CN109736595A - A kind of assembled steel stair - Google Patents

A kind of assembled steel stair Download PDF

Info

Publication number
CN109736595A
CN109736595A CN201811639314.0A CN201811639314A CN109736595A CN 109736595 A CN109736595 A CN 109736595A CN 201811639314 A CN201811639314 A CN 201811639314A CN 109736595 A CN109736595 A CN 109736595A
Authority
CN
China
Prior art keywords
layer
upright bar
operation layer
assembled steel
bench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811639314.0A
Other languages
Chinese (zh)
Inventor
陆本燕
刘扬华
罗斌
朱亚飞
段开祥
陈高昌
郑智华
徐如烈
陈跃华
王朋
陈澄波
张威扬
谢兴荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201811639314.0A priority Critical patent/CN109736595A/en
Publication of CN109736595A publication Critical patent/CN109736595A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of assembled steel stair, it is whole to be made of steel, including the first operation layer, second operation layer, the second upright bar being erected on second operation layer, first bench, the second step and quadrangle is built up in for being fixedly connected with the first upright bar of the first operation layer and the second operation layer, second operation layer is H-shaped operating platform, both ends are respectively provided with a notch, it is a transfer platform among two notches, the entrance of first bench is connected with one end of first operation layer, it exports and is connected to each other with one end of the transfer platform, the entrance of the second step and the other end of the transfer platform are connected to each other, it exports and is fixedly linked in the middle part of second upright bar, and the height of the second step matches with building storey height, the height of first upright bar is flushed with second upright bar, first upright bar and Two upright bars are connected by third layer transverse beam, are connected between first upright bar by third layer longitudinal beam.

Description

A kind of assembled steel stair
Technical field
The present invention relates to building fields, in particular to a kind of assembled steel stair.
Background technique
Existing some high building index beds are constructed using aluminum dipping form+climbing frame+PC assembly method, and stair are using lifting, i.e., It just carries out can be carried out lifting after the completion of next layer main body construction, i.e., layer main body construction where after this floor ladder, Gu at upper one layer When main body construction, the channel of last work surface is not led to.Cause is according to existing construction site Normal practice, for stair each time Operation scaffold and adjacent side protection are set up after lifting, carry out the operation scaffold and adjacent side protection again when need to carry out stair lifting Dismounting work, and operating worker also needs in addition to set up stair frame up to work layer, while Normal practice repetition and waste is artificial Also site operation progress is influenced.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of assembled steel stair, it is ensured that staircase two sides wall column steel Muscle, template construction operation are gone on smoothly, and can be used as towards the channel of upper one layer of work surface.
The technical solution adopted by the present invention is that: a kind of assembled steel stair are provided, it is whole to be made of steel, including be located at First operation layer of bottom, the second operation layer above the first operation layer, be erected on second operation layer second Upright bar, the first bench, the second step and quadrangle is built up in for being fixedly connected with the first of the first operation layer and the second operation layer Upright bar, second operation layer are H-shaped operating platform, and it is a transfer platform, institute among two notches that both ends, which are respectively provided with a notch, The entrance for stating the first bench is connected with one end of first operation layer, exports and is connected to each other with one end of the transfer platform, institute The other end for stating the entrance and the transfer platform of the second step is connected to each other, the middle part stationary phase of outlet and second upright bar Even, and the height of the second step matches with building storey height, and the height of first upright bar is flushed with second upright bar, First upright bar is connected with the second upright bar by third layer transverse beam, passes through third layer longitudinal beam phase between first upright bar Even.
In assembled steel stair of the present invention, first operation layer includes first layer longitudinal beam, first layer cross To beam and first layer inboard beams, two first layer longitudinal beams and two first layer transverse beams composition that joins end to end are used for Enclose the rectangular frame at the first operation layer edge;Two first layer inboard beams are parallel with the first layer longitudinal beam and end It is mounted in first layer transverse beam, the first connection is installed between the first layer inboard beams and the first layer longitudinal beam The entrance of plate, first bench is connected by otic placode and bolt with the first layer inboard beams.
In assembled steel stair of the present invention, first operation layer further includes four the first bearing beams, described First layer longitudinal beam and the first bearing beam side of being are logical, and the shape of first bearing beam is less than the first layer longitudinal beam Shape can be inserted into one end of first bearing beam and be fixed in the first layer longitudinal beam.
In assembled steel stair of the present invention, it is logical that multiple first are offered on one end of first bearing beam Hole offers multiple the second through-holes corresponding with the first through hole, first operation layer on the first layer longitudinal beam It further include being interspersed in the first through hole and the second through-hole to make first bearing beam and the first layer longitudinal beam phase simultaneously Mutually fixed round steel.
In assembled steel stair of the present invention, first operation layer further includes buttcover plate, the buttcover plate one End is rotatedly connected with the first layer transverse beam close to one end of first bearing beam, and the other end passes through chain and described first Upright bar is connected.
In assembled steel stair of the present invention, it is equipped with and described second on the other end of first bearing beam The third through-hole that through-hole matches.
In assembled steel stair of the present invention, second operation layer includes second layer longitudinal beam, second layer cross To beam and second layer inboard beams, two second layer longitudinal beams and two second layer transverse beams composition that joins end to end are used for Enclose the rectangular frame at the second operation layer edge;Two second layer inboard beams are parallel with the second layer longitudinal beam and end It is mounted in second layer transverse beam, between the adjacent second layer inboard beams and the second layer longitudinal beam, two described The intermediate position of two layers of inboard beams is equipped with the second connecting plate, and the outlet of first bench passes through otic placode and bolt and described the Two layers of inboard beams are connected.
In assembled steel stair of the present invention, it is equipped with first support bar in one end of first operation layer, The both ends of the transfer platform are respectively equipped with second support bar and third support rod, first bench and the second step it is lateral It is respectively equipped with the first protective frame and the second protective frame, the both ends of first protective frame are respectively and fixedly installed to first support Bar and second support bar, the both ends of second protective frame are respectively and fixedly installed in the third support rod and the second upright bar.
In assembled steel stair of the present invention, second operation layer is equipped with the shield for protecting construction personnel Column.
In assembled steel stair of the present invention, second operation layer be surrounded by it is multiple for lifting Hollow round plate.
By the way that stair are divided into two bench, setting transfer platform in centre facilitates field personnel and leads to the present invention Construction operation is carried out at left and right sides of transfer platform, makes construction personnel that can construct by the second operation layer, while can also lead to Cross the first bench, the second step leads to upper one layer of work surface;First operation layer is equipped with the first load, has beam stair bottom very Good stress point, stair are whole more firm;The outlet of the second step is arranged in the middle part of the second upright bar, keeps third layer lateral It can be also laid with ceiling shield on beam and third layer longitudinal beam, realized with this and protected to positioned at construction personnel therein, together When do not influence the discrepancy of construction personnel;Various components and component are all made of steel and only do, and entire stair are to assemble, each Component adds the reinforcing mode of bolt using otic placode, easy to disassemble, is conducive to transport sundry item and is utilized again.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the overall structure diagram of the embodiment of the present invention;
Fig. 2 is the partial structural diagram of the first operation layer of the embodiment of the present invention;
Fig. 3 is the partial structural diagram of the second operation layer of the embodiment of the present invention;
Fig. 4 is the partial structural diagram at the top of the embodiment of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figures 1 to 4, assembled steel stair provided in an embodiment of the present invention, the first operation including being located at bottom Layer 1, the second operation layer 2 above the first operation layer 1, the second upright bar 3 being erected on the second operation layer 2, the first bench 4, the second step 5 and quadrangle is built up in for being fixedly connected with the first upright bar 6 of the first operation layer 1 and the second operation layer 2.This reality Applying the second operation layer 2 in example is H-shaped operating platform, and both ends are respectively provided with a notch 21, put down among two notches 21 for a transfer Platform 22, the entrance of the first bench 4 are connected with one end of the first operation layer 1, export and are connected to each other with one end of transfer platform 22, and second The entrance of bench 5 and the other end of transfer platform 22 are connected to each other, and are exported and are fixedly linked with the middle part of the second upright bar 3, and the second ladder The height of section 5 matches with building storey height, and the height of the first upright bar 6 is flushed with the second upright bar 3, the first upright bar 6 and the second upright bar 3 It is connected by third layer transverse beam 7, is connected between the first upright bar 6 by third layer longitudinal beam 8.By the way that stair are divided into two ladders Section, centre setting transfer platform facilitate field personnel towards the transfer platform left and right sides and carry out construction operation, make to construct Personnel can be constructed by the second operation layer 2, while can also lead to upper one layer of operation by the first bench 4, the second step 5 Face.The outlet of the second step 5 is arranged in the middle part of the second upright bar 3, is made on third layer transverse beam 7 and third layer longitudinal beam 8 also It can be laid with ceiling shield, realized with this and protected to positioned at construction personnel therein, while not influencing going out for construction personnel Enter.
Specifically, as shown in Fig. 2, the first operation layer 1 includes first layer longitudinal beam 11, first layer transverse beam 12 and first layer Inboard beams 13, two first layer longitudinal beams 11 and two first layer transverse beams 12 join end to end composition for enclosing the first operation layer The rectangular frame at 1 edge;Two first layer inboard beams 13 are parallel with first layer longitudinal beam 11 and end is mounted on first layer transverse direction On beam 12, the first connecting plate 14 is installed between first layer inboard beams 13 and first layer longitudinal beam 11, so that on the inside of first layer Connection between beam 13 and first layer longitudinal beam 11 is more firm;The entrance of first bench 4 passes through otic placode and bolt and first layer Inboard beams 13 are fixedly linked.Due to stair must from level to level toward hanging oneself liter, Gu the length of stair should be slightly less than the length of PC stair, but It is that must have good stress point in stair bottom, to consolidate 1 stress of the first operation layer more, first in the present embodiment Operation layer 1 further includes four the first bearing beams 15, and first layer longitudinal beam 11 and 15 side of being disposed as of the first bearing beam are logical, and first The shape of bearing beam 15 is less than the shape of first layer longitudinal beam 11, and one end of the first bearing beam 15 is made to can be inserted into and be fixed on first In layer longitudinal beam 11.Further, multiple first through hole are offered on one end of the first bearing beam 15, in first layer longitudinal beam Offer multiple the second through-holes corresponding with first through hole on 11, the first operation layer 1 further include be interspersed in simultaneously first through hole and The round steel 16 for making the first bearing beam 15 and first layer longitudinal beam 11 be fixed to each other in second through-hole.Meanwhile in the first bearing beam 15 The other end (one end being not inserted into first layer longitudinal beam 11) be equipped with the third through-hole that matches with the second through-hole, thus when The case where first bearing beam 15 is scalable to first layer longitudinal beam 11 when lifting stair, interferes lifting to avoid it.This implementation The first bearing beam 15 in example is logical using the side of 90 × 60mm size, and the side that first layer longitudinal beam 11 is 100 × 80mm is logical, and first Bearing beam 15 is inserted into 11 inside 50mm of first layer longitudinal beam, and in addition 50mm is located at outside first layer longitudinal beam 11.Simultaneously first Open the hole that three diameters are 40mm on the side of bearing beam 15 is logical, two of them be in internal first through hole, another be External third through-hole, the corresponding position on first layer longitudinal beam 11 open up that there are two the second through-holes.When fixed, first is held Two first through hole of power beam 15 and two the second through-holes of first layer longitudinal beam 11 pass through the interspersed fixation of round steel 16, in stair When hanging liter, consolidate by the first bearing beam 15 toward the inner contraction of first layer longitudinal beam 11 and by third through-hole and the interspersed round steel of the second through-hole It is fixed.First operation layer 1 further includes buttcover plate 17, and 17 one end of buttcover plate and first layer transverse beam 12 are close to the one of the first bearing beam 15 End is rotatedly connected, and the other end is connected by chain 18 with the first upright bar 6, makes construction personnel's stair activity can be more by buttcover plate 17 The convenience added, can be reduced the case where tripping, simultaneously as chain 18 is soft connection, past can recycle when stair are in lifting, So that it will not influence the normal lifting of stair.
As shown in figure 3, the second operation layer 2 in the present embodiment includes second layer longitudinal beam 23,24 and of second layer transverse beam Second layer inboard beams 25, two second layer longitudinal beams 23 and two second layer transverse beams 24 join end to end composition for enclosing second The rectangular frame at 2 edge of operation layer;Two second layer inboard beams 25 are parallel with second layer longitudinal beam 23 and end is mounted on second In layer transverse beam 24, between adjacent second layer inboard beams 25 and second layer longitudinal beam 23, in two second layer inboard beams 25 Between position the second connecting plate 26 is installed, the outlet of the first bench 4 is connected by otic placode and bolt with second layer inboard beams 25.The One of notch 21 is corresponding with the first bench 4 in two notches 21 in two operation layers 2, below as the first bench 4, The notch is used for the first bench 4 above and below construction personnel, another notch 21 is corresponding with the second step 5, and the second step 5 is arranged Above it, therefore the notch is to lay plate to save material.In addition to quadrangle between first operation layer 1 and the second operation layer 2 Four first upright bars 6 support and fix outer, it is vertical also to pass through four thirds at the middle part of the first operation layer 1 and the second operation layer 2 Column 9 is fixedly linked, and four third columns 9 respectively correspond the longitudinal beam of the first operation layer 1 and the second operation layer 2, above and below interior survey beam Correspondence is fixedly linked, and keeps the connection between the first operation layer 1 and the second operation layer 2 more firm, the second operation layer 2 is in operation When can be more steady.
First protective frame 41 and second that is laterally respectively equipped with of the first bench 4 and the second step 5 in the present embodiment is protected Frame 51 is equipped with first support bar 17 in one end of the first operation layer 1, is respectively equipped with second support bar at the both ends of transfer platform 22 27 and third support rod 28, the both ends of the first protective frame 41 be respectively and fixedly installed to first support bar 17 and second support bar 27, The both ends of second protective frame 51 are respectively and fixedly installed on third support rod 28 and the second upright bar 3, pass through 41 He of the first protective frame Second protective frame 51 can increase safety when construction personnel's stair activity.Meanwhile it being additionally provided on the second operation layer 2 for protecting The guardrail 10 of construction personnel's safety is protected, guardrail 10 is higher by work surface 900mm, and one end of which is fixed on second support bar 27 or third branch Strut 28, the other end are fixed on 6 in the first upright bar.To be easy to lift the stair, it is additionally provided in the surrounding of the second operation layer 2 more It is a for lifting hollow round plate 29, the present embodiment be respectively arranged on two second layer longitudinal beams 23 2 piece 120 × 120mm and the intermediate hollow round plate for having diameter 50mm, hang the stair can by catching on hollow round plate in lifting Dress, no longer needs to install other lifting parts.Various components and component in the present embodiment are all made of steel and only do, and entire stair are Assembling, each component adds the reinforcing mode of bolt using otic placode, and it is easy to disassemble, be conducive to transport sundry item progress again Secondary utilization.
The embodiment of the present invention is described in conjunction with attached drawing above, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (10)

1. a kind of assembled steel stair, which is characterized in that it is whole to be made of steel, including be located at bottom the first operation layer, The second operation layer above the first operation layer, the second upright bar being erected on second operation layer, the first bench, second Bench and quadrangle is built up in for being fixedly connected with the first upright bar of the first operation layer and the second operation layer, second operation layer For H-shaped operating platform, both ends are respectively provided with a notch, are a transfer platform among two notches, the entrance of first bench with One end of first operation layer is connected, and outlet and one end of the transfer platform are connected to each other, the entrance of the second step and The other end of the transfer platform is connected to each other, and is exported and is fixedly linked in the middle part of second upright bar, and the second step Outlet height matches with building storey height, and the height of first upright bar is flushed with second upright bar, first upright bar and Second upright bar is connected by third layer transverse beam, is connected between first upright bar by third layer longitudinal beam.
2. assembled steel stair according to claim 1, which is characterized in that first operation layer includes first layer longitudinal direction Beam, first layer transverse beam and first layer inboard beams, two first layer longitudinal beams and two first layer transverse beam head and the tail It is connected to form the rectangular frame for enclosing the first operation layer edge;Two first layer inboard beams and the first layer are longitudinal Liangping row and end are mounted in first layer transverse beam, are installed between the first layer inboard beams and the first layer longitudinal beam There is the first connecting plate, the entrance of first bench is connected by otic placode and bolt with the first layer inboard beams.
3. assembled steel stair according to claim 2, which is characterized in that first operation layer further includes four first Bearing beam, the first layer longitudinal beam and the first bearing beam side of being are logical, and the shape of first bearing beam is less than described the The shape of one layer of longitudinal beam can be inserted into one end of first bearing beam in the first layer longitudinal beam or from the first layer It is extracted out in longitudinal beam.
4. assembled steel stair according to claim 3, which is characterized in that opened up on one end of first bearing beam There are multiple first through hole, multiple the second through-holes corresponding with the first through hole, institute are offered on the first layer longitudinal beam Stating the first operation layer further includes being interspersed in the first through hole and the second through-hole to make first bearing beam and described simultaneously The round steel that one layer of longitudinal beam is fixed to each other.
5. assembled steel stair according to claim 3, which is characterized in that first operation layer further includes buttcover plate, Described buttcover plate one end is rotatedly connected with the first layer transverse beam close to one end of first bearing beam, and the other end passes through chain Item is connected with first upright bar.
6. assembled steel stair according to claim 4, which is characterized in that set on the other end of first bearing beam There is the third through-hole to match with second through-hole.
7. assembled steel stair according to claim 1, which is characterized in that second operation layer includes second layer longitudinal direction Beam, second layer transverse beam and second layer inboard beams, two second layer longitudinal beams and two second layer transverse beam head and the tail It is connected to form the rectangular frame for enclosing the second operation layer edge;Two second layer inboard beams and the second layer are longitudinal Liangping row and end are mounted in second layer transverse beam, the adjacent second layer inboard beams and the second layer longitudinal beam it Between, the intermediate positions of two second layer inboard beams the second connecting plate is installed, the outlet of first bench passes through otic placode It is connected with bolt with the second layer inboard beams.
8. assembled steel stair according to claim 1, which is characterized in that be equipped with the in one end of first operation layer One support rod is respectively equipped with second support bar and third support rod, first bench and at the both ends of the transfer platform Two bench are laterally respectively equipped with the first protective frame and the second protective frame, and the both ends of first protective frame are respectively and fixedly installed to In the first support bar and second support bar, the both ends of second protective frame are respectively and fixedly installed to the third support rod In the second upright bar.
9. assembled steel stair according to claim 1, which is characterized in that second operation layer is equipped with to be applied for protecting The guardrail of worker person.
10. assembled steel stair according to claim 1, which is characterized in that in being surrounded by for second operation layer Multiple hollow round plates for lifting.
CN201811639314.0A 2018-12-29 2018-12-29 A kind of assembled steel stair Pending CN109736595A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811639314.0A CN109736595A (en) 2018-12-29 2018-12-29 A kind of assembled steel stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811639314.0A CN109736595A (en) 2018-12-29 2018-12-29 A kind of assembled steel stair

Publications (1)

Publication Number Publication Date
CN109736595A true CN109736595A (en) 2019-05-10

Family

ID=66362525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811639314.0A Pending CN109736595A (en) 2018-12-29 2018-12-29 A kind of assembled steel stair

Country Status (1)

Country Link
CN (1) CN109736595A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205475709U (en) * 2016-04-08 2016-08-17 中国建筑第八工程局有限公司 A scalable stores pylon for high -rise, super high -rise building jacking platform
CN205654127U (en) * 2016-04-15 2016-10-19 中国建筑第五工程局有限公司深圳分公司 Portable operation protective platform of assembly type structure stairwell
CN207453439U (en) * 2017-06-30 2018-06-05 中国建筑第五工程局有限公司 A kind of elevated hoistway operation platform of subsidiary movable inserted link

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205475709U (en) * 2016-04-08 2016-08-17 中国建筑第八工程局有限公司 A scalable stores pylon for high -rise, super high -rise building jacking platform
CN205654127U (en) * 2016-04-15 2016-10-19 中国建筑第五工程局有限公司深圳分公司 Portable operation protective platform of assembly type structure stairwell
CN207453439U (en) * 2017-06-30 2018-06-05 中国建筑第五工程局有限公司 A kind of elevated hoistway operation platform of subsidiary movable inserted link

Similar Documents

Publication Publication Date Title
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN104763109B (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN105586867A (en) Installation method for over-length over-weight steel reinforcement cage
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN204876578U (en) Building construction system
CN105113539A (en) Combined multifunctional underground continuous wall core tube in top-down method and construction method thereof
CN109736595A (en) A kind of assembled steel stair
CN204876577U (en) Building construction system
CN204850469U (en) Commercial mansion system that builds
CN207526050U (en) Elevator is installed in a kind of metal self-supporting integration additional
CN210420875U (en) Safe bridge construction platform
CN215829932U (en) Assembled steel-concrete elevator well with anti-seismic high-stability performance
CN214576004U (en) Staircase regularization platform of going up people
CN106121252B (en) A kind of hydraulic stepping is from climbing material transfering device and method
CN205475709U (en) A scalable stores pylon for high -rise, super high -rise building jacking platform
KR102230445B1 (en) Rocking bridge supported by multi-wire and movable frame, method for constructing this same
CN205100543U (en) Novel construction system of commercial mansion
CN207177120U (en) A kind of overhanging type vertical shaft stair
CN110565934A (en) building outer wall suspension type passenger-cargo elevator construction platform and installation method thereof
CN207321102U (en) ± 800kV current conversion station DC fields low-voltage equipment mounting structures
CN207392864U (en) A kind of 400kV support insulators supporting structure
CN219157419U (en) Bridge pier construction encloses cage
CN204876576U (en) Building construction system
CN104675093B (en) Dish-type node type scaffold
CN214034693U (en) Modular assembly step ladder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510

RJ01 Rejection of invention patent application after publication