CN109747786A - 400 tons of pulling winch support constructions and installation method in ocean engineering cabin - Google Patents
400 tons of pulling winch support constructions and installation method in ocean engineering cabin Download PDFInfo
- Publication number
- CN109747786A CN109747786A CN201811534481.9A CN201811534481A CN109747786A CN 109747786 A CN109747786 A CN 109747786A CN 201811534481 A CN201811534481 A CN 201811534481A CN 109747786 A CN109747786 A CN 109747786A
- Authority
- CN
- China
- Prior art keywords
- box
- plate
- support
- shaped
- vertical plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Body Structure For Vehicles (AREA)
Abstract
The invention discloses 400 tons of pulling winch support constructions in a kind of ocean engineering cabin, including support inner bottom plating (1), connection bracket (2), first end baffle (3), the first box-shaped vertical plate (4), Kong Jiaqiang compound plate (6), whim support plate (7), box-shaped panel (9), the second box-shaped vertical plate (10), the second end baffle (11) and connection framework plate (12).400 tons of pulling winch support constructions and installation method in a kind of ocean engineering cabin of the present invention, in the case where guaranteeing that structural strength meets pulling winch workload, design and optimization structure type connect to form entirety with hull inner bottom plating structure, be conducive to its load and be efficiently transferred to Ship Structure, pulling winch workload is avoided to damage the fatigue strength of support construction.
Description
Technical field
The present invention relates to 400 tons of pulling winch support constructions in a kind of ocean engineering cabin.
Background technique
In the building course of ocean engineering vehicle, pulling winch is important one of equipment, and at sea underground cable is spread
If, large-scale mooring system folding and unfolding and leading in cable mooring operation play a significant role, during shipping work, since traction twists
Vehicle workload is big, stress is complicated, to support construction require it is also quite high, guarantee structural strength meet pulling winch work
In the case where load, optimization structure type connect to form entirety with hull inner bottom plating structure, is conducive to its load and effectively transmits
To Ship Structure, pulling winch workload is avoided to damage the fatigue strength of support construction.
Summary of the invention
The object of the present invention is to provide a kind of more succinct, connection and reasonable arrangement, attractive appearance, structural strength height, meet equipment
Use 400 tons of pulling winch support constructions in the ocean engineering cabin of functional requirement.
Present invention technical solution used for the above purpose is: 400 tons of tractions strands in a kind of ocean engineering cabin
Vehicle support construction, including support inner bottom plating (1), connection bracket (2), first end baffle (3), the first box-shaped vertical plate (4), Kong Jia
Strong compound plate (6), whim support plate (7), box-shaped panel (9), the second box-shaped vertical plate (10), the second end baffle (11) and connection frame
Frame plate (12), the support inner bottom plating (1), connection bracket (2), first end baffle (3), the first box-shaped vertical plate (4), box-shaped face
Plate (9), the second box-shaped vertical plate (10) and the second end baffle (11) fit together, and compound plate (6) and whim branch are reinforced in the hole
Fagging (7) fits together, the hole reinforce after compound plate (6) and whim support plate (7) assembling with support inner bottom plating (1), connect
Bracket (2), first end baffle (3), the first box-shaped vertical plate (4), box-shaped panel (9), the second box-shaped vertical plate (10) and second end
It is fixed by connection framework plate (12) with Hull Welding after portion's baffle (11) group is vertical.
The first anti-tripping bracket (5) and the second support elbow are respectively equipped between the whim support plate (7) and box-shaped panel (9)
Plate (8).
The support inner bottom plating (1), connection bracket (2) and box-shaped panel (9) form box structure.
Box shaped diaphragm (13) are equipped between the first box-shaped vertical plate (4) and the second box-shaped vertical plate (10).
The first connecting plate (14) are equipped between the first end baffle (3) and the first box-shaped vertical plate (4).
The second connecting plate (15) are equipped between the second box-shaped vertical plate (10) and the second end baffle (11).
Lightening hole is opened up on the box-shaped vertical plate (4).
Lightening hole is opened up on the box shaped diaphragm (13).
It is a further object of the present invention to provide a kind of more succinct, connection and reasonable arrangement, attractive appearance, structural strength height, meet
Equipment uses 400 tons of pulling winch support construction installation methods in the ocean engineering cabin of functional requirement.
Present invention technical solution used for the above purpose is: 400 tons of tractions strands in a kind of ocean engineering cabin
Vehicle support construction installation method, comprising the following steps:
A, the thickness and size of winch support plate (7) are designed in the requirement according to pulling winch stress condition and to working space,
And it passes through after inner bottom plating is docked with interior floor and forms entirety;
B, according to the workload of pulling winch and to the requirement of reinforcement structure, the size of reinforcement and connection structure is designed, and
Optimization is designed to structure arrangement, size and form, bracket (2), first end baffle (3), the first connecting plate will be connected
(14), the first box-shaped vertical plate (4), box shaped diaphragm (13), box-shaped panel (9), the second box-shaped vertical plate (10), the second connecting plate
(15), the second end baffle (11) carry out group it is vertical after, the first anti-tripping bracket (5) in bulk and the second anti-tripping bracket (8) are simultaneously propped up
The strength check of support structure and reinforcement structure designs reasonable structure type and connect with Ship Structure, support construction load is passed
It is delivered to Ship Structure;
C, strength check is carried out to structure in the cabin of support construction region, to guarantee that the structure overall strength in the region meets rule
The related request of model opens up lightening hole on (13) in box-shaped vertical plate (4), box shaped diaphragm, carries out school to support construction intensity again
Core.
400 tons of pulling winch support constructions and installation method in a kind of ocean engineering cabin of the present invention are guaranteeing that structure is strong
Degree meet pulling winch workload in the case where, design and optimization structure type connect with hull inner bottom plating structure to be formed it is whole
Body is conducive to its load and is efficiently transferred to Ship Structure, avoids pulling winch workload to the fatigue strength of support construction
It damages.
Detailed description of the invention
Fig. 1 is the side view of 400 tons of pulling winch support constructions in a kind of ocean engineering cabin of the present invention.
Fig. 2 is the main view of 400 tons of pulling winch support constructions in a kind of ocean engineering cabin of the present invention.
Fig. 3 is the top view of 400 tons of pulling winch support constructions in a kind of ocean engineering cabin of the present invention.
In figure: 1, supporting inner bottom plating;2, bracket is connected;3, first end baffle;4, the first box-shaped vertical plate;5, the first support
Bracket;6, Kong Jiaqiang compound plate;7, whim support plate;8, the second anti-tripping bracket;9, box-shaped panel;10, the second box-shaped vertical plate;11,
The second end baffle;12, connection framework plate;13, box shaped diaphragm;14, the first connecting plate;15, the second connecting plate.
Specific embodiment
As shown in Figure 1 to Figure 3,400 tons of pulling winch support constructions in ocean engineering cabin, including support inner bottom plating 1, connect
Connect bracket 2, first end baffle 3, the first box-shaped vertical plate 4, the first anti-tripping bracket 5, Kong Jiaqiang compound plate 6, whim support plate 7,
Two anti-tripping brackets 8, box-shaped panel 9, the second box-shaped vertical plate 10, the second end baffle 11, connection framework plate 12, box shaped diaphragm 13,
First connecting plate 14 and the second connecting plate 15, Kong Jiaqiang compound plate 6, whim support plate 7 are fitted together with support inner bottom plating 1, even
Connect bracket 2, first end baffle 3, the first connecting plate 14, the first box-shaped vertical plate 4, box shaped diaphragm 13, the second box-shaped vertical plate 10, case
Shape panel 9, the second connecting plate 15,11 groups of the second end baffle it is vertical after, the first anti-tripping bracket 5 in bulk and the weldering of the second anti-tripping bracket 8
It connects to form integrated support structure, and passes through the inner bottom plating and longitudinal bulkhead structure welding of connection framework plate 12 and hull, support interior bottom
Weld winch support plate 7 on plate 1, the box structure that the first box-shaped vertical plate 4, the second box-shaped vertical plate 10 are formed with box-shaped panel 9 with
And reinforce winch support plate 7 jointly with the first anti-tripping bracket 5, the second anti-tripping bracket 8,400 tons in ocean engineering cabin of the present invention
Pulling winch support construction installation method, specific method step are as follows: A, firstly, empty according to pulling winch stress condition and to work
Between requirement design the thickness and size of winch support plate 7, and pass through after inner bottom plating dock with interior floor formation integrally, with
Just support stress is effectively transmitted to Ship Structure;B, secondly, according to the workload of pulling winch and to reinforcement structure
It is required that designing the size of reinforcement and connection structure, and optimization is designed to structure arrangement, size and form, elbow will be connected
Plate 2, first end baffle 3, the first connecting plate 14, the first box-shaped vertical plate 4, box shaped diaphragm 13, box-shaped panel 9, the second box-shaped are vertical
Plate 10, the second connecting plate 15, the second end baffle 11 carry out group it is vertical after, the first anti-tripping bracket 5 in bulk and the second anti-tripping bracket 8 are simultaneously
It is supported the strength check of structure and reinforcement structure, reasonable structure type is designed and is connect with Ship Structure, by support construction
Load is efficiently transferred to Ship Structure, avoids damaging the fatigue strength of support construction;C, finally, to support construction institute
Structure carries out strength check in the cabin in region, to guarantee that the structure overall strength in the region meets the related request of specification, in case
Lightening hole is opened up on shape vertical plate 4, box shaped diaphragm 13, in order to site operation, mitigates construction weight and facilitates the movement of persons, examines
It repairs, in the case where reinforcement structure intensity meets pulling winch workload, on box-shaped vertical plate 4, box shaped diaphragm 13 as far as possible
It is equipped with aperture more, then support construction intensity is checked again, to achieve the purpose that optimization design, pulling winch support
Structure and installation method are more succinct, connection and reasonable arrangement, attractive appearance, structural strength are high, meet equipment using functional requirement, and with
Ship Structure group is integral, and the local overall strength effectively transmitted service load, participate in Ship Structure improves support construction
Stability and service life.
Claims (9)
1. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin, it is characterised in that: including support inner bottom plating (1), even
Connect bracket (2), first end baffle (3), the first box-shaped vertical plate (4), Kong Jiaqiang compound plate (6), whim support plate (7), box-shaped face
Plate (9), the second box-shaped vertical plate (10), the second end baffle (11) and connection framework plate (12), the support inner bottom plating (1) connect
Connect bracket (2), first end baffle (3), the first box-shaped vertical plate (4), box-shaped panel (9), the second box-shaped vertical plate (10) and second
End baffle (11) fits together, and compound plate (6) are reinforced in the hole and whim support plate (7) fits together, and the hole is reinforced
Compound plate (6) and whim support plate (7) assembling after with support inner bottom plating (1), connect bracket (2), first end baffle (3), first
Box-shaped vertical plate (4), box-shaped panel (9), the second box-shaped vertical plate (10) and the second end baffle (11) group pass through connection framework after standing
Plate (12) is fixed with Hull Welding.
2. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin according to claim 1, it is characterised in that:
The first anti-tripping bracket (5) and the second anti-tripping bracket (8) are respectively equipped between the whim support plate (7) and box-shaped panel (9).
3. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin according to claim 1, it is characterised in that:
The support inner bottom plating (1), connection bracket (2) and box-shaped panel (9) form box structure.
4. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin according to claim 1, it is characterised in that:
Box shaped diaphragm (13) are equipped between the first box-shaped vertical plate (4) and the second box-shaped vertical plate (10).
5. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin according to claim 1, it is characterised in that:
The first connecting plate (14) are equipped between the first end baffle (3) and the first box-shaped vertical plate (4).
6. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin according to claim 1, it is characterised in that:
The second connecting plate (15) are equipped between the second box-shaped vertical plate (10) and the second end baffle (11).
7. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin, feature exist according to claim 1 or 5
In: lightening hole is opened up on the box-shaped vertical plate (4).
8. 400 tons of pulling winch support constructions in a kind of ocean engineering cabin according to claim 4, it is characterised in that:
Lightening hole is opened up on the box shaped diaphragm (13).
9. 400 tons of pulling winch support construction installation methods in a kind of ocean engineering cabin according to claim 1, special
Sign is, comprising the following steps:
A, the thickness and size of winch support plate (7) are designed in the requirement according to pulling winch stress condition and to working space,
And it passes through after inner bottom plating is docked with interior floor and forms entirety;
B, according to the workload of pulling winch and to the requirement of reinforcement structure, the size of reinforcement and connection structure is designed, and
Optimization is designed to structure arrangement, size and form, bracket (2), first end baffle (3), the first connecting plate will be connected
(14), the first box-shaped vertical plate (4), box shaped diaphragm (13), box-shaped panel (9), the second box-shaped vertical plate (10), the second connecting plate
(15), the second end baffle (11) carry out group it is vertical after, the first anti-tripping bracket (5) in bulk and the second anti-tripping bracket (8) are simultaneously propped up
The strength check of support structure and reinforcement structure designs reasonable structure type and connect with Ship Structure, support construction load is passed
It is delivered to Ship Structure;
C, strength check is carried out to structure in the cabin of support construction region, to guarantee that the structure overall strength in the region meets rule
The related request of model opens up lightening hole on (13) in box-shaped vertical plate (4), box shaped diaphragm, carries out school to support construction intensity again
Core.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811534481.9A CN109747786A (en) | 2018-12-14 | 2018-12-14 | 400 tons of pulling winch support constructions and installation method in ocean engineering cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811534481.9A CN109747786A (en) | 2018-12-14 | 2018-12-14 | 400 tons of pulling winch support constructions and installation method in ocean engineering cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109747786A true CN109747786A (en) | 2019-05-14 |
Family
ID=66403750
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811534481.9A Pending CN109747786A (en) | 2018-12-14 | 2018-12-14 | 400 tons of pulling winch support constructions and installation method in ocean engineering cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109747786A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111498026A (en) * | 2020-04-17 | 2020-08-07 | 中船黄埔文冲船舶有限公司 | Installation method of marine winch |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2038268A (en) * | 1978-12-20 | 1980-07-23 | Small I | Webbing winding and storage device |
CN204384792U (en) * | 2014-12-30 | 2015-06-10 | 江苏韩通船舶重工有限公司 | A kind of control and regulation of the tension force for two roller friction winch device |
CN204871485U (en) * | 2015-08-26 | 2015-12-16 | 上海船舶研究设计院 | Installation fixing device of sea worker's winch operation equipment |
CN205440777U (en) * | 2016-03-15 | 2016-08-10 | 江南造船(集团)有限责任公司 | Base construction that liquefied gas carrier hung on deck |
CN107416135A (en) * | 2017-06-01 | 2017-12-01 | 武汉船用机械有限责任公司 | Winch support |
CN206704462U (en) * | 2016-12-28 | 2017-12-05 | 中国船舶工业集团公司第七0八研究所 | A kind of door shape mooring winch base construction |
CN108100907A (en) * | 2017-12-31 | 2018-06-01 | 常俊红 | A kind of anti-disorder cable winch |
CN208216928U (en) * | 2018-04-18 | 2018-12-11 | 中国舰船研究设计中心 | The connection and support construction of tower structure peculiar to vessel |
-
2018
- 2018-12-14 CN CN201811534481.9A patent/CN109747786A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2038268A (en) * | 1978-12-20 | 1980-07-23 | Small I | Webbing winding and storage device |
CN204384792U (en) * | 2014-12-30 | 2015-06-10 | 江苏韩通船舶重工有限公司 | A kind of control and regulation of the tension force for two roller friction winch device |
CN204871485U (en) * | 2015-08-26 | 2015-12-16 | 上海船舶研究设计院 | Installation fixing device of sea worker's winch operation equipment |
CN205440777U (en) * | 2016-03-15 | 2016-08-10 | 江南造船(集团)有限责任公司 | Base construction that liquefied gas carrier hung on deck |
CN206704462U (en) * | 2016-12-28 | 2017-12-05 | 中国船舶工业集团公司第七0八研究所 | A kind of door shape mooring winch base construction |
CN107416135A (en) * | 2017-06-01 | 2017-12-01 | 武汉船用机械有限责任公司 | Winch support |
CN108100907A (en) * | 2017-12-31 | 2018-06-01 | 常俊红 | A kind of anti-disorder cable winch |
CN208216928U (en) * | 2018-04-18 | 2018-12-11 | 中国舰船研究设计中心 | The connection and support construction of tower structure peculiar to vessel |
Non-Patent Citations (1)
Title |
---|
朱英富等: "《舰船隐身技术》", 30 September 2003 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111498026A (en) * | 2020-04-17 | 2020-08-07 | 中船黄埔文冲船舶有限公司 | Installation method of marine winch |
CN111498026B (en) * | 2020-04-17 | 2021-05-11 | 中船黄埔文冲船舶有限公司 | Installation method of marine winch |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102267670B (en) | Connecting frame, boom system with connecting frame, and lifting appliance | |
CN101429928A (en) | Integral hoisting method for wind generator set on the sea | |
CN109747772A (en) | The side ejector sleeve support construction and installation method of ocean engineering ship bow part Side Thrusters | |
CN101723237B (en) | Novel soft rope strut type hanger for box girder | |
CN206485519U (en) | Seabed operation supports the stern drum support structure of ship | |
CN109747786A (en) | 400 tons of pulling winch support constructions and installation method in ocean engineering cabin | |
KR101029583B1 (en) | Jig for transporting derrick structure using floatingcrane | |
CN204737016U (en) | Large -scale towing gear that makes up under water | |
CN201901515U (en) | Special lifting device for ship cabin cleaning machinery | |
CN205469308U (en) | Hybrid passenger train tail end structure | |
CN201237543Y (en) | Ocean derrick loading test seat | |
CN205222454U (en) | Row is hung in special use of liquefied natural gas ship compressor unit | |
CN209797332U (en) | Hoisting system for complex space heavy pipeline equipment | |
CN102849218A (en) | Mounting beam for auxiliary power unit of aircraft | |
CN115321444B (en) | Work platform and overhead working truck | |
CN207510505U (en) | A kind of full aluminium chassis frame | |
CN201037231Y (en) | Yacht dock (bateau bridge) | |
CN105857405B (en) | A kind of hybrid power passenger car end construction | |
CN212609006U (en) | Hoisting tool for cooling pipeline of flexible direct-current converter valve | |
CN201587793U (en) | Novel flexible cable-strut-type box girder hoisting tool | |
CN101941531B (en) | Micro-satellite assembly and disassembly method based on large-span hanging | |
CN201722621U (en) | Integral hoisting frame of pre-fabricated box beam | |
CN211223762U (en) | Double-bottom bracket-free type cargo oil hose crane base of oil tanker | |
CN105584939A (en) | Arm head special for wind power generator hoisting | |
CN207670619U (en) | A kind of fishing device for bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190514 |