection, the flat connection insertion of screw rod (101) stops cantilever (102) In link slot, to through connection before and after rivet.
4. laterally docking assembles the quick tightening device of angle steel tower to helicopter according to claim 3, it is characterised in that: described The right end of only cantilever (102) be planar end surface, the left end of described only cantilever (102) is circular arc chamfering.
5. laterally docking assembles the quick tightening device of angle steel tower to helicopter according to claim 1, it is characterised in that: described Wind include handle (106) and rocker arm (105), the left end of handle (106) is equipped with screw thread, passes through rocker arm (105) upper end It is fastened after through-hole with acorn nut (107), rocker arm (105) lower end and round nut (104) are welded to connect.
6. the group tower method of the assembling quick tightening device of angle steel tower is laterally docked using helicopter described in claim 1, it is special Sign be the following steps are included:
1) steel tower cross-arm (2) is pre-processed: one group of cross-arm by plane on steel tower cross-arm (2) and lower plane close to tower body side Oblique material (202) is bound with iron wire respectively on cross-arm main material (201), and passes through the oblique material of cross-arm (202) connection cross-arm main material (201) Spiro keyhole position far from tower body side is fixed;
2) hang to steel tower cross-arm (2): when helicopter (3) hangs steel tower cross-arm (2), cross-arm lifts posture should be with horizontal plane The angle of depression is in 5~10 ° of angles, i.e. cross arm end (203) should be 5~10 ° lower than cross-arm root (204);
3) carry out to steel tower cross-arm (2) lower plane in place: helicopter (3) lifts steel tower cross-arm (2) steel tower cross-arm (2) in place first Two cross-arm main materials (201) of lower plane, concrete operation step are by two cross-arm main material (201) insertion tower bodies of cross-arm lower plane Inside, the spiro keyhole position in place close to tower body main material (4), while plane angle steel being avoided to touch with tower body;
4) steel tower cross-arm (2) quickly tightening in place: rapidly will be in place by quick tightening device (1) by high altitude operation personnel on tower Tower section lower plane two point tightenings in place, helicopter (3) remains floating state in this process;
5) steel tower cross-arm (2) rotation is promoted: after steel tower cross-arm (2) lower plane penetrates quick tightening device (1) and tightens fixation, with This is axis, and helicopter (3) is slowly lifted up the steel tower cross-arm (2) of lifting, makes plane cross-arm main material on steel tower cross-arm (2) (201) on the inside of insertion tower body;
6) plane is in place on steel tower cross-arm (2): when two cross-arm main materials (201) of plane on steel tower cross-arm (2) are inserted into tower body Behind side, the spiro keyhole position in place close to tower body main material (4) is rapid by quick tightening device (1) by high altitude operation personnel on tower By two, plane in tower section in place point tightenings in place, helicopter (3) remains floating state in this process;
7) helicopter (3), which breaks off relations, mends dress bolt: when plane is in place with quick tightening device (1) completion on steel tower cross-arm (2) and receives It is next, it issues and instructs from ground control personnel to helicopter (3) driver, helicopter (3), which breaks off relations, returns to landing point, then, by High altitude operation personnel remove quick tightening device (1) and mend remaining tower material spiral shell of dress after with regard to concatenating 3-5 bolt at site on tower Bolt.
7. helicopter according to claim 6 laterally docks the group tower method of the assembling quick tightening device of angle steel tower, special Sign is: step 4) and 6) in, quick tightening device (1) penetrates steel tower tower body main material (4) bolt hole and cross-arm on the outside of the tower body Main material (201) bolt hole, then rotate quick tightening device (1) stops cantilever (102), when only cantilever (102) and quickly tightening Device (1) screw rod (101) is rotated clockwise by the wind of quick tightening device (1) in 90 ° of angles and after consolidating, makes to justify Nut (104) pushes top cover (103) tightening steel tower tower body main material (4) and cross-arm main material (201) spacing, until steel tower tower body main material (4) it is mutually abutted with cross-arm main material (201).
CN201910063497.4A 2019-01-23 2019-01-23 Laterally docking assembles the quick tightening device of angle steel tower and group tower method to helicopter Pending CN109779380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910063497.4A CN109779380A (en) 2019-01-23 2019-01-23 Laterally docking assembles the quick tightening device of angle steel tower and group tower method to helicopter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910063497.4A CN109779380A (en) 2019-01-23 2019-01-23 Laterally docking assembles the quick tightening device of angle steel tower and group tower method to helicopter

Publications (1)

Publication Number Publication Date
CN109779380A true CN109779380A (en) 2019-05-21

Family

ID=66501162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910063497.4A Pending CN109779380A (en) 2019-01-23 2019-01-23 Laterally docking assembles the quick tightening device of angle steel tower and group tower method to helicopter

Country Status (1)

Country Link
CN (1) CN109779380A (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB558934A (en) * 1942-10-31 1944-01-27 Alexander Wilson Temporary service bolt
DE29518375U1 (en) * 1995-11-20 1996-01-25 Schneider Franz Brakel Gmbh Device for fixing an attachment
JP2002130230A (en) * 2000-10-23 2002-05-09 Wakai & Co Ltd Anchor device
US20060239793A1 (en) * 2003-03-04 2006-10-26 Cobra Fixations Cie Ltee-Cobra Anchors Co. Ltd Wall mounted toggle hook
EP2003268A2 (en) * 2007-06-15 2008-12-17 Sateco Tie for supporting and attaching a structure to a wall, associated structure and corresponding structure assembly
FR2944538A1 (en) * 2009-04-17 2010-10-22 Sateco Sa Clamp for supporting and fixing corbel work structure on wall of building, has locking unit having latch and clamping element delimiting journal against internal surface of traversing opening of wall to lock clamp on wall
CN103031978A (en) * 2012-12-12 2013-04-10 中国电力科学研究院 Installation assisting system for erection of power transmission line iron tower and erection method for iron tower
CN104564961A (en) * 2014-12-22 2015-04-29 宁波市镇海翔遨机电有限公司 Expansion bolt
CN204828180U (en) * 2015-07-18 2015-12-02 宁波永诚五金机械有限公司 Orchid is pressed from both sides
JP5843936B1 (en) * 2014-09-30 2016-01-13 大和ハウス工業株式会社 Hook type one side fixed hardware
CN105464456A (en) * 2015-12-30 2016-04-06 国家电网公司 Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN105927640A (en) * 2016-06-02 2016-09-07 祁欣妤 Single-sheet type riveting device
CN106382046A (en) * 2016-11-18 2017-02-08 国网通用航空有限公司 Helicopter hoisting auxiliary device for ultrahigh voltage cup tower head and hoisting method
CN108386430A (en) * 2005-03-21 2018-08-10 眼镜蛇紧固件股份有限公司 Anchor assemblies for fastener
CN209704154U (en) * 2019-01-23 2019-11-29 浙江省送变电工程有限公司 Laterally docking assembles the quick tightening device of angle steel tower to helicopter

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB558934A (en) * 1942-10-31 1944-01-27 Alexander Wilson Temporary service bolt
DE29518375U1 (en) * 1995-11-20 1996-01-25 Schneider Franz Brakel Gmbh Device for fixing an attachment
JP2002130230A (en) * 2000-10-23 2002-05-09 Wakai & Co Ltd Anchor device
US20060239793A1 (en) * 2003-03-04 2006-10-26 Cobra Fixations Cie Ltee-Cobra Anchors Co. Ltd Wall mounted toggle hook
CN108386430A (en) * 2005-03-21 2018-08-10 眼镜蛇紧固件股份有限公司 Anchor assemblies for fastener
EP2003268A2 (en) * 2007-06-15 2008-12-17 Sateco Tie for supporting and attaching a structure to a wall, associated structure and corresponding structure assembly
FR2944538A1 (en) * 2009-04-17 2010-10-22 Sateco Sa Clamp for supporting and fixing corbel work structure on wall of building, has locking unit having latch and clamping element delimiting journal against internal surface of traversing opening of wall to lock clamp on wall
CN103031978A (en) * 2012-12-12 2013-04-10 中国电力科学研究院 Installation assisting system for erection of power transmission line iron tower and erection method for iron tower
JP5843936B1 (en) * 2014-09-30 2016-01-13 大和ハウス工業株式会社 Hook type one side fixed hardware
CN104564961A (en) * 2014-12-22 2015-04-29 宁波市镇海翔遨机电有限公司 Expansion bolt
CN204828180U (en) * 2015-07-18 2015-12-02 宁波永诚五金机械有限公司 Orchid is pressed from both sides
CN105464456A (en) * 2015-12-30 2016-04-06 国家电网公司 Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN105927640A (en) * 2016-06-02 2016-09-07 祁欣妤 Single-sheet type riveting device
CN106382046A (en) * 2016-11-18 2017-02-08 国网通用航空有限公司 Helicopter hoisting auxiliary device for ultrahigh voltage cup tower head and hoisting method
CN209704154U (en) * 2019-01-23 2019-11-29 浙江省送变电工程有限公司 Laterally docking assembles the quick tightening device of angle steel tower to helicopter

Similar Documents

Publication Publication Date Title
CN209704154U (en) Laterally docking assembles the quick tightening device of angle steel tower to helicopter
CN107838943A (en) A kind of multi-angle mount type industrial carrying machine people
CN109779380A (en) Laterally docking assembles the quick tightening device of angle steel tower and group tower method to helicopter
CN109110699A (en) A kind of nacelle device and engineering machinery
CN106078761B (en) One kind can reaction type cable arch maintenance robot
CN201818245U (en) Spiral pile driving and coupling device
CN202279359U (en) Rotary glass placement frame
CN105064214B (en) A kind of inclined guy cable stretching device eliminating back twist
CN110130392A (en) A kind of clip pile platform and embodiments thereof for single pile embedding in rock
CN206645693U (en) A kind of stone tongs with upset and gravity center adjustment function
CN2809623Y (en) Safety protector for accelerator joystick of aircraft engine test bench
CN202560239U (en) Lifting type drilling and blasting trolley
CN108590685A (en) A kind of replacing options tearing knife assembly and its tearing cutter
CN107671883A (en) Grab stone apparatus for work
CN203742439U (en) Double-lifting-platform four-arm rock-bolt and anchor-wire drill carriage
CN208485570U (en) Cabin operation spider arm
CN106393083A (en) Rotating multi-joint intelligent mechanical arm
CN208763014U (en) A kind of piling machine with folding guide rail being readily transported
CN210315645U (en) Pile clamping platform for single-pile rock-socketed
CN205465144U (en) Vertical type cylinder assembling machine
CN204012484U (en) Trapezoidal bridge frame cable laying directive wheel fixture
CN202937277U (en) Manual grasping device for large-diameter tunnel segment
CN207326845U (en) A kind of wind power hub pitch variable bearings automatic screwing down apparatus
CN106207847A (en) A kind of cable maintenance robot
CN106929881B (en) A kind of Full automatic bus lift frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination