CN109725129B - Tbm隧洞岩体分级方法 - Google Patents
Tbm隧洞岩体分级方法 Download PDFInfo
- Publication number
- CN109725129B CN109725129B CN201910072259.XA CN201910072259A CN109725129B CN 109725129 B CN109725129 B CN 109725129B CN 201910072259 A CN201910072259 A CN 201910072259A CN 109725129 B CN109725129 B CN 109725129B
- Authority
- CN
- China
- Prior art keywords
- rock
- rock mass
- index
- integrity
- grading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910072259.XA CN109725129B (zh) | 2019-01-25 | 2019-01-25 | Tbm隧洞岩体分级方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910072259.XA CN109725129B (zh) | 2019-01-25 | 2019-01-25 | Tbm隧洞岩体分级方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109725129A CN109725129A (zh) | 2019-05-07 |
CN109725129B true CN109725129B (zh) | 2021-03-23 |
Family
ID=66300329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910072259.XA Active CN109725129B (zh) | 2019-01-25 | 2019-01-25 | Tbm隧洞岩体分级方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109725129B (zh) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110516730B (zh) * | 2019-08-20 | 2022-09-23 | 中铁工程装备集团有限公司 | 基于pso-svm算法和图像识别的围岩质量在线分级方法 |
CN110671150B (zh) * | 2019-10-14 | 2021-04-27 | 中铁第四勘察设计院集团有限公司 | 基于隧道埋深及风化层厚度的围岩分级修正方法及装置 |
CN111079342B (zh) * | 2019-11-29 | 2023-04-07 | 中铁工程装备集团有限公司 | 一种基于在线岩体等级分类的tbm掘进性能预测方法 |
CN110990936A (zh) * | 2019-12-23 | 2020-04-10 | 中国煤炭地质总局地球物理勘探研究院 | 一种岩体质量指标的确定方法及系统 |
CN111581785A (zh) * | 2020-04-18 | 2020-08-25 | 中铁二院工程集团有限责任公司 | 高驼峰应力围岩分级方法 |
CN111595671B (zh) * | 2020-05-05 | 2023-03-21 | 贵州工程应用技术学院 | 一种基于坚硬和完整程度连续函数的岩体质量评价方法 |
CN111706322B (zh) * | 2020-07-17 | 2023-03-21 | 中国铁建重工集团股份有限公司 | 一种岩石钻进响应的预测方法和预测系统 |
CN112990227B (zh) * | 2021-02-08 | 2022-12-27 | 中国铁建重工集团股份有限公司 | 掌子面地质检测方法 |
CN113094914A (zh) * | 2021-04-21 | 2021-07-09 | 北京市水利规划设计研究院 | 用于围岩分级的方法、处理器及存储介质 |
CN113933297B (zh) * | 2021-09-10 | 2024-05-07 | 中铁第一勘察设计院集团有限公司 | 隧道围岩分级方法、装置、电子设备和介质 |
CN114522776B (zh) * | 2022-04-23 | 2022-06-24 | 南通腾宇环保设备有限公司 | 锌浮渣筛分-研磨方法 |
CN115271367A (zh) * | 2022-07-01 | 2022-11-01 | 中铁二十局集团有限公司 | 高原隧道围岩分级方法、装置、设备以及存储介质 |
CN114926101B (zh) * | 2022-07-18 | 2022-10-28 | 石家庄铁道大学 | 一种面向施工速度与安全的tbm适应性围岩分级方法 |
CN117168419B (zh) * | 2023-11-02 | 2024-02-02 | 中国电建集团西北勘测设计研究院有限公司 | 一种基于机器视觉系统的岩体结构与质量自动化识别方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6490527B1 (en) * | 1999-07-13 | 2002-12-03 | The United States Of America As Represented By The Department Of Health And Human Services | Method for characterization of rock strata in drilling operations |
CN102331488A (zh) * | 2011-07-06 | 2012-01-25 | 中冶集团武汉勘察研究院有限公司 | 矿山竖井工程围岩分级因素层次分析方法 |
CN104217124A (zh) * | 2014-09-15 | 2014-12-17 | 天津大学 | 以工程样本数据为依托的tbm施工围岩分级方法 |
CN105938611A (zh) * | 2016-07-06 | 2016-09-14 | 山东大学 | 一种基于随钻参数对地下工程围岩快速实时分级的方法 |
CN106570292A (zh) * | 2016-11-14 | 2017-04-19 | 中建山东投资有限公司 | 一种基于超大断面隧道的围岩分级方法 |
CN108519284A (zh) * | 2018-03-30 | 2018-09-11 | 山东大学 | 地下工程围岩数字钻探实时分级方法 |
-
2019
- 2019-01-25 CN CN201910072259.XA patent/CN109725129B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6490527B1 (en) * | 1999-07-13 | 2002-12-03 | The United States Of America As Represented By The Department Of Health And Human Services | Method for characterization of rock strata in drilling operations |
CN102331488A (zh) * | 2011-07-06 | 2012-01-25 | 中冶集团武汉勘察研究院有限公司 | 矿山竖井工程围岩分级因素层次分析方法 |
CN104217124A (zh) * | 2014-09-15 | 2014-12-17 | 天津大学 | 以工程样本数据为依托的tbm施工围岩分级方法 |
CN105938611A (zh) * | 2016-07-06 | 2016-09-14 | 山东大学 | 一种基于随钻参数对地下工程围岩快速实时分级的方法 |
CN106570292A (zh) * | 2016-11-14 | 2017-04-19 | 中建山东投资有限公司 | 一种基于超大断面隧道的围岩分级方法 |
CN108519284A (zh) * | 2018-03-30 | 2018-09-11 | 山东大学 | 地下工程围岩数字钻探实时分级方法 |
Non-Patent Citations (1)
Title |
---|
基于模糊综合评判的护盾式TBM施工围岩稳定性分类;杨继华等;《吉林大学学报(地球科学版)》;20180930;第48卷(第5期);1596-1602 * |
Also Published As
Publication number | Publication date |
---|---|
CN109725129A (zh) | 2019-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109725129B (zh) | Tbm隧洞岩体分级方法 | |
CN106157181B (zh) | 一种基于随钻参数对土质围岩快速实时分级的方法 | |
CN103823038A (zh) | 一种裂隙岩体工程稳定性分级方法 | |
CN111325482B (zh) | 一种大跨度地下洞库的围岩快速分级方法 | |
CN110648082B (zh) | 一种深埋硬岩隧道岩爆等级评估的快速查表方法 | |
CN110331987B (zh) | 用于硬岩地层的双护盾tbm掘进施工方法 | |
CN106639879A (zh) | 一种底部钻具组合造斜率预测方法 | |
Dey et al. | Predicting" cuttability" with surface miners-A rockmass classification approach | |
Christaras et al. | Blastability quality system (BQS) for using it, in bedrock excavation | |
CN107958333A (zh) | 水力发电工程中围岩工程地质精细化分类方法 | |
Restner et al. | Rock mechanical aspects of roadheader excavation | |
Xin-lin et al. | Prediction and classification of rock mass boreability in TBM tunnel | |
Chatziangelou et al. | A new development of BQS (blastability quality system) for closely spaced formations | |
JP5223333B2 (ja) | 削孔速度比及び地山パラメータの相関関係算出方法及びそれを用いた切羽前方予測方法 | |
CN110130321A (zh) | 一种人工挖孔桩施工中岩石的处理方法 | |
CN109460612A (zh) | 一种煤岩切削过程中钻屑平均粒径预测方法 | |
Liu et al. | The thin coal seam (TCS) mining technology for open pit mines in China | |
CN105525925B (zh) | 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法 | |
JPS63594A (ja) | コアボ−リング法による岩石の破壊じん性値算定法 | |
Ma et al. | prediction model for deformation risk grade of the soft rock tunnel based on GRA-Extension | |
CN108388754B (zh) | 一种tbm正滚刀间距的设计方法 | |
Murthy | Role of Rock Excavation Tests for Predicting TBM Performance | |
Cheng et al. | Numerical simulation study on rock breaking efficiency of shield cutters in large-size boulder strata | |
CN113268806B (zh) | 硬岩隧道掘进机刀盘滚刀的刀间距优化方法及其刀盘 | |
Cheng et al. | TBM cutter wear prediction in inclined shaft project based on tunnelling parameters |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 450003 No. 109 Jinshui Road, Jinshui District, Henan, Zhengzhou Applicant after: Yellow River Survey Planning and Design Research Institute Co., Ltd. Address before: 450003 No. 109 Jinshui Road, Jinshui District, Henan, Zhengzhou Applicant before: Yellow River Engineering Consulting Co., Ltd. |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Jinliang Inventor after: Zhang Dangli Inventor after: Li Qingbo Inventor after: Xue Yunfeng Inventor after: Miao Dong Inventor after: Qi Sanhong Inventor after: Guo Weixin Inventor after: Yang Jihua Inventor after: Yang Fengwei Inventor after: Yao Yang Inventor before: Miao Dong Inventor before: Qi Sanhong Inventor before: Guo Weixin Inventor before: Yang Jihua Inventor before: Yang Fengwei Inventor before: Yao Yang Inventor before: Zhang Dangli |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |