CN109751050A - The continuous stratification method of mining by the way of filling is inlayed without muscle to bumps under one kind - Google Patents

The continuous stratification method of mining by the way of filling is inlayed without muscle to bumps under one kind Download PDF

Info

Publication number
CN109751050A
CN109751050A CN201910043081.6A CN201910043081A CN109751050A CN 109751050 A CN109751050 A CN 109751050A CN 201910043081 A CN201910043081 A CN 201910043081A CN 109751050 A CN109751050 A CN 109751050A
Authority
CN
China
Prior art keywords
stope
mining
ore
layer
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910043081.6A
Other languages
Chinese (zh)
Other versions
CN109751050B (en
Inventor
刘青灵
简文彬
陈诗伟
楼晓明
李兵磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201910043081.6A priority Critical patent/CN109751050B/en
Publication of CN109751050A publication Critical patent/CN109751050A/en
Application granted granted Critical
Publication of CN109751050B publication Critical patent/CN109751050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to inlay the continuous stratification method of mining by the way of filling without muscle to bumps under one kind, comprising the following steps: (1) is the stage by ore body division, the stage is divided into multilayer middle section in the height direction;(2) a step stope is arranged in mineral building, arranges that two step stopes, every 5 ~ 7 pillars of a house stopes constitute a panel in ore pillar;(3) Barebone is adopted using the outer trackless of arteries and veins, ore is transported to panel drop shaft by turning layer connecting taxiway under the center route in each middle section and the adopting of upper and lower part both wings ore body, completes ore drawing in stope process;(4) stope in each layer middle section is made of center route, first layer and the second layering, completes the actual mining of each layer ore body of a step stope of panel mineral building, under the lateral protection of a step stope filling body, two step stopes of back production Panel barrier.Have panel stope production capacity big using the method for mining by the way of filling of the present invention, mining time is short, and stoping safety is high, and resources loss is small, adopts and fills process cycles and take over rationally equal remarkable advantages.

Description

The continuous stratification method of mining by the way of filling is inlayed without muscle to bumps under one kind
Technical field
The breaking ore body that the present invention relates to a kind of for ore-rock pole built on the sand, the grade of ore is high, economic value is big is low safely Poor loss stoping method, and in particular to inlay the continuous stratification method of mining by the way of filling without muscle to bumps under a kind of.
Background technique
In the ore body that grade is high, economic value is big, especially ore-rock pole built on the sand, the extremely broken production technique item of ore body Under part, how to realize that safe and efficient, the low poor damage exploitation of ore body is world's mining technique problem.On the one hand, such ore body Economic value it is big, the loss late and the rate of dilution that mining methods are unreasonable to be will result directly in mining mineral resource process are big, make At the profligacy of mineral resources;On the other hand, ore-rock is extremely broken, and traditional method not can guarantee between each charge stratifying It is effective cementing, slicing and filling body intensity is unable to meet production requirement.Meanwhile stope ground pressure is difficult to be controlled effectively, and adopts Field roof control is difficult, fills top plate large area inbreak problem frequent occurrence in exploitation process, brings to mining safety production Major safety risks.
According to existing literature statistics, back production for such ore body is domestic mainly to use horizontal cut and fill stoping, water Flat stratified filling method 52%, remaining is mainly route method and the room-and-pillar method for constructing artificial ore pillar;External this kind of ore body is then main Filling method (Cut and Fill Mining) is cut using adopting, in addition ratio uses square-set method up to 75% (Square-set Mining) accounts for 10%;Remaining mainly uses the small-scale shrinkage method in part and natural caving method back production.
Summary of the invention
In view of this, stoping safety is high, under resources loss is small the object of the present invention is to provide a kind of mining time is short The continuous stratification method of mining by the way of filling is inlayed without muscle to bumps.
The present invention is realized using following scheme: the continuous stratification method of mining by the way of filling is inlayed without muscle to bumps under a kind of, including with Lower step: (1) ore body is in vertical direction divided into stage, reserves oblique top column, a stage between neighbouring two stages A reserved oblique top column is undertaken, the safety coal extraction of stage ore body is completed under the protection of oblique top column, the stage draws in the height direction It is divided into multilayer middle section;(2) it is spaced apart mineral building and ore pillar by divided stages along orebody trend, a step is arranged in mineral building Stope arranges that two step stopes, every 5 ~ 7 pillars of a house stopes constitute a panel in ore pillar;(3) quasi- system is adopted using the outer trackless of arteries and veins System, including level haulage tunnel and turn layer connecting taxiway outside level haulageway, panel drop shaft, arteries and veins;The center route in each middle section and Ore is transported to panel drop shaft by turning layer connecting taxiway under the adopting of upper and lower part both wings ore body, completes ore drawing in stope process;(4) each The stope in layer middle section is made of center route, first layer and the second layering, is first passed through and is turned layer connecting taxiway completion center route Back production, using tailing-filled after the route ore removal of center;(5) after the admission passage filling of center, scene carry out to turn layer into The actual mining of row first layer, with center route do not connect route top both wings ore body centered on top part continue back production from By space, back production is completed in the form that route expands side and is formed lower to convex back production section, after stope mining, is filled out using tailings Fill to be formed it is lower to convex obturation;(6) second layering in middle section by lower under the protection of convex obturation, passing through connection center The layer connecting taxiway that turn of route carries out lower to turning layer, expands the form back production that side bears down on one with route and is formed to spill back production section, out Filling counterfort and drainage layer are constructed after mine, using tailing-filled stope and are connect in the formation of top to spill obturation;(7) it completes The actual mining of each layer ore body of a step stope of panel mineral building, under the lateral protection of a step stope filling body, back production disk Two step stopes of area's ore pillar.
Further, in step (1), stage high 60m, oblique top column 5 ~ 10m of thickness, the high 10 ~ 15m in middle section;In step (2), mine Wide 8 ~ the 12m in room, the wide 10 ~ 15m of ore pillar.
Further, in step (4), center drift stoping control is risen as 6 ~ 7m, back production 3 ~ 4m of breadth, center route ore removal After using 1:4 ~ 1:8 proportion tailing-filled 3 ~ 3.5m.
Further, in step (5), back production height is 3 ~ 3.5m, after stope mining, first matches tail with 1:4 ~ 1:8 Then 2 ~ 2.5m of sandfilling continues consolidated fill stope with the proportion tailings of 1:8 ~ 1:20 and connects to fill under top is formed to convex Body.
Further, in step (6), on to the height of spill back production section be 3 ~ 3.5m, maximum control heights of roofs be 6 ~ 7m, Tailing-filled process is first to match tailing-filled 2 ~ 2.5m with 1:4 ~ 1:8, then continues cementing fill with 1:8 ~ 1:20 proportion tailings It fills out stope and connects top and formed to spill obturation.
Compared with prior art, the invention has the following advantages: being directed to product using the method for mining by the way of filling of the present invention Position is high, economic value is big, the extremely unsteady breaking ore body of ore-rock, and the safety for overcoming existing mining methods to face is low, pushes up Plate normalization is collapsed, and inbreak, resource depletion loss be big, technique mining circulation takes over that complicated, mechanization degree is low, large labor intensity The disadvantages of, have panel stope production capacity big, mining time is short, and stoping safety is high, and resources loss is small, adopts and fills process cycles It takes over and rationally waits remarkable advantages.
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, specific embodiment and phase will be passed through below Attached drawing is closed, invention is further described in detail.
Detailed description of the invention
Fig. 1 is frame structure sectional view of the present invention;
Fig. 2 is the B-B sectional view of Fig. 1;
Fig. 3 is the C-C sectional view of Fig. 1;
Fig. 4 is local structure schematic diagram in Fig. 2;
Figure label explanation: under 1- oblique top column, 2- to convex obturation, 3- is upper adopts lower ore, the center 5- to spill obturation, 4- The outer level haulage lane of route, mono- step stope of 6-, 7-panel drop shafts, the horizontal connecting taxiway of 8-, 9- return air fill pass, 10- arteries and veins Road, bis- step stope of 11-, 12- tailgate, 13- level haulageway, 14- Desending slicing mine, 15- turn layer connecting taxiway.
Specific embodiment
As shown in Fig. 1 ~ 4, the continuous stratification method of mining by the way of filling is inlayed without muscle to bumps under one kind, comprising the following steps: (1) will Ore body is divided into the stage in vertical direction, and oblique top column is reserved between neighbouring two stages, and a stage undertakes one and reserves Oblique top column completes the safety coal extraction of stage ore body under the protection of oblique top column, and the stage is divided into multilayer middle section in the height direction; (2) it is spaced apart mineral building and ore pillar by divided stages along orebody trend, a step stope is arranged in mineral building, in ore pillar Arrange that two step stopes, every 5 ~ 7 pillars of a house stopes constitute a panel;(3) Barebone, including stage fortune are adopted using the outer trackless of arteries and veins Defeated tunnel, panel drop shaft, the outer level haulage tunnel of arteries and veins and turn layer connecting taxiway;Under the protection of reserved oblique top column, the is realized first The back production filling operation of one layer of middle section stope center route, the center route in each middle section and the Cai Xiakuang of upper and lower part both wings ore body Stone is transported to panel drop shaft by turning layer connecting taxiway, completes ore drawing in stope process;(4) stope in each layer middle section by center route, First layer and the second layering are constituted, and are first passed through and are turned the back production that layer connecting taxiway completes center route, after the route ore removal of center Using tailing-filled;(5) after the admission passage filling of center, scene carry out to turn layer carry out first layer actual mining, with Center route does not connect the free space of both wings ore body continuation back production in route top centered on top part, expands the form of side with route It completes back production and is formed lower to convex back production section, after stope mining, fill to be formed down to convex obturation using tailings; (6) second layering in middle section, under the protection of convex obturation, will be carried out lower by the layer connecting taxiway that turn of connection center route It is lower to turning layer, the form back production that side bears down on one is expanded with route and is formed to spill back production section, constructs filling counterfort after ore removal And drainage layer, using tailing-filled stope and connect in the formation of top to spill obturation;(7) a step stope of panel mineral building is completed The actual mining of each layer ore body, under the lateral protection of a step stope filling body, two step stopes of back production Panel barrier are real The existing poor damage of resource minimizes.
Desending slicing completion method is generally used to carry out back production using the method for mining by the way of filling of the present invention, the stope in each layer middle section is again It is made of center route, first layer and the second layering, and successively carries out back production;The stope in first floor middle section is in reserved oblique top column Protection is lower to carry out actual mining, and then the stope in remaining each layer middle section carries out under the obturator protection of upper one layer of middle section stope Actual mining, the second layering in the stope in each layer middle section are then to carry out actual mining under the filling topic protection of first layer, In the entire exploitation process of stope, each stages process process cycle alternation forms stable bumps without muscle mosaic texture, realizes The safety coal extraction of stope.
It is directed to that grade is high, economic value is big, the extremely unsteady breaking ore body of ore-rock using the method for mining by the way of filling of the present invention, Inbreak that safety for overcoming existing mining methods to face is low, top plate normalization is collapsed, resource depletion loss be big, technique mining Circulation takes over the disadvantages of complicated, mechanization degree is low, large labor intensity, has panel stope production capacity big, and mining time is short, Stoping safety is high, and resources loss is small, adopts and fills process cycles and take over rationally equal remarkable advantages;(1) safe Gao Xinggao: panel is exploited Pillars of a house stope uses working to the dip, and in the entire exploitation process of stope, each middle section process for stoping process cycle alternation is formed surely Fixed is concave-convex without muscle mosaic texture, and worker and winning equipment are always in oblique top column and the concave-convex protection without muscle mosaic texture obturation Lower operation, while the trackless of panel stope adopts Barebone and is arranged in ore body lower wall, has safe production operation condition;(2) it provides The source rate of dilution, loss late are low: the present invention is directed to the extreme breaking ore body of high-grade, on the one hand, under the premise of ensuring safety, only exists Oblique top column is reserved between each stage, oblique top column is with a thickness of 5 ~ 10m, after panel stope back production, passes through route or V-arrangement moat The recycling of ditch realization oblique top column mineral resources;On the other hand, a step rooming, two step stooping pillarings, strict control are adopted Mine breadth and control heights of roofs, are filled after stope using the consolidated fill technique of different ratio and packed height, are not stayed Lower stope pillar realizes low poor damage back production;(3) panel stope production capacity is big, mining time is short: every 5 ~ 7 pillars of a house stope structure At a panel, the wide 8 ~ 12m of mineral building, the wide 10 ~ 15m of ore pillar;In recovery process, a nugget is simutaneously arranged non-interfering adopt Field work surface, realizes the orderly converting parallel operation of stope space-time.Meanwhile ore removal is carried out using Trackless self equipment, Qiang Caiqiang goes out, Substantially reduce the stope mining time.Mining experiment effect shows that it can be 275.0t/d that panel, which averagely produces, maximum statistics disk Area's production capacity reaches 445.0t/d;(4) segmentation stope structure is simple: the present invention is directed to the extreme breaking ore body of high-grade, in Heart route, first layer, the second layering stope are constituted, and first layer stope is cementing by different ratio three times and packed height Filling process forms lower to convex obturation;Second layering stope, which is formed by consolidated fill technique twice to spill, to be filled Body;In practice process, a stage arranges 4 ~ 5 middle sections, needs to arrange a center route and a water in each middle section Flat turns layer connecting taxiway, by connection center route turn layer connecting taxiway above and below to turn layer take over completion adopt the technique for filling circulation Process is orderly connected.
Invention method of mining by the way of filling main economic and technical indices are as follows:
(1) it adopts and cuts ratio: 36.7m3/kt, add up to 9.2 standard m/kt.
(2) rock drilling machine-team efficiency: 25 ~ 30m/ machine-team.
(3) ore removal efficiency: 100 ~ 150t/ machine-team.
(4) panel stope overall efficiency: 200 ~ 450t/d.
(5) mining shift efficiency: 20 ~ 35t/ work team.
(6) recovery process loss late: 5.3%.
(7) the recovery process rate of dilution: 6.0%.
(8) mining direct cost: 37.5 yuan/t.
In the present embodiment, in step (1), stage high 60m, oblique top column 5 ~ 10m of thickness, the high 10 ~ 15m in middle section;Step (2) In, the wide 8 ~ 12m of mineral building, the wide 10 ~ 15m of ore pillar.
In the present embodiment, in step (4), center drift stoping control is risen as 6 ~ 7m, back production 3 ~ 4m of breadth, center route Using tailing-filled 3 ~ 3.5m of 1:4 ~ 1:8 proportion after ore removal.
In the present embodiment, in step (5), back production height is 3 ~ 3.5m, after stope mining, is first matched with 1:4 ~ 1:8 Than tailing-filled 2 ~ 2.5m, then continue consolidated fill stope with the proportion tailings of 1:8 ~ 1:20 and connect to fill under top is formed to convex Fill out body.
In the present embodiment, in step (6), on to the height of spill back production section be 3 ~ 3.5m, maximum control heights of roofs be 6 ~ 7m, tailing-filled process are first to match tailing-filled 2 ~ 2.5m with 1:4 ~ 1:8, then continue glue with 1:8 ~ 1:20 proportion tailings Knot filling stope simultaneously connects in the formation of top to spill obturation.
Fujian Longyan mine is structural fracture or the ore body that crushed zone controls, and ore body totally moves towards northwest (NW), is inclined to Nan Xihuo East northeast.Ore body upper lower burrs country rock predominantly in grain granite, intact rock laboratory list compression strength value is generally 30.5~ 42.6MPa.Field survey discovery, protolith ore body and upper lower burrs country rock are controlled by structural fracture or crushed zone, crack hair development, rock Stone RQD value is generally less than 40%, and in mining engineering, main engineering geological problems are goaf top plate normalization inbreak.X-ray It is horizontal to -40m in -225m level in preservation absolute altitude that ore body tests nugget, this I-2 ore body 31 lines between 46 lines (about 225m), the slanting angle of ore body is 45 ° ~ 61 °, and 15 ~ 30m of thickness moves towards long 175m.
Select mine -100 ~ -40 as the stage for implement under the present invention to bumps without muscle inlay continuous stratification filling adopt Mine method, specific implementation step are:
(1) stage high 60m, reserved oblique top column between the upper next stage, oblique top 5 ~ 10m of column thickness, each divided stages multilayer middle section, often The layer high 10 ~ 15m in middle section, a stage undertake a reserved oblique top column, the peace of the stage ore body are completed under the protection of oblique top column Full back production;
(2) the spaced apart mineral building of divided stages and ore pillar are arranged into a step stope, in ore pillar in mineral building along orebody trend Two step stopes of middle arrangement, every 5 ~ 7 pillars of a house stopes constitute a panel, the wide 8 ~ 12m of mineral building, the wide 10 ~ 15m of ore pillar;
(3) include level haulageway, panel drop shaft, the outer level haulage tunnel of arteries and veins and turn layer connecting taxiway;In reserved oblique top column Under protection, the back production filling operation of first layer middle section stope center route is realized first, the stope in middle section is again by center route, the One layering and the second layering are constituted, and ore is by turning layer contact under the center route in each middle section and the adopting of upper and lower part both wings ore body Road is transported to panel drop shaft, completes ore drawing in stope process;
(4) it is -43.5m that head, which adopts middle section absolute altitude, by under the protection of reserved oblique top column, turns layer connection by connection center route The back production of network road completion center route, center drift stoping control are risen as 6 ~ 7m, back production 3 ~ 4m of breadth, and center route ore removal is complete Finish, 3 ~ 3.5m of tailing-filled filling is matched using 1:4 ~ 1:8;
(6) after the admission passage filling of center, scene is carried out to turning layer, is not connect centered on top part on route with center route Portion's both wings ore body continues the free space of back production, completes back production in the form that route expands side, back production height is 3 ~ 3.5m, and stope returns After adopting, tailing-filled 2 ~ 2.5m first is matched with 1:4 ~ 1:8, then continues consolidated fill with the proportion tailings of 1:8 ~ 1:20 and adopts Field simultaneously connects under top is formed to convex obturation;
(7) first the second slicing absolute altitude for adopting middle section is -50.0m, under the protection of convex obturation, will pass through company lower Connect center route turn layer connecting taxiway carry out it is lower to turning layer, with route expand the form back production that side bears down on one formed it is disconnected to spill back production Face, profile height are 3 ~ 3.5m, and maximum control heights of roofs is 6 ~ 7m, constructs filling counterfort and drainage layer after ore removal, first uses 1:4 Then the tailing-filled 2 ~ 2.5m of ~ 1:8 high mixture ratio continues consolidated fill stope with the low proportion tailings of 1:8 ~ 1:20 and connects top, shape On to spill obturation.
(8) it connects each layering access road of center route and takes over circulation to turning layer above and below, a step of completion panel mineral building The actual mining of each layer ore body of stope, under the lateral protection of a step stope filling body, two steps of back production Panel barrier are adopted , realize that the poor damage of resource minimizes.
Any technical solution disclosed in aforementioned present invention unless otherwise stated, if it discloses numberical range, Disclosed numberical range is preferred numberical range, and any it should be appreciated by those skilled in the art preferred numberical ranges The only obvious or representative numerical value of technical effect in many enforceable numerical value.It, can not since numerical value is more Exhaustion, so the present invention just discloses technical solution of the component values to illustrate the present invention, also, the above-mentioned numerical value enumerated is not The limitation to the invention protection scope should be constituted.
If the present invention is open or relates to the components or structural member of connection fastened to each other, unless otherwise stated, It is fixedly connected it is to be understood that connection (such as connecting using bolt or screw) can be removedly fixed, it is understood that are as follows: It is non-removable to be fixedly connected with (such as riveting, welding), certainly, connection fastened to each other or integral structure (such as make Manufactured with casting technique is integrally formed) replaced (obviously can not be using except integrally formed technique).
In addition, for indicating the art of positional relationship or shape applied in any technical solution disclosed in aforementioned present invention Its meaning includes approximate with its, similar or close state or shape to language unless otherwise stated.
Either component provided by the invention by multiple individual component parts either assembled, or one The separate part that forming technology manufactures.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, it should be understood by those ordinary skilled in the art that: still It can modify to a specific embodiment of the invention or some technical features can be equivalently replaced;Without departing from this hair The spirit of bright technical solution should all cover within the scope of the technical scheme claimed by the invention.

Claims (5)

1. inlaying the continuous stratification method of mining by the way of filling without muscle to bumps under one kind, it is characterised in that: the following steps are included: (1) is by mine Body is divided into the stage in vertical direction, and oblique top column is reserved between neighbouring two stages, and a stage undertakes one and reserves tiltedly Top pillar completes the safety coal extraction of stage ore body under the protection of oblique top column, and the stage is divided into multilayer middle section in the height direction; (2) it is spaced apart mineral building and ore pillar by divided stages along orebody trend, a step stope is arranged in mineral building, in ore pillar Arrange that two step stopes, every 5 ~ 7 pillars of a house stopes constitute a panel;(3) Barebone, including stage fortune are adopted using the outer trackless of arteries and veins Defeated tunnel, panel drop shaft, the outer level haulage tunnel of arteries and veins and turn layer connecting taxiway;The center route and upper and lower part both wings mine in each middle section Ore is transported to panel drop shaft by turning layer connecting taxiway under the adopting of body, completes ore drawing in stope process;(4) stope in each layer middle section by Center route, first layer and the second layering are constituted, and are first passed through and are turned the back production that layer connecting taxiway completes center route, and center route goes out Using tailing-filled after mine;(5) after the admission passage filling of center, scene is carried out to the back production for turning layer progress first layer Work is not connect the free space of both wings ore body continuation back production in route top centered on top part with center route, is expanded with route The form of side completes back production and is formed lower to convex back production section, after stope mining, fills to be formed down to convex using tailings Obturation;(6) second layering in middle section, under the protection of convex obturation, will turn layer contact by connection center route lower Road carries out lower to turning layer, expands the form back production that side bears down on one with route and is formed to spill back production section, constructs and fill after ore removal Barricade and drainage layer are filled out, using tailing-filled stope and is connect in the formation of top to spill obturation;(7) step of panel mineral building is completed The actual mining of each layer ore body of rapid stope, under the lateral protection of a step stope filling body, two steps of back production Panel barrier Stope.
2. lower the continuous stratification method of mining by the way of filling is inlayed without muscle to bumps according to claim 1, it is characterised in that: step (1) in, stage high 60m, oblique top column 5 ~ 10m of thickness, the high 10 ~ 15m in middle section;In step (2), the wide 8 ~ 12m of mineral building, ore pillar is wide by 10 ~ 15m。
3. lower the continuous stratification method of mining by the way of filling is inlayed without muscle to bumps according to claim 1, it is characterised in that: step (4) in, center drift stoping control is risen as 6 ~ 7m, back production 3 ~ 4m of breadth, is matched after the route ore removal of center using 1:4 ~ 1:8 Tailing-filled 3 ~ 3.5m.
4. lower the continuous stratification method of mining by the way of filling is inlayed without muscle to bumps according to claim 1, it is characterised in that: step (5) in, back production height is 3 ~ 3.5m, after stope mining, first matches tailing-filled 2 ~ 2.5m with 1:4 ~ 1:8, then uses 1:8 The proportion tailings of ~ 1:20 continues consolidated fill stope and connects under top is formed to convex obturation.
5. lower the continuous stratification method of mining by the way of filling is inlayed without muscle to bumps according to claim 1, it is characterised in that: step (6) in, on to the height of spill back production section be 3 ~ 3.5m, maximum control heights of roofs be 6 ~ 7m, tailing-filled process is first to use 1:4 ~ 1:8 matches tailing-filled 2 ~ 2.5m, then continues consolidated fill stope with 1:8 ~ 1:20 proportion tailings and connect top to be formed to recessed Shape obturation.
CN201910043081.6A 2019-01-17 2019-01-17 Downward concave-convex rib-free inlaid continuous layered filling mining method Active CN109751050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910043081.6A CN109751050B (en) 2019-01-17 2019-01-17 Downward concave-convex rib-free inlaid continuous layered filling mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910043081.6A CN109751050B (en) 2019-01-17 2019-01-17 Downward concave-convex rib-free inlaid continuous layered filling mining method

Publications (2)

Publication Number Publication Date
CN109751050A true CN109751050A (en) 2019-05-14
CN109751050B CN109751050B (en) 2020-07-07

Family

ID=66405835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910043081.6A Active CN109751050B (en) 2019-01-17 2019-01-17 Downward concave-convex rib-free inlaid continuous layered filling mining method

Country Status (1)

Country Link
CN (1) CN109751050B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485883A (en) * 2020-04-30 2020-08-04 昆明理工大学 High ground stress environment low-cost mining method based on paste-multi-medium collaborative filling
CN112576302A (en) * 2020-11-24 2021-03-30 河南理工大学 Partition paste filling method for preventing slurry leakage and improving filling effect
CN113356851A (en) * 2021-06-08 2021-09-07 山东黄金矿业(莱州)有限公司三山岛金矿 Medium-thickness ore body continuous downward medium-length hole subsection open stoping subsequent filling mining method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1291631A (en) * 2000-09-06 2001-04-18 山东黄金集团有限公司焦家金矿 Cementing filler for mine
CN1456788A (en) * 2003-06-06 2003-11-19 中南大学 Continuous mining process with deep hole dropping and top-bottom pillars mining in advance
CN104847352A (en) * 2015-06-06 2015-08-19 山东黄金矿业(莱州)有限公司三山岛金矿 Chamber and overhand cut combined cut-and-filling stoping method in pre-roof-protecting stage
CN108643906A (en) * 2018-04-17 2018-10-12 贵州开磷集团股份有限公司 The method of mining by the way of filling in a kind of arteries and veins

