CN105201506B - The mining methods of afterwards filling are reinforced before a kind of heir - Google Patents

The mining methods of afterwards filling are reinforced before a kind of heir Download PDF

Info

Publication number
CN105201506B
CN105201506B CN201510560777.8A CN201510560777A CN105201506B CN 105201506 B CN105201506 B CN 105201506B CN 201510560777 A CN201510560777 A CN 201510560777A CN 105201506 B CN105201506 B CN 105201506B
Authority
CN
China
Prior art keywords
ore body
ore
filling
steady
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510560777.8A
Other languages
Chinese (zh)
Other versions
CN105201506A (en
Inventor
金长宇
孙玺
侯晓乐
崔瑞瑞
王旭刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201510560777.8A priority Critical patent/CN105201506B/en
Publication of CN105201506A publication Critical patent/CN105201506A/en
Application granted granted Critical
Publication of CN105201506B publication Critical patent/CN105201506B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention discloses the mining methods that afterwards filling is reinforced before a kind of heir, including step is:1) lower dry stowing station is configured, in the country rock of ore body top, parallel ore bodies upper lower burrs both sides and several Filling Stations are set respectively along orebody trend;2) set filling drop shaft, along orebody trend in ore body upper lower burrs both sides, several filling drop shafts are set, fill the upper end of drop shaft and then dry stowing station, go directly ore body for lower end;3) dig from steady roadway group;4) development layout is carried out to ore body using sublevel caving method without sill pillar;5) use and determine that method is segmented to ore body with sublevel caving method without sill pillar identical height of lift;6) exploited using sublevel caving method without sill pillar;7) fill;8) repeat step 6) and 7) until ore body is all produced and filled and finishes from top to down.The mining methods had both had the advantages that the efficient of sublevel caving method without sill pillar, safety, production capacity were big, and it is possible to prevente effectively from caused by Caving Method with Large Space the shortcomings of subsidence.

Description

The mining methods of afterwards filling are reinforced before a kind of heir
Technical field
The present invention relates to a kind of underground mining method, add especially for before a kind of heir of buried high-dipping middle thickness orebody Gu the mining methods of afterwards filling.
Background technology
At present, non-pillar sublevel caving mining methods are most widely used in underground mine.Such a method and other method Compared to simple in construction, flexibility is high, and security is good, and mining preparation work amount is small, and process for stoping is simple, and mechanization degree height etc. is excellent Point, but the most basic applicable elements of this method are that earth's surface allows to collapse.Now due to the continuous innovation of national policy, more and more Mining area surface does not allow to collapse, and such sublevel caving method without sill pillar just loses its applicable elements, its advantage protruded It cannot play.
The content of the invention
In order to solve technical problem set forth above, the invention provides the mining side that afterwards filling is reinforced before a kind of heir Method, mainly for the exploitation of buried high-dipping middle thickness orebody, the mining methods had both had efficient, the peace of sublevel caving method without sill pillar Entirely, the advantages of production capacity is big, and it is possible to prevente effectively from caused by Caving Method with Large Space the shortcomings of subsidence.
The technical solution adopted by the present invention is:
The mining methods of afterwards filling are reinforced before a kind of heir, are comprised the following steps:
1) lower dry stowing station is configured, in the country rock of ore body top, parallel ore bodies upper lower burrs both sides and along orebody trend Several Filling Stations are set respectively;
2) filling drop shaft is set, several filling drop shafts are set in ore body upper lower burrs both sides along orebody trend, filling drop shaft Upper end and then dry stowing station, go directly ore body for lower end;
3) dig from steady roadway group, dug in the country rock of ore body top it is several parallel to orebody trend from steady tunnel, should Arranged from steady roadway group in upper country rock in fan-like pattern;
4) development layout, development layout is carried out using the adopt quasi- technique similar to sublevel caving method without sill pillar to ore body;
5) determine that method carries out step-by-step arrangement to ore body using with sublevel caving method without sill pillar identical height of lift, by ore deposit Body is from top to bottom divided into the 1st, 2 ... n sections;
6) dig up mine, the 1st section of ore body is exploited using sublevel caving method without sill pillar, retrusive is carried out in stope drift active workings Back production, a working cycles:Complete long and medium hole drilling, powder charge, explosion and the ore removal operation of an ore caving interval ore body;
7) fill, filling operation is carried out using the filled station of dry stowing material and the split goaf of filling drop shaft;
8) repeat step 6) and 7) until ore body is all produced and filled and finishes from top to down.
Above-mentioned mining methods, step 2) in filling drop shaft inclination angle with respect to the horizontal plane be α, 45 ° of < α≤60 ° (due to The natural repose angle of broken ore and dry stowing material is all within 45 °).
Above-mentioned mining methods, step 3) in all set in every tunnel Bolt to carry out supporting.
Above-mentioned mining methods, step 4) specifically, according to ore stability and the rock drilling apparatus of middle deep hole used institute Adaptable height, determines that method determines ore body height of lift, edge using with sublevel caving method without sill pillar identical height of lift Orebody trend arranges stope drift active workings, adjacent stope drift active workings interlaced arrangement, and the plan that every stope drift active workings are undertaken digs up mine body for rhombogen.
Above-mentioned mining methods, step 7) filling, it need not be filled initial stage in mining operations, top ore body is according to bottomless After column sectional Mining by caving method operation, it can be collapsed automatically shape positioned at the country rock between steady roadway group and ore body upper bound Into certain volume from steady dead zone, and coating is formed on ore body, with constantly moving down for mining operations face, held from steady dead zone It is continuous to become big, until being reached from steady dead zone after safety and stability value, then start packing job.
The invention has the advantages that:
1. the invention is compared with sublevel caving method without sill pillar, because structure type Harvesting equipment is identical, therefore with safety, height Effect, ability are big, low cost and other advantages;And the present invention carries out dry stowing with the progress of actual mining to goaf, continues Maintain certain volume from steady dead zone, prevent that dead zone volume is excessive, it is ensured that from steady roadway group " pressure arch " in the country rock of top The lasting formation of effect, effectively prevent the problem of earth's surface avalanche is collapsed.
2. the present invention uses dry filling method, compared with slush and consolidated fill, dry stowing is with low cost, filling Mining activity can be carried out after operation immediately, it is not necessary to wait the dehydration of slush and the maintenance of consolidated fill, ensure the person While safe, mining efficiency is also improved.
3. the present invention carries out dry stowing using permanent filling drop shaft, the arrangement of various filling pipelines is eliminated, greatly The big cost that reduces is also easy to maintenance management, and the drop shaft group of upper lower burrs parallel arrangement can be while operation, substantially increases and fill Fill out efficiency.
4. the present invention is in the country rock of ore body top, the roadway group that fan-like pattern is arranged parallel to orebody trend is dug in advance, often One tunnel all carries out supporting with Bolt and reaches certain supporting intensity.Due to the high stress of buried ore body country rock Effect, the roadway layout of covering of the fan shape has automatically formed " pressure arch " effect, and the deadweight and high stress to overlying rock rise Support effect is arrived.When carrying out Caving Method with Large Space mining from the ore body under steady roadway group, even if between roadway group and ore body The avalanche for occurring country rock is collapsed, due to " pressure arch " effect, and roadway group bottom row can continue to keep from steady sky into one piece Area, and the country rock of top will not occur avalanche and collapse, and thus effectively prevent and made because ore body top country rock persistently collapses Into surface subsidence problem.
Brief description of the drawings
Fig. 1 illustrates in the mining methods to reinforce afterwards filling before a kind of heir of the invention along the mining structure of orebody trend Figure.
Fig. 2 is A-A diagrammatic cross-sections in Fig. 1.
Fig. 3 is B-B diagrammatic cross-sections in Fig. 1.
Wherein 1- Filling Stations, 2- is from steady tunnel, and 3- is from steady dead zone, 4- ore bodies coboundary, 5- Bolts, 6- fillings Drop shaft, 7- gobs, 8- is upper to fanhole(s), 9- ore bodies, 10- stope drift active workings.
Embodiment
The mining methods of afterwards filling are reinforced before a kind of heir, are comprised the following steps:
1) it is configured lower dry stowing station
Away from the certain distance of ore body coboundary 4, in the top country rock of ore body 9, moved towards along ore body 9, parallel to the upper lower burrs of ore body 9 Both sides set many places underground dry stowing station 1 every a segment distance (distance is depending on specific orebody trend length), for ground Lower dry stowing parallel operations are used.
2) filling drop shaft is set
Moved towards along ore body 9 in ore body upper lower burrs both sides, and then underground dry stowing station 1 is dug inclination angle and is less than more than 45 degree Filling drop shaft 6 equal to 60 degree, until sensible ore body 9, the filling afterbody of drop shaft 6 is directly contacted with ore body 9, the filling drop shaft 6 is made For the circuit of later stage dry stowing.Moved towards along ore body 9, the filling drop shaft 6 cooperates every certain unit with dry stowing station 1 Distance is arranged parallel to orebody trend, the parallel filling drop shaft 6 groups existed as the upper lower burrs both sides of ore body 9, after Can be while parallel operations, greatly improve pack effectiveness in dry stowing work.
3) dig from steady tunnel
Dig in advance from steady 2 groups of formation " pressure arch " effects in tunnel, in the top country rock of ore body 9, fan-like pattern is dug in advance Be arranged parallel to orebody trend from steady 2 groups, tunnel, each all carries out supporting with Bolt 5 from steady tunnel 2 and reaches To certain supporting intensity.Due to the high stress of buried ore body country rock, the roadway layout of covering of the fan shape automatically forms " pressure Arch " effect, deadweight and high stress to overlying rock serve support effect.Enter when from the ore body 9 under steady 2 groups, tunnel During row Caving Method with Large Space mining, even if the avalanche for occurring country rock between ore body 9 from steady 2 groups, tunnel is collapsed, due to " pressure arch " Effect, one piece of dead zone 3 that can continue to keep itself firm can be still formed from steady 2 groups of lower sections in tunnel, and the country rock of top will not Generation avalanche and collapse, thus effectively prevent because the top country rock of ore body 9 persistently collapses the surface subsidence problem caused.
4) development layout
Top is dug after the completion of arrangement for 2 groups from steady tunnel, and the ore actual mining design of bottom is substantially and bottom-column-free sectional Caving Method with Large Space is similar.According to the adaptable height of ore stability and current rock drilling apparatus of middle deep hole institute, and then ore body top Border is used determines that method determines that ore body is segmented distance with sublevel caving method without sill pillar identical height of lift.Along orebody trend water Plain cloth puts stope drift active workings 10, the adjacent interlaced arrangement of stope drift active workings 10, and the plan that every stope drift active workings 10 are undertaken digs up mine body for rhombogen.
5) using determining that method is segmented to ore body with sublevel caving method without sill pillar identical height of lift, by ore body by Up to be divided into the 1st down, 2 ... n sections.
6) dig up mine
Implement segmentation mining.Back production:Actual mining is similar to sublevel caving method without sill pillar, is all the route in stope drift active workings Middle carry out drawing back, ore body long and medium hole drilling, powder charge, explosion, the ore removal of an ore caving interval are completed by extracting drift Operation.On arranged to fanhole(s) 8:Dug in stope drift active workings 10 every the vertical top plate of stope drift active workings 10 of an ore caving interval To fanhole(s) 8, for carrying out charge explosion.
7) fill
Filling operation is carried out to dead zone using Filling Station 1 and filling drop shaft 6, at mining operations initial stages, from steady roadway group with Country rock between ore body can collapse automatically to be formed certain volume from steady dead zone 3, country rock forms coating on ore body 9, The coating is that follow-up ore body 9 proceeds Caving Method with Large Space mining formation condition, the stage without carrying out packing job because " pressure arch " effect formed from steady 2 groups, tunnel can maintain the formation from steady dead zone 3 of certain volume size, but with opening Constantly moving down for the scope of operation is adopted, the lasting change from steady dead zone is big, and " pressure arch " effect can not maintain the stabilization from steady dead zone again, be Ensure the lasting holding of " pressure arch " effect, packing job needs to proceed by this stage.It is the stage, complete in extracting drift Into after the ore removal operation of an ore caving interval, the dry stowing material of selection suitable particle size is slipped by the way that underground dry stowing station is filled Well is filled by deadweight to dead zone, it is ensured that substantially remain in the steady of safety from the dead zone volume of steady 2 groups of bottoms in tunnel Definite value, makes persistently to keep stable from steady space, it is to avoid surface subsidence etc. is destroyed.
8) after the filling operation for completing an ore caving interval, the next ore caving interval of back production repeats above-mentioned two step, directly Finished to a complete back production of segmentation and filling.
9) process next by back production and filling is extended to next segment level, repeats the above steps and proceeds back Adopt and filling operation.By that analogy, until ore body is all produced and filled and finishes from top to bottom.
The mining methods have carried out experimental applications in Anshan iron ore experiment stope, and significantly, achievement is protruded effect, it was demonstrated that its Feasibility.

Claims (4)

1. the mining methods of afterwards filling are reinforced before a kind of heir, it is characterised in that comprise the following steps:
1) lower dry stowing station is configured, in the country rock of ore body top, parallel ore bodies upper lower burrs both sides and is distinguished along orebody trend Several Filling Stations are set;
2) filling drop shaft is set, several filling drop shafts are set in ore body upper lower burrs both sides along orebody trend, the upper end of drop shaft is filled And then dry stowing station, go directly ore body for lower end;
3) dig from steady roadway group, dug in the country rock of ore body top it is several parallel to orebody trend from steady tunnel, should be from steady Roadway group is in upper country rock in fan-shaped arrangement;
4) development layout, development layout is carried out using the adopt quasi- technique similar to sublevel caving method without sill pillar to ore body;
5) using with sublevel caving method without sill pillar identical height of lift determine method to ore body carry out step-by-step arrangement, by ore body by Up to be divided into the 1st down, 2 ... n sections;
6) dig up mine, the 1st section of ore body is exploited using sublevel caving method without sill pillar, retrusive is carried out in stope drift active workings and is returned Adopt, a working cycles:Complete long and medium hole drilling, powder charge, explosion and the ore removal operation of an ore caving interval ore body;
7) fill, filling operation is carried out using the filled station of dry stowing material and the split goaf of filling drop shaft;In mining operations Initial stage need not be filled, after top ore body is according to sublevel caving method without sill pillar mining operations, positioned at from steady roadway group and ore deposit Country rock between body upper bound can collapse automatically to be formed certain volume from steady dead zone, and on ore body formed covering Layer, with constantly moving down for mining operations face, persistently becomes big from steady dead zone, until reached from steady dead zone after safety and stability value, then Start packing job;
8) repeat step 6) and 7) until ore body is all produced and filled and finishes from top to down.
2. before a kind of heir according to claim 1 reinforce afterwards filling mining methods, it is characterised in that step 2) in fill The inclination angle of drop shaft with respect to the horizontal plane is filled out for α, 45 ° of < α≤60 °.
3. reinforce the mining methods of afterwards filling before a kind of heir according to claim 1, it is characterised in that step 3) in it is every Bolt is all set to carry out supporting in bar tunnel.
4. the mining methods of afterwards filling are reinforced before a kind of heir according to claim 1, it is characterised in that step 4) it is specific According to the adaptable height of ore stability and the rock drilling apparatus of middle deep hole used institute, to be collapsed using with bottom-column-free sectional Fall method identical height of lift and determine that method determines ore body height of lift, stope drift active workings, adjacent back production lane are arranged along orebody trend Road interlaced arrangement, the plan mining body that every stope drift active workings are undertaken is rhombogen.
CN201510560777.8A 2015-09-06 2015-09-06 The mining methods of afterwards filling are reinforced before a kind of heir Expired - Fee Related CN105201506B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510560777.8A CN105201506B (en) 2015-09-06 2015-09-06 The mining methods of afterwards filling are reinforced before a kind of heir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510560777.8A CN105201506B (en) 2015-09-06 2015-09-06 The mining methods of afterwards filling are reinforced before a kind of heir

Publications (2)

Publication Number Publication Date
CN105201506A CN105201506A (en) 2015-12-30
CN105201506B true CN105201506B (en) 2017-10-17

Family

ID=54949419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510560777.8A Expired - Fee Related CN105201506B (en) 2015-09-06 2015-09-06 The mining methods of afterwards filling are reinforced before a kind of heir

Country Status (1)

Country Link
CN (1) CN105201506B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909247A (en) * 2016-04-26 2016-08-31 西南科技大学 Non-pillar sublevel mining cemented filling mining method
CN106223955B (en) * 2016-08-04 2018-09-28 西北矿冶研究院 Rhombic bench cemented filling mining method
CN106121647A (en) * 2016-08-04 2016-11-16 西北矿冶研究院 Method for centralized recovery of lag pillars through fractional blasting
CN107605486B (en) * 2017-09-26 2019-05-31 西安科技大学 A kind of mining methods suitable for deep metal mine
CN108398235B (en) * 2018-03-20 2020-03-20 东北大学 Adjustable gentle-inclined medium-thickness ore body ore drawing test device
CN109490499B (en) * 2018-11-15 2021-02-05 长沙矿山研究院有限责任公司 Dynamic monitoring and predicting method for water quality of filling body
CN113047835B (en) * 2021-02-24 2022-04-15 中南大学 Deep well thick and large ore body mining method integrating emptying, caving and filling
CN113187481B (en) * 2021-05-28 2023-05-26 辽宁科技大学 Filling mining method for centralized grouting caving stoping of overburden rock

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101737052B (en) * 2009-12-28 2012-09-05 河北邯邢矿冶设计院有限公司 Sublevel fill-mining method
CN101881169A (en) * 2010-06-25 2010-11-10 东北大学 Sublevel shrinkage caving stage open stope afterwards filling mining method
CN102261248B (en) * 2011-08-15 2013-04-03 辽宁科技大学 Sill-pillar-free stage caving stopping method based on creasing-type structure
CN102587915A (en) * 2012-03-21 2012-07-18 西安建筑科技大学 Induction caving mining method under artificial false roof
CN103437769B (en) * 2013-09-06 2015-10-28 中南大学 Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method

Also Published As

Publication number Publication date
CN105201506A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN105201506B (en) The mining methods of afterwards filling are reinforced before a kind of heir
CN109083644B (en) A kind of safe and efficient mining methods of gently inclined medium thick orebody
CN105649631B (en) A kind of efficient mining methods of the mechanization of slight slope and thin ore body
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN108612530A (en) A kind of mining methods of upper disk rock crusher slant middle thick orebody
CN103967493B (en) A kind of slight slope and thin ore body ore pillar mining codes
CN103437769B (en) Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method
CN104481543B (en) Stage shrink caved stopes
CN103306720A (en) Inclined layered solid filling coal mining method for ultra-thick coal seam
CN106223958A (en) The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN103104259A (en) Inclination fragmentation ore body segment top board reconstruction middle-deep hole ore break down filling mining method
CN108756885A (en) A kind of high-dipping ore block that ore-rock is smashed to pieces it is lower to or on to consolidated fill mechanized mining method
CN106837335B (en) Truck cooperates with ore removal sill pillars sublevel caving method
CN108561136B (en) From kerve Block caving system
CN106121643A (en) The reserved retaining wall ore deposit two step nesting combination method of mining by the way of filling
CN106499396B (en) Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN107829742A (en) Caving-filling-open stope-caving mining method
CN104895566A (en) Mining method with residual ore recovery function
CN105909247A (en) Non-pillar sublevel mining cemented filling mining method
CN110905517B (en) Continuous mining method suitable for high and middle sections
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN102979526B (en) Building process of ore removal trench by adopting filling method in medium-length hole sublevel mining
CN103557001B (en) A kind of low section high oper cylinler shrink afterwards filling mining method
CN108086979A (en) Mining process of vertical deep hole columnar cartridge bag ore breaking stage by using chamber method
CN111594170B (en) Method for stoping residual ore body on top and bottom plates of gently inclined ore body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171017

CF01 Termination of patent right due to non-payment of annual fee