CN102155227A - Vertical direction continuous mining method and application in whole ore body continuous mining - Google Patents

Vertical direction continuous mining method and application in whole ore body continuous mining Download PDF

Info

Publication number
CN102155227A
CN102155227A CN2011100408623A CN201110040862A CN102155227A CN 102155227 A CN102155227 A CN 102155227A CN 2011100408623 A CN2011100408623 A CN 2011100408623A CN 201110040862 A CN201110040862 A CN 201110040862A CN 102155227 A CN102155227 A CN 102155227A
Authority
CN
China
Prior art keywords
stage casing
middle section
numbered
mining
mined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100408623A
Other languages
Chinese (zh)
Other versions
CN102155227B (en
Inventor
杨小聪
解联库
杨志强
郭利杰
许文远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anqing Copper Mine Of Tongling Nonferrous Metals Group Co ltd
BGRIMM Technology Group Co Ltd
Tongling Nonferrous Metals Group Co Ltd
Original Assignee
Beijing General Research Institute of Mining and Metallurgy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Research Institute of Mining and Metallurgy filed Critical Beijing General Research Institute of Mining and Metallurgy
Priority to CN 201110040862 priority Critical patent/CN102155227B/en
Publication of CN102155227A publication Critical patent/CN102155227A/en
Application granted granted Critical
Publication of CN102155227B publication Critical patent/CN102155227B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明提供了一种垂直方向上连续开采方法及在全矿体连续开采中的应用,包括将矿体划分为若干个中段,各中段间隔式划分矿房和矿柱,并对矿房和矿柱进行编号;以三个中段为例,对编号为奇数的采场上中段和中间中段先后进行开采,采完后对编号为奇数的采场上中段和中间中段采用胶结充填,底部采用一定厚度高强度胶结充填;对编号为偶数的采场下中段和中间中段先后进行开采,采完后对编号为偶数的采场下中段顶部、底部及中间中段底部采用一定厚度高强度胶结充填,下中段其余部分采用胶结充填,中间中段其余部分采用非胶结充填;对偶数区域的上中段进行开采,采完后采用非胶结充填;对编号为奇数的采场下中段进行开采,采完后对编号为奇数的采场下中段底部采用高强度胶结充填,其余部分采用胶结充填。底部结构的三角矿柱和高强度胶结充填体构成隔离层,隔离层取代原岩水平矿柱。实现矿体自上而下连续开采。

Figure 201110040862

The invention provides a continuous mining method in the vertical direction and its application in the continuous mining of the whole ore body. The column is numbered; taking the three middle sections as an example, the upper middle section and the middle middle section of the stope with odd numbers are mined successively. After mining, the upper middle section and middle middle section of the stope with odd numbers are filled with cement, and the bottom is used with a certain thickness. High-strength cemented filling; the lower middle section and the middle middle section of the even-numbered stope are mined successively. After mining, a certain thickness of high-strength cemented filling is used for the top and bottom of the lower middle section of the even-numbered stope and the bottom of the middle middle section. The lower middle section The remaining part adopts cemented filling, and the rest of the middle section adopts non-cemented filling; the upper middle section of the even-numbered area is mined, and non-cemented filling is used after mining; the lower middle section of the odd-numbered stope is mined, and the numbered The bottom of the lower and middle section of the odd-number stope is filled with high-strength cement, and the rest is filled with cement. The triangular ore pillars of the bottom structure and the high-strength cemented filling body constitute the isolation layer, and the isolation layer replaces the horizontal ore pillars of the original rock. Realize the top-down continuous mining of the ore body.

Figure 201110040862

Description

垂直方向上连续开采方法及在全矿体连续开采中的应用Continuous Mining Method in Vertical Direction and Its Application in Whole Orebody Continuous Mining

技术领域technical field

本发明涉及一种垂直方向连续开采方法及在全矿体垂直方向开采中的应用,属于采矿技术领域。The invention relates to a vertical continuous mining method and its application in the vertical mining of the whole ore body, belonging to the technical field of mining.

背景技术Background technique

自20世纪80年代以来,国际矿业界已将实现连续高效开采问题视为发展矿山生产、提高经济效益最有效的途径。地下矿山采矿连续工艺的基本定义为:在一个矿体、阶段或矿块的回采过程中,落矿、出矿和运矿三大工序各自具有相对独立的作业条件,各工序间相互协调,在不同的空间平行连续进行所组成的机械化采矿作业系统。Since the 1980s, the international mining industry has regarded the realization of continuous and efficient mining as the most effective way to develop mine production and improve economic benefits. The basic definition of continuous mining process in underground mines is: in the mining process of an ore body, stage or ore block, the three major processes of ore dropping, ore extraction and ore transportation have relatively independent operating conditions, and each process is coordinated with each other. A mechanized mining operation system composed of parallel and continuous operations in different spaces.

在传统的自上而下的矿床开采方法中,相邻阶段之间需要保留水平矿柱,水平矿柱主要由下部采场的顶柱、上部采场的底柱或专门的阶段隔离矿柱构成,回采顺序一般是先回采完上中段再采下中段,或者上中段超前下中段回采。水平矿柱的基本作用是隔离上下阶段,控制地压活动,保护阶段巷道。这种保留水平矿柱的开采方式,存在一些无法解决的问题:In the traditional top-down mining method of ore deposits, horizontal ore pillars need to be kept between adjacent stages, and the horizontal ore pillars are mainly composed of the top pillar of the lower stope, the bottom pillar of the upper stope or special stage isolation pillars , the mining sequence is generally to finish mining the upper and middle section first and then to mine the lower middle section, or the upper and middle sections are mined ahead of the lower and middle section. The basic function of the horizontal pillar is to isolate the upper and lower stages, control the ground pressure activity, and protect the roadway in the stage. There are some unsolvable problems in this mining method of retaining horizontal pillars:

1.上下阶段的回采完毕后,水平矿柱作为上下盘围岩的支撑体,往往承受着巨大载荷,形成强应力集中,从而发生强烈变形甚至破坏,由于水平矿柱及其附近一般地压活动强烈,存在较大的地压灾害隐患,尤其对于深井矿山,水平矿柱及其附近往往是岩爆多发地;1. After the upper and lower stages of mining are completed, the horizontal ore pillar, as the support of the upper and lower wall rocks, often bears a huge load, forming a strong stress concentration, resulting in strong deformation or even destruction. Due to the general ground pressure activities of the horizontal ore pillar and its vicinity Strong, there is a great hidden danger of ground pressure disasters, especially for deep mines, horizontal pillars and their vicinity are often places where rockbursts frequently occur;

2.水平矿柱一般只作为残矿回收,其回收在技术上存在较多的问题,因此回收率较低,有的甚至无法回收,造成矿产资源大量损失;2. Horizontal ore pillars are generally only recovered as residual ore, and there are many technical problems in its recovery, so the recovery rate is low, and some even cannot be recovered, resulting in a large loss of mineral resources;

3.由于水平矿柱回收滞后,致使阶段的作业长期不能结束,井巷工程、风水管线及设备维护工作量大,直接影响井下开采的经济效益;3. Due to the lag in the recovery of horizontal pillars, the operation of the stage cannot be completed for a long time, and the workload of shaft engineering, Fengshui pipeline and equipment maintenance is heavy, which directly affects the economic benefits of underground mining;

4.由于水平矿柱不能在正常回采单元内回采,这就减小了正常回采单元的生产矿量,从而直接影响采切比及采场综合生产能力等多项采矿技术指标;4. Since the horizontal ore pillar cannot be recovered in the normal recovery unit, this reduces the production ore volume of the normal recovery unit, thus directly affecting multiple mining technical indicators such as the cutting ratio and the comprehensive production capacity of the stope;

5.由于水平矿柱回收滞后,回收困难,生产率又低,致使井下作业线拉长,给矿山生产管理带来很多困难,也影响井下人均劳动生产率的提高,矿山的经济效益受到影响,在已完成建设投资的情况下,保留水平矿柱相当于占用了部分建设资金,从而直接影响投资收益。5. Due to the delayed recovery of horizontal ore pillars, difficulty in recovery, and low productivity, the underground operation line is elongated, which brings many difficulties to mine production management and also affects the improvement of underground per capita labor productivity. The economic benefits of mines have been affected. When the construction investment is completed, retaining the horizontal pillars is equivalent to occupying part of the construction funds, which directly affects the investment income.

另外,传统的自上而下非连续采矿方式,在上下阶段间的生产衔接方面也存在一些问题:由于下部阶段需在推进方向上滞后于上部阶段回采,因此必然会限制下部阶段的开采范围,使得上下阶段能同时作业的采场数量减少,限制了矿山可达到的生产能力,对于二步骤采矿方式和走向长度较短的矿体条件,这种影响更为突出。In addition, the traditional top-down discontinuous mining method also has some problems in the production connection between the upper and lower stages: since the lower stage needs to lag behind the upper stage in the direction of advancement, the mining range of the lower stage will inevitably be limited. This reduces the number of stopes that can be operated at the same time in the upper and lower stages, and limits the achievable production capacity of the mine. This effect is more prominent for the two-step mining method and ore body conditions with shorter strike lengths.

在地下矿山广泛采用的充填法采矿二步骤回采方式中,上下阶段非连续开采易造成一步骤采场和二步骤采场的回采失衡。因二步骤采场的矿石混有一定数量的充填材料,矿石贫化相对较大,生产能力也相对较低,所以两类采场需要均衡生产。但是,传统的上下阶段非连续开采方式,在上下相邻阶段过渡开采前,易形成二步骤采场集中出现的局面,严重影响矿山生产的均衡性。In the two-step stope method of filling method widely used in underground mines, discontinuous mining in the upper and lower stages may easily cause a mining imbalance between the first-step stope and the second-step stope. Because the ore in the two-step stope is mixed with a certain amount of filling material, the ore dilution is relatively large, and the production capacity is relatively low, so the two types of stope need balanced production. However, the traditional discontinuous mining method of the upper and lower stages is easy to form a situation where two-step stopes are concentrated before the transitional mining of the upper and lower adjacent stages, which seriously affects the balance of mine production.

发明内容Contents of the invention

本发明为解决在传统的自上而下的矿床开采方法中存在由水平矿柱难以回收、承受压力较大且容易被地质活动破坏导致的生产效率较低、生产安全性较差,以及非连续开采影响矿山生产的均衡性的问题,提供了一种垂直方向上连续开采方法及在全矿体连续开采中的应用。该方法包括:The present invention aims to solve the problems of low production efficiency, poor production safety, and discontinuous mining in the traditional top-down mining method of ore deposits, which are difficult to recover from horizontal ore pillars, bear high pressure, and are easily damaged by geological activities. The problem that mining affects the balance of mine production provides a continuous mining method in the vertical direction and its application in the continuous mining of the whole ore body. The method includes:

在垂直方向,将矿体划分为若干个中段,并将每个所述中段划分为上中段、中间中段和下中段,按预定的方向对所述若干个中段进行编号;In the vertical direction, the ore body is divided into several middle sections, and each said middle section is divided into an upper middle section, a middle middle section and a lower middle section, and the several middle sections are numbered according to a predetermined direction;

对所述编号为奇数且至少间隔两个所述中段的上中段和中间中段先后进行开采,并对开采完成的中间中段采用预定厚度的高强度胶结充填,对开采完成的上中段及中间中段的其余部分采用胶结充填;The upper middle section and the middle middle section whose number is odd and separated by at least two middle sections are mined successively, and the middle and middle sections that have been mined are filled with high-strength cement with a predetermined thickness. The rest is filled with cement;

当所有的所述编号为奇数的中段都开采并充填完毕后,对所述编号为偶数且至少间隔两个所述中段的下中段和中间中段先后进行开采,对开采完成的下中段的顶部和底部以及中间中段的底部都采用预定厚度的高强度胶结充填,对开采完成下中段的其余部分采用胶结充填,对开采完成的中间中段的其余部分采用非胶结充填;After all the odd-numbered middle sections have been mined and filled, the lower middle section and the middle middle section with an even number and at least two intervals between the middle sections are successively mined. Both the bottom and the bottom of the middle section are filled with high-strength cemented filling with a predetermined thickness, cemented filling is used for the rest of the mined lower middle section, and non-cemented filling is used for the rest of the mined middle middle section;

对已经完成开采并充填的所述编号为偶数的中段的上中段进行开采,并对开采完成的上中段采用非胶结充填;Mining the upper middle section of the even-numbered middle section that has been mined and filled, and using non-cemented filling for the mined upper middle section;

当所有的所述编号为偶数的中段都开采并充填完毕后,对所述编号为奇数区域的下中段进行开采,并开采完成的下中段的底部采用高强度胶结充填,对开采完成的下中段的其余部分采用胶结充填。After all the even-numbered middle sections have been mined and filled, the lower middle section of the odd-numbered area is mined, and the bottom of the mined lower middle section is filled with high-strength cement. The remainder is filled with cement.

该方法用于在垂直方向上进行全矿体连续开采。This method is used for continuous mining of the whole ore body in the vertical direction.

由上述技术方案可以看出,本发明通过在垂直方向对矿体进行划分,并分别对矿块同时进行开采和充填,保证了矿山生产的均衡性,并且在开采和充填阶段间不预留水平矿柱,有效减少了阶段间水平矿柱矿量的损失,还能保证各中段采场安全回采和有效的衔接,通过沿用矿山大规模、高强度的集中强化开采,提高采场的综合生产能力,缩短采场的回采周期。It can be seen from the above technical scheme that the present invention divides the ore body in the vertical direction, and simultaneously mines and fills the ore blocks respectively, so as to ensure the balance of mine production, and does not reserve a level between the mining and filling stages. The ore pillar effectively reduces the loss of the horizontal pillar ore volume between stages, and can also ensure the safe recovery and effective connection of the middle stopes. By continuing to use the large-scale, high-intensity intensive intensive mining of the mine, the comprehensive production capacity of the stope is improved. , shorten the stope recovery cycle.

附图说明Description of drawings

图1是本发明的具体实施方式提供的垂直方向连续开采方法的流程示意图。Fig. 1 is a schematic flow chart of a vertical continuous mining method provided by a specific embodiment of the present invention.

图2是本发明的具体实施方式提供的采场分配示意图;Fig. 2 is the stope distribution schematic diagram that the specific embodiment of the present invention provides;

图3是本发明的具体实施方式提供的开采及充填顺序示意图;Fig. 3 is a schematic diagram of the mining and filling sequence provided by the specific embodiment of the present invention;

具体实施方式Detailed ways

本具体实施方式提供了一种垂直方向连续开采方法,包括在垂直方向,将矿体划分为若干个中段,以三个中段为例,按预定方向对上中段、中间中段及下中段进行编号;对编号为奇数且至少间隔两个中段的上中段和中间中段先后进行开采,并对开采完成的中间中段采用预定厚度的高强度胶结充填,对开采完成的上中段及中间中段的其余部分采用胶结充填;当所有的编号为奇数的中段都开采并充填完毕后,对编号为偶数且至少间隔两个中段的下中段和中间中段先后进行开采,对开采完成的下中段的顶部和底部以及中间中段的底部都采用预定厚度的高强度胶结充填,对开采完成下中段的其余部分采用胶结充填,对开采完成的中间中段的其余部分采用非胶结充填;对已经完成开采并充填的编号为偶数的中段的上中段进行开采,并对开采完成的上中段采用非胶结充填;当所有的编号为偶数的中段都开采并充填完毕后,对编号为奇数区域的下中段进行开采,并开采完成的下中段的底部采用高强度胶结充填,对开采完成的下中段的其余部分采用胶结充填。This specific embodiment provides a vertical continuous mining method, including dividing the ore body into several middle sections in the vertical direction, taking the three middle sections as an example, numbering the upper middle section, the middle middle section and the lower middle section according to a predetermined direction; The upper middle section and the middle middle section with an odd number and at least two middle sections are mined successively, and the middle and middle sections that have been mined are filled with high-strength cement with a predetermined thickness, and the remaining parts of the upper middle section and the middle middle section that have been mined are cemented. Filling; when all the odd-numbered middle sections have been mined and filled, the lower middle section and the middle middle section with an even number and at least two middle sections are mined successively, and the top and bottom of the lower middle section and the middle middle section that have been mined are completed. The bottom of the bottom is filled with a predetermined thickness of high-strength cemented filling, cemented filling is used for the remaining part of the mined lower middle section, and non-cemented filling is used for the remaining part of the mined middle middle section; for the even-numbered middle section that has been mined and filled The upper and middle section of the area is mined, and non-cemented filling is used for the upper and middle sections that have been mined; when all the even-numbered middle sections have been mined and filled, the lower and middle section of the odd-numbered area is mined, and the completed lower and middle sections are mined High-strength cemented backfill is used at the bottom of the mine, and cemented backfill is used for the rest of the mined lower middle section.

为了更清楚的说明该技术方案,下面以具体的矿场环境并结合说明书附图进行说明,如图1所示,该方法具体可以包括:In order to illustrate the technical solution more clearly, the specific mine environment will be described below in conjunction with the drawings of the description, as shown in Figure 1, the method can specifically include:

步骤1,在垂直方向,将矿体划分为若干个中段,并将每个中段划分为上中段、中间中段和下中段,按预定的方向对若干个中段进行编号。Step 1, in the vertical direction, divide the ore body into several middle sections, and divide each middle section into upper middle section, middle middle section and lower middle section, and number the several middle sections according to the predetermined direction.

以一个生产能力为3500t/d的矿山为例,其矿体平均厚为40至50m,最大厚度达80至100m,倾角70°以上,矿体形态较规整,采矿方法主要为大直径深孔嗣后充填采矿法,采场垂直矿体走向布置,分矿房、矿柱,间隔式两步回采。为便于说明,本实施例选择矿体在-400m至-560m阶段之间,从上至下为3个阶段。Taking a mine with a production capacity of 3500t/d as an example, the average thickness of the ore body is 40 to 50m, the maximum thickness is 80 to 100m, and the inclination angle is more than 70°. In the filling mining method, the stope is arranged vertically to the direction of the ore body, divided into mine rooms and pillars, and two-step mining at intervals. For the convenience of illustration, in this embodiment, the ore body is selected to be between -400m and -560m, and there are 3 stages from top to bottom.

如图2所示,采场依次编号1~15,奇数编号为矿房采场,用R表示,偶数编号为矿柱采场,用P表示。三个中段分别为:上中段(-400m~-460m阶段)、中间中段(-460m~-510m阶段)、下中段(-510m~-560m阶段),并依次用编号1、2、3表示,将具体采场所在或所包含的阶段编号作为采场标识的后缀,如R矿块划分为R12矿块和R3矿块,并且R12为双阶段矿块,R3为单阶段矿块;P矿块划分为P1矿块和P23矿块,即P1矿块为单阶段矿块,P23为双阶段矿块。在本具体实施方式中,“R”和“P”只是标识,并不一定代表就是“矿房”和“矿柱”。As shown in Figure 2, the stopes are numbered 1 to 15 in sequence, the odd number is the mine stope, represented by R, and the even number is the pillar stope, represented by P. The three middle sections are: upper middle section (-400m~-460m stage), middle middle section (-460m~-510m stage), lower middle section (-510m~-560m stage), and are represented by numbers 1, 2, and 3 in sequence, The stage number where the specific stope is located or included is used as the suffix of the stope identification. For example, R ore block is divided into R12 ore block and R3 ore block, and R12 is a two-stage ore block, R3 is a single-stage ore block; P ore block It is divided into P1 ore block and P23 ore block, that is, P1 ore block is a single-stage ore block, and P23 is a two-stage ore block. In this specific embodiment, "R" and "P" are just signs, and do not necessarily represent "mine house" and "mine pillar".

当上中段和中间中段两相邻的一步骤矿块回采及充填完毕后,它们中间的二步骤矿块是从中间中段和下中段开始回采,回采完后再采上中段矿块。因此称一步骤矿块为矿房,二步骤矿块为矿柱,则可将这一布置方式称为“矿房矿柱上下交错布置”。这种采场布置方式的主要特点是:可以不留-510m水平矿柱,矿房矿柱在-510m垂直交错布置,与目前矿柱对应的采场直接从-560m往上回采,是一个-400m~-560m的整体开采方案。After the two adjacent one-step ore blocks in the upper middle section and the middle middle section have been mined and filled, the two-step ore blocks in the middle of them are mined from the middle middle section and the lower middle section, and the upper middle section ore blocks are mined after the back mining. Therefore, the one-step ore block is called a mine house, and the two-step ore block is an ore pillar, and this arrangement can be called "the mine house ore pillar is staggered up and down". The main features of this stope arrangement are: no horizontal pillars at -510m can be left, the mine pillars are vertically staggered at -510m, and the stope corresponding to the current mine pillars is mined directly from -560m upwards, which is a - The overall mining plan of 400m~-560m.

步骤2,对编号为奇数且至少间隔两个中段的上中段和中间中段先后进行开采,并对开采完成的中间中段采用预定厚度的高强度胶结充填,对开采完成的上中段及中间中段的其余部分采用胶结充填。Step 2: Mining the upper middle section and the middle middle section with an odd number and at least two middle sections apart, and adopting high-strength cemented filling with a predetermined thickness for the middle middle section that has been mined, and filling the remaining upper middle section and the middle middle section that have been mined. Some are filled with cement.

开采及充填的顺序如图3所示,按数字标注的顺序进行开采,首先从图3左端的1R12矿块进行开采,为了实现全矿体同时开采并保证矿岩的稳定性,可以先对编号为1、5、9和13的中间间隔一个R12的矿块进行同时开采,再对编号为3、7和11的R12矿块进行开采。对所有的R12矿块采用胶结充填,并且对R12矿块的底部充填厚度为10米的高强度胶结,在R12矿块的底部两侧各保留一块三角区域的矿块不采。The sequence of mining and filling is shown in Figure 3. Mining is carried out in the order marked by numbers. First, the 1R12 ore block at the left end of Figure 3 is mined. In order to realize simultaneous mining of the entire ore body and ensure the stability of the ore rock, the numbering Simultaneously mine an R12 ore block in the middle of 1, 5, 9 and 13, and then mine the R12 ore blocks numbered 3, 7 and 11. All the R12 ore blocks are filled with cement, and the bottom of the R12 ore block is filled with high-strength cement with a thickness of 10 meters. On both sides of the bottom of the R12 ore block, a block in a triangular area is reserved for non-mining.

步骤3,当所有的编号为奇数的中段都开采并充填完毕后,对编号为偶数且至少间隔两个中段的下中段和中间中段先后进行开采,对开采完成的下中段的顶部和底部以及中间中段的底部都采用预定厚度的高强度胶结充填,对开采完成下中段的其余部分采用胶结充填,对开采完成的中间中段的其余部分采用非胶结充填。Step 3, when all the odd-numbered middle sections have been mined and filled, the lower middle section and the middle middle section with an even number and at least two middle sections are successively mined, and the top, bottom and middle sections of the lower middle section that have been mined are mined. The bottom of the middle section is filled with high-strength cement with a predetermined thickness, cemented filling is used for the rest of the mined lower middle section, and non-cemented filling is used for the rest of the mined middle middle section.

开采及充填的顺序如图3所示,为了实现全矿体同时开采,可以对编号为2、6和10的中间间隔一个P23的矿块进行同时开采,再对编号为4、8和12的P23矿块进行开采。开采完成后对编号为偶数的采场下中段顶部、底部及中间中段底部采用灰沙比为1比4的高强度尾砂胶结充填,充填的厚度为20米,下中段其余部分采用胶结充填,中间中段其余部分采用非胶结充填。The sequence of mining and filling is shown in Figure 3. In order to realize the simultaneous mining of the whole ore body, the ore blocks numbered 2, 6 and 10 can be mined at the same time with a P23 in the middle, and then the ore blocks numbered 4, 8 and 12 can be mined simultaneously. The P23 ore block is mined. After the mining is completed, the top and bottom of the lower middle section of the even-numbered stope and the bottom of the middle middle section are cemented with high-strength tailings with a gray-sand ratio of 1:4. The filling thickness is 20 meters, and the rest of the lower middle section is cemented. The rest of the middle section is filled with non-cemented filling.

步骤4,对已经完成开采并充填的编号为偶数的中段的上中段进行开采,并对开采完成的上中段采用非胶结充填。Step 4: Mining the upper middle section of the even-numbered middle section that has been mined and filled, and using non-cemented filling for the mined upper middle section.

开采及充填的顺序如图3所示,,为了实现全矿体同时开采,可以对编号为2、6和10的中间间隔一个P1的矿块进行同时开采,再对编号为4、8和12的P1矿块进行开采。开采完成后对P1矿块采用非胶结充填。The sequence of mining and filling is shown in Figure 3. In order to realize the simultaneous mining of the whole ore body, the ore blocks numbered 2, 6 and 10 can be mined at the same time with a P1 in the middle, and then the ore blocks numbered 4, 8 and 12 can be mined simultaneously. The P1 ore blocks are mined. After the mining is completed, non-cemented filling is used for the P1 ore block.

步骤5,当所有的编号为偶数的中段都开采并充填完毕后,对编号为奇数区域的下中段进行开采,并开采完成的下中段的底部采用高强度胶结充填,对开采完成的下中段的其余部分采用胶结充填。Step 5: After all the even-numbered middle sections have been mined and filled, the lower middle section of the odd-numbered area is mined, and the bottom of the mined lower middle section is filled with high-strength cement. The rest is filled with cement.

开采及充填的顺序如图3所示,,当所有的编号为偶数的区域都回采并充填完毕后,为了实现全矿体同时开采,可以对编号为1、5、9和13的中间间隔一个R3的矿块进行同时开采,再对编号为3、7和11的R3进行开采。开采完成后对对R3矿块德下中段底部采用高强度胶结充填,其余部分采用胶结充填。The sequence of mining and filling is shown in Figure 3. After all the even-numbered areas have been mined and filled, in order to realize the simultaneous mining of the entire ore body, it is possible to divide the intervals between numbers 1, 5, 9 and 13 by one The ore blocks of R3 are mined at the same time, and then the R3s numbered 3, 7 and 11 are mined. After the mining is completed, the bottom of the lower and middle section of the R3 ore block is filled with high-strength cement, and the rest is filled with cement.

采用步骤2-5的充填方式后,在-510m隔离层由-400m至-510m矿房采场的高强度充填体、三角形矿柱以及-460m至-560m矿柱采场的中部高强度充填第构成。经数值模拟,其中,-400m至-510m矿房采场充填体强度应不小于(C=0.7MPa、=30,对应c=2.4MPa),厚度应不小于10m;-460m至-560m矿柱采场的中部高强度充填体的强度应不小于(C=0.9MPa、=30,对应c=3.1MPa),其厚度应不小于20m。根据力学计算结果,由于充填体有良好的“让压性”,该隔离层的安全隔离效果好于原岩矿柱,而且这种充填方式也使上下中段间不存在胶结充填接顶问题,能从根本上解决世界性的充填接顶难题。After adopting the filling method of steps 2-5, in the -510m isolation layer, the high-strength filling body of the -400m to -510m mine stope, the triangular ore pillar and the middle part of the high-strength filling of the -460m to -560m ore pillar stope constitute. Through numerical simulation, the strength of the filling body in the stope of the mine house from -400m to -510m should not be less than (C=0.7MPa, =30, corresponding to c=2.4MPa), and the thickness should not be less than 10m; the ore pillar from -460m to -560m The strength of the high-strength filling body in the middle of the stope should not be less than (C=0.9MPa, =30, corresponding to c=3.1MPa), and its thickness should not be less than 20m. According to the mechanical calculation results, because the filling body has a good "compressibility", the safety isolation effect of this isolation layer is better than that of the original rock pillar, and this filling method also prevents the problem of cemented filling and roof connection between the upper and lower middle sections, which can Fundamentally solve the worldwide filling and topping problem.

本实施例提供的垂直方向连续开采方法适合于矿体厚大(厚度≥40m),矿体倾角65~90度,矿体和围岩稳固性好,且使用阶段空场嗣后充填采矿法回采的矿山。该方法在阶段间不预留水平矿柱的基础上,既保证各中段采场安全回采,有效的衔接,又沿用矿山大规模、高强度的集中强化开采,改善井下工人的作业环境和工作条件,提高采场的综合生产能力,缩短采场的回采周期。在我国进行推广,将有效减少阶段间水平矿柱矿量的损失;提升我国地下金属矿山的采矿技术水平,促进全国地下金属矿山连续采矿技术的发展;有效改观全国地下金属矿山生产水平低下(特别是水平矿柱回采)的被动局面;降低全国地下金属矿山间柱采场的贫化率和损失率,促进金属资源最大化回收;提升全国地下矿山采矿的机械化水平,进而促使提高国产采矿机械的革新与进步。The vertical continuous mining method provided in this embodiment is suitable for thick ore body (thickness ≥ 40m), ore body inclination angle of 65-90 degrees, good stability of ore body and surrounding rock, and backfill mining method in the use stage. mine. On the basis of not reserving horizontal ore pillars between stages, this method not only ensures the safe mining and effective connection of each middle stope, but also continues to use the large-scale, high-intensity intensive intensive mining of mines to improve the working environment and working conditions of underground workers , improve the comprehensive production capacity of the stope, and shorten the recovery period of the stope. Promotion in our country will effectively reduce the loss of horizontal ore pillars between stages; improve the mining technology level of my country's underground metal mines and promote the development of continuous mining technology in underground metal mines nationwide; effectively improve the low production level of underground metal mines in the country (especially It is a passive situation of horizontal ore pillar mining); reduce the dilution rate and loss rate of inter-pillar stopes in underground metal mines nationwide, and promote the maximum recovery of metal resources; improve the mechanization level of underground mine mining in the country, and then promote the improvement of domestic mining machinery. Innovation and progress.

以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art within the technical scope disclosed in the present invention can easily think of changes or Replacement should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention should be determined by the protection scope of the claims.

Claims (4)

1. continuous exploitation method on the vertical direction is characterized in that, comprising:
In vertical direction, ore body is divided into several stage casings, and each described stage casing is divided into stage casing, middle stage casing and following stage casing, by predetermined direction described several stage casings are numbered;
Be numbered odd number and successively exploit in the last stage casing and the middle stage casing in two described stage casings at least at interval to described, and the middle stage casing that exploitation is finished adopted the high strength consolidated fill of predetermined thickness, the last stage casing that exploitation is finished and the remainder employing consolidated fill in middle stage casing;
When all exploit and after filling finishes in all described stage casings that is numbered odd number, be numbered even number and successively exploit in the following stage casing and the middle stage casing in two described stage casings at least at interval to described, the high strength consolidated fill of predetermined thickness is all adopted in the top in the following stage casing that exploitation is finished and the bottom in bottom and middle stage casing, the remainder of exploitation being finished down the stage casing adopts consolidated fill, and the remainder in the middle stage casing that exploitation is finished adopts non-consolidated fill;
The described last stage casing that is numbered the stage casing of even number of finishing exploitation and filling is exploited, and non-consolidated fill is adopted in the last stage casing that exploitation is finished;
When all exploit and after filling finishes in all described stage casings that is numbered even number, the described following stage casing that is numbered the odd number zone is exploited, and the bottom in the exploitation following stage casing of finishing adopts the high strength consolidated fill, and the remainder in the following stage casing that exploitation is finished adopts consolidated fill.
2. method according to claim 1 is characterized in that, the dust and sand that described high strength tailings gluing is a predetermined thickness is than the tailings gluing that is 1 to 4.
3. method according to claim 1 is characterized in that, to described be numbered the odd number stage casing in the process of exploiting of stage casing and middle stage casing, the two bottom sides in stage casing respectively keeps the nugget of a Delta Region in the middle of described.
4. based on the application of continuous exploitation method on the described vertical direction of claim 1 to 3, it is characterized in that this method is used for carrying out full ore body in vertical direction and exploits continuously.
CN 201110040862 2011-02-18 2011-02-18 Continuous Mining Method in Vertical Direction and Its Application in Whole Orebody Continuous Mining Active CN102155227B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110040862 CN102155227B (en) 2011-02-18 2011-02-18 Continuous Mining Method in Vertical Direction and Its Application in Whole Orebody Continuous Mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110040862 CN102155227B (en) 2011-02-18 2011-02-18 Continuous Mining Method in Vertical Direction and Its Application in Whole Orebody Continuous Mining

Publications (2)

Publication Number Publication Date
CN102155227A true CN102155227A (en) 2011-08-17
CN102155227B CN102155227B (en) 2013-02-20

Family

ID=44436871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110040862 Active CN102155227B (en) 2011-02-18 2011-02-18 Continuous Mining Method in Vertical Direction and Its Application in Whole Orebody Continuous Mining

Country Status (1)

Country Link
CN (1) CN102155227B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337892A (en) * 2011-08-25 2012-02-01 长沙矿山研究院 Upward access filling method
CN102562065A (en) * 2012-01-12 2012-07-11 北京科技大学 Sublevel open-stop and delayed filling mining method
CN103147760A (en) * 2013-03-15 2013-06-12 金川集团股份有限公司 Large-scale horizontal jamb mining method under existence of bottom caving group occurrence
CN104481538A (en) * 2014-11-21 2015-04-01 北京矿冶研究总院 Method for treating interlayer in steeply inclined multi-layer ore body of non-coal mine
CN105952454A (en) * 2016-05-10 2016-09-21 中国恩菲工程技术有限公司 Open-stoping subsequent backfilling mining method for deep-shaft mines
CN110439561A (en) * 2019-08-29 2019-11-12 山东能源集团科技发展有限公司 A kind of Lian Cailian fills coal winning technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050242654A1 (en) * 2004-05-03 2005-11-03 Jean-Marie Fecteau Continuous extraction of underground narrow-vein metal-bearing deposits by thermal rock fragmentation
WO2007148251A1 (en) * 2006-06-19 2007-12-27 Magatar Mining Ip (Pty) Limited A mining method and system for use therein
CN101105129A (en) * 2007-07-16 2008-01-16 中南大学 Mining Environment Reconstruction Continuous Mining Followed by Fill Mining
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN101899976A (en) * 2010-07-15 2010-12-01 煤炭科学研究总院太原研究院 Continuous coal mining process method of open-pit coal mine
CN101956556A (en) * 2009-07-16 2011-01-26 中国瑞林工程技术有限公司 Roof and bottom pillar-free stage upward continuous filling and mining method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050242654A1 (en) * 2004-05-03 2005-11-03 Jean-Marie Fecteau Continuous extraction of underground narrow-vein metal-bearing deposits by thermal rock fragmentation
WO2007148251A1 (en) * 2006-06-19 2007-12-27 Magatar Mining Ip (Pty) Limited A mining method and system for use therein
CN101105129A (en) * 2007-07-16 2008-01-16 中南大学 Mining Environment Reconstruction Continuous Mining Followed by Fill Mining
CN101956556A (en) * 2009-07-16 2011-01-26 中国瑞林工程技术有限公司 Roof and bottom pillar-free stage upward continuous filling and mining method
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN101899976A (en) * 2010-07-15 2010-12-01 煤炭科学研究总院太原研究院 Continuous coal mining process method of open-pit coal mine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
崔仑等: "机械化盘区上向分层充填采矿方法试验", 《黄金》 *
龙翼: "高效采矿法在复杂矿体开采中的应用", 《新疆有色金属》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337892A (en) * 2011-08-25 2012-02-01 长沙矿山研究院 Upward access filling method
CN102337892B (en) * 2011-08-25 2014-06-25 长沙矿山研究院 Upward access filling method
CN102562065A (en) * 2012-01-12 2012-07-11 北京科技大学 Sublevel open-stop and delayed filling mining method
CN103147760A (en) * 2013-03-15 2013-06-12 金川集团股份有限公司 Large-scale horizontal jamb mining method under existence of bottom caving group occurrence
CN104481538A (en) * 2014-11-21 2015-04-01 北京矿冶研究总院 Method for treating interlayer in steeply inclined multi-layer ore body of non-coal mine
CN104481538B (en) * 2014-11-21 2016-09-21 北京矿冶研究总院 A treatment method for interlayers in steeply inclined multi-layer ore bodies in non-coal mines
CN105952454A (en) * 2016-05-10 2016-09-21 中国恩菲工程技术有限公司 Open-stoping subsequent backfilling mining method for deep-shaft mines
CN105952454B (en) * 2016-05-10 2017-12-19 中国恩菲工程技术有限公司 Deep Shaft Mine in China open stope afterwards filling mining method
CN110439561A (en) * 2019-08-29 2019-11-12 山东能源集团科技发展有限公司 A kind of Lian Cailian fills coal winning technology

Also Published As

Publication number Publication date
CN102155227B (en) 2013-02-20

Similar Documents

Publication Publication Date Title
CN101818643B (en) Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN101858217B (en) House pillar changeable panel upward demix filling mining method
CN102251773B (en) Route type upward horizontal layered filling mining method suitable for extremely complex ore body mining
CN104895566B (en) A kind of residual ore recovery mining method
CN104018836B (en) A kind of point mining method that has false top rake middle thickness orebody built on the sand
CN102155227B (en) Continuous Mining Method in Vertical Direction and Its Application in Whole Orebody Continuous Mining
US20180195386A1 (en) Parallel digging, mining and filling operation coal mining method for controlling overlaying strata fracture and surface subsidence
CN104863592B (en) A kind of big structure sublevel drill and benching ore removal afterwards filling mining method
CN110295909B (en) Filling body underground mining method only with tooth-shaped ore pillar
CN106223958A (en) The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN102619513A (en) Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN105545307A (en) Method for over-pit and under-pit cooperative control of roofs of far and near fields of extra-large stoping space
CN102086765B (en) High-sublevel multi-layer mining method of ultrathin copper ore body
CN103244123B (en) High-dipping medium thick ore body mining method
CN102678121A (en) Layered top-controlling filling mining method for residual ores in deep hole in diskless area
CN104675399B (en) Colliery digging fills integrated coal-mining method
CN104330107A (en) Method for evaluating filling quality of solid filling coal mining working face
CN105909247A (en) Non-pillar sublevel mining cemented filling mining method
CN105201506B (en) The mining methods of afterwards filling are reinforced before a kind of heir
CN101487392A (en) House pillar type coal mining method
CN111828007A (en) Stoping method for residual studs in underground mine goaf
CN105317438A (en) Middle pre-mining slicing top-coal breaking coal mining method for super high seams
CN104453900A (en) Filling mining method of near-horizontal ore body
CN102589372A (en) Chamber and deep hole blasting method of gob
CN111852478B (en) Thick, large and stable ore body filling mining method with H-shaped stud structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ANQING COOPER MINE OF TONGLING NONFERROUS METALS G

Effective date: 20120724

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Xiaocong

Inventor after: Fang Zhifu

Inventor after: Xie Lianku

Inventor after: Wei Ming

Inventor after: Yang Zhiqiang

Inventor after: Zou Xianji

Inventor after: Guo Lijie

Inventor after: Xu Wenyuan

Inventor before: Yang Xiaocong

Inventor before: Xie Lianku

Inventor before: Yang Zhiqiang

Inventor before: Guo Lijie

Inventor before: Xu Wenyuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YANG XIAOCONG JIE LIANKU YANG ZHIQIANG GUO LIJIE XU WENYUAN TO: YANG XIAOCONG FANG ZHIFU JIE LIANKU WEI MING YANG ZHIQIANG ZOU XIANJI GUO LIJIE XU WENYUAN

TA01 Transfer of patent application right

Effective date of registration: 20120724

Address after: 100070 Beijing City, South West Fourth Ring Road, Fengtai District, No. 188 headquarters base area, building eighteen, No. 23

Applicant after: BEIJING GENERAL Research Institute OF MINING AND METALLURGY

Co-applicant after: ANQING COPPER MINE OF TONGLING NONFERROUS METALS GROUP Co.,Ltd.

Address before: 100070 Beijing City, South West Fourth Ring Road, Fengtai District, No. 188 headquarters base area, building eighteen, No. 23

Applicant before: BEIJING GENERAL Research Institute OF MINING AND METALLURGY

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100160 Beijing City, South West Fourth Ring Road, Fengtai District, No. 188 headquarters base area, building eighteen, No. 23

Co-patentee after: ANQING COPPER MINE OF TONGLING NONFERROUS METALS GROUP Co.,Ltd.

Patentee after: Bgrimm Technology Group

Address before: 100070, No. 23, building eighteen, 188, base station, South Fourth Ring Road West, Beijing, Fengtai District

Co-patentee before: ANQING COPPER MINE OF TONGLING NONFERROUS METALS GROUP Co.,Ltd.

Patentee before: Beijing General Research Institute of Mining and Metallurgy

TR01 Transfer of patent right

Effective date of registration: 20200423

Address after: 100160 Beijing City, South West Fourth Ring Road, Fengtai District, No. 188 headquarters base area, building eighteen, No. 23

Co-patentee after: TONGLING NONFERROUS METALS GROUP Co.,Ltd.

Patentee after: Bgrimm Technology Group

Address before: 100160 Beijing City, South West Fourth Ring Road, Fengtai District, No. 188 headquarters base area, building eighteen, No. 23

Co-patentee before: ANQING COPPER MINE OF TONGLING NONFERROUS METALS GROUP Co.,Ltd.

Patentee before: Bgrimm Technology Group

TR01 Transfer of patent right