CN109707996A - A kind of station boiler installation oxygen belt, acetylene belt connecton layout - Google Patents

A kind of station boiler installation oxygen belt, acetylene belt connecton layout Download PDF

Info

Publication number
CN109707996A
CN109707996A CN201811582281.0A CN201811582281A CN109707996A CN 109707996 A CN109707996 A CN 109707996A CN 201811582281 A CN201811582281 A CN 201811582281A CN 109707996 A CN109707996 A CN 109707996A
Authority
CN
China
Prior art keywords
main
belt
oxygen
acetylene
main line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811582281.0A
Other languages
Chinese (zh)
Inventor
李育熙
张俭平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO Electric Power Construction Co Ltd
Original Assignee
SEPCO Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO Electric Power Construction Co Ltd filed Critical SEPCO Electric Power Construction Co Ltd
Priority to CN201811582281.0A priority Critical patent/CN109707996A/en
Publication of CN109707996A publication Critical patent/CN109707996A/en
Priority to PCT/CN2019/111893 priority patent/WO2020134398A1/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • F17D1/04Pipe-line systems for gases or vapours for distribution of gas
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of station boiler installation oxygen belts, acetylene belt connecton layout, by several main line components, several branch line components and several threeway parts assemble to be formed, main line component is identical with the structure of branch line component, the main structure of main line component and threeway part is square tubular structure, one end of main structure passes through flaring structure connecting interface, interface is square tubular structure, the length-width ratio of radial section of length-width ratio and main structure of the radial section of interface is equal, the radial section product of interface is greater than the radial section product of main structure, the other end of the main structure of main line component is a socket, the radial section of the socket of main line component and the radial section of main structure are identical, the other end of the main structure of threeway part is at least two sockets, angle between the every two socket of threeway part is all larger than 0 ° small In 180 °, the present invention is able to solve station boiler construction and arranges in disorder problem with oxygen-acetylene belt dispersing type mode.

Description

A kind of station boiler installation oxygen belt, acetylene belt connecton layout
Technical field
The present invention relates to a kind of station boiler installation oxygen belts, acetylene belt connecton layout.
Background technique
Here statement only provides background information related to the present invention, without necessarily constituting the prior art.
Station boiler is a kind of energy converter, it is thermal energy or other thermal energy using fuel combustion release by working-medium water Or the equipment that other fluids are heated to certain parameter.Station boiler volume, weight are huge, and components are various, can only be in manufactory Loose mail factory, transports to power station scene and carries out in-site installation.The on-site installation work amount of station boiler is very big, and heating surface weld bond is more Up to 40,000 to 80,000, and the needs such as platform staircase, cigarette air duct, steam-water pipe are installed simultaneously, are required to meet installation period, It generally takes furnace bottom, open up the construction method that multiple work surfaces are installed simultaneously in the middle part of furnace, after furnace roof and stokehold, furnace.It applies at scene In work, it is Metal Cutting, the main operational method of Baking out that oxygen-acetylene fire, which welds operation, is made extensively and largely With under normal circumstances, being will use in 600MW~1000MW station boiler daily construction to 20~40 sets of oxygen-acetylene fire and welded Tool, place to use is throughout entire boiler construction operation area.
Station boiler installation at present is generally used distributed arrangement with oxygen-acetylene fire welding tool, that is, is using oxygen The position (such as furnace bottom area, furnace roof region) of gas, the weldering operation of acetylene fire compared with concentration, regionality arrangement oxygen, acetylene cage, in cage Interior placement oxygen, acetylene gas bottle connect upper gas cylinder with oxygen, acetylene belt, manually pull belt to each construction operation place, into Row operation operation.Oxygen, acetylene cage can be arranged in formal boiler steel platform, without the position of suitable steel platform, be needed Temporary platform is set up with hack lever, frame plate.When oxygen, acetylene are finished, empty oxygen-acetylene cage is hung down with tower crane, then being full of Oxygen-acetylene cage is hung to deployment site;Or oxygen, acetylene are replaced by bottle by construction elevator with manpower.
Had using the defect that oxygen-acetylene fire welds installation station boiler:
(1) lack unified arrangement planning, oxygen, acetylene belt arrangement are in disorder, and construction personnel seeks conveniently sometimes, can be by skin From oxygen-acetylene cage, directly straight line is pulled to construction gas place to band in the sky, seriously affects civilized construction effect;
(2) the random drawing of the dispersed placement of oxygen-acetylene cage, oxygen-acetylene belt is set, and often from channel is blocked, is influenced Personnel are current;Or influence the lifting of equipment/component, installment work.
(3) it to prevent oxygen-acetylene belt from losing/being tampered, when going into operation daily, requires oxygen-acetylene belt from gas Bottle, which is drawn, to be set to construction gas place (according to construction needs, after being distributed across different level, stokehold furnace with gas place, the left furnace of furnace The different place such as right);When knocking off, then by belt from gas place withdraw, it is time-consuming and laborious.In addition, needing employment when gas cylinder is finished Power is replaced, and labor intensive is more;Crane handling is such as used, then occupies crane machine-team, influences crane service efficiency.
Summary of the invention
In order to solve the deficiencies in the prior art, it is an aspect of the present invention to provide a kind of station boiler installation oxygen skins Band, acetylene belt connecton layout, oxygen belt, acetylene belt can be fixed, and use to solve station boiler construction Oxygen-acetylene belt dispersing type mode is arranged in disorder, influences that civilized construction, influence personnel are current, influence equipment/component lifting, peace The problem of dress.
To achieve the goals above, the technical solution of the present invention is as follows:
A kind of station boiler installation oxygen belt, acetylene belt connecton layout, by several main line components, several branch line portions Part and several threeway parts assemble to be formed;
Main line component is identical with the structure of branch line component, and the main structure of main line component and threeway part is square tubular Structure, one end of the main structure is by flaring structure connecting interface, and the interface is square tubular structure, the interface The length-width ratio of radial section of length-width ratio and main structure of radial section is equal, and the radial section product of the interface is greater than main body The radial section product of structure, the other end of the main structure of main line component are a socket, and the radial direction of the socket of main line component is cut Face is identical as the radial section of main structure, and the other end of the main structure of threeway part is at least two sockets, threeway part Every two socket between angle be all larger than 0 ° less than 180 °;
The straight line tubular structure that several main line components are formed by the interface that the socket of main line component is plugged on main line component As main line, pass through several threeway parts of plug connection of interface and socket in main line, several branch line components pass through branch line component Socket be plugged on tubular structure that the interface of branch line component is formed as branch line, threeway part remains in the quantity and main line of branch line Remaining socket quantity is consistent, and each branch line passes through threeway part socket and the grafting of branch line unit interface is mounted on main line, Main line inner space forms wiring main line channel, and branch line inner space forms wiring branch line passage, and main line is connected to power station vertically On the column of boiler support.
Oxygen belt, acetylene belt can be laid in connecton layout, and be mounted on electricity by connecton layout by the present invention Stand on boiler support, be laid on station boiler bracket so that oxygen belt, acetylene belt are orderly, at the same for oxygen belt, It includes avoiding theft that acetylene belt, which provides shell,.If connecton layout is divided into dry part by the present invention, so that connecton layout installation letter Single, square tubular structure is arranged in each component, on the one hand can increase the contact area of connecton layout Yu station boiler bracket, guarantees Connecton layout is bonded comprehensively with the bracket of station boiler, so that the branch for being connected to station boiler that connecton layout is firm On frame;On the other hand, facilitate the connection of several sockets of threeway part.
Another aspect provides a kind of station boiler installation oxygen belts, acetylene belt wiring method, mention For above-mentioned connecton layout, several oxygen belts and several acetylene belts are drawn from oxygen station and acetylene generating station, by oxygen belt and second Alkynes belt is laid in the main line channel of the connecton layout, then by the branch line passage of the connecton layout by oxygen belt The construction installed with acetylene Belt Conveying to station boiler gas place.
The invention has the benefit that
1, the present invention is by the analysis to construction operation point, to oxygen, acetylene generating station and oxygen, acetylene belt wiring channel Arrangement, cabling carry out unified planning, neat appearance.
2, oxygen, acetylene belt arranged in channel, cabling, will not occur arbitrarily disorderly to draw phenomenon, will not be current to personnel It is impacted in place with equipment hoisting, installation.
3, wiring channel can be made using steel plate, firm reliable, oxygen, acetylene belt arrangement wherein, on the one hand It can prevent fires, is antitheft, on the other hand not needing to put when on and off duty, receive belt, construction personnel is facilitated to use, improving work effect Rate.
4, oxygen, acetylene belt arrangement reduce in channel and shine the influence to belt on open-air atmosphere leeward rain day, prolong Delay belt aging speed, extends service life.
5, oxygen, acetylene generating station can be arranged in zero meter of layer of boiler, when replacing air bottle, not need manually to pass through construction elevator It carries, or uses crane handling, replacement operation is light, easy, and saves a large amount of artificial and mechanical one-shifts.
6, wiring channel uses standarized component, is flexibly arranged, is assembled according to practice of construction situation at the scene, and its Surface is painted by derusting, long service life, so, wiring channel is suitable for entry and is repeatedly used in turn.
Detailed description of the invention
The Figure of description for constituting a part of this disclosure is used to provide further understanding of the disclosure, and the disclosure is shown Meaning property embodiment and its explanation do not constitute the improper restriction to the disclosure for explaining the disclosure.
Fig. 1 is the structural schematic diagram of connecton layout of the invention;
Fig. 2 serves as theme the structural schematic diagram of component;
Fig. 3 is the structural schematic diagram of branch line component;
Fig. 4 is the structural schematic diagram of threeway part;
The partial cross-sectional structural diagram of structure based on Fig. 5;
The radial section structural schematic diagram of structure based on Fig. 6;
Wherein, 1. main structure, 2. flaring structures, 3. interfaces, 4. sockets, 5. spacer bars, 6. fixed steel bars, 7. is main Line, 8. branch lines, 9. columns, 10. crossbeams, 11. wiring doors, 12. acetylene generating stations, 13. oxygen stations, 14. station boilers.
Specific embodiment
It is noted that described further below be all exemplary, it is intended to provide further instruction to the disclosure.Unless another It indicates, all technical and scientific terms used herein has usual with disclosure person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the disclosure.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As background technique is introduced, orderly cloth can not be carried out to oxygen belt, acetylene belt by existing in the prior art Belt caused by setting is in disorder, gas cylinder needs the deficiencies of lifting, and in order to solve technical problem as above, the present disclosure proposes a kind of electricity It stands boiler erection oxygen belt, acetylene belt connecton layout.
A kind of exemplary embodiment of the disclosure provides a kind of station boiler installation oxygen belt, acetylene belt cloth Line apparatus is assembled and is formed by several main line components, several branch line components and several threeway parts;
Main line component is identical with the structure of branch line component, and the main structure of main line component and threeway part is square tubular Structure, one end of the main structure is by flaring structure connecting interface, and the interface is square tubular structure, the interface The length-width ratio of radial section of length-width ratio and main structure of radial section is equal, and the radial section product of the interface is greater than main body The radial section product of structure, the other end of the main structure of main line component are a socket, and the radial direction of the socket of main line component is cut Face is identical as the radial section of main structure, and the other end of the main structure of threeway part is at least two sockets, threeway part Every two socket between angle be all larger than 0 ° less than 180 °;
The straight line tubular structure that several main line components are formed by the interface that the socket of main line component is plugged on main line component As main line, pass through several threeway parts of plug connection of interface and socket in main line, several branch line components pass through branch line component Socket be plugged on tubular structure that the interface of branch line component is formed as branch line, threeway part remains in the quantity and main line of branch line Remaining socket quantity is consistent, and each branch line passes through threeway part socket and the grafting of branch line unit interface is mounted on main line, Main line inner space forms wiring main line channel, and branch line inner space forms wiring branch line passage, and main line is connected to power station vertically On the column of boiler support.
Oxygen belt, acetylene belt can be laid in connecton layout, and be mounted on electricity by connecton layout by the disclosure Stand on boiler support, be laid on station boiler bracket so that oxygen belt, acetylene belt are orderly, at the same for oxygen belt, It includes avoiding theft that acetylene belt, which provides shell,.If connecton layout is divided into dry part by the disclosure, so that connecton layout installation letter Single, square tubular structure is arranged in each component, on the one hand can increase the contact area of connecton layout Yu station boiler bracket, guarantees Connecton layout is bonded comprehensively with the bracket of station boiler, so that the branch for being connected to station boiler that connecton layout is firm On frame;On the other hand, facilitate the connection of several sockets of threeway part.The size of main line component and branch line component can be identical, It can be different.
In order to facilitate the laying of oxygen belt, acetylene belt, in one or more embodiments of the embodiment, main line part Wiring door is equipped in the main structure of part and branch line component, the wiring door is flexibly connected in the wiring mouth of main structure.Institute Stating flexible connection can be grafting, pivot joint etc..Wiring door is plugged to integrally to be plugged in wiring mouth.Pivot joint is wiring mouth and wiring Door is equipped with the pivoted linkage of cooperation, so that wiring door carries out opening closure in wiring mouth.
Due to needing to be sent to oxygen belt, acetylene belt to each construction point by branch line passage, so in main line channel Oxygen belt, acetylene belt after branch line passage can less a part, in order to reduce cost, one kind of the embodiment or In various embodiments, all sockets of threeway part are drawn from the other end of threeway part, and the radial section of all sockets is wide It spends and is equal with the radial section width of the main structure of threeway part, the sum of radial section length of all sockets and threeway portion The radial section equal length of the main structure of part.It can guarantee that oxygen belt, acetylene belt orderly pass through branch line passage and carry out It lays.
In one or more embodiments of the embodiment, branch line is connected on the crossbeam of station boiler bracket.It can make cloth Line apparatus is more stable to be connected on station boiler bracket.
In one or more embodiments of the embodiment, the angle between threeway part every two socket is 90 °.It is convenient The fixation of branch line.
In one or more embodiments of the embodiment, the socket of threeway part is two.
In one or more embodiments of the embodiment, acetylene generating station and oxygen station are installed in close to station boiler bracket Ground.The acetylene generating station is the container for holding acetylene cylinder, its purpose is that installation station boiler provides acetylene gas.The oxygen station For the container for holding oxygen cylinder, its purpose is that installation station boiler provides oxygen.
In order to which oxygen belt, acetylene belt are fixed in connecton layout, one or more embodiments of the embodiment In, the concrete-bar component for supporting oxygen belt and acetylene belt, the concrete-bar component packet are equipped in main line component and branch line component Spacer bar and fixed steel bars are included, fixed steel bars are cyclic structure, and spacer bar is connected to the inner wall of main structure, fixed steel bars Connect with spacer bar, fixed steel bars and main structure it is axially vertical.Oxygen belt, acetylene belt are fixed on by binding strap In fixed steel bars, oxygen belt, acetylene belt are fixed in connecton layout to realize.
In one or more embodiments of the embodiment, corner piece, corner piece and branch line component are equipped in branch line Structure it is identical, difference is: corner piece main line component be tubular structure, and the interface direction of corner piece main line component with The angle in socket direction is 90 °.
Present disclose provides another embodiment, a kind of station boiler installation oxygen belt, acetylene belt are provided Wiring method provides above-mentioned connecton layout, several oxygen belts and several acetylene belts is drawn from oxygen station and acetylene generating station, by oxygen Gas belt and acetylene belt are laid in the main line channel of the connecton layout, then pass through the branch line passage of the connecton layout The construction gas place that oxygen belt and acetylene Belt Conveying to station boiler are installed.
In one or more embodiments of the embodiment, use binding strap by oxygen skin by wiring door every 4~8m Band, acetylene belt are fixed in fixed steel bars.
In one or more embodiments of the embodiment, every road oxygen belt, acetylene belt are numbered, and to every Gas cylinder, the construction point belt outlet side of road belt connection are numbered with identical number.Guarantee the correctness of replacement gas cylinder.
In order to enable those skilled in the art can clearly understand the technical solution of the disclosure, below with reference to tool The technical solution of the disclosure is described in detail in the embodiment of body.
Embodiment
A kind of station boiler installation oxygen belt, acetylene belt connecton layout, by several main line components, several branch line portions Part and several threeway parts assemble to be formed.Main line component, branch line component and threeway part use 3mm thick steel plate welding production and At outer surface carries out derusting by sandblasting, and brushing antirust paint.
Main line component is identical with the structure of branch line component, and the main structure 1 of main line component and threeway part is square tube Shape structure, by 2 connecting interface 3 of flaring structure, interface 3 is square tubular structure, the radial direction of interface 3 for one end of main structure 1 The length-width ratio in section is equal with the length-width ratio of the radial section of main structure 1, and the radial section product of interface 3 is greater than main structure 1 Radial section product, the other end of the main structure 1 of main line component is a socket 4, the radial section of the socket 4 of main line component Identical as the radial section of main structure 1, the other end of the main structure 1 of threeway part is two sockets 4, the two of threeway part 90 ° of angle between a socket 4.
Main line component width specifications are 40~100cm, and branch line component width specification is 20~30cm;Main line component, branch line The every section length of component is 200~600cm.
The concrete-bar component for supporting oxygen belt and acetylene belt, concrete-bar component packet are equipped in main line component and branch line component Spacer bar 5 and fixed steel bars 6 are included, fixed steel bars 6 are cyclic structure, and spacer bar 5 is connected to the inner wall of main structure 1, Gu Determine reinforcing bar 6 to connect with spacer bar 5, fixed steel bars 6 are axially vertical with main structure 1.
The straight line tubular knot that several main line components are formed by the interface 3 that the socket 4 of main line component is plugged on main line component Structure passes through several threeway parts of plug connection of interface 3 and socket 4 as main line 7 in main line 7, several branch line components pass through branch The tubular structure that the interface 3 that the socket 4 of line component is plugged on branch line component is formed is as branch line 8, in the quantity and main line of branch line 8 The remaining socket quantity of threeway part is consistent, and each branch line 8 passes through the grafting of threeway part socket 4 and branch line unit interface 3 It is mounted on main line 7,7 inner space of main line forms wiring main line channel, and 8 inner space of branch line forms wiring branch line passage, main Line 7 is connected to vertically on the column 9 of 14 bracket of station boiler, and branch line 8 connects on the crossbeam 10 of 14 bracket of station boiler.
Wiring door 11 is equipped in the main structure 1 of main line component and branch line component, wiring door 11 is articulated in main structure 1 Wiring mouth in.
Two sockets 4 of threeway part from the other end of threeway part draw, the radial section width of two sockets 4 with The radial section width of the main structure 1 of threeway part is equal, the sum of radial section length of two sockets 4 and threeway part Main structure 1 radial section equal length.
Corner piece is equipped in branch line 8, corner piece is identical as the structure of branch line component, and difference is: corner piece master Line component is tubular structure, and the angle in the interface direction of corner piece main line component and socket direction is 90 °.
Acetylene generating station 12 and oxygen station 13 are installed in close to the ground of 14 bracket of station boiler.
Oxygen belt, the wiring of acetylene belt are as follows:
1, suitable position (close to boiler steel frame column) arrangement by consulting associated construction drawing, near boiler body Oxygen station and acetylene generating station, stand in can according to construction gas consumption arrange 30~50 bottles of oxygen, acetylene gas.Oxygen station and acetylene generating station Between arrangement distance meet associated safety regulation regulation.
2, lead-out wiring channel is distinguished from oxygen, acetylene generating station, wiring channel main line, main line are being synthesized at steel frame column Channel is arranged from the bottom up along steel frame column, according to the Specific construction distribution in gas place, at suitable position (absolute altitude), After separating branch line passage to stokehold, furnace from main line channel, furnace is left, furnace is right etc. respectively with gas point.It is welded by channel steel bracket in channel It is fixed on column, on crossbeam.
3, in wiring channel, oxygen, acetylene belt are installed, lower end is connected to oxygen, the oxygen in acetylene generating station, acetylene Bottle, upper end is led to each construction gas place as needed.Construction personnel is by wiring door, oxygen, the acetylene belt in channel It is fixed in the belt fixed steel bars in channel every suitable distance (4m~8m) with binding strap.
4, every road oxygen, acetylene belt are numbered, the lower end being connect with gas cylinder, are numbered with construction with the upper end of gas point Identical number, it is correct to guarantee when replacing gas cylinder.
5, it according to the air bottle situation in oxygen, acetylene generating station, replaces in due course, supplement new gas cylinder, guarantee oxygen, acetylene at any time With gas abundance.
The foregoing is merely preferred embodiment of the present disclosure, are not limited to the disclosure, for the skill of this field For art personnel, the disclosure can have various modifications and variations.It is all within the spirit and principle of the disclosure, it is made any to repair Change, equivalent replacement, improvement etc., should be included within the protection scope of the disclosure.

Claims (10)

1. a kind of station boiler installation oxygen belt, acetylene belt connecton layout, characterized in that if by several main line components, Heavenly Stems and Earthly Branches line component and several threeway parts assemble to be formed;
Main line component is identical with the structure of branch line component, and the main structure of main line component and threeway part is square tubular knot Structure, by flaring structure connecting interface, the interface is square tubular structure, the diameter of the interface for one end of the main structure The length-width ratio of radial section of length-width ratio and main structure to section is equal, and the radial section product of the interface is greater than main body knot The radial section product of structure, the other end of the main structure of main line component are a socket, the radial section of the socket of main line component Identical as the radial section of main structure, the other end of the main structure of threeway part is at least two sockets, threeway part Angle between every two socket is all larger than 0 ° less than 180 °;
The straight line tubular structure conduct that several main line components are formed by the interface that the socket of main line component is plugged on main line component Main line, passes through several threeway parts of plug connection of interface and socket in main line, and several branch line components are inserted by branch line component The tubular structure that the interface that mouth is plugged on branch line component is formed is as branch line, and threeway part is remaining in the quantity and main line of branch line Socket quantity is consistent, and each branch line passes through threeway part socket and the grafting of branch line unit interface is mounted on main line, main line Inner space forms wiring main line channel, and branch line inner space forms wiring branch line passage, and main line is connected to station boiler vertically On the column of bracket.
2. connecton layout as described in claim 1, characterized in that be equipped in the main structure of main line component and branch line component It is routed door, the wiring door is flexibly connected in the wiring mouth of main structure.
3. connecton layout as described in claim 1, characterized in that all sockets of threeway part are from the another of threeway part End is drawn, and the radial section width of the main structure of the radial section width and threeway part of all sockets is equal, all to insert Radial section equal length of the sum of the radial section length of mouth with the main structure of threeway part.
4. connecton layout as described in claim 1, characterized in that branch line connects on the crossbeam of station boiler bracket.
5. connecton layout as described in claim 1, characterized in that the angle between threeway part every two socket is 90 °.
6. connecton layout as described in claim 1, characterized in that be equipped in main line component and branch line component and support oxygen skin The concrete-bar component of band and acetylene belt, the concrete-bar component include spacer bar and fixed steel bars, and fixed steel bars are cyclic structure, Spacer bar is connected to the inner wall of main structure, and fixed steel bars are connect with spacer bar, the axial direction of fixed steel bars and main structure Vertically.
7. connecton layout as described in claim 1, characterized in that be equipped with corner piece, corner piece and branch line portion in branch line The structure of part is identical, and difference is: corner piece main line component is tubular structure, and the interface direction of corner piece main line component Angle with socket direction is 90 °.
8. a kind of station boiler installation oxygen belt, acetylene belt wiring method, characterized in that provide claim 1~7 times Connecton layout described in one draws several oxygen belts and several acetylene belts from oxygen station and acetylene generating station, by oxygen belt and Acetylene belt is laid in the main line channel of the connecton layout, then by the branch line passage of the connecton layout by oxygen skin The construction gas place that band and acetylene Belt Conveying to station boiler are installed.
9. wiring method as claimed in claim 8, characterized in that use binding strap by oxygen by wiring door every 4~8m Belt, acetylene belt are fixed in fixed steel bars.
10. wiring method as claimed in claim 8, characterized in that every road oxygen belt, acetylene belt are numbered, and Identical number is numbered with to gas cylinder, the construction point belt outlet side of the connection of every road belt.
CN201811582281.0A 2018-12-24 2018-12-24 A kind of station boiler installation oxygen belt, acetylene belt connecton layout Pending CN109707996A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811582281.0A CN109707996A (en) 2018-12-24 2018-12-24 A kind of station boiler installation oxygen belt, acetylene belt connecton layout
PCT/CN2019/111893 WO2020134398A1 (en) 2018-12-24 2019-10-18 Wiring device for oxygen belts and acetylene belts for installation of power station boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811582281.0A CN109707996A (en) 2018-12-24 2018-12-24 A kind of station boiler installation oxygen belt, acetylene belt connecton layout

Publications (1)

Publication Number Publication Date
CN109707996A true CN109707996A (en) 2019-05-03

Family

ID=66256187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811582281.0A Pending CN109707996A (en) 2018-12-24 2018-12-24 A kind of station boiler installation oxygen belt, acetylene belt connecton layout

Country Status (2)

Country Link
CN (1) CN109707996A (en)
WO (1) WO2020134398A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020134398A1 (en) * 2018-12-24 2020-07-02 中国电建集团山东电力建设第一工程有限公司 Wiring device for oxygen belts and acetylene belts for installation of power station boiler

Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8132004U1 (en) * 1981-11-03 1982-02-25 Rienks, Gerd, 5630 Remscheid Flexible shaft
US6037543A (en) * 1994-11-17 2000-03-14 Panduit Corp. Wiring duct fittings
JP2001258141A (en) * 2000-03-09 2001-09-21 Okinawa Electric Power Co Ltd Protective tube for submarine cable
US6395974B1 (en) * 1996-12-04 2002-05-28 Sat (Societe Anonyme De Telecommunications) Protective pipe element for sheathed cable for controlling the integrity of the sheath
CN1409452A (en) * 2001-09-06 2003-04-09 株式会社椿本链索 Protective guide device for cable
JP2003290380A (en) * 2002-03-29 2003-10-14 Nohmi Bosai Ltd Water filling type fire extinguishing equipment and preservation method for fire extinguishing piping of water filling type fire extinguishing equipment
JP2005287269A (en) * 2004-03-31 2005-10-13 Honda Motor Co Ltd Linear member protecting tube
CN1762811A (en) * 2005-09-07 2006-04-26 贵阳铝镁设计研究院 Combined workshop collocation method using delivery belt corridor as link
EP1850050A2 (en) * 2006-04-26 2007-10-31 Friedrich Bürcher Ducting element for a duct to carry flow media, cables and similar
US20080217487A1 (en) * 2004-01-23 2008-09-11 O'rourke James D Monolithic Enclosed Cable Carrier
CN101680510A (en) * 2007-04-13 2010-03-24 Igus有限公司 Side wall segment for a cable guide device, cable guide device having a side wall segment, and method for producing the side wall segment
EP2458234A2 (en) * 2010-11-30 2012-05-30 Yuan-Hung Wen Cable sheath
CN202521222U (en) * 2012-03-16 2012-11-07 中国十七冶集团有限公司 Central gas supply device for multilayer steel structure frame construction
KR20130001521U (en) * 2011-08-26 2013-03-06 현대중공업 주식회사 Potable Coupler Device for Gas Distribution
KR20130005220U (en) * 2012-02-24 2013-09-03 주식회사 한국고무산업 Rubber hose for suppying gas
CN203454182U (en) * 2013-08-23 2014-02-26 山西省工业设备安装有限公司 Central gas supply system of boiler
CN203463941U (en) * 2013-08-19 2014-03-05 中石化第五建设有限公司 Boiler installation central gas supply device
CN204254269U (en) * 2014-10-26 2015-04-08 中国兵器工业集团第五五研究所 Oxygen infusion control gear
CN204284795U (en) * 2014-11-25 2015-04-22 沈阳东软医疗系统有限公司 A kind of structure preventing hose surface from wearing and tearing
CN205781446U (en) * 2016-05-26 2016-12-07 南安市永腾技术咨询有限公司 A kind of spliced protection pipe box
CN206409894U (en) * 2017-01-23 2017-08-15 西南交通大学 Welding protection gas concentrates mixed gas supply system
CN107158529A (en) * 2017-05-27 2017-09-15 重庆智阖康医疗器械有限公司 A kind of multiple terminals independently exports central gas supply system and method
CN206754806U (en) * 2017-03-16 2017-12-15 南通天源气体有限公司 A kind of acetylene cylinder air supply system
US20170363229A1 (en) * 2014-09-18 2017-12-21 Igus Gmbh Line guide device, in particular for clean room applications, shell portions and support rib structure for same
CN108870084A (en) * 2018-08-10 2018-11-23 宁波奉天海供氧净化成套设备有限公司 A kind of liquid oxygen intelligent control air supply system and its installation method
CN209762722U (en) * 2018-12-24 2019-12-10 中国电建集团山东电力建设第一工程有限公司 Oxygen belt and acetylene belt wiring device for power station boiler installation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707996A (en) * 2018-12-24 2019-05-03 中国电建集团山东电力建设第一工程有限公司 A kind of station boiler installation oxygen belt, acetylene belt connecton layout

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8132004U1 (en) * 1981-11-03 1982-02-25 Rienks, Gerd, 5630 Remscheid Flexible shaft
US6037543A (en) * 1994-11-17 2000-03-14 Panduit Corp. Wiring duct fittings
US6395974B1 (en) * 1996-12-04 2002-05-28 Sat (Societe Anonyme De Telecommunications) Protective pipe element for sheathed cable for controlling the integrity of the sheath
JP2001258141A (en) * 2000-03-09 2001-09-21 Okinawa Electric Power Co Ltd Protective tube for submarine cable
CN1409452A (en) * 2001-09-06 2003-04-09 株式会社椿本链索 Protective guide device for cable
JP2003290380A (en) * 2002-03-29 2003-10-14 Nohmi Bosai Ltd Water filling type fire extinguishing equipment and preservation method for fire extinguishing piping of water filling type fire extinguishing equipment
US20080217487A1 (en) * 2004-01-23 2008-09-11 O'rourke James D Monolithic Enclosed Cable Carrier
JP2005287269A (en) * 2004-03-31 2005-10-13 Honda Motor Co Ltd Linear member protecting tube
CN1762811A (en) * 2005-09-07 2006-04-26 贵阳铝镁设计研究院 Combined workshop collocation method using delivery belt corridor as link
EP1850050A2 (en) * 2006-04-26 2007-10-31 Friedrich Bürcher Ducting element for a duct to carry flow media, cables and similar
CN101680510A (en) * 2007-04-13 2010-03-24 Igus有限公司 Side wall segment for a cable guide device, cable guide device having a side wall segment, and method for producing the side wall segment
EP2458234A2 (en) * 2010-11-30 2012-05-30 Yuan-Hung Wen Cable sheath
KR20130001521U (en) * 2011-08-26 2013-03-06 현대중공업 주식회사 Potable Coupler Device for Gas Distribution
KR20130005220U (en) * 2012-02-24 2013-09-03 주식회사 한국고무산업 Rubber hose for suppying gas
CN202521222U (en) * 2012-03-16 2012-11-07 中国十七冶集团有限公司 Central gas supply device for multilayer steel structure frame construction
CN203463941U (en) * 2013-08-19 2014-03-05 中石化第五建设有限公司 Boiler installation central gas supply device
CN203454182U (en) * 2013-08-23 2014-02-26 山西省工业设备安装有限公司 Central gas supply system of boiler
US20170363229A1 (en) * 2014-09-18 2017-12-21 Igus Gmbh Line guide device, in particular for clean room applications, shell portions and support rib structure for same
CN204254269U (en) * 2014-10-26 2015-04-08 中国兵器工业集团第五五研究所 Oxygen infusion control gear
CN204284795U (en) * 2014-11-25 2015-04-22 沈阳东软医疗系统有限公司 A kind of structure preventing hose surface from wearing and tearing
CN205781446U (en) * 2016-05-26 2016-12-07 南安市永腾技术咨询有限公司 A kind of spliced protection pipe box
CN206409894U (en) * 2017-01-23 2017-08-15 西南交通大学 Welding protection gas concentrates mixed gas supply system
CN206754806U (en) * 2017-03-16 2017-12-15 南通天源气体有限公司 A kind of acetylene cylinder air supply system
CN107158529A (en) * 2017-05-27 2017-09-15 重庆智阖康医疗器械有限公司 A kind of multiple terminals independently exports central gas supply system and method
CN108870084A (en) * 2018-08-10 2018-11-23 宁波奉天海供氧净化成套设备有限公司 A kind of liquid oxygen intelligent control air supply system and its installation method
CN209762722U (en) * 2018-12-24 2019-12-10 中国电建集团山东电力建设第一工程有限公司 Oxygen belt and acetylene belt wiring device for power station boiler installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020134398A1 (en) * 2018-12-24 2020-07-02 中国电建集团山东电力建设第一工程有限公司 Wiring device for oxygen belts and acetylene belts for installation of power station boiler

Also Published As

Publication number Publication date
WO2020134398A1 (en) 2020-07-02

Similar Documents

Publication Publication Date Title
CN103971576B (en) A kind of subway station key binding sites Fire Smoke Control simulation experiment platform
CN110440429B (en) Subway arched roof ventilating pipeline assembling construction method
CN206450371U (en) A kind of water pouring test equipment
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN103878870A (en) Special automatic oil spraying device for aerated concrete block mold
CN112681714A (en) Construction method of steel wire rope lengthened rear support type hanging basket
CN109707996A (en) A kind of station boiler installation oxygen belt, acetylene belt connecton layout
CN205207933U (en) Combined flexible telescopic air duct
CN101382565B (en) Extra-high voltage corona cage for researching corona characteristic of conductor
CN107476439A (en) A kind of retractable flexible encapsulated net canopy of new large span
CN101721862B (en) Meta-synthesis construction method of 600MW unit bag-type dust remover
CN206874963U (en) A kind of Multifunctional cable bridge
CN101928579A (en) Installing method of dry quenching fire automatic alarm system
CN209762722U (en) Oxygen belt and acetylene belt wiring device for power station boiler installation
CN210486028U (en) Static pressure box structure below grandstand ladder
CN207422541U (en) A kind of underground garage air exhausting device
CN206770787U (en) A kind of rolling support of pipe network internal pipeline installation
CN201304644Y (en) Gantry type tool assembly dolly
CN205574235U (en) Bulk freighter wing tank section construction stores pylon
CN106907698B (en) High temperature reheater pipe arranges construction method for hanging
CN116002581A (en) Equipment experiment platform on post
CN205055716U (en) Spout frame from rotating big gyration spraying dust fall
CN103927839B (en) The assembling and disassembling device of a kind of detector for fire alarm system and method
CN113566021B (en) Construction method for suspended-ceiling-free comprehensive pipeline at entrance and exit of subway station
CN208552900U (en) A kind of escape truck ventilation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination