CN106570292A - 一种基于超大断面隧道的围岩分级方法 - Google Patents
一种基于超大断面隧道的围岩分级方法 Download PDFInfo
- Publication number
- CN106570292A CN106570292A CN201611001140.6A CN201611001140A CN106570292A CN 106570292 A CN106570292 A CN 106570292A CN 201611001140 A CN201611001140 A CN 201611001140A CN 106570292 A CN106570292 A CN 106570292A
- Authority
- CN
- China
- Prior art keywords
- rock
- tunnel
- face
- subregion
- fender graded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/23—Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种基于超大断面隧道的围岩分级方法,所述基于超大断面隧道的围岩分级方法包括以下步骤:(1)获取隧道开挖断面面积S;(2)根据公式S/50计算确定掌子面的数量,S为步骤(1)中的隧道开挖断面面积,并确保每个掌子面的面积相同;(3)对实际工程进行有限元数值模拟分析,对掌子面及其拓展区域进行强度折减,得到不同的安全系数a1,a2,a3,a4;(4)根据步骤(3)中不同的安全系数a1,a2,a3,a4的倒数确定权重值b1,b2,b3,b4;(5)对现场掌子面进行分区;(6)计算分区的[BQ],根据[BQ]进行加权得到[BQ]A;(7)根据实际情况完成掌子面素描,标注各分区的[BQ]和[BQ]A。
Description
技术领域
本发明涉及围岩分级技术领域,特别是涉及基于超大断面隧道的围岩分级方法。
背景技术
围岩分级是根据岩体完整程度和岩石强度等指标将无限的岩体序列划分为具有不同稳定程度的有限个类别。
现阶段我国使用的公路隧道围岩分级是采用定性特征划分和定量指标划分相结合的方法进行综合评判。岩质围岩基本指标为岩石坚硬程度和岩体完整程度,完整程度顶两只采用岩体完整性系数Kv表示,当现场Kv无实测值,可根据岩体体积节理数Jv确定。由于我国近年隧道开挖时的断面越来越大,围岩情况复杂,掌子面可能同时出现不同级别围岩特征,因此我国现阶段使用的围岩分级方法已经无法精确的确定大断面隧道的围岩等级。
因此希望有一种基于超大断面隧道的围岩分级方法可以提高围岩分级的准确性。
发明内容
本发明的目的在于提供一种基于超大断面隧道的围岩分级方法来克服现有技术中存在的上述问题。
为实现上述目的,本发明提供一种基于超大断面隧道的围岩分级方法包括以下步骤;
(1)获取隧道开挖断面面积S;
(2)根据公式S/50计算确定掌子面的数量,S为步骤(1)中的隧道开挖断面面积,并确保每个掌子面的面积相同;
(3)对实际工程进行有限元数值模拟分析,对掌子面及其拓展区域进行强度折减,得到不同的安全系数a1,a2,a3,a4;
(4)根据步骤(3)中不同的安全系数a1,a2,a3,a4的倒数确定权重值b1,b2,b3,b4;
(5)对现场掌子面进行分区;
(6)计算分区的[BQ],根据[BQ]进行加权得到[BQ]A;
(7)根据实际情况完成掌子面素描,标注各分区的[BQ]和[BQ]A。
优选地,所述步骤(2)中取公式S/50的整数来确定掌子面的数量。
优选地,所述步骤(5)利用修正BQ法对隧道掌子面各分区进行围岩分级,获取岩石单轴饱和抗压强度Rc,若无Rc实测值,利用点荷载试验进行换算确定,公式为:
其中IS(50)为岩石点荷载强度指数,与岩石坚硬程度定性值对应关系可按表1的规定确定;RC为岩石单轴饱和抗压强度
表1IS(50)与岩石坚硬程度定性值的对应关系
优选地,所述步骤(5)对各分区进行围岩完整程度划分,测定围岩弹性纵波波速,并在同一分区内取样测定岩石弹性纵波波速,围岩弹性纵波波速Kv根据公式计算:
Kv=(vpm/vpr)2
vpm为评价区域岩体的弹性纵波速度(km/s);
vpr为评价区域岩石的弹性纵波速度(km/s);
若无Kv实测值根据下表中的岩体体积节理数Jv确定
Jv | <3 | 3-10 | 10-20 | 20-35 | >35 |
Kv | >0.75 | 0.75-0.55 | 0.55-0.35 | 0.35-0.15 | <0.15 |
岩石完整程度定性值 | 完整 | 较完整 | 较破碎 | 破碎 | 极破碎 |
Kv、Kv1、Kv2、Kv3和Kv4。
优选地,所述步骤(6)利用公式BQ=90+3RC+250Kv计算分区的BQ值,其中RC>90Kv+30时,应以RC=90Kv+30和Kv代入计算BQ值;Kv>0.04RC+0.4时,Kv=0.04RC+0.4和RC代入计算BQ值,计算得出不同分区的BQ值包括:BQ1、BQ2、BQ3和BQ4值,并再次对BQ1、BQ2、BQ3和BQ4值进行修正。
优选地,所述步骤(6)获取不同分区的修正系数k11,k12,k13,k14,k21,k22,k23,k24,k31,k32,k33和k34,并根据公式[BQ]=BQ-100(K1+K2+K3)得出不同分区的围岩基本质量指标修正值[BQ1]、[BQ2]、[BQ3]和[BQ4];
其中,[BQ]为岩质围岩基本质量指标修正值;
BQ为岩质围岩基本质量指标;
K1为地下水状态影响修正系数,根据表2确定;
K2为主要软弱结构面产状影响修正系数,根据表3确定;
K3为初始地应力状态影响修正系数,根据表4确定;
表2地下水状态影响修正系数K1
表3主要软弱结构面产状影响修正系数K2
表4初始地应力状态影响修正系数K3
优选地,所述步骤(7)根据按表5围岩分级表进行围岩等级划分;
表5围岩分级表
本发明提供了一种基于超大断面隧道的围岩分级方法,本发明的基于超大断面隧道的围岩分级方法解决了现有分级技术中对复杂围岩条件判定模糊的局限性,提高了围岩分级的准确性,通过[BQ]A可以判断隧道围岩的自稳能力,通过[BQ1]、[BQ2]、[BQ3]和[BQ4]可较准确判别出掌子面围岩情况,并根据[BQ1]、[BQ2]、[BQ3]、[BQ4]和[BQ]A进行综合设计施工优化。
附图说明
图1是不同开挖断面的分块示意图。
图2是基于超大断面隧道的围岩分级方法的流程示意图。
具体实施方式
为使本发明实施的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行更加详细的描述。在附图中,自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。所描述的实施例是本发明一部分实施例,而不是全部的实施例。下面通过参考附图描述的实施例是示例性的,旨在用于解释本发明,而不能理解为对本发明的限制。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。下面结合附图对本发明的实施例进行详细说明。
如图2所示,基于超大断面隧道的围岩分级方法包括以下步骤;
(1)获取隧道开挖断面面积S;
(2)根据公式S/50计算确定掌子面的数量,S为步骤(1)中的隧道开挖断面面积,并确保每个掌子面的面积相同;
(3)对实际工程进行有限元数值模拟分析,对掌子面及其拓展区域进行强度折减,得到不同的安全系数a1,a2,a3,a4;
(4)根据步骤(3)中不同的安全系数a1,a2,a3,a4的倒数确定权重值b1,b2,b3,b4;
(5)对现场掌子面进行分区;
(6)计算分区的[BQ],根据[BQ]进行加权得到[BQ]A;
(7)根据实际情况完成掌子面素描,标注各分区的[BQ]和[BQ]A。
所述步骤(2)中取公式S/50的整数来确定掌子面的数量。
所述步骤(5)利用修正BQ法对隧道掌子面各分区进行围岩分级,获取岩石单轴饱和抗压强度Rc,若无Rc实测值,利用点荷载试验进行换算确定,公式为:
其中IS(50)为岩石点荷载强度指数,与岩石坚硬程度定性值对应关系可按表1的规定确定;RC为岩石单轴饱和抗压强度
表1IS(50)与岩石坚硬程度定性值的对应关系
所述步骤(5)对各分区进行围岩完整程度划分,测定围岩弹性纵波波速,并在同一分区内取样测定岩石弹性纵波波速,围岩弹性纵波波速Kv根据公式计算:
Kv=(vpm/vpr)2
vpm为评价区域岩体的弹性纵波速度(km/s);
vpr为评价区域岩石的弹性纵波速度(km/s);
若无Kv实测值根据下表中的岩体体积节理数Jv确定
Jv | <3 | 3-10 | 10-20 | 20-35 | >35 |
Kv | >0.75 | 0.75-0.55 | 0.55-0.35 | 0.35-0.15 | <0.15 |
岩石完整程度定性值 | 完整 | 较完整 | 较破碎 | 破碎 | 极破碎 |
Kv、Kv1、Kv2、Kv3和Kv4。
所述步骤(6)利用公式BQ=90+3RC+250Kv计算分区的BQ值,其中RC>90Kv+30时,应以RC=90Kv+30和Kv代入计算BQ值;Kv>0.04RC+0.4时,Kv=0.04RC+0.4和RC代入计算BQ值,计算得出不同分区的BQ值包括:BQ1、BQ2、BQ3和BQ4值,并再次对BQ1、BQ2、BQ3和BQ4值进行修正。
所述步骤(6)获取不同分区的修正系数k11,k12,k13,k14,k21,k22,k23,k24,k31,k32,k33和k34,并根据公式[BQ]=BQ-100(K1+K2+K3)得出不同分区的围岩基本质量指标修正值[BQ1]、[BQ2]、[BQ3]和[BQ4];
其中,[BQ]为岩质围岩基本质量指标修正值;
BQ为岩质围岩基本质量指标;
K1为地下水状态影响修正系数,根据表2确定;
K2为主要软弱结构面产状影响修正系数,根据表3确定;
K3为初始地应力状态影响修正系数,根据表4确定;
表2地下水状态影响修正系数K1
表3主要软弱结构面产状影响修正系数K2
表4初始地应力状态影响修正系数K3
所述步骤(7)根据按表5围岩分级表进行围岩等级划分;
表5围岩分级表
如图1所示,分别体现开挖断面面积为200m2,150m2,50m2时的掌子面划分方法。
最后需要指出的是:以上实施例仅用以说明本发明的技术方案,而非对其限制。尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。
Claims (7)
1.一种基于超大断面隧道的围岩分级方法,其特征在于,包括以下步骤;
(1)获取隧道开挖断面面积S:
(2)根据公式S/50计算确定掌子面的数量,S为步骤(1)中的隧道开挖断面面积,并确保每个掌子面的面积相同;
(3)对实际工程进行有限元数值模拟分析,对掌子面及其拓展区域进行强度折减,得到不同的安全系数a1,a2,a3,a4;
(4)根据步骤(3)中不同的安全系数a1,a2,a3,a4的倒数确定权重值b1,b2,b3,b4;
(5)对现场掌子面进行分区;
(6)计算分区的[BQ],根据[BQ]进行加权得到[BQ]A;
(7)根据实际情况完成掌子面素描,标注各分区的[BQ]和[BQ]A。
2.如权利要求1所述的基于超大断面隧道的围岩分级方法,其特征在于,所述步骤(2)中取公式S/50的整数来确定掌子面的数量。
3.如权利要求1所述的基于超大断面隧道的围岩分级方法,其特征在于,所述步骤(5)利用修正BQ法对隧道掌子面各分区进行围岩分级,获取岩石单轴饱和抗压强度Rc,若无Rc实测值,利用点荷载试验进行换算确定,公式为:
其中IS(50)为岩石点荷载强度指数,与岩石坚硬程度定性值对应关系可按表1的规定确定;RC为岩石单轴饱和抗压强度
表1 IS(50)与岩石坚硬程度定性值的对应关系
4.如权利要求3所述的基于超大断面隧道的围岩分级方法,其特征在于,所述步骤(5)对各分区进行围岩完整程度划分,测定围岩弹性纵波波速,并在同一分区内取样测定岩石弹性纵波波速,围岩弹性纵波波速Kv根据公式计算:
Kv=(vpm/vpr)2
vpm为评价区域岩体的弹性纵波速度(km/s);
vpr为评价区域岩石的弹性纵波速度(km/s);
若无Kv实测值根据下表中的岩体体积节理数Jv确定
Kv、Kv1、Kv2、Kv3和Kv4。
5.如权利要求4所述的基于超大断面隧道的围岩分级方法,其特征在于,所述步骤(6)利用公式BQ=90+3RC+250Kv计算分区的BQ值,其中RC>90Kv+30时,应以RC=90Kv+30和Kv代入计算BQ值;Kv>0.04RC+
0.4时,Kv=0.04RC+0.4和RC代入计算BQ值,计算得出不同分区的BQ值包括:BQ1、BQ2、BQ3和BQ4值,并再次对BQ1、BQ2、BQ3和BQ4值进行修正。
6.如权利要求5所述的基于超大断面隧道的围岩分级方法,其特征在于,所述步骤(6)获取不同分区的修正系数k11,k12,k13,k14,k21,k22,k23,k24,k31,k32,k33和k34,并根据公式[BQ]=BQ-100(K1+K2+K3)得出不同分区的围岩基本质量指标修正值[BQ1]、[BQ2]、[BQ3]和[BQ4];
其中,[BQ]为岩质围岩基本质量指标修正值;
BQ为岩质围岩基本质量指标;
K1为地下水状态影响修正系数,根据表2确定;
K2为主要软弱结构面产状影响修正系数,根据表3确定;
K3为初始地应力状态影响修正系数,根据表4确定;
表2地下水状态影响修正系数K1
表3主要软弱结构面产状影响修正系数K2
表4初始地应力状态影响修正系数K3
7.如权利要求6所述的基于超大断面隧道的围岩分级方法,其特征在于,所述步骤(7)根据按表5围岩分级表进行围岩等级划分;
表5围岩分级表
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611001140.6A CN106570292A (zh) | 2016-11-14 | 2016-11-14 | 一种基于超大断面隧道的围岩分级方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611001140.6A CN106570292A (zh) | 2016-11-14 | 2016-11-14 | 一种基于超大断面隧道的围岩分级方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106570292A true CN106570292A (zh) | 2017-04-19 |
Family
ID=58542752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611001140.6A Pending CN106570292A (zh) | 2016-11-14 | 2016-11-14 | 一种基于超大断面隧道的围岩分级方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106570292A (zh) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035752A (zh) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | 基于顶板稳定性的煤巷强顶护帮锚杆支护方法 |
CN108646298A (zh) * | 2018-04-09 | 2018-10-12 | 陕西铁道工程勘察有限公司 | 多井多参数约束下隧道波速反演成像及围岩分级的方法 |
CN109374456A (zh) * | 2018-09-03 | 2019-02-22 | 山东大学 | 适用于隧道围岩质量分级及风化程度判别装置及方法 |
CN109725129A (zh) * | 2019-01-25 | 2019-05-07 | 黄河勘测规划设计有限公司 | Tbm隧洞岩体分级方法 |
CN109740183A (zh) * | 2018-12-06 | 2019-05-10 | 武汉理工大学 | 隧道掌子面稳定性评价模型及台阶法开挖高度设计方法 |
CN110646282A (zh) * | 2019-09-16 | 2020-01-03 | 中国国家铁路集团有限公司 | 基于围岩质量指标BQ的围岩弹性反力系数k确定方法 |
CN110781552A (zh) * | 2019-11-19 | 2020-02-11 | 中国电建集团西北勘测设计研究院有限公司 | 一种适于二维数值计算的地下洞室开挖方法 |
CN110889834A (zh) * | 2019-11-19 | 2020-03-17 | 长沙理工大学 | 一种基于云计算的公路隧道围岩分级方法 |
CN110889532A (zh) * | 2019-10-08 | 2020-03-17 | 中国铁建重工集团股份有限公司 | 一种隧道开挖及支护参数的智能选择及优化方法、系统 |
CN111325482A (zh) * | 2020-03-17 | 2020-06-23 | 中铁(天津)隧道工程勘察设计有限公司 | 一种大跨度地下洞库的围岩快速分级方法 |
CN111537330A (zh) * | 2020-04-13 | 2020-08-14 | 贵州桥梁建设集团有限责任公司 | 一种基于钻进速度获取隧道掌子面围岩全域强度的方法 |
CN111929424A (zh) * | 2020-08-21 | 2020-11-13 | 中铁隧道局集团有限公司 | 一种基于尺寸效应的巨跨地下洞室硬质围岩亚分级方法 |
CN113295850A (zh) * | 2021-05-24 | 2021-08-24 | 中交一公局集团有限公司 | 基于多源数据融合的隧道围岩定量快速分级方法与装置 |
CN113312433A (zh) * | 2021-06-18 | 2021-08-27 | 苏柏瑞 | 一种围岩分类方法及分类系统 |
CN115019171A (zh) * | 2022-06-09 | 2022-09-06 | 广西北投公路建设投资集团有限公司 | 非接触式围岩快速分区分级方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060132857A1 (en) * | 2004-12-17 | 2006-06-22 | Canon Kabushiki Kaisha | Image-processing apparatus and method for controlling image-processing apparatus |
CN102736124A (zh) * | 2012-06-14 | 2012-10-17 | 北京市市政工程研究院 | 基于综合参数的隧道开挖围岩动态细化分级方法 |
-
2016
- 2016-11-14 CN CN201611001140.6A patent/CN106570292A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060132857A1 (en) * | 2004-12-17 | 2006-06-22 | Canon Kabushiki Kaisha | Image-processing apparatus and method for controlling image-processing apparatus |
CN102736124A (zh) * | 2012-06-14 | 2012-10-17 | 北京市市政工程研究院 | 基于综合参数的隧道开挖围岩动态细化分级方法 |
Non-Patent Citations (1)
Title |
---|
黄锋等: "基于监控量测的隧道围岩分级方法及其应用研究", 《铁道建筑》 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019109700A1 (zh) * | 2017-12-08 | 2019-06-13 | 中国矿业大学 | 基于顶板稳定性的煤巷强顶护帮锚杆支护方法 |
CN108035752A (zh) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | 基于顶板稳定性的煤巷强顶护帮锚杆支护方法 |
CN108646298A (zh) * | 2018-04-09 | 2018-10-12 | 陕西铁道工程勘察有限公司 | 多井多参数约束下隧道波速反演成像及围岩分级的方法 |
CN109374456A (zh) * | 2018-09-03 | 2019-02-22 | 山东大学 | 适用于隧道围岩质量分级及风化程度判别装置及方法 |
CN109740183A (zh) * | 2018-12-06 | 2019-05-10 | 武汉理工大学 | 隧道掌子面稳定性评价模型及台阶法开挖高度设计方法 |
CN109725129A (zh) * | 2019-01-25 | 2019-05-07 | 黄河勘测规划设计有限公司 | Tbm隧洞岩体分级方法 |
CN109725129B (zh) * | 2019-01-25 | 2021-03-23 | 黄河勘测规划设计研究院有限公司 | Tbm隧洞岩体分级方法 |
CN110646282A (zh) * | 2019-09-16 | 2020-01-03 | 中国国家铁路集团有限公司 | 基于围岩质量指标BQ的围岩弹性反力系数k确定方法 |
CN110889532A (zh) * | 2019-10-08 | 2020-03-17 | 中国铁建重工集团股份有限公司 | 一种隧道开挖及支护参数的智能选择及优化方法、系统 |
CN110889834A (zh) * | 2019-11-19 | 2020-03-17 | 长沙理工大学 | 一种基于云计算的公路隧道围岩分级方法 |
CN110781552A (zh) * | 2019-11-19 | 2020-02-11 | 中国电建集团西北勘测设计研究院有限公司 | 一种适于二维数值计算的地下洞室开挖方法 |
CN111325482A (zh) * | 2020-03-17 | 2020-06-23 | 中铁(天津)隧道工程勘察设计有限公司 | 一种大跨度地下洞库的围岩快速分级方法 |
CN111537330A (zh) * | 2020-04-13 | 2020-08-14 | 贵州桥梁建设集团有限责任公司 | 一种基于钻进速度获取隧道掌子面围岩全域强度的方法 |
CN111537330B (zh) * | 2020-04-13 | 2023-06-27 | 贵州桥梁建设集团有限责任公司 | 一种基于钻进速度获取隧道掌子面围岩全域强度的方法 |
CN111929424A (zh) * | 2020-08-21 | 2020-11-13 | 中铁隧道局集团有限公司 | 一种基于尺寸效应的巨跨地下洞室硬质围岩亚分级方法 |
CN113295850A (zh) * | 2021-05-24 | 2021-08-24 | 中交一公局集团有限公司 | 基于多源数据融合的隧道围岩定量快速分级方法与装置 |
CN113312433A (zh) * | 2021-06-18 | 2021-08-27 | 苏柏瑞 | 一种围岩分类方法及分类系统 |
CN115019171A (zh) * | 2022-06-09 | 2022-09-06 | 广西北投公路建设投资集团有限公司 | 非接触式围岩快速分区分级方法 |
CN115019171B (zh) * | 2022-06-09 | 2024-04-26 | 广西北投公路建设投资集团有限公司 | 非接触式围岩快速分区分级方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106570292A (zh) | 一种基于超大断面隧道的围岩分级方法 | |
Pang et al. | Seismic fragility analysis of cable-stayed bridges considering different sources of uncertainties | |
CN104268791A (zh) | 山地赋存环境中500kV高压输电线路的健康评估方法 | |
CN104715159A (zh) | 一种线性工程地质灾害危险性评估的多层次分析法 | |
CN109241668B (zh) | 桥梁抗震重要性系数修正方法 | |
Chen et al. | Wind-induced response and universal equivalent static wind loads of single layer reticular dome shells | |
Novruzov | Local-in-space blow-up criteria for a class of nonlinear dispersive wave equations | |
CN105302969A (zh) | 一种地铁隧道综合技术状况评定方法 | |
Naserasadi et al. | Seismic fragility evaluation of arch concrete dams through nonlinear incremental analysis using smeared crack model | |
CN103778330B (zh) | 一种复合材料杆件轴压稳定系数的确定方法 | |
CN109829202A (zh) | 一种建筑结构节点分析杆件内力确定方法 | |
CN113933297A (zh) | 隧道围岩分级方法、装置、电子设备和介质 | |
CN102270246A (zh) | 一种计算网页重要性的方法 | |
Cheng et al. | Calculation of critical flow depth using method of algebraic inequality | |
Curtis | Complementary extremum principles for isoperimetric optimization problems | |
Talebi et al. | Investigation of the Effects of Land Use Change on Flooding and Sedimentation In Honifaqan Watershed | |
Sanjarovskiy et al. | General theory and foundations for calculating reinforced concrete structures of buildings and structures in modern construction | |
Baczynski | GSI adjustments for directional Hoek-Brown strength quantified by case studies | |
Ni et al. | Internal stability assessment of granular soils using the Kezdi and Sherard methods | |
Liu et al. | Time-dependent seismic fragility analysis of buried steel pipes in alkaline and near-neutral soil environments | |
Cao et al. | Evaluation of local scour calculation equations for bridge piers in sandy riverbed | |
CN106651165B (zh) | 用于地质灾害区域评估预警的降雨量风险分级方法及装置 | |
Liu et al. | Approximate equation for evaluating global buckling load of single-layer cylindrical space frames with crossing pattern | |
Yuan et al. | Restoration strategies of urban road network after earthquake based on corrected component probabilistic importance | |
Freeman | Performance-Based Seismic Engineering: Past, Current, and Future |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170419 |