CN109766649A - A kind of Air Conditioning Facilities prefabrication of tube section installation method - Google Patents

A kind of Air Conditioning Facilities prefabrication of tube section installation method Download PDF

Info

Publication number
CN109766649A
CN109766649A CN201910045260.3A CN201910045260A CN109766649A CN 109766649 A CN109766649 A CN 109766649A CN 201910045260 A CN201910045260 A CN 201910045260A CN 109766649 A CN109766649 A CN 109766649A
Authority
CN
China
Prior art keywords
air conditioning
prefabricated
model
bim
conditioning facilities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910045260.3A
Other languages
Chinese (zh)
Inventor
吴舜斌
裴以军
莫世杨
洪元堂
陈宗科
乔哲明
范福广
张永亮
张国圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Third Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Installation Engineering Co Ltd filed Critical China Construction Third Bureau Installation Engineering Co Ltd
Priority to CN201910045260.3A priority Critical patent/CN109766649A/en
Publication of CN109766649A publication Critical patent/CN109766649A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Air Conditioning Facilities prefabrication of tube section installation methods, comprising:The BIM model of building structure is established based on Architectural Structure Design drawing;It carries out Deepen Design and combines the BIM collective model of the BIM model foundation Air Conditioning Facilities of Air Conditioning Facilities building structure;The building structure size inside Air Conditioning Facilities is scanned on the spot and the point cloud data for obtaining scanning carries out reverse modeling processing, obtain the BIM model on the spot of building structure;Using the BIM model of the model of the BIM on the spot replacement original building structure of building structure;According to the BIM model of building structure adjusted and electromechanical Deepen Design model, prefabricated merogenesis analysis is carried out to air conditioner water pipeline section in computer room, provides prefabricated merogenesis figure;The modularization in conjunction with prefabricated merogenesis figure and BIM model adjusted progress prefabricated tube section is prefabricated and assembles;The in-site installation for carrying out prefabricated tube section after construction layout and construction layout is carried out, the technical effect for improving worker's operating environment, improving working efficiency has been reached.

Description

A kind of Air Conditioning Facilities prefabrication of tube section installation method
Technical field
The present invention relates to architectural engineering electromechanics mounting technique field, in particular to a kind of Air Conditioning Facilities prefabrication of tube sectionization installation Method.
Background technique
With the continuous continuous improvement accelerated with building construction technology of Urbanization in China, city terrestrial reference Super High The exploitation construction of building is quickly grown.For the terrestrial reference super high-rise building of current each department, index bed air-conditioning system mainstream Design scheme is all-air system, i.e., every layer is separately provided Air Conditioning Facilities, and air centralized processing is sent to air-conditioned room each in floor. Since standard is high layer by layer, area, layout, air conditioner load are essentially identical, the Air Conditioning Facilities position of each layer, area, unit are big Small, division of room etc. is also essentially identical, therefore has the condition of the prefabricated design and construction of computer room completely.It is low herein in conjunction with Chinese honor Area's Air-conditioning Engineering compares traditional construction scheme, proposes a kind of prefabricated design mounting technique of Super High Air Conditioning Facilities, it is pre- to analyze this Inhibition and generation designs the characteristics of mounting technique, concludes the design and construction process process of the technology, clearly design and construction method, analysis design Heavy difficult point in work progress.
Super high-rise building Air Conditioning Facilities are constructed, and generally existing computer room is more, space is small, installation quality requires high, the installation scale of construction Greatly, the problems such as short construction period, super-high storied building transport difficult, and air conditioner water pipeline section and valve construction are construction operation amounts in computer room With the maximum position of difficulty of construction.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of Air Conditioning Facilities prefabrication of tube sectionization installation Method has and can avoid live fire operation, improves worker's operating environment;Improve building Air Conditioning Facilities integral construction efficiency, section About construction cost;Most of pipeline construction content can carry out on ground, be installed compared in computer room small space in high-altitude And the conventional construction methods such as weld job, the advantages of pipeline construction quality can be improved, reduce construction safety risk.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of Air Conditioning Facilities prefabrication of tube section installation method, comprising:
The BIM model of building structure is established based on Architectural Structure Design drawing, BIM model is according to Architectural Structure Design drawing Shown in axis, positioning, layout dimension and absolute altitude establish;
Deepen Design is carried out based on electromechanical speciality drawing each in Air Conditioning Facilities, in combination with the BIM of Air Conditioning Facilities building structure The BIM collective model of model foundation Air Conditioning Facilities;
The building structure size inside Air Conditioning Facilities is scanned on the spot, the point cloud data that writing scan obtains and will be swept The point cloud data retouched carries out reverse modeling processing, obtains the BIM model on the spot for the building structure that can import modeling software;
Using the BIM model of the model of the BIM on the spot replacement original building structure of building structure;Compare building structure on the spot BIM model adjusts electromechanical Deepen Design model to guarantee that prefabricated tube section can be quasi- with the air-conditioning water pipe intake-outlet in Air Conditioning Facilities Really plug into;
According to the BIM model of building structure adjusted and electromechanical Deepen Design model, to air conditioner water pipeline section in computer room into The prefabricated merogenesis analysis of row, provides prefabricated merogenesis figure, the dimensioning of each prefabricated tube section and prefabricated tube section bracket is marked in merogenesis figure Very little and location dimension;
The modularization in conjunction with prefabricated merogenesis figure and BIM model adjusted progress prefabricated tube section is prefabricated and assembles;
The in-site installation that prefabricated tube section is carried out after construction layout and construction layout is carried out.
It is prefabricated using computer room by using above-mentioned technical proposal, the field erected time can be saved as far as possible and operation is difficult Degree improves installation efficiency;Narrow space in computer room, atmosphere draught-free, when traditional construction, need to carry out dynamic weldering operation, and air is dirty Dye is big, and worker's operating environment is severe;It can avoid live fire operation using prefabricated processing, improve worker's operating environment;Use machine The prefabricated construction technology of real estate management's section, it is prefabricated in high volume to carry out computer room, improves building Air Conditioning Facilities integral construction efficiency, saving is applied Work cost;Construction operation is carried out according to prefabrication of tube section construction technology, most of pipeline construction content can be carried out on ground, be compared The conventional construction methods such as installation and weld job are carried out in high-altitude in computer room small space, pipeline construction quality can be improved, subtract Few construction safety risk.
Preferably, the stepInclude:
Comprehensive wiring content in clear computer room, content include but is not limited to the material specification of pipeline and material used, computer room Interior equipment and nozzle dimensions;
Combine the preliminary BIM of the BIM model foundation Air Conditioning Facilities electromechanical speciality of electromechanical speciality drawing and Air Conditioning Facilities comprehensive Molding type;
In-depth arrangement is carried out to preliminary BIM collective model, determines that intend prefabricated air conditioner water pipeline section in Air Conditioning Facilities arranges substantially Mode for cloth.
By using above-mentioned technical proposal, by the comprehensive wiring content in confirmation computer room and above content bonding machine is combined Electric profession drawing carries out the foundation of BIM collective model, enables preliminary BIM collective model more accurate in place, and improving should The practical value of invention.
Preferably, the stepInFurther include:
A. the race library of each valve member and spoolpiece size is established according to actual size.
By using above-mentioned technical proposal, the pool of material data is carried out by way of the race library for establishing each valve member, It is convenient for the buying of each valve member.
Preferably, the stepInFurther include:
A. whether inspection model content is completely to avoid omission pipeline content.
By using above-mentioned technical proposal, detect whether to avoid by the whether complete mode of increased inspection model content Pipeline content is omitted, increasing this step can prevent from generating to omit in work progress causing shadow to whole prefabricated design in turn It rings.
Preferably, the stepInclude:
Pipeline section is divided to two sections to carry out prefabricated, and among pipeline section or valve punishment saves;
, prefabricated tube section flange is set, two pipeline sections of flanged joint merogenesis are passed through.
By using above-mentioned technical proposal, since air conditioner water length of pipe section is smaller in Air Conditioning Facilities, whole section of prefabricated transport is tired Difficulty, pipeline section can be divided into two sections carry out it is prefabricated, among pipeline section or valve punishment section, in this way be convenient for pipeline section transport, Improve the convenience of construction.
Preferably, the stepInThe flange used is lap joint flange.
By using above-mentioned technical proposal, erection stage is combined, prefabricated tube section is when with the docking of air conditioner water standpipe, flange pair Mouth is not easy to be consistent, therefore considers that lap joint flange is arranged on prefabricated tube section, it is ensured that merging precision.
Preferably, the stepInclude:
The construction layout of pipeline section and bracket is carried out using BIM setting-out robot.
By using above-mentioned technical proposal, construction layout is carried out by using the mode of BIM setting-out robot, guarantees air-conditioning Bracket installation site is accurate when computer room prefabricated tube section in-site installation.
Preferably, the stepInInclude:
A., site control point coordinate and fabric structure point coordinate are set in BIM model;
B. lofting control point is created in BIM model and electromechanical pipeline suspension and support point arrangement is set;
C. data acquisition is carried out to field lofting control point with the live coordinate of positioning robot by setting-out robot;
D. required layout point in BIM model is chosen, commander setting-out robot sights realistic by way of emitting infrared laser Position.
By using above-mentioned technical proposal, enable to carry out accurate construction layout by setting-out robot, raising is put Sample precision.
In conclusion present invention has the advantage that
1. it is prefabricated using computer room, field erected time and operation difficulty can be saved as far as possible, improve installation efficiency;Big portion Divide pipeline construction content that can carry out on ground, carries out the tradition such as installation and weld job in high-altitude compared in computer room small space Pipeline construction quality can be improved in construction method, reduces construction safety risk;
2. can avoid live fire operation using prefabricated processing, improve worker's operating environment;It is constructed using computer room prefabrication of tube sectionization Technology, it is prefabricated in high volume to carry out computer room, improves building Air Conditioning Facilities integral construction efficiency, saves construction cost;
3. whole section of prefabricated transport difficult, pipeline section, which can be divided into two sections, to carry out in advance since air conditioner water length of pipe section is smaller in Air Conditioning Facilities System, among pipeline section or valve punishment saves, and is convenient for the transport of pipeline section in this way, improves the convenience of construction.
Detailed description of the invention
Fig. 1 is the flow diagram of embodiment method and step.
Specific embodiment
A kind of Air Conditioning Facilities prefabrication of tube section installation method, as shown in Figure 1, comprising the following steps:
1. Air Conditioning Facilities build BIM model foundation.
The prefabricated design and construction first step of Air Conditioning Facilities is that the Architectural Structure Design drawing provided according to designing institute is intended The building structure model modeling of prefabricated Air Conditioning Facilities completes Air Conditioning Facilities building structure BIM model foundation using Revit software. Buildings model need to be established in strict accordance with axis, positioning shown in drawing, layout dimension and absolute altitude, and model content should be complete, include Computer room interior wall, beam, column, floor, basis etc., model accuracy grade are LOD400.
2. Air Conditioning Facilities electromechanics Deepen Design models.
After the completion of Air Conditioning Facilities build BIM model foundation, the in-depth modeling of Air Conditioning Facilities electromechanics can be carried out, electromechanical speciality is deep Change modeling to be carried out in three steps.The first step, arranges each electromechanical speciality drawing in Air Conditioning Facilities, including HVAC, it is electrical, plumbing, disappear It is anti-etc., comprehensive arrangement content is specified in computer room, each electromechanical speciality specification is studied, specifies pipeline used in each profession and material Material, specification specify equipment and nozzle dimensions in computer room.Second step integrates each professional drawing in computer room, builds in conjunction with computer room BIM model establishes the preliminary BIM collective model of computer room electromechanical speciality, and whether inspection model content is complete, avoids omitting in pipeline Hold.Third step carries out electromechanical preliminary BIM collective model according to the requirement of each Specialty Design explanation, design specification and acceptance specification In-depth arrangement, determines and intends the prefabricated basic arrangement mode of air conditioner water pipeline section in computer room.Electromechanical model each valve member and pipe when modeling Section size builds race in strict accordance with actual product size.Electromechanical model need to react form and the position of prefabricated tube section bracket.
3D is scanned 3 Air Conditioning Facilities structures on the spot.
Since there are large errors for live building structure actual size and building BIM model, and prefabricated computer room requires pipeline section Error precision is very high, and prefabricated tube section merging precision should control within 3mm, it is therefore necessary to Air Conditioning Facilities buildings model into Row scans on the spot.Scans content include in computer room interior wall, beam, column, floor, basis and computer room the hole of each set aside pre-embedded and Constructed in component and computer room completion each electromechanical pipeline and connecting port, air-conditioner set equipment in place has been installed etc..Chinese honor The prefabricated spatial digitizer using current more mainstream of Air Conditioning Facilities scans computer room internal structure on the spot, and scanning accuracy is 2mm.Obtained point cloud data is scanned for subsequent reverse modeling.The purpose of computer room 3D scanning is that accurate positioning air-conditioning water pipe is prefabricated The relative positional relationship plugged between pipeline section and unit and main riser, it is ensured that unit and standpipe in subsequent prefabricated tube section and computer room Accurate docking.
4. scan data reverse modeling.
After the completion of Air Conditioning Facilities internal structure 3D scanning, reverse modeling is carried out by the point cloud data obtained to laser scanning Processing obtains the computer room building BIM model that can import revit software.
5. scan model is combined to adjust Deepen Design model.
The computer room building BIM model that Air Conditioning Facilities scan data reverse modeling obtains is linked into electrical and mechanical comprehensive in-depth model In, it replaces former Air Conditioning Facilities and builds BIM model, adjust air-conditioning water pipe prefabricated tube section in electromechanical Deepen Design model and plug into position, Guarantee after prefabricated tube section completes can in computer room air conditioner water standpipe and unit intake-outlet accurately dock.Meanwhile benefit With the computer room buildings model obtained according to reverse modeling, the accurate stent size for drawing prefabricated tube section.
6. drawing prefabricated merogenesis figure according to adjustment section.
After the completion of the adjustment of Air Conditioning Facilities electromechanics Deepen Design model, prefabricated merogenesis point is carried out to air conditioner water pipeline section in computer room Analysis, the merogenesis of precast section mainly consider two o'clock.First is that transport channel allows current size, including elevator, aisle, computer room door opening Size etc..Air conditioner water length of pipe section is smaller in Air Conditioning Facilities, under the premise of conditions permit, can carry out according to whole section pipeline section pre- System, if whole section of prefabricated transport difficult, pipeline section can be divided into two sections carry out it is prefabricated, among pipeline section or valve punishment section.Second is that considering The precision of precast section docking, is arranged prefabricated tube section lap joint flange.Erection stage is combined, prefabricated tube section is docked with air conditioner water standpipe When, flange abutting joint is not easy to be consistent, therefore considers that lap joint flange is arranged on prefabricated tube section, it is ensured that merging precision.According to Above-mentioned merogenesis thinking carries out merogenesis processing to Air Conditioning Facilities electromechanics in-depth model, provides prefabricated merogenesis figure.Mark each prefabricated tube section Geometric dimension and location dimension.
7. carrying out prefabrication of tube section according to merogenesis figure.
After pipeline section merogenesis figure completes, the prefabricated operating personnel of processing factory is carried out in conjunction with BIM model and prefabricated merogenesis figure Processing is told somebody what one's real intentions are.Processing factory receives prefabricated manuscript and carries out blanking according to drawing size tubulation material later, and assembles valve and component. Being segmented prefabricated need to consider the O. gracilipes such as pipeline mantle fiber length, flange plate thickness.According to in-depth figure deployment scenarios when valve assembles Adjust valve handle direction.After each pipeline section and valve part are completed, according to Deepen Design layout design rack form and Size makes the bracket of prefabricated tube section, and bracket and prefabricated tube section overall package are completed.And whole Transporting is quasi- to construction site Standby in-site installation.
8. situ machine people's setting-out.
Bracket installation site is accurate when to guarantee Air Conditioning Facilities prefabricated tube section in-site installation, and BIM setting-out is used in computer room Robot carries out pipeline and bracket construction layout.Site control point coordinate and fabric structure point coordinate are set from BIM model Component creates lofting control point in BIM model and electromechanical pipeline suspension and support point is arranged as BIM model composition contrasting foundation Arrangement imports all layout points in setting-out software.Using BIM setting-out robot to field lofting control inside Air Conditioning Facilities System clicks through the acquisition of row data, at once the live coordinate of construction layout robot.It is put needed for being chosen in BIM model by tablet computer Sampling point, robot command transmitting infrared laser sight real point automatically.
9. prefabricated tube section in-site installation.
The pipeline section that flat moulded prefabricated is completed is transported to building-site, in conjunction with on-site actual situations, is transported using tower crane or elevator Inside defeated prefabricated tube section to each floor Air Conditioning Facilities.In-site installation worker is carried out using Air Conditioning Facilities electromechanics in-depth BIM model Installation exercise is told somebody what one's real intentions are.And it is positioned according to field lofting and determines that the installation site of prefabricated tube section and bracket is installed.Installation process The connecting port flange of prefabricated tube section and unit and prefabricated standpipe is tentatively docked in middle elder generation, installs fixed prefabricated tube section bracket, adjusts The installation level and verticality of Prefabricated composite pipeline section guarantee prefabricated tube section installation review code requirement.
10. combining the prefabricated computer room of BIM model acceptance.
After prefabricated tube section is installed, in conjunction with the comprehensive in-depth BIM model testing pipeline section installation situation of computer room.After the completion of examination Carry out the construction such as subsequent pipeline pressure testing and heat preservation.

Claims (8)

1. a kind of Air Conditioning Facilities prefabrication of tube section installation method characterized by comprising
The BIM model of building structure is established based on Architectural Structure Design drawing, BIM model is according to Architectural Structure Design drawing institute Axis, positioning, layout dimension and the absolute altitude shown is established;
Deepen Design is carried out based on electromechanical speciality drawing each in Air Conditioning Facilities, in combination with the BIM of Air Conditioning Facilities building structure The BIM collective model of model foundation Air Conditioning Facilities;
The building structure size inside Air Conditioning Facilities is scanned on the spot, the point cloud data that writing scan obtains and will be swept The point cloud data retouched carries out reverse modeling processing, obtains the BIM model on the spot for the building structure that can import modeling software;
Using the BIM model of the model of the BIM on the spot replacement original building structure of building structure;Compare the BIM on the spot of building structure Model adjusts electromechanical Deepen Design model to guarantee that prefabricated tube section can be accurate with the air-conditioning water pipe intake-outlet in Air Conditioning Facilities It plugs into;
According to the BIM model of building structure adjusted and electromechanical Deepen Design model, to air conditioner water pipeline section in computer room into The prefabricated merogenesis analysis of row, provides prefabricated merogenesis figure, the dimensioning of each prefabricated tube section and prefabricated tube section bracket is marked in merogenesis figure Very little and location dimension;
The modularization in conjunction with prefabricated merogenesis figure and BIM model adjusted progress prefabricated tube section is prefabricated and assembles;
The in-site installation that prefabricated tube section is carried out after construction layout and construction layout is carried out.
2. a kind of Air Conditioning Facilities prefabrication of tube section installation method according to claim 1, which is characterized in that the step Include:
Comprehensive wiring content in clear computer room, content include but is not limited to the material specification of used pipeline and material, in computer room Equipment and nozzle dimensions;
Combine the preliminary BIM of the BIM model foundation Air Conditioning Facilities electromechanical speciality of electromechanical speciality drawing and Air Conditioning Facilities comprehensive Model;
In-depth arrangement is carried out to preliminary BIM collective model, determines that intend prefabricated air conditioner water pipeline section in Air Conditioning Facilities arranges substantially Mode.
3. a kind of Air Conditioning Facilities prefabrication of tube section installation method according to claim 2, which is characterized in that the step InFurther include:
A. the race library of each valve member and spoolpiece size is established according to actual size.
4. a kind of Air Conditioning Facilities prefabrication of tube section installation method according to claim 2, it is characterised in that: the step InFurther include:
A. whether inspection model content is completely to avoid omission pipeline content.
5. a kind of Air Conditioning Facilities prefabrication of tube section installation method according to claim 1, which is characterized in that the step Include:
Pipeline section is divided to two sections to carry out prefabricated, and among pipeline section or valve punishment saves;
, prefabricated tube section flange is set, two pipeline sections of flanged joint merogenesis are passed through.
6. a kind of Air Conditioning Facilities prefabrication of tube section installation method according to claim 5, which is characterized in that the step InThe flange used is lap joint flange.
7. a kind of Air Conditioning Facilities prefabrication of tube section installation method according to claim 1, which is characterized in that the step Include:
The construction layout of pipeline section and bracket is carried out using BIM setting-out robot.
8. a kind of Air Conditioning Facilities prefabrication of tube section installation method according to claim 7, which is characterized in that the step InInclude:
A., site control point coordinate and fabric structure point coordinate are set in BIM model;
B. lofting control point is created in BIM model and electromechanical pipeline suspension and support point arrangement is set;
C. data acquisition is carried out to field lofting control point with the live coordinate of positioning robot by setting-out robot;
D. required layout point in BIM model is chosen, commander setting-out robot sights realistic by way of emitting infrared laser Position.
CN201910045260.3A 2019-01-17 2019-01-17 A kind of Air Conditioning Facilities prefabrication of tube section installation method Pending CN109766649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910045260.3A CN109766649A (en) 2019-01-17 2019-01-17 A kind of Air Conditioning Facilities prefabrication of tube section installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910045260.3A CN109766649A (en) 2019-01-17 2019-01-17 A kind of Air Conditioning Facilities prefabrication of tube section installation method

Publications (1)

Publication Number Publication Date
CN109766649A true CN109766649A (en) 2019-05-17

Family

ID=66452963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910045260.3A Pending CN109766649A (en) 2019-01-17 2019-01-17 A kind of Air Conditioning Facilities prefabrication of tube section installation method

Country Status (1)

Country Link
CN (1) CN109766649A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110440054A (en) * 2019-07-17 2019-11-12 中铁十二局集团有限公司 Subway station refrigerator room pipeline assembling constructing method
CN110864625A (en) * 2019-11-18 2020-03-06 上海建工四建集团有限公司 Method and system for installing, positioning and detecting construction site equipment
CN110952811A (en) * 2019-10-24 2020-04-03 中天西北建设投资集团有限公司 Assembly type machine room deepening design process based on BIM and construction method thereof
CN111058661A (en) * 2019-12-25 2020-04-24 中交机电工程局有限公司 Modular assembly type machine room pipeline construction method
CN111104709A (en) * 2019-12-31 2020-05-05 青岛国信海天中心建设有限公司 BIM-based large-scale refrigeration machine room digital assembly method and system
CN111339598A (en) * 2020-02-29 2020-06-26 南通市中南建工设备安装有限公司 BIM-based machine room arrangement and construction guidance method
CN112446073A (en) * 2020-11-10 2021-03-05 上海宝冶集团有限公司 Rapid construction method for air conditioner room of automobile factory building based on BIM deepened design
CN112632684A (en) * 2020-12-31 2021-04-09 南通装配式建筑与智能结构研究院 Assembled electromechanical construction method for subway environmental control machine room based on BIM technology
CN112651067A (en) * 2020-11-16 2021-04-13 中国建筑一局(集团)有限公司 Prefabricated machine room assembly construction method and system based on BIM
CN112982474A (en) * 2021-02-25 2021-06-18 中建八局第四建设有限公司 Method for prefabricating and effectively fixing equipment foundation
CN113781634A (en) * 2021-09-10 2021-12-10 太仓博德房车科技有限公司 Three-dimensional data 1:1 vehicle scanning system and working method thereof
CN114482605A (en) * 2022-02-14 2022-05-13 泰州职业技术学院 Construction method for implementing hospital building electromechanical system transformation based on BIM
CN114547754A (en) * 2022-03-04 2022-05-27 陕西建工集团股份有限公司 Installation method of super-long public space electromechanical pipeline
CN117195445A (en) * 2023-08-02 2023-12-08 中建八局第四建设有限公司 Modularized assembly construction method for clustered air conditioner room

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160160515A1 (en) * 2006-08-26 2016-06-09 Global Building Modules, Inc. System for modular building construction
CN105888317A (en) * 2016-04-19 2016-08-24 中建三局第二建设工程有限责任公司 Central refrigeration machine room modular prefabrication and assembled construction method
CN107542161A (en) * 2017-08-23 2018-01-05 中建八局第建设有限公司 BIDA engineering of integrating technical systems

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160160515A1 (en) * 2006-08-26 2016-06-09 Global Building Modules, Inc. System for modular building construction
CN105888317A (en) * 2016-04-19 2016-08-24 中建三局第二建设工程有限责任公司 Central refrigeration machine room modular prefabrication and assembled construction method
CN107542161A (en) * 2017-08-23 2018-01-05 中建八局第建设有限公司 BIDA engineering of integrating technical systems

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴小建等: "基于BIM的装配式制冷机房施工技术", 《施工技术》 *
钟凯等: "浅谈制冷机房BIM+工厂预制化装配式施工应用", 《安装》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110440054B (en) * 2019-07-17 2021-07-06 中铁十二局集团有限公司 Subway station refrigerating machine room pipeline assembling construction method
CN110440054A (en) * 2019-07-17 2019-11-12 中铁十二局集团有限公司 Subway station refrigerator room pipeline assembling constructing method
CN110952811A (en) * 2019-10-24 2020-04-03 中天西北建设投资集团有限公司 Assembly type machine room deepening design process based on BIM and construction method thereof
CN110864625A (en) * 2019-11-18 2020-03-06 上海建工四建集团有限公司 Method and system for installing, positioning and detecting construction site equipment
CN111058661B (en) * 2019-12-25 2021-06-15 中交机电工程局有限公司 Modular assembly type machine room pipeline construction method
CN111058661A (en) * 2019-12-25 2020-04-24 中交机电工程局有限公司 Modular assembly type machine room pipeline construction method
CN111104709A (en) * 2019-12-31 2020-05-05 青岛国信海天中心建设有限公司 BIM-based large-scale refrigeration machine room digital assembly method and system
CN111339598A (en) * 2020-02-29 2020-06-26 南通市中南建工设备安装有限公司 BIM-based machine room arrangement and construction guidance method
CN112446073A (en) * 2020-11-10 2021-03-05 上海宝冶集团有限公司 Rapid construction method for air conditioner room of automobile factory building based on BIM deepened design
CN112651067A (en) * 2020-11-16 2021-04-13 中国建筑一局(集团)有限公司 Prefabricated machine room assembly construction method and system based on BIM
CN112632684A (en) * 2020-12-31 2021-04-09 南通装配式建筑与智能结构研究院 Assembled electromechanical construction method for subway environmental control machine room based on BIM technology
CN112982474A (en) * 2021-02-25 2021-06-18 中建八局第四建设有限公司 Method for prefabricating and effectively fixing equipment foundation
CN113781634A (en) * 2021-09-10 2021-12-10 太仓博德房车科技有限公司 Three-dimensional data 1:1 vehicle scanning system and working method thereof
CN114482605A (en) * 2022-02-14 2022-05-13 泰州职业技术学院 Construction method for implementing hospital building electromechanical system transformation based on BIM
CN114547754A (en) * 2022-03-04 2022-05-27 陕西建工集团股份有限公司 Installation method of super-long public space electromechanical pipeline
CN117195445A (en) * 2023-08-02 2023-12-08 中建八局第四建设有限公司 Modularized assembly construction method for clustered air conditioner room

Similar Documents

Publication Publication Date Title
CN109766649A (en) A kind of Air Conditioning Facilities prefabrication of tube section installation method
CN111033536A (en) Method and system for generating adaptive projected reality at construction site
CN105888317A (en) Central refrigeration machine room modular prefabrication and assembled construction method
CN108824816B (en) High-altitude long-span net frame sliding, positioning, installing and monitoring method
CN113656858B (en) Double-ball nested structure digital-analog comparison method based on laser scanning point cloud and BIM model
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN114541264B (en) Cable-stayed bridge cable guide pipe integrated measurement positioning method
CN110306804A (en) A kind of curtain wall construction method
CN113374282B (en) Method for controlling embedded bolt by adopting assumed coordinate system
CN108952178B (en) Bidirectional angular displacement accumulation lifting method for irregular free-form surface steel roof
CN116734757A (en) Tunnel surrounding rock deformation monitoring and early warning method based on unmanned aerial vehicle-mounted laser scanner
CN106247931A (en) Guidance method is revised by the variance analysis of a kind of large complicated deformed steel member and factory
CN113221221A (en) BIM technology-based method for positioning prestressed pipeline on precast beam
CN112685807A (en) Scaffold construction process application method and system based on BIM technology
CN107724574B (en) All-transparent louver glass double skin aspiratory curtain wall equivalent space construction technology
CN104746433A (en) Rotating hinge positioning method
CN110565856B (en) Quick installation method for double-curved-surface metal plate curtain wall
CN111719870A (en) One-step forming installation method for electromechanical pipeline of super high-rise standard layer
CN115584816B (en) High-precision steel inclined curved curtain wall system installation method based on intelligent lofting technology
CN111891379B (en) Stable attitude adjusting and mounting method for aero-engine based on interference pre-analysis
Muthumanickam et al. Combining AI and BIM in the design and construction of a Mars habitat
Studer et al. Construction
CN112052501A (en) Prefabricated construction method for modular factory of laboratory electromechanical system
JP2004086788A (en) Construction drawing-less design method and building production method using the design method
Balaguer EU FutureHome project results

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517

RJ01 Rejection of invention patent application after publication