CN109719839B CN201910044001.9A CN201910044001A CN109719839B CN 109719839 B CN109719839 B CN 109719839B CN 201910044001 A CN201910044001 A CN 201910044001A CN 109719839 B CN109719839 B CN 109719839B
Authority
CN
China
Prior art keywords
bevel gear
wheel
rotating shaft
frame
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910044001.9A
Other languages
Chinese (zh)
Other versions
CN109719839A (en
Inventor
徐倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAI'AN GESA DISPLAY PROPS Co.,Ltd.
Original Assignee
Huai'an Gesa Display Props Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huai'an Gesa Display Props Co ltd filed Critical Huai'an Gesa Display Props Co ltd
Priority to CN201910044001.9A priority Critical patent/CN109719839B/en
Publication of CN109719839A publication Critical patent/CN109719839A/en
Application granted granted Critical
Publication of CN109719839B publication Critical patent/CN109719839B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a grouting device, in particular to a grouting device for a cement prefabricated part for a railway. The technical problem is as follows: the grouting device for the cement prefabricated parts for the railways is provided with a filling device, and is higher in efficiency and shorter in vibration time. The technical scheme is as follows: a grouting device for a cement prefabricated part for a railway comprises a frame, a first wheel, a second wheel, a first rotating shaft, a driving mechanism, a first bearing seat, a second rotating shaft, a first bevel gear, a second bevel gear, a third bevel gear and the like; the front end and the rear end of the right side of the bottom of the frame are respectively provided with a first wheel, the front end and the rear end of the left side of the bottom of the frame are respectively provided with a second wheel, and a first rotating shaft is arranged between the front second wheel and the rear second wheel. The first wheel and the second wheel can be driven to move by the arranged driving mechanism, so that people can move and fill concrete conveniently without pushing manually, the physical strength of people is saved, and the working efficiency is improved.

Description

Cement prefabricated part slip casting ware for railway
Technical Field
The invention relates to a grouting device, in particular to a grouting device for a cement prefabricated part for a railway.
Background
When people process cement prefabricated parts, people need to add the stirred concrete into the forming equipment of the cement prefabricated parts, because the amount of the concrete required by the cement prefabricated parts is small, the waste is serious when a large-scale concrete transportation device is used, meanwhile, the field required by the large-scale transportation device is large, and the small-scale device has the problem of inconvenient movement; people usually use equipment with a vibrator to vibrate after the concrete is filled, so that the filling of the concrete is influenced, and the vibration time is longer.
Disclosure of Invention
In order to overcome the defects of manual filling, low efficiency and long vibration time when people fill concrete at present, the technical problem is as follows: the grouting device for the cement prefabricated parts for the railways is provided with a filling device, and is higher in efficiency and shorter in vibration time.
The technical scheme is as follows: a cement prefabricated part grouting device for railways comprises a frame, a first wheel, a second wheel, a first rotating shaft, a driving mechanism, a first bearing seat, a second rotating shaft, a first bevel gear, a second bevel gear, a third bevel gear, a box body, a third rotating shaft, a fourth bevel gear, blades, a second bearing seat, a filling pipe, a discharging pipe and a valve, wherein the first wheel is arranged at the front end and the rear end of the right side of the bottom of the frame, the second wheel is arranged at the front end and the rear end of the left side of the bottom of the frame, the first rotating shaft is arranged between the front second wheel and the rear second wheel, the driving mechanism is arranged on the first rotating shaft, the left side of the driving mechanism is connected with the bottom of the frame, the first bearing seat is arranged on the left side of the frame, the second rotating shaft is arranged on the first bearing seat, the second bevel gear is arranged at the lower end of the second rotating shaft, the upper end of the second rotating shaft is provided with a third bevel gear, the middle of the top of the frame is provided with a box body, the left wall and the right wall of the box body are internally provided with second bearing seats in an embedded mode, the left side and the right side of each second bearing seat are provided with a third rotating shaft, the left end of each third rotating shaft is provided with a fourth bevel gear, the fourth bevel gear is positioned on the left side of the box body and meshed with the third bevel gear, blades are arranged on the third rotating shafts and positioned in the box body, the top of the box body is provided with a filling pipe, the right.
Furthermore, the driving mechanism comprises a first chain wheel, a supporting block, a double-shaft motor, a second chain wheel and a chain, the first chain wheel is arranged in the middle of the first rotating shaft, the supporting block is arranged on the left side of the frame bottom plate and located behind the first bearing seat, the double-shaft motor is arranged at the bottom of the supporting block, the front end of an output shaft of the double-shaft motor is connected with the first bevel gear, the second chain wheel is arranged at the rear end of the output shaft of the double-shaft motor, and the chain is wound on the second chain wheel and the first.
Further, the folding bicycle comprises hinges, a box door, a baffle, clamping blocks, inserting blocks and a handle, wherein the hinges are arranged on the upper side and the lower side of the lower portion of the front side of the box body, the box door is arranged on the hinges on the upper side and the lower side, the baffle is arranged on the rear side of the top of the frame, the baffle is located right behind the box door, the clamping blocks are arranged on the upper portion of the front side of the box body, the inserting blocks are arranged on the upper portion of the front side of the box door, the inserting blocks are matched.
Further, still including vibrator, vibrating tube, slide rail, slide bar, pull ring and vibrting spear, frame top right side is equipped with the vibrator, and the vibrator rear end is equipped with the vibrating tube, is equipped with the slide rail in the middle of the bottom half, and slide rail bottom slidingtype is equipped with the slide bar, and slide bar bottom even slidingtype is equipped with a plurality of pull rings, and the pull ring is passed to the vibrating tube front end, and the vibrating tube front end is equipped with the vibrting spear, and the vibrting spear.
When people need to perform grouting, people firstly inject concrete into the box body through the filling pipe, then people start the driving mechanism to work, and further drive the second wheel to move through the first rotating shaft, and drive the frame and the first wheel to move, meanwhile, the driving mechanism can drive the first bevel gear to rotate, and further drive the second rotating shaft, the second bevel gear, the third bevel gear and the fourth bevel gear to rotate, and further drive the third rotating shaft and the blades to rotate, so that the concrete in the box body can be continuously pushed rightwards, the concrete can be conveniently discharged, the concrete cannot be accumulated in the box body, inconvenience is brought to cleaning of people, when people move to the forming equipment of the cement prefabricated part, people open the valve, and further discharge the concrete in the box body from the discharge pipe, and then the concrete falls into the forming equipment of the cement prefabricated part, along with the movement of the second wheel and the first wheel, the concrete can fill the forming equipment, when people fill the forming equipment, people close the valve and move the invention to the forming equipment of the next cement prefabricated component for filling the concrete, when people fill the forming equipment, people move the invention to the original position and then close the driving mechanism, so that the first wheel and the second wheel stop moving, and the blade stops rotating.
When people need to move the second wheel, people start the double-shaft motor to work, the rotation of the output shaft of the double-shaft motor drives the second chain wheel and the chain to rotate, the chain drives the first chain wheel to rotate, and then drives the first rotating shaft and the second wheel to rotate, so that the bicycle can be moved, meanwhile, the rotation of the output shaft of the double-shaft motor drives the first bevel gear to rotate, and then drives the blades to rotate, and after people finish using, people turn off the double-shaft motor, and then the second wheel stops rotating, and the blades stop rotating.
When people need to take and place objects from a gap at the bottom of the box body, people open the box door by rotating the handle, then people turn the box door rightwards, after the insert block is inserted into the clamp block, the clamp block can fix the position of the box door, then people can loosen the handle and do not turn the box door any more, after people take and place the box door, people turn the box door leftwards again, so that the insert block is pulled out of the clamp block, then people can put the box door back to the original position, after the box door is reset, people rotate the handle again and lock the box door, the box door is prevented from being opened when the box door is moved, the hinge is used for facilitating the left and right turning of the box door, the box door can prevent the objects inside from falling off, and people can avoid picking up the box door.
When people need to vibrate the concrete, people open the box door firstly, then take out the vibrating rod, then start the vibrator to work, and further extend the vibrating rod into the concrete in the forming equipment for vibration, so that the concrete filling can be more full, the quality of the cement prefabricated component can be improved.
The beneficial effects are that: the first wheel and the second wheel can be driven to move by the arranged driving mechanism, so that people can move and fill concrete conveniently without manual pushing, the physical strength of people is saved, and the working efficiency is improved; the vibrator can vibrate when people fill concrete, so that the concrete is easier to fill, the vibration time is shorter, the quality of the cement prefabricated part is improved, and meanwhile, the vibrator can better utilize the frame to store objects, so that the function of the frame is better exerted.
Drawings
Fig. 1 is a schematic front view of the present invention.
Fig. 2 is a partial schematic front view of the present invention.
Fig. 3 is a partial right view structural diagram of the present invention.
Part names and serial numbers in the figure: 1 vehicle frame, 2 first wheels, 3 second wheels, 4 first rotating shafts, 5 driving mechanisms, 51 first chain wheels, 52 supporting blocks, 53 double-shaft motors, 54 second chain wheels, 55 chains, 6 first bearing seats, 7 second rotating shafts, 8 first bevel gears, 9 second bevel gears, 10 third bevel gears, 11 boxes, 12 third rotating shafts, 13 fourth bevel gears, 14 blades, 15 second bearing seats, 16 filling pipes, 17 discharging pipes, 18 valves, 19 hinges, 20 box doors, 201 baffles, 21 clamping blocks, 22 inserting blocks, 23 handles, 24 vibrators, 25 vibrating pipes, 26 sliding rails, 27 sliding rods, 28 pull rings and 29 vibrating rods.
Detailed Description
The technical scheme of the invention is further explained by combining the attached drawings.
Example 1
A cement prefabricated part grouting device for railways, as shown in figures 1-3, comprises a frame 1, a first wheel 2, a second wheel 3, a first rotating shaft 4, a driving mechanism 5, a first bearing seat 6, a second rotating shaft 7, a first bevel gear 8, a second bevel gear 9, a third bevel gear 10, a box body 11, a third rotating shaft 12, a fourth bevel gear 13, blades 14, a second bearing seat 15, a filling pipe 16, a discharging pipe 17 and a valve 18, wherein the front end and the rear end of the right side of the bottom of the frame 1 are respectively provided with the first wheel 2, the front end and the rear end of the left side of the bottom of the frame 1 are respectively provided with the second wheel 3, the first rotating shaft 4 is arranged between the front and rear second wheels 3, the first rotating shaft 4 is provided with the driving mechanism 5, the left side of the driving mechanism 5 is connected with the bottom of the frame 1, the first bearing seat 6 is arranged on the left side of the frame 1, the second rotating shaft 7 is, the second bevel gear 9 is located in front of the driving mechanism 5, a first bevel gear 8 is arranged on the front side of the driving mechanism 5, the first bevel gear 8 is meshed with the second bevel gear 9, a third bevel gear 10 is arranged at the upper end of a second rotating shaft 7, a box body 11 is arranged in the middle of the top of the frame 1, second bearing seats 15 are arranged in the left wall and the right wall of the box body 11 in an embedded mode, a third rotating shaft 12 is arranged on the second bearing seats 15 in the left side and the right side, a fourth bevel gear 13 is arranged at the left end of the third rotating shaft 12, the fourth bevel gear 13 is meshed with the third bevel gear 10, blades 14 are arranged on the third rotating shaft 12, the blades 14 are located in the box body 11, a filling pipe 16 is arranged at the top of the box body 11, a discharging pipe 17 is.
Example 2
A cement prefabricated part grouting device for railways, as shown in figures 1-3, comprises a frame 1, a first wheel 2, a second wheel 3, a first rotating shaft 4, a driving mechanism 5, a first bearing seat 6, a second rotating shaft 7, a first bevel gear 8, a second bevel gear 9, a third bevel gear 10, a box body 11, a third rotating shaft 12, a fourth bevel gear 13, blades 14, a second bearing seat 15, a filling pipe 16, a discharging pipe 17 and a valve 18, wherein the front end and the rear end of the right side of the bottom of the frame 1 are respectively provided with the first wheel 2, the front end and the rear end of the left side of the bottom of the frame 1 are respectively provided with the second wheel 3, the first rotating shaft 4 is arranged between the front and rear second wheels 3, the first rotating shaft 4 is provided with the driving mechanism 5, the left side of the driving mechanism 5 is connected with the bottom of the frame 1, the first bearing seat 6 is arranged on the left side of the frame 1, the second rotating shaft 7 is, the second bevel gear 9 is located in front of the driving mechanism 5, a first bevel gear 8 is arranged on the front side of the driving mechanism 5, the first bevel gear 8 is meshed with the second bevel gear 9, a third bevel gear 10 is arranged at the upper end of a second rotating shaft 7, a box body 11 is arranged in the middle of the top of the frame 1, second bearing seats 15 are arranged in the left wall and the right wall of the box body 11 in an embedded mode, a third rotating shaft 12 is arranged on the second bearing seats 15 in the left side and the right side, a fourth bevel gear 13 is arranged at the left end of the third rotating shaft 12, the fourth bevel gear 13 is meshed with the third bevel gear 10, blades 14 are arranged on the third rotating shaft 12, the blades 14 are located in the box body 11, a filling pipe 16 is arranged at the top of the box body 11, a discharging pipe 17 is.
The driving mechanism 5 comprises a first chain wheel 51, a supporting block 52, a double-shaft motor 53, a second chain wheel 54 and a chain 55, the first chain wheel 51 is arranged in the middle of the first rotating shaft 4, the supporting block 52 is arranged on the left side of the bottom plate of the frame 1, the supporting block 52 is positioned behind the first bearing seat 6, the double-shaft motor 53 is arranged at the bottom of the supporting block 52, the front end of an output shaft of the double-shaft motor 53 is connected with the first bevel gear 8, the second chain wheel 54 is arranged at the rear end of the output shaft of the double-shaft motor 53, and the chain 55 is wound on the second.
Example 3
A cement prefabricated part grouting device for railways, as shown in figures 1-3, comprises a frame 1, a first wheel 2, a second wheel 3, a first rotating shaft 4, a driving mechanism 5, a first bearing seat 6, a second rotating shaft 7, a first bevel gear 8, a second bevel gear 9, a third bevel gear 10, a box body 11, a third rotating shaft 12, a fourth bevel gear 13, blades 14, a second bearing seat 15, a filling pipe 16, a discharging pipe 17 and a valve 18, wherein the front end and the rear end of the right side of the bottom of the frame 1 are respectively provided with the first wheel 2, the front end and the rear end of the left side of the bottom of the frame 1 are respectively provided with the second wheel 3, the first rotating shaft 4 is arranged between the front and rear second wheels 3, the first rotating shaft 4 is provided with the driving mechanism 5, the left side of the driving mechanism 5 is connected with the bottom of the frame 1, the first bearing seat 6 is arranged on the left side of the frame 1, the second rotating shaft 7 is, the second bevel gear 9 is located in front of the driving mechanism 5, a first bevel gear 8 is arranged on the front side of the driving mechanism 5, the first bevel gear 8 is meshed with the second bevel gear 9, a third bevel gear 10 is arranged at the upper end of a second rotating shaft 7, a box body 11 is arranged in the middle of the top of the frame 1, second bearing seats 15 are arranged in the left wall and the right wall of the box body 11 in an embedded mode, a third rotating shaft 12 is arranged on the second bearing seats 15 in the left side and the right side, a fourth bevel gear 13 is arranged at the left end of the third rotating shaft 12, the fourth bevel gear 13 is meshed with the third bevel gear 10, blades 14 are arranged on the third rotating shaft 12, the blades 14 are located in the box body 11, a filling pipe 16 is arranged at the top of the box body 11, a discharging pipe 17 is.
The driving mechanism 5 comprises a first chain wheel 51, a supporting block 52, a double-shaft motor 53, a second chain wheel 54 and a chain 55, the first chain wheel 51 is arranged in the middle of the first rotating shaft 4, the supporting block 52 is arranged on the left side of the bottom plate of the frame 1, the supporting block 52 is positioned behind the first bearing seat 6, the double-shaft motor 53 is arranged at the bottom of the supporting block 52, the front end of an output shaft of the double-shaft motor 53 is connected with the first bevel gear 8, the second chain wheel 54 is arranged at the rear end of the output shaft of the double-shaft motor 53, and the chain 55 is wound on the second.
The folding bicycle frame is characterized by further comprising hinges 19, a box door 20, a baffle plate 201, clamping blocks 21, inserting blocks 22 and a handle 23, the hinges 19 are arranged on the upper side and the lower side of the lower portion of the front side of the box body 11, the box door 20 is arranged on the hinges 19 on the upper side and the lower side, the baffle plate 201 is arranged on the rear side of the top of the frame 1, the baffle plate 201 is located right behind the box door 20, the clamping blocks 21 are arranged on the upper portion of the front side of the box body 11, the inserting blocks 22 are arranged on the upper portion of the front side of the box door 20.
Example 4
A cement prefabricated part grouting device for railways, as shown in figures 1-3, comprises a frame 1, a first wheel 2, a second wheel 3, a first rotating shaft 4, a driving mechanism 5, a first bearing seat 6, a second rotating shaft 7, a first bevel gear 8, a second bevel gear 9, a third bevel gear 10, a box body 11, a third rotating shaft 12, a fourth bevel gear 13, blades 14, a second bearing seat 15, a filling pipe 16, a discharging pipe 17 and a valve 18, wherein the front end and the rear end of the right side of the bottom of the frame 1 are respectively provided with the first wheel 2, the front end and the rear end of the left side of the bottom of the frame 1 are respectively provided with the second wheel 3, the first rotating shaft 4 is arranged between the front and rear second wheels 3, the first rotating shaft 4 is provided with the driving mechanism 5, the left side of the driving mechanism 5 is connected with the bottom of the frame 1, the first bearing seat 6 is arranged on the left side of the frame 1, the second rotating shaft 7 is, the second bevel gear 9 is located in front of the driving mechanism 5, a first bevel gear 8 is arranged on the front side of the driving mechanism 5, the first bevel gear 8 is meshed with the second bevel gear 9, a third bevel gear 10 is arranged at the upper end of a second rotating shaft 7, a box body 11 is arranged in the middle of the top of the frame 1, second bearing seats 15 are arranged in the left wall and the right wall of the box body 11 in an embedded mode, a third rotating shaft 12 is arranged on the second bearing seats 15 in the left side and the right side, a fourth bevel gear 13 is arranged at the left end of the third rotating shaft 12, the fourth bevel gear 13 is meshed with the third bevel gear 10, blades 14 are arranged on the third rotating shaft 12, the blades 14 are located in the box body 11, a filling pipe 16 is arranged at the top of the box body 11, a discharging pipe 17 is.
The driving mechanism 5 comprises a first chain wheel 51, a supporting block 52, a double-shaft motor 53, a second chain wheel 54 and a chain 55, the first chain wheel 51 is arranged in the middle of the first rotating shaft 4, the supporting block 52 is arranged on the left side of the bottom plate of the frame 1, the supporting block 52 is positioned behind the first bearing seat 6, the double-shaft motor 53 is arranged at the bottom of the supporting block 52, the front end of an output shaft of the double-shaft motor 53 is connected with the first bevel gear 8, the second chain wheel 54 is arranged at the rear end of the output shaft of the double-shaft motor 53, and the chain 55 is wound on the second.
The folding bicycle frame is characterized by further comprising hinges 19, a box door 20, a baffle plate 201, clamping blocks 21, inserting blocks 22 and a handle 23, the hinges 19 are arranged on the upper side and the lower side of the lower portion of the front side of the box body 11, the box door 20 is arranged on the hinges 19 on the upper side and the lower side, the baffle plate 201 is arranged on the rear side of the top of the frame 1, the baffle plate 201 is located right behind the box door 20, the clamping blocks 21 are arranged on the upper portion of the front side of the box body 11, the inserting blocks 22 are arranged on the upper portion of the front side of the box door 20.
Still including vibrator 24, vibrating tube 25, slide rail 26, slide bar 27, pull ring 28 and vibrting spear 29, frame 1 top right side is equipped with vibrator 24, vibrator 24 rear end is equipped with vibrating tube 25, be equipped with slide rail 26 in the middle of the box 11 bottom, slide rail 26 bottom slidingtype is equipped with slide bar 27, slide bar 27 bottom even slidingtype is equipped with a plurality of pull rings 28, vibrating tube 25 front end passes pull ring 28, vibrating tube 25 front end is equipped with vibrting spear 29, vibrting spear 29 is located vibrator 24 left.
When people need to perform grouting, people firstly inject concrete into the box body 11 through the filling pipe 16, then people start the driving mechanism 5 to work, and then the second wheel 3 is driven to move through the first rotating shaft 4, and the frame 1 and the first wheel 2 are driven to move, meanwhile, the driving mechanism 5 drives the first bevel gear 8 to rotate, and further drives the second rotating shaft 7, the second bevel gear 9, the third bevel gear 10 and the fourth bevel gear 13 to rotate, and further drives the third rotating shaft 12 and the blades 14 to rotate, so that the concrete in the box body 11 can be continuously pushed rightwards, the concrete is convenient to feed, the concrete cannot be accumulated in the box body 11, the cleaning of people is inconvenient, when people move to the forming equipment of the cement prefabricated part, people open the valve 18, and further discharge the concrete in the box body 11 from the discharge pipe 17, and then the concrete falls into the forming equipment of the cement prefabricated part, the forming equipment can be filled with concrete along with the movement of the second wheel 3 and the first wheel 2, when people fill the forming equipment, people close the valve 18, then move the invention to the forming equipment of the next cement prefabricated component for filling with concrete, when people fill the forming equipment, people move the invention to the original position, then close the driving mechanism 5, further stop the movement of the first wheel 2 and the second wheel 3, and stop the rotation of the blade 14, the driving mechanism 5 can drive the first wheel 2 and the second wheel 3 to move, so that people can move and fill with concrete conveniently, the manual pushing is not needed, the physical strength of people is saved, and the working efficiency is improved.
When people need to move the second wheel 3, people start the double-shaft motor 53 to work, the rotation of the output shaft of the double-shaft motor 53 drives the second chain wheel 54 and the chain 55 to rotate, the chain 55 drives the first chain wheel 51 to rotate, and further drives the first rotating shaft 4 and the second wheel 3 to rotate, so that the invention can be moved, meanwhile, the rotation of the output shaft of the double-shaft motor 53 drives the first bevel gear 8 to rotate, and further drives the blade 14 to rotate, and after people finish using, people close the double-shaft motor 53, further stop the rotation of the second wheel 3, and stop the rotation of the blade 14.
When people need to take and place objects from the bottom gap of the box body 11, people open the box door 20 by rotating the handle 23, then people turn the box door 20 to the right, after the insert 22 is inserted into the clamp 21, the clamp 21 can fix the position of the box door 20, then people can release the hands, and the box door 20 is not turned any more, after people take and place the objects, people turn the box door 20 to the left, then the insert 22 is pulled out of the clamp 21, then people can put the box door 20 back to the original position, after the box door 20 is reset, people rotate the handle 23 again, and then lock the box door 20, so that the box door 20 is prevented from being opened when the box door 20 moves, the hinge 19 is used for facilitating the left and right turning of the box door 20, the box door 20 can prevent the objects inside from falling off, and people can avoid picking up the objects.
When people need to vibrate the concrete, people firstly open the box door 20, then take out the vibrating rod 29, then start the vibrator 24 to work, and the vibrating rod 29 is extended into the concrete in the forming equipment to vibrate, so that the concrete filling can be more full, the quality of the cement prefabricated part can be improved, when the vibrating tube 25 is not long enough, people pull the sliding rod 27 and the pull ring 28 forwards, the vibrating tube 25 is then extended forward, and when the user is finished, the user moves the slide bar 27 and the pull ring 28 backward to the original position, closes the vibrator 24, and the vibrating rod 29 is put back to the original position, so that people can vibrate while filling concrete, the concrete is easier to fill, the vibration time is shorter, meanwhile, the vibrator 24 is arranged on the bicycle frame, so that the bicycle frame 1 can be better utilized for storing articles, and the function of the bicycle frame 1 can be better exerted.
The embodiments described above are provided to enable persons skilled in the art to make or use the invention and that modifications or variations can be made to the embodiments described above by persons skilled in the art without departing from the inventive concept of the present invention, so that the scope of protection of the present invention is not limited by the embodiments described above but should be accorded the widest scope consistent with the innovative features set forth in the claims.

Claims (1)

1. The utility model provides a cement prefabricated component slip casting ware for railway, including frame (1), first wheel (2), second wheel (3), first pivot (4) and actuating mechanism (5), both ends all are equipped with first wheel (2) around frame (1) bottom right side, both ends all are equipped with second wheel (3) around frame (1) bottom left side, be equipped with first pivot (4) between front and back both sides second wheel (3), be equipped with actuating mechanism (5) on first pivot (4), actuating mechanism (5) left side is connected its characterized in that with frame (1) bottom: the novel bicycle frame is characterized by further comprising a first bearing seat (6), a second rotating shaft (7), a first bevel gear (8), a second bevel gear (9), a third bevel gear (10), a box body (11), a third rotating shaft (12), a fourth bevel gear (13), blades (14), a second bearing seat (15), a filling pipe (16), a discharging pipe (17) and a valve (18), wherein the first bearing seat (6) is installed on the left side of the frame (1), the second rotating shaft (7) is installed on the first bearing seat (6), the second bevel gear (9) is arranged at the lower end of the second rotating shaft (7), the second bevel gear (9) is located in front of the driving mechanism (5), the first bevel gear (8) is arranged on the front side of the driving mechanism (5), the first bevel gear (8) is meshed with the second bevel gear (9), the third bevel gear (10) is arranged at the upper end of the second rotating shaft (7), second bearing seats (15) are embedded in the left wall and the right wall of the box body (11), third rotating shafts (12) are mounted on the left second bearing seats and the right second bearing seats (15), a fourth bevel gear (13) is arranged at the left end of the third rotating shaft (12), the fourth bevel gear (13) is positioned at the left side of the box body (11), the fourth bevel gear (13) is meshed with the third bevel gear (10), blades (14) are arranged on the third rotating shaft (12), the blades (14) are positioned in the box body (11), a filling pipe (16) is arranged at the top of the box body (11), a discharging pipe (17) is arranged at the right side of the bottom of the box body (11), a valve (18) is arranged on the discharging pipe (17), a driving mechanism (5) comprises a first chain wheel (51), a supporting block (52), a double-shaft motor (53), a second chain wheel (54) and a chain (55), the first chain wheel (51) is arranged in, the supporting block (52) is positioned behind the first bearing block (6), the bottom of the supporting block (52) is provided with a double-shaft motor (53), the front end of an output shaft of the double-shaft motor (53) is connected with the first bevel gear (8), the rear end of the output shaft of the double-shaft motor (53) is provided with a second chain wheel (54), the second chain wheel (54) and the first chain wheel (51) are wound with a chain (55), the box door structure further comprises hinges (19), a box door (20), a baffle plate (201), a clamping block (21), an inserting block (22) and a handle (23), the upper side and the lower side of the lower part of the front side of the box body (11) are respectively provided with the hinges (19), the box door (20) is arranged on the upper side and the lower side of the hinges (19), the baffle plate (201) is arranged on the rear side of the top of the frame (1), the baffle plate (201) is positioned right behind the box door, the insert block (22) is matched with the clamping block (21), and the lower part of the front side of the box door (20) is provided with a handle (23); still including vibrator (24), vibrating tube (25), slide rail (26), slide bar (27), pull ring (28) and vibrting spear (29), frame (1) top right side is equipped with vibrator (24), vibrator (24) rear end is equipped with vibrating tube (25), be equipped with slide rail (26) in the middle of box (11) bottom, slide rail (26) bottom slidingtype is equipped with slide bar (27), slide bar (27) bottom even slidingtype is equipped with a plurality of pull rings (28), pull ring (28) are passed to vibrating tube (25) front end, vibrating tube (25) front end is equipped with vibrting spear (29), vibrting spear (29) are located vibrator (24) left.
CN201910044001.9A 2019-01-17 2019-01-17 Cement prefabricated part slip casting ware for railway Active CN109719839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910044001.9A CN109719839B (en) 2019-01-17 2019-01-17 Cement prefabricated part slip casting ware for railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910044001.9A CN109719839B (en) 2019-01-17 2019-01-17 Cement prefabricated part slip casting ware for railway

Publications (2)

Publication Number Publication Date
CN109719839A CN109719839A (en) 2019-05-07
CN109719839B true CN109719839B (en) 2021-04-06

Family

ID=66299764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910044001.9A Active CN109719839B (en) 2019-01-17 2019-01-17 Cement prefabricated part slip casting ware for railway

Country Status (1)

Country Link
CN (1) CN109719839B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110373981B (en) * 2019-06-19 2021-08-03 浙江今安新材料科技有限公司 Cement mortar patching device is used in construction
CN117325282B (en) * 2023-11-30 2024-03-12 山西一建集团有限公司 Bearing wall pouring forming device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205063355U (en) * 2015-09-16 2016-03-02 中国建筑材料工业地质勘查中心江苏总队 Novel concrete pour fast device
CN206110677U (en) * 2016-09-30 2017-04-19 杨晨 Concrete placement machine that can long -range wireless control
CN106985279A (en) * 2017-05-20 2017-07-28 赵沅飞 A kind of high-effective concrete stirs casting machine
CN206913424U (en) * 2017-06-16 2018-01-23 陈威 A kind of hydraulic engineering conveying arrangement capable of stirring
CN208072903U (en) * 2018-03-08 2018-11-09 中国建筑一局(集团)有限公司 Equipment is paved in a kind of stirring of finishing concrete
CN207974538U (en) * 2018-03-20 2018-10-16 张俊 A kind of concrete construction vibrating device
CN208219364U (en) * 2018-03-30 2018-12-11 刘慧� A kind of way of concrete foundations construction device

Also Published As

Publication number Publication date
CN109719839A (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN109719839B (en) Cement prefabricated part slip casting ware for railway
CN112275392B (en) Construction waste collecting and transporting equipment and transporting method thereof
CN111591780B (en) Loading mechanism is built in room
CN112356282A (en) Concrete mixing device of convenient control
CN112044853A (en) Waste steel bar recycling and cleaning device
CN111994531B (en) Multifunctional electric sanitation truck convenient to use
CN209601663U (en) A kind of husky equipment of dress for building
CN112726467B (en) Efficient energy-saving environment-friendly road garbage cleaning device
CN111214977A (en) Construction cement transport vehicle for preventing cement from solidifying
CN115382452A (en) High-aluminum castable batching method and batching system
CN207330010U (en) Twisted and released of the cable line and surface cleaning integrated apparatus
CN112220408A (en) Automatic garbage collecting and dumping and floor cleaning equipment suitable for train
CN214421382U (en) Civil engineering house building waste treatment device
CN208497330U (en) The feeding device of gypsum hollow board assembly line
CN209482282U (en) A kind of collection device of water conservancy river floating refuse
CN213448256U (en) Sweeper for road construction
CN215822990U (en) Mixer discharging device for diamond saw blade production
CN111877248A (en) Sand screening equipment for cleaning rubbish on beach
CN117026876A (en) Energy-saving electric three-wheeled cleaning vehicle
CN114575400B (en) Automatic high-efficient pipe shaking machine with soil material conveying function
CN108925608A (en) A kind of birds meat Full-automatic variable-frequency vacuum tumbler
CN218986650U (en) Detachable car hopper for handcart
CN220848520U (en) Building rubbish clearing device in high-rise building construction floor
CN216878973U (en) Asphalt concrete transportation tank
CN220350736U (en) Road cleaning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210318

Address after: 223400 No.38 Yanhuang Avenue, Lianshui Economic Development Zone, Huai'an City, Jiangsu Province

Applicant after: HUAI'AN GESA DISPLAY PROPS Co.,Ltd.

Address before: No.1 Shiyanyuan, Nanhu District, Jiaxing City, Zhejiang Province 314000

Applicant before: Xu Qian

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A grouting device for cement prefabricated components used in Railway

Effective date of registration: 20220629

Granted publication date: 20210406

Pledgee: Bank of China Limited Lianshui Branch

Pledgor: HUAI'AN GESA DISPLAY PROPS Co.,Ltd.

Registration number: Y2022980009552

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230621

Granted publication date: 20210406

Pledgee: Bank of China Limited Lianshui Branch

Pledgor: HUAI'AN GESA DISPLAY PROPS Co.,Ltd.

Registration number: Y2022980009552