CN116002581A - Equipment experiment platform on post - Google Patents

Equipment experiment platform on post Download PDF

Info

Publication number
CN116002581A
CN116002581A CN202211048642.XA CN202211048642A CN116002581A CN 116002581 A CN116002581 A CN 116002581A CN 202211048642 A CN202211048642 A CN 202211048642A CN 116002581 A CN116002581 A CN 116002581A
Authority
CN
China
Prior art keywords
air bag
equipment
hoop support
column
folding air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211048642.XA
Other languages
Chinese (zh)
Inventor
刘飞
杨欢红
方鸣
王永晴
江成
沈晨
金浩
谢嘉城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Power University
State Grid Shanghai Electric Power Co Ltd
Original Assignee
Shanghai Electric Power University
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power University, State Grid Shanghai Electric Power Co Ltd filed Critical Shanghai Electric Power University
Priority to CN202211048642.XA priority Critical patent/CN116002581A/en
Publication of CN116002581A publication Critical patent/CN116002581A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention relates to an experimental platform of on-column equipment, which comprises a lower hoop support, a folding air bag, an air compressor, an upper hoop support and a sleeve; the lower hoop support is provided with an annular clamping hoop matched with the outer diameter of the electric pole, the inner diameter of the sleeve is matched with the outer diameter of the electric pole, and the sleeve is connected with the upper hoop support; one end of the folding air bag is connected with the lower hoop support, the other end of the folding air bag is connected with the upper hoop support, and the air compressor is connected with the air inlet of the folding air bag. Compared with the prior art, the invention has the advantages of convenient operation, high operation efficiency, high safety and the like.

Description

Equipment experiment platform on post
Technical Field
The invention relates to the field of electric power operation, in particular to an experimental platform for on-column equipment.
Background
In the distribution lines of outdoor severe terrain, intelligent equipment such as a pole-mounted circuit breaker and the like is adopted, faults can be effectively self-healed, the running reliability of a power grid is improved, however, in the outdoor severe terrain, the pole-mounted circuit breaker is very troublesome to overhaul, maintain and debug, is also power equipment with higher integration level, and integrates secondary equipment such as analog quantity acquisition, relay protection, circuit breaker arc extinguishing mechanisms and the like, so that the test of the pole-mounted circuit breaker has a plurality of new requirements.
Because the on-pole circuit breakers are dispersedly arranged on branch poles of each distribution network, the experiment difficulty of the characteristics of the on-pole circuit breakers is relatively high, particularly the test of the tripping characteristic and the relay protection action characteristic of the circuit breakers is very troublesome on site, general secondary professionals do not have the pole climbing high-altitude operation capability, and maintenance personnel with the high-altitude operation capability have professional knowledge of not having secondary control protection equipment, so that the on-site detection of the on-pole circuit breakers needs multiple kinds of cooperation, the operation efficiency is very low, the number of the on-pole circuit breakers is very high, and a plurality of power supply departments often cannot check all the circuit breakers in a jurisdiction on schedule, thereby causing hidden danger to the future operation.
The utility model discloses a pole in many fields or the abominable topography such as pond, because the arm car can't be close to the construction of elevating, often has to adopt the manual platform of ascending a height of manpower chain block, climbs along the pole, realizes the pole operation of ascending a height of certain degree, however manpower chain block wastes time and energy, and production efficiency is very low.
Therefore, at present, the inspection of the pole-mounted circuit breaker still has multi-work type cooperation operation, low operation efficiency and troublesome operation, and workers in bad terrains can only use the chain block to ascend a height, so that the production efficiency is low, and time and labor are wasted.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide an experimental platform for equipment on a column.
The aim of the invention can be achieved by the following technical scheme:
an experimental platform for on-column equipment comprises a lower hoop support, a folding air bag, an air compressor, an upper hoop support and a sleeve;
the lower hoop support is provided with an annular clamping hoop matched with the outer diameter of the electric pole, the inner diameter of the sleeve is matched with the outer diameter of the electric pole, and the sleeve is connected with the upper hoop support;
one end of the folding air bag is connected with the lower hoop support, the other end of the folding air bag is connected with the upper hoop support, and the air compressor is connected with the air inlet of the folding air bag.
Preferably, a workbench is arranged on one side of the upper hoop support opposite to the side where the upper hoop support is connected with the folding air bag, and comprises a controller which is in communication connection with an air compressor.
Preferably, the workbench further comprises a lighting device.
Preferably, the on-column equipment experiment platform further comprises an expansion turbine and a generator, wherein the expansion turbine and the generator are both fixed on one side of the upper hoop support opposite to the side where the folding air bag is connected, an air source inlet of the expansion turbine is connected with an air outlet of the folding air bag, and a power output shaft of the expansion turbine is connected with a rotating shaft of the generator.
Preferably, an air source outlet of the expansion turbine is connected with a turbine exhaust pipe.
Preferably, a safety protection facility is arranged on one side of the upper hoop support opposite to the connecting folding air bag.
Preferably, the safety protection device comprises a safety seat.
Preferably, the exhaust port of the steam turbine exhaust pipe (8) faces the direction of the safety seat.
Preferably, the power output end of the generator is connected with a power strip.
Compared with the prior art, the invention has the following advantages:
(1) According to the invention, the foldable air bag and the hoop support provide a working platform capable of lifting for workers, so that the trouble of debugging and overhauling secondary control equipment by multi-variety cooperation is avoided, the operation is simple and convenient, and the working efficiency is greatly improved.
(2) The crawler belt rollers are arranged below the lower hoop support, so that the device can be used in severe environments, and the inefficiency and inconvenience of aloft work of the devices such as a hand-pulling hoist are avoided.
(3) The working platform on the upper hoop support is provided with an independent power supply, so that the use of some high-power electric tools or intelligent meters is possible, and lighting tools can be installed, thereby improving the efficiency of night work.
(4) According to the invention, the exhaust port of the exhaust pipe of the steam turbine faces the direction of the safety seat, so that summer heat is reduced for workers, and the safety of the workers working aloft on hot days is further protected.
Drawings
Fig. 1 is a schematic structural diagram of an experimental platform for on-column equipment according to an embodiment of the present invention;
in the figure, 1, lower anchor ear support, 2, sleeve, 3, folding gasbag, 4, air compressor, 5, go up anchor ear support, 6, safety seat, 7, expansion turbine, 8, steam turbine blast pipe, 9, generator, 10, power row of inserting, 11, workstation, 12, track gyro wheel.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention. The components of the embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the invention, as presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures.
In the description of the present invention, it should be noted that, directions or positional relationships indicated by terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are directions or positional relationships based on those shown in the drawings, or are directions or positional relationships conventionally put in use of the inventive product, are merely for convenience of describing the present invention and simplifying the description, and are not indicative or implying that the apparatus or element to be referred to must have a specific direction, be constructed and operated in a specific direction, and thus should not be construed as limiting the present invention.
It should be noted that the terms "first," "second," and "second" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implying a number of technical features being indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present application, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
Furthermore, the terms "horizontal," "vertical," and the like do not denote a requirement that the component be absolutely horizontal or overhang, but rather may be slightly inclined. As "horizontal" merely means that its direction is more horizontal than "vertical", and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.
Example 1
As shown in fig. 1, the experimental platform for the on-column equipment comprises a lower hoop bracket 1, a folding air bag 3, an air compressor 4, an upper hoop bracket 5 and a sleeve 2;
the lower hoop support 1 is provided with an annular clamping hoop matched with the outer diameter of the electric pole, the inner diameter size of the sleeve 2 is matched with the outer diameter size of the electric pole, and the sleeve 2 is connected with the upper hoop support 5;
one end of the folding air bag 3 is connected with the lower hoop support 1, the other end is connected with the upper hoop support 5, and the air compressor 4 is connected with the air inlet of the folding air bag 3.
Working principle: during operation, the whole device is moved to an operation position, the bottom of an electric pole is clamped and fixed by the lower hoop support 1 through the annular clamping hoops, the upper hoop support 5 is in sliding connection with the electric pole through the sleeve 2, and a worker is positioned on the upper hoop support 5;
the air compressor 4 is used for inflating the folding air bag 3, the folding air bag 3 is inflated and stretched, the upper hoop support 5 is pushed to move upwards along the electric pole through the sleeve 2, after the air compressor 4 reaches a working area, the air compressor 4 stops inflating the folding air bag 3, the upper hoop support 5 stops moving, and workers start working;
after the operation is finished, the folding air bag 3 is exhausted through the exhaust port, the folding air bag 3 is contracted, the upper hoop support 5 moves downwards along the electric pole through the sleeve 2 due to gravity, the operation reaches an initial state, the exhaust is stopped, and the staff returns to the ground to finish the operation.
According to the invention, the lower hoop support 1 is used for fixing the electric pole, the upper hoop support 5 is in sliding connection with the electric pole, the upper hoop support 5 is enabled to move up and down along the electric pole by utilizing the folding air bag 3, so that the working personnel can realize high-altitude operation, the trouble and low efficiency of multi-species collaborative operation are avoided, and secondary professional personnel directly carry out debugging and maintenance on secondary control protection equipment, so that the operation is convenient and efficient.
As a preferred embodiment, as shown in fig. 1, a track roller 12 is installed at the side of the lower anchor bracket 1 opposite to the connection folding air bag 3, and even for some bad terrains, the equipment test platform can be pulled to the working area by the track roller 12.
The upper hoop support 5 is provided with a workbench 11 on the side opposite to the side connected with the folding air bag 3, and the workbench 11 comprises a controller which is connected with the air compressor 4 in a communication manner, so that a worker can conveniently and completely control the lifting action of the workbench on the workbench. The table 11 further comprises lighting devices.
The on-column equipment experimental platform further comprises an expansion turbine 7 and a generator 9, wherein the expansion turbine 7 and the generator 9 are both fixed on one side of the upper hoop support 5 opposite to the side, which is connected with the folding air bag 3, of the upper hoop support, an air source inlet of the expansion turbine 7 is connected with an air outlet of the folding air bag 3, and a power output shaft of the expansion turbine 7 is connected with a rotating shaft of the generator 9.
The gas source outlet of the expansion turbine 7 is connected with a turbine exhaust pipe 8.
The side of the upper hoop support 5 opposite to the connecting folding air bag 3 is provided with a safety protection facility. The safety seat 6 realizes the safety protection of the working personnel.
The exhaust port of the turbine exhaust pipe 8 is directed toward the safety seat 6. The power output end of the generator 9 is connected with a power strip 10.
The working steps are as follows:
1) The device comprises a lower hoop support 1, a lower hoop support 2, a sleeve 2, a pole sliding connection, a crawler roller 12, a pole-mounted equipment test platform, a working area, a working staff, a pole-mounted equipment test platform, a working area, a pole-mounted equipment test platform, a pole-mounted equipment, a working staff and a pole-mounted equipment.
2) The worker sits on the safety seat 6 and takes safety measures, the air compressor 4 is turned on to inflate the folding air bag 3, the working platform on the upper hoop support 5 and the worker move upwards along the electric pole, the air compressor 4 is turned off after the worker reaches the working area, the upper hoop support 5 stops moving, and the worker starts working;
if the operation is in hot days or night, a worker can open the exhaust port of the folding air bag 3 and simultaneously open the air compressor 4, and the exhaust pipe 8 of the steam turbine is oriented to the worker through the expansion steam turbine 7 connected with the exhaust port of the folding air bag 3 and the exhaust pipe 8 of the steam turbine connected with the air source outlet of the expansion steam turbine 7, so as to realize cooling;
or the high-altitude independent power supply is obtained through the generator 9 connected with the power output shaft of the expansion turbine 7, and the power output end of the generator 9 is electrically connected with the power strip 10, so that the lighting equipment can be powered at the moment.
3) After the operation is finished, the exhaust port of the folding air bag 3 is opened, the upper hoop support 5 moves downwards along the electric pole, and after the exhaust is finished, the exhaust port of the folding air bag 3 is closed, and the worker returns to the ground to finish the operation.
The foregoing describes in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be made in accordance with the concepts of the invention by one of ordinary skill in the art without undue burden. Therefore, all technical solutions which can be obtained by logic analysis, reasoning or limited experiments based on the prior art by the person skilled in the art according to the inventive concept shall be within the scope of protection defined by the claims.

Claims (10)

1. The experimental platform for the on-column equipment is characterized by comprising a lower hoop support (1), a folding air bag (3), an air compressor (4), an upper hoop support (5) and a sleeve (2);
the lower hoop support (1) is provided with an annular clamping hoop matched with the outer diameter of the electric pole, the inner diameter size of the sleeve (2) is matched with the outer diameter size of the electric pole, and the sleeve (2) is connected with the upper hoop support (5);
one end of the folding air bag (3) is connected with the lower hoop support (1), the other end of the folding air bag is connected with the upper hoop support (5), and the air compressor (4) is connected with an air inlet of the folding air bag (3).
2. The experimental platform of the on-column equipment according to claim 1, wherein the side of the lower hoop bracket (1) opposite to the connecting folding air bag (3) is provided with a track roller (12).
3. The equipment on column experiment platform according to claim 1, wherein a workbench (11) is arranged on the side, opposite to the side where the folding air bag (3) is connected, of the upper hoop support (5), and the workbench (11) comprises a controller which is in communication connection with the air compressor (4).
4. A column-mounted equipment experiment platform as claimed in claim 3, characterized in that the work bench (11) further comprises lighting equipment.
5. The equipment on-column experiment platform according to claim 1, further comprising an expansion turbine (7) and a generator (9), wherein the expansion turbine (7) and the generator (9) are both fixed on one side of the upper hoop support (5) opposite to the side where the folding air bag (3) is connected, an air source inlet of the expansion turbine (7) is connected with an air outlet of the folding air bag (3), and a power output shaft of the expansion turbine (7) is connected with a rotating shaft of the generator (9).
6. The on-column equipment experimental platform according to claim 5, wherein an air source outlet of the expansion turbine (7) is connected with a turbine exhaust pipe (8).
7. The equipment on column experiment platform according to claim 6, wherein the side of the upper hoop support (5) opposite to the connecting folding air bag (3) is provided with a safety protection facility.
8. A bench-top equipment according to claim 7, characterized in that said safety protection means comprise safety seats (6).
9. The equipment on column test platform according to claim 8, characterized in that the exhaust port of the turbine exhaust pipe (8) is directed towards the safety seat (6).
10. The equipment on column experiment platform according to claim 5, wherein the power output end of the generator (9) is connected with a power strip (10).
CN202211048642.XA 2022-08-29 2022-08-29 Equipment experiment platform on post Pending CN116002581A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211048642.XA CN116002581A (en) 2022-08-29 2022-08-29 Equipment experiment platform on post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211048642.XA CN116002581A (en) 2022-08-29 2022-08-29 Equipment experiment platform on post

Publications (1)

Publication Number Publication Date
CN116002581A true CN116002581A (en) 2023-04-25

Family

ID=86030541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211048642.XA Pending CN116002581A (en) 2022-08-29 2022-08-29 Equipment experiment platform on post

Country Status (1)

Country Link
CN (1) CN116002581A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117566634A (en) * 2024-01-16 2024-02-20 沈阳添润信息技术有限公司 Communication is with holding pole device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117566634A (en) * 2024-01-16 2024-02-20 沈阳添润信息技术有限公司 Communication is with holding pole device
CN117566634B (en) * 2024-01-16 2024-03-19 沈阳添润信息技术有限公司 Communication is with holding pole device

Similar Documents

Publication Publication Date Title
CN116002581A (en) Equipment experiment platform on post
CN106241661A (en) A kind of electric power overhaul hoistable platform
CN207832944U (en) A kind of novel on-vehicle pilot system for Field AC Withstand Voltage Test
CN208794107U (en) A kind of portable power maintenance repairing lighting apparatus
CN206753471U (en) A kind of power construction repairing ladder
CN205081385U (en) Safe climbing platform
CN210107246U (en) Street lamp capable of climbing
CN115259035B (en) Lifting operation table for overhauling transformer
CN201526262U (en) Movable indoor maintenance ladder frame
CN105179956A (en) Frequency-conversion and energy-saving mobile illumination lighthouse
CN113097951B (en) Method for hoisting lower 500kVGIL pipeline bus vertical expansion joint
CN113270803B (en) Power transformation cabinet for power transmission and transformation
CN107720644A (en) A kind of new high-voltage line down-lead bracket
CN205977561U (en) Weather station support and contain wind generating set of this support
CN206147013U (en) Capacitance of electric condenser volume measuring device is mended to cluster
CN212900845U (en) A annular gasbag formula intelligent tool for electric power overhauls at night
CN205104688U (en) High -voltage line wire support
CN210894431U (en) Insulator detection device
CN209565017U (en) A kind of chemical test removable experimental bench
CN114859219A (en) Pole-climbing-free uninterruptible pole-mounted switch test auxiliary system
CN208577374U (en) A kind of simplicity detachable hoisting apparatus
CN111533040A (en) Lifting device for boiler maintenance
CN112265946A (en) Electric pole climbing device for field electric power overhaul
CN110255331A (en) A kind of building hoist testing stand
CN206505536U (en) A kind of cigarette temperature fire disaster detector test device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination