CN109754143A - 基于无人机航拍和建筑信息模型管理工程场地的方法 - Google Patents

基于无人机航拍和建筑信息模型管理工程场地的方法 Download PDF

Info

Publication number
CN109754143A
CN109754143A CN201711092771.8A CN201711092771A CN109754143A CN 109754143 A CN109754143 A CN 109754143A CN 201711092771 A CN201711092771 A CN 201711092771A CN 109754143 A CN109754143 A CN 109754143A
Authority
CN
China
Prior art keywords
engineering
construction
model
information model
building information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711092771.8A
Other languages
English (en)
Inventor
李桦
刘恒宇
何兵
初毅
段宗哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201711092771.8A priority Critical patent/CN109754143A/zh
Publication of CN109754143A publication Critical patent/CN109754143A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种基于无人机航拍和建筑信息模型管理工程场地的方法,本方法首先建立工程场地的三维建筑信息模型,同时根据工程进度计划和实际完成情况创建不同阶段的工程施工阶段进度模型;建立定时无人机航拍制度,保证航拍照片的标准性与实效性;对建筑信息模型进度情况进行三维展示;将航拍图片插入工程施工阶段进度模型,调整位置尺寸使得图片与模型对齐,完成用于工程场地管理的工程场地施工管理模型并依据该模型实施工程施工现场的监控管理。本方法将无人机航拍与建筑信息模型相结合,实现无人机航拍与建筑信息模型的同平台浏览,确保无人机航拍与建筑信息模型空间位置的对应,实现工程场地施工过程的实时监控。

Description

基于无人机航拍和建筑信息模型管理工程场地的方法
技术领域
本发明涉及一种基于无人机航拍和建筑信息模型管理工程场地的方法。
背景技术
随着无人机技术的发展,无人机航拍得到了越来越多的广泛应用,其具有强大的影像能力,得到高画质的影像信息。但无人机航拍在工程项目中的应用目前仍处于完善阶段,使用无人机航拍与建筑信息模型相结合尚处于探索阶段,目前尚无成熟的无人机航拍与建筑信息模型相结合用于工程场地管理的方法,在工程项目管理中应用无人机航拍技术仍有许多难题有待解决。
发明内容
本发明所要解决的技术问题是提供一种基于无人机航拍和建筑信息模型管理工程场地的方法,本方法将无人机航拍与建筑信息模型相结合,实现无人机航拍与建筑信息模型的同平台浏览,确保无人机航拍与建筑信息模型空间位置的对应,实现工程场地施工过程的实时监控。
为解决上述技术问题,本发明基于无人机航拍和建筑信息模型管理工程场地的方法包括如下步骤:
步骤一、根据工程设计信息、场地勘探信息以及工程场地布置方案和工程进度计划建立三维建筑信息模型,三维建筑信息模型包括工程进度计划不同阶段的三维场地信息模型和三维工程建筑信息模型;
步骤二:建立无人机的定时航拍制度,并设定拍摄定位、标高、角度达到确定值,根据工程进度计划定时对整个工程场地进行俯视图航拍;
步骤三、根据工程进度计划和实际完成情况,对三维工程建筑信息模型信息进行添加修正,其中对不同工作面和不同工序进行区分,对已经完成施工区域和未完成施工区域进行区分,并与当前阶段三维场地信息模型进行整合,形成工程施工阶段进度模型;
步骤四、采用建模工具将航拍俯视图插入工程施工阶段进度模型,并调整大小、对齐网轴,形成工程场地施工管理模型;
步骤五、依据工程场地施工管理模型对工程施工现场进行监控管理。
进一步,所述建筑信息模型采用三维建模工具创建,其中包含工程场地的临时道路、临时用房、施工临时设施、永久建筑和红线外道路。
进一步,所述工程施工阶段进度模型采用三维建模工具创建,三维展示工程项目进度,包括不同工作面工序完成状况、计划完成与实际完成工序对比。
进一步,所述工程场地施工管理模型采用三维建模工具实现工程施工现场场地航拍照片与工程施工阶段进度模型同平台展示,快速准确对工程施工现场场地进行监控,并得到工程计划进度与实际进度的对比。
由于本发明基于无人机航拍和建筑信息模型管理工程场地的方法采用了上述技术方案,本方法首先建立工程场地的三维建筑信息模型,同时根据工程进度计划和实际完成情况创建不同阶段的工程施工阶段进度模型;建立定时无人机航拍制度,保证航拍照片的标准性与实效性;对建筑信息模型进度情况进行三维展示;将航拍图片插入工程施工阶段进度模型,调整位置尺寸使得图片与模型对齐,完成用于工程场地管理的工程场地施工管理模型并依据该模型实施工程施工现场的监控管理。本方法将无人机航拍与建筑信息模型相结合,实现无人机航拍与建筑信息模型的同平台浏览,确保无人机航拍与建筑信息模型空间位置的对应,实现工程场地施工过程的实时监控。
具体实施方式
本发明基于无人机航拍和建筑信息模型管理工程场地的方法包括如下步骤:
步骤一、根据工程设计信息、场地勘探信息以及工程场地布置方案和工程进度计划建立三维建筑信息模型,三维建筑信息模型包括工程进度计划不同阶段的三维场地信息模型和三维工程建筑信息模型;
步骤二:建立无人机的定时航拍制度,并设定拍摄定位、标高、角度达到确定值,根据工程进度计划定时对整个工程场地进行俯视图航拍;
步骤三、根据工程进度计划和实际完成情况,对三维工程建筑信息模型信息进行添加修正,其中对不同工作面和不同工序进行区分,对已经完成施工区域和未完成施工区域进行区分,并与当前阶段三维场地信息模型进行整合,形成工程施工阶段进度模型;
步骤四、采用建模工具将航拍俯视图插入工程施工阶段进度模型,并调整大小、对齐网轴,形成工程场地施工管理模型;
步骤五、依据工程场地施工管理模型对工程施工现场进行监控管理。
优选的,所述建筑信息模型采用三维建模工具创建,其中包含工程场地的临时道路、临时用房、施工临时设施、永久建筑和红线外道路。
优选的,所述工程施工阶段进度模型采用三维建模工具创建,三维展示工程项目进度,包括不同工作面工序完成状况、计划完成与实际完成工序对比。
优选的,所述工程场地施工管理模型采用三维建模工具实现工程施工现场场地航拍照片与工程施工阶段进度模型同平台展示,快速准确对工程施工现场场地进行监控,并得到工程计划进度与实际进度的对比。
本方法通过将创建的建筑信息模型(BIM)以及工程施工阶段进度模型与无人机航拍相结合,得到工程场地施工的管理模型,依据该模型方便实施工程施工现场的监控管理,并可适用各种复杂地形情况对场地进行实时有效管理。实现无人机航拍图与建筑信息模型的同平台展示,使得工程场地的动态管理更为高效准确。

Claims (4)

1.一种基于无人机航拍和建筑信息模型管理工程场地的方法,其特征在于本方法包括如下步骤:
步骤一、根据工程设计信息、场地勘探信息以及工程场地布置方案和工程进度计划建立三维建筑信息模型,三维建筑信息模型包括工程进度计划不同阶段的三维场地信息模型和三维工程建筑信息模型;
步骤二:建立无人机的定时航拍制度,并设定拍摄定位、标高、角度达到确定值,根据工程进度计划定时对整个工程场地进行俯视图航拍;
步骤三、根据工程进度计划和实际完成情况,对三维工程建筑信息模型信息进行添加修正,其中对不同工作面和不同工序进行区分,对已经完成施工区域和未完成施工区域进行区分,并与当前阶段三维场地信息模型进行整合,形成工程施工阶段进度模型;
步骤四、采用建模工具将航拍俯视图插入工程施工阶段进度模型,并调整大小、对齐网轴,形成工程场地施工管理模型;
步骤五、依据工程场地施工管理模型对工程施工现场进行监控管理。
2.根据权利要求1所述的基于无人机航拍和建筑信息模型管理工程场地的方法,其特征在于:所述建筑信息模型采用三维建模工具创建,其中包含工程场地的临时道路、临时用房、施工临时设施、永久建筑和红线外道路。
3.根据权利要求1所述的基于无人机航拍和建筑信息模型管理工程场地的方法,其特征在于:所述工程施工阶段进度模型采用三维建模工具创建,三维展示工程项目进度,包括不同工作面工序完成状况、计划完成与实际完成工序对比。
4.根据权利要求1所述的基于无人机航拍和建筑信息模型管理工程场地的方法,其特征在于:所述工程场地施工管理模型采用三维建模工具实现工程施工现场场地航拍照片与工程施工阶段进度模型同平台展示,快速准确对工程施工现场场地进行监控,并得到工程计划进度与实际进度的对比。
CN201711092771.8A 2017-11-08 2017-11-08 基于无人机航拍和建筑信息模型管理工程场地的方法 Pending CN109754143A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711092771.8A CN109754143A (zh) 2017-11-08 2017-11-08 基于无人机航拍和建筑信息模型管理工程场地的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711092771.8A CN109754143A (zh) 2017-11-08 2017-11-08 基于无人机航拍和建筑信息模型管理工程场地的方法

Publications (1)

Publication Number Publication Date
CN109754143A true CN109754143A (zh) 2019-05-14

Family

ID=66402081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711092771.8A Pending CN109754143A (zh) 2017-11-08 2017-11-08 基于无人机航拍和建筑信息模型管理工程场地的方法

Country Status (1)

Country Link
CN (1) CN109754143A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490415A (zh) * 2019-07-15 2019-11-22 同济大学 一种多无人机视觉协同的建筑进度评估方法
CN110544293A (zh) * 2019-07-15 2019-12-06 同济大学 一种多无人机视觉协同的建筑场景识别方法
CN110866738A (zh) * 2019-11-20 2020-03-06 上海宝冶集团有限公司 一种基于bim技术的施工现场进度分析方法及其系统
CN111242435A (zh) * 2020-01-03 2020-06-05 民太安财产保险公估股份有限公司 一种全新的针对线性工程风险动态展示系统
CN111338380A (zh) * 2020-03-25 2020-06-26 河南华北水电工程监理有限公司 一种无人机工程监控方法
CN112365111A (zh) * 2020-02-28 2021-02-12 中国二十二冶集团有限公司 工程进度管理方法
CN112651567A (zh) * 2020-12-30 2021-04-13 湖南虹康规划勘测咨询有限公司 一种国土空间规划实施监督管理方法、系统以及存储介质
CN113362029A (zh) * 2021-06-05 2021-09-07 浙江宏诚工程咨询管理有限公司 一种基于无人机的工程进度监理方法、装置及电子设备
CN113409441A (zh) * 2021-05-07 2021-09-17 中建科技集团有限公司 建筑信息展示方法、装置、设备及计算机可读存储介质

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101354688B1 (ko) * 2013-07-05 2014-01-27 한국건설기술연구원 공사현장 감리 시스템 및 감리 방법
CN105719200A (zh) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 运用三维全景技术结合bim技术进行工程进度监督的方法
CN106022587A (zh) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 一种基于挣值原理的bim项目进度及成本管理系统
US20160307366A1 (en) * 2015-04-14 2016-10-20 ETAK Systems, LLC Virtualized site survey systems and methods for cell sites
CN106055839A (zh) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 基于bim的三维扫描技术在建筑工程中的应用方法
CN106886849A (zh) * 2017-01-20 2017-06-23 深圳广田集团股份有限公司 一种bim模拟与航拍相结合的施工管控方法及系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101354688B1 (ko) * 2013-07-05 2014-01-27 한국건설기술연구원 공사현장 감리 시스템 및 감리 방법
US20160307366A1 (en) * 2015-04-14 2016-10-20 ETAK Systems, LLC Virtualized site survey systems and methods for cell sites
CN105719200A (zh) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 运用三维全景技术结合bim技术进行工程进度监督的方法
CN106022587A (zh) * 2016-05-12 2016-10-12 广州络维建筑信息技术咨询有限公司 一种基于挣值原理的bim项目进度及成本管理系统
CN106055839A (zh) * 2016-06-30 2016-10-26 上海宝冶集团有限公司 基于bim的三维扫描技术在建筑工程中的应用方法
CN106886849A (zh) * 2017-01-20 2017-06-23 深圳广田集团股份有限公司 一种bim模拟与航拍相结合的施工管控方法及系统

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490415A (zh) * 2019-07-15 2019-11-22 同济大学 一种多无人机视觉协同的建筑进度评估方法
CN110544293A (zh) * 2019-07-15 2019-12-06 同济大学 一种多无人机视觉协同的建筑场景识别方法
CN110544293B (zh) * 2019-07-15 2023-04-28 同济大学 一种多无人机视觉协同的建筑场景识别方法
CN110866738A (zh) * 2019-11-20 2020-03-06 上海宝冶集团有限公司 一种基于bim技术的施工现场进度分析方法及其系统
CN111242435A (zh) * 2020-01-03 2020-06-05 民太安财产保险公估股份有限公司 一种全新的针对线性工程风险动态展示系统
CN112365111A (zh) * 2020-02-28 2021-02-12 中国二十二冶集团有限公司 工程进度管理方法
CN111338380A (zh) * 2020-03-25 2020-06-26 河南华北水电工程监理有限公司 一种无人机工程监控方法
CN112651567A (zh) * 2020-12-30 2021-04-13 湖南虹康规划勘测咨询有限公司 一种国土空间规划实施监督管理方法、系统以及存储介质
CN113409441A (zh) * 2021-05-07 2021-09-17 中建科技集团有限公司 建筑信息展示方法、装置、设备及计算机可读存储介质
CN113362029A (zh) * 2021-06-05 2021-09-07 浙江宏诚工程咨询管理有限公司 一种基于无人机的工程进度监理方法、装置及电子设备

Similar Documents

Publication Publication Date Title
CN109754143A (zh) 基于无人机航拍和建筑信息模型管理工程场地的方法
CN104361628B (zh) 一种基于航空倾斜摄影测量的三维实景建模系统
CN105844624B (zh) 动态标定系统、动态标定系统中的联合优化方法及装置
CN106485785B (zh) 一种基于室内三维建模和定位的场景生成方法及系统
CN101605211B (zh) 将虚拟三维建筑与现实环境实拍视频无缝合成的方法
CN108563742B (zh) 自动创建人工智能图像识别训练素材与标注文件的方法
CN105719200A (zh) 运用三维全景技术结合bim技术进行工程进度监督的方法
CN106886849A (zh) 一种bim模拟与航拍相结合的施工管控方法及系统
CN105844696A (zh) 基于射线模型三维重构的图像定位方法以及装置
CN107292954B (zh) 一种三维模型与照片融合方法
CN104463969B (zh) 一种对航空倾斜拍摄的地理照片的模型的建立方法
CN111199066A (zh) 一种基于bim+gis的施工场地虚拟构建复原方法
CN106611441B (zh) 三维地图的处理方法和装置
Oskiper et al. Augmented reality binoculars
CN110544314B (zh) 虚拟现实与仿真模型的融合方法、系统、介质及设备
CN111006646A (zh) 基于无人机倾斜摄影测量技术实现施工进度监测的方法
JP2017026577A (ja) 三次元測量写真の作成方法
Tran et al. Low-cost 3D scene reconstruction for response robots in real-time
CN102938164A (zh) 一种基于航空遥感摄影测量的快速建模方法
CN114299236A (zh) 倾斜摄影测量空地融合实景建模方法、装置、产品及介质
CN105678839A (zh) 基于计算机三维场景模拟技术的安防设备分布设计方法
CN114022568A (zh) 虚实相机位姿矫正方法、装置、存储介质及电子设备
CN104683758A (zh) 一种便捷获得具体位置和周围环境的三维视频监控方法
CN110223233B (zh) 一种基于图像拼接的无人机航拍建图方法
CN108122249A (zh) 一种基于gan网络深度学习模型的光流估计方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190514