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1291631A (en) * 2000-09-06 2001-04-18 山东黄金集团有限公司焦家金矿 Cementing filler for mine
CN1456788A (en) * 2003-06-06 2003-11-19 中南大学 Continuous mining process with deep hole dropping and top-bottom pillars mining in advance
CN104847352A (en) * 2015-06-06 2015-08-19 山东黄金矿业(莱州)有限公司三山岛金矿 Chamber and overhand cut combined cut-and-filling stoping method in pre-roof-protecting stage
CN108643906A (en) * 2018-04-17 2018-10-12 贵州开磷集团股份有限公司 The method of mining by the way of filling in a kind of arteries and veins

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485883A (en) * 2020-04-30 2020-08-04 昆明理工大学 High ground stress environment low-cost mining method based on paste-multi-medium collaborative filling
CN111485883B (en) * 2020-04-30 2021-07-23 昆明理工大学 High ground stress environment low-cost mining method based on paste-multi-medium collaborative filling
CN112576302A (en) * 2020-11-24 2021-03-30 河南理工大学 Partition paste filling method for preventing slurry leakage and improving filling effect
CN112576302B (en) * 2020-11-24 2022-08-30 河南理工大学 Partition paste filling method for preventing slurry leakage and improving filling effect
CN113356851A (en) * 2021-06-08 2021-09-07 山东黄金矿业(莱州)有限公司三山岛金矿 Medium-thickness ore body continuous downward medium-length hole subsection open stoping subsequent filling mining method
CN113356851B (en) * 2021-06-08 2024-02-02 山东黄金矿业(莱州)有限公司三山岛金矿 Continuous downward medium-length hole segmented open stoping subsequent filling mining method for medium-thickness ore body

Also Published As

Publication number Publication date
CN109751050B (en) 2020-07-07

Similar Documents

Publication Publication Date Title
CN107339104B (en) Security personnel's curtain wall recovery method
CN108894787B (en) Leave the pressure break release method of ore pillar stress concentration in Overburden gob area
CN103557002B (en) A kind of mechanized concentrates drop shaft filling-up method
CN101858217A (en) House pillar changeable panel upward demix filling mining method
CN108194088A (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN107829742B (en) Caving-filling-open stope-caving mining method
CN105041314A (en) Method for united mining of deep subsequent stoping chamber and layered stoping jamb
CN110295909A (en) Only stay mining methods under the obturation of tooth form ore pillar
CN109751050A (en) The continuous stratification method of mining by the way of filling is inlayed without muscle to bumps under one kind
CN107725052B (en) One kind, which is adopted, stays integration exploitation gob side entry top plate constant-resistance anchor body beam method for protecting support
CN103628878B (en) Under breaking surrounding rock ore body to route layering without segmentation tunnel filling mining methods
CN108894785B (en) A kind of layer and section combination recovery method of breaking ore body interlayer
CN107687341A (en) A kind of Upward slicing point pillar filling mining method of extremely thick big unstable ore body
CN109339785B (en) A kind of intensive mining methods of gently inclined medium thick orebody multiple-unit combination
CN105019902A (en) Intra-vein inclined drift overhand cut-and-filling mining method
CN103244123A (en) High-dipping medium thick ore body mining method
CN104453900A (en) Filling mining method of near-horizontal ore body
CN109723441A (en) Control ground pressure two step mechanization of pillars of a house collaboration high sublevel is without solid waste production practice
CN106640075B (en) Low-angle dip mineral ore continuous mining based on combination checkerboard type bottom structure
CN115853514A (en) Reserved interval type ore pillar downward access filling mining method
CN103557003A (en) Iron ore body safety pillar mining method
CN102926754B (en) Two-tunneling bidirectional stripping two-step pre-support mining method
CN202360116U (en) U-shaped shed roadway junction support device
CN102155227A (en) Vertical direction continuous mining method and application in whole ore body continuous mining
CN110344832A (en) Downward layering open stoping method for gently inclined medium-thickness ore body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant