CN109707452A - A kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision - Google Patents

A kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision Download PDF

Info

Publication number
CN109707452A
CN109707452A CN201811398945.8A CN201811398945A CN109707452A CN 109707452 A CN109707452 A CN 109707452A CN 201811398945 A CN201811398945 A CN 201811398945A CN 109707452 A CN109707452 A CN 109707452A
Authority
CN
China
Prior art keywords
tunnel
face
preliminary bracing
section
surrounding rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811398945.8A
Other languages
Chinese (zh)
Other versions
CN109707452B (en
Inventor
袁松
周威锦
邵林
廖沛源
王希宝
郑国强
张生
甘立松
张廷彪
周科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Communication Surveying and Design Institute Co Ltd
Original Assignee
Sichuan Communication Surveying and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Communication Surveying and Design Institute Co Ltd filed Critical Sichuan Communication Surveying and Design Institute Co Ltd
Priority to CN201811398945.8A priority Critical patent/CN109707452B/en
Publication of CN109707452A publication Critical patent/CN109707452A/en
Application granted granted Critical
Publication of CN109707452B publication Critical patent/CN109707452B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Image Processing (AREA)
  • Closed-Circuit Television Systems (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

The invention discloses a kind of remote operating systems for tunnel tunnel face Grades of Surrounding Rock intelligent decision, including tunnel excavation face, builder's staging is arranged in tunnel excavation face rear, preliminary bracing section and secondary lining section are set gradually along the direction far from tunnel excavation face on the builder's staging, the imaging of setting face and scanning device at the top of the builder's staging, preliminary bracing section infrared ray real-time monitoring system is set in the preliminary bracing section, further includes remote system terminal.The present invention solves and of the existing technology can not remotely solve tunnel construction site problem encountered, and the problem of guiding opinions and suggestions are proposed to the construction of next step, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision is provided, its construction face for being applied to tunnel, real-time judgment is carried out to its face situation, effectively improves construction efficiency.

Description

A kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision
Technical field
The present invention relates to vcehicular tunnel technical fields, and in particular to one kind is used for tunnel tunnel face Grades of Surrounding Rock intelligent decision Remote operating system.
Background technique
The judgement of tunnel construction tunnel face Grades of Surrounding Rock at present all rely on geomatics engineer scene to face situation into Row description, judges, in many projects in tunnel often not in combination with advance geologic prediction conclusion and monitoring measurement situation It is able to achieve timely judgement.Simultaneously as the work depends on the scene judgement of geomatics engineer, the requirement professional to its High, larger difference may be had by possessing the conclusion that the engineers of different experiences obtains.
If it is possible to allow simple question to give intelligence system completion, complicated problem by modern information technologies Can carry out online remote analysis, can not only accomplish it is real-time solve the problems, such as, but also can guarantee the accuracy of Problem judgment, can be significantly The investment of manpower and material resources is reduced, more objectively reflects construction site situation, is had to promotion Tunnel Design construction technology level great It helps.
Summary of the invention
The present invention solve it is of the existing technology can not remotely solve tunnel construction site problem encountered, and under The construction of one step proposes the problem of guiding opinions and suggestions, provides a kind of for tunnel tunnel face Grades of Surrounding Rock intelligent decision Remote operating system is applied to the construction face in tunnel, carries out real-time judgment to its face situation, effectively improves construction Efficiency;By various intelligence systems, the consistency and accuracy of deposit index can be ensured, avoid making due to engineer experience's deficiency At erroneous judgement;By real time information technology, the difficulty of designing unit's scene coordinative construction is greatly reduced, is saved human and material resources.
The present invention is achieved through the following technical solutions:
A kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, including tunnel excavation face, Builder's staging is arranged in tunnel excavation face rear, on the builder's staging along the direction far from tunnel excavation face according to Secondary setting preliminary bracing section and secondary lining section, the builder's staging top setting face is imaged and scanning device, described first Preliminary bracing section infrared ray real-time monitoring system is set in phase supporting section, further includes remote system terminal, the face imaging And scanning device the case where being used for tunnel excavation face, carries out real time imagery scanning, and scanning result is uploaded to long-range system System terminal, the preliminary bracing section infrared ray real-time monitoring system are used to carry out real-time monitoring to the deformation of preliminary bracing section And monitoring data are uploaded into remote system terminal, the remote system terminal is for dividing scanning result and monitoring data Analysis, and analysis result is transferred to site operation and manager.
Further, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, the initial stage branch Protect section infrared ray real-time monitoring system quantity be it is several, several preliminary bracing section infrared ray real-time monitoring systems are along initial stage branch Protect section equidistantly distributed.
Further, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, the face Imaging and scanning device and preliminary bracing section infrared ray real-time monitoring system are arranged to can online real-time transmission data.
Further, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, the secondary lining It builds and infrared distance measuring base station is set in section, several infrared monitoring points, the infrared monitoring point are set in the preliminary bracing section It is real that equidistantly distributed in supporting section in the early stage, infrared distance measuring base station and infrared monitoring point form the preliminary bracing section infrared ray When monitor system.
Further, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, the infrared prison Measuring point setting is in the early stage on the cross section of supporting section.
Further, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, the infrared prison The quantity of measuring point is 3-6.
Further, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, the face Imaging and scanning device include high power video camera and high power camera.
Compared with prior art, the present invention having the following advantages and benefits:
1, the present invention can be used for the cunicular construction face of institute, carries out real-time judgment to its face situation, effectively mentions High construction efficiency;
2, the present invention can be ensured the consistency and accuracy of deposit index, be avoided due to engineering by various intelligence systems Teacher's experience deficiency causes to judge by accident;
3, the present invention one or two of engineer can carry out to the construction in multiple tunnels real by real time information technology When service, greatly reduce the difficulty of designing unit's scene coordinative construction, save human and material resources.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is present system technical principle schematic diagram.
Label and corresponding parts title in attached drawing:
1- tunnel excavation face, 2- builder's staging, 3- preliminary bracing section, 4- secondary lining section, 5- face imaging and Scanning device, 6- preliminary bracing section infrared ray real-time monitoring system, 7- remote system terminal, 8- site operation and manager.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment 1
As shown in Figure 1 to Figure 2, a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, including Tunnel excavation face 1,1 rear of tunnel excavation face are arranged builder's staging 2, along far from tunnel on the builder's staging 2 The direction that road excavates face 1 sets gradually preliminary bracing section 3 and secondary lining section 4, and area is arranged at the top of the builder's staging 2 Face is imaged and scanning device 5, and preliminary bracing section infrared ray real-time monitoring system 6 is arranged in the preliminary bracing section 3, further includes remote Journey system terminal 7, the face imaging and scanning device 5 are for carrying out real time imagery to the case where tunnel excavation face 1 Scanning, and scanning result is uploaded into remote system terminal 7, the preliminary bracing section infrared ray real-time monitoring system 6 for pair The deformation of preliminary bracing section 3 carries out real-time monitoring and monitoring data is uploaded to remote system terminal 7, the remote system Terminal 7 is transferred to site operation and manager 8 for analyzing scanning result and monitoring data, and by analysis result.Institute The quantity for stating preliminary bracing section infrared ray real-time monitoring system 6 is several, several preliminary bracing section infrared ray real-time monitoring systems System 6 is along 3 equidistantly distributed of preliminary bracing section.The face imaging and scanning device 5 and preliminary bracing section infrared ray are supervised in real time Examining system 6 is arranged to can online real-time transmission data.Infrared distance measuring base station is set in the secondary lining section 4, it is described first Several infrared monitoring points are set in phase supporting section 3, and infrared monitoring point equidistantly distributed in supporting section 3 in the early stage is infrared Line ranging base station and infrared monitoring point form the preliminary bracing section infrared ray real-time monitoring system 6.The infrared monitoring point is set It sets on the cross section of supporting section 3 in the early stage.The quantity of the infrared monitoring point is 3-6.The face imaging and scanning are set Standby 5 include high power video camera and high power camera.
The course of work of the invention is as follows:
(1) imaging of installation high-precision and scanning device (or the vehicle-mounted imaging device of installation) on constructing tunnel rack 2, in tunnel After road construction is blown out every time, face geological condition is imaged and is scanned in time, achievement can automatic or manual upload Into operating system.
(2) infrared survey is laid according to certain spacing in the paragraph that tunnel has applied preliminary bracing but two linings are not constructed also Distance meter monitors Tunnel steel frame deformation in real time, and measured data is uploaded to operating system automatically.
(3) after being collected into image and scanning data, real time monitoring deformation data, operating system carries out preliminary analysis, Obtain the judgement of general issues, three kinds of challenge, high-leveled and difficult problem different levels.
(4) operating system has preset the multiple modules such as wisdom judgement, expert judgments, meeting judgement in terms of processing problem; The problem of corresponding different stage, wisdom judgement processing general issues, expert judgments handle challenge, and meeting judgement processing is high-leveled and difficult Problem.
(5) operating system is made of computer end and mobile phone terminal, by be arranged different signal allow corresponding geomatics engineer, Experienced expert etc. can real-time reception on-site signal, after determining face Grades of Surrounding Rock according to live image and monitoring data By result return system.
(6) system issues site operation instruction according to judgement conclusion.
Embodiment 2
Based on embodiment 1, the working principle of preliminary bracing section infrared ray real-time monitoring:
(1) infrared distance measuring base station is set up in secondary lining section 4, in the early stage each of supporting section 3 at a certain distance 3-6 monitoring point of optimal crosssection forms preliminary bracing section infrared ray real-time monitoring system 6.
(2) it is required according to monitoring accuracy, sets base station monitors frequency, measure the relative displacement between monitoring point and base station, And measurement result is uploaded to remote system terminal 7 in due course.
(3) after remote system terminal 7 receives signal, its data is automatically analyzed, obtains each break by calculating The real-time deformation data and curves in face.
The working principle of remote system terminal 7:
(1) country rock remote online judges that system is a computer program, judges systemic presupposition by country rock remote online Country rock qualitative discrimination method, quantitative identification method, expert understand a variety of method of discrimination such as commercial law, on-line meeting method.
(2) remote system terminal 7 receive face imaging and scanning device 5, preliminary bracing section infrared ray supervise in real time It after image and data that examining system 6 uploads in real time, is tentatively identified, corresponding different difficulty selects different method of discrimination Judged.
(3) it by after system automatic discrimination, submitting auditor's authorization, is obtained if to face country rock if authorizing The judgement result of rank;If authorization does not pass through, other methods are selected to judge again by auditor, until authorization passes through It obtains a result.
(4) after remote system terminal 7 obtains the country rock judgement result of face, its conclusion is sent to site operation And manager 8, the arrangement and method for construction of next step is formulated according to the result of judgement by site operation and manager 8.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (7)

1. a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision, which is characterized in that opened including tunnel It digs face (1), builder's staging (2) are arranged in tunnel excavation face (1) rear, along separate on the builder's staging (2) The direction of tunnel excavation face (1) sets gradually preliminary bracing section (3) and secondary lining section (4), builder's staging (2) top Face imaging and scanning device (5) is arranged in portion, and preliminary bracing section infrared ray real-time monitoring is arranged on the preliminary bracing section (3) System (6) further includes remote system terminal (7), and the face imaging and scanning device (5) are used for tunnel excavation face (1) the case where, carries out real time imagery scanning, and scanning result is uploaded to remote system terminal (7), the preliminary bracing Duan Hong Outside line real-time monitoring system (6) is used to carry out real-time monitoring to the deformation of preliminary bracing section (3) and uploads monitoring data To remote system terminal (7), the remote system terminal (7) will divide for analyzing scanning result and monitoring data Analysis result is transferred to site operation and manager.
2. a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision according to claim 1, Be characterized in that, the quantity of the preliminary bracing section infrared ray real-time monitoring system (6) be it is several, several preliminary bracing sections are infrared Line real-time monitoring system (6) is along preliminary bracing section (3) equidistantly distributed.
3. a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision according to claim 1, It is characterized in that, the face imaging and scanning device (5) and preliminary bracing section infrared ray real-time monitoring system (6) are arranged to It can online real-time transmission data.
4. a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision according to claim 2, It is characterized in that, infrared distance measuring base station is set on the secondary lining section (4), several are set on the preliminary bracing section (3) Infrared monitoring point, the infrared monitoring point equidistantly distributed, infrared distance measuring base station and infrared monitoring in supporting section (3) in the early stage Point forms the preliminary bracing section infrared ray real-time monitoring system (6).
5. a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision according to claim 4, It is characterized in that, the infrared monitoring point setting is in the early stage on the cross section of supporting section (3).
6. a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision according to claim 4, It is characterized in that, the quantity of the infrared monitoring point is 3-6.
7. a kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision according to claim 1, It is characterized in that, the face imaging and scanning device (5) include high power video camera and high power camera.
CN201811398945.8A 2018-11-22 2018-11-22 Remote operation system for intelligently judging surrounding rock level of tunnel face Active CN109707452B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811398945.8A CN109707452B (en) 2018-11-22 2018-11-22 Remote operation system for intelligently judging surrounding rock level of tunnel face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811398945.8A CN109707452B (en) 2018-11-22 2018-11-22 Remote operation system for intelligently judging surrounding rock level of tunnel face

Publications (2)

Publication Number Publication Date
CN109707452A true CN109707452A (en) 2019-05-03
CN109707452B CN109707452B (en) 2020-12-29

Family

ID=66254411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811398945.8A Active CN109707452B (en) 2018-11-22 2018-11-22 Remote operation system for intelligently judging surrounding rock level of tunnel face

Country Status (1)

Country Link
CN (1) CN109707452B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110174695A (en) * 2019-06-13 2019-08-27 成都畅达通检测技术股份有限公司 A kind of Geological Advanced Prediction detection system and detection method for constructing tunnel
CN113685189A (en) * 2021-08-25 2021-11-23 同济大学 Automatic measuring method for tunnel face excavation deformation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103016063A (en) * 2012-12-13 2013-04-03 长安大学 Monitoring system for construction safety
CN203368637U (en) * 2013-07-17 2013-12-25 中铁十三局集团第五工程有限公司 Remote wired video real-time tunnel monitoring system
CN103559372A (en) * 2013-11-20 2014-02-05 中铁十三局集团第一工程有限公司 Method and device for dynamically analyzing big arch springing CRD stratified excavation footage of cross-section tunnel
CN103698817A (en) * 2013-12-27 2014-04-02 上海川海信息科技有限公司 Method for rapidly and safely predicting tunnel face of underground cavity on basis of image
CN105756711A (en) * 2016-03-02 2016-07-13 中交第二航务工程局有限公司 Tunnel construction primary support limit invasion monitoring analysis early-warning method based on three-dimensional laser scanning
CN106224007A (en) * 2016-08-26 2016-12-14 招商局重庆交通科研设计院有限公司 Safety for tunnel engineering monitoring and warning management system
CN208089351U (en) * 2018-04-20 2018-11-13 中国水利水电第十四工程局有限公司 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103016063A (en) * 2012-12-13 2013-04-03 长安大学 Monitoring system for construction safety
CN203368637U (en) * 2013-07-17 2013-12-25 中铁十三局集团第五工程有限公司 Remote wired video real-time tunnel monitoring system
CN103559372A (en) * 2013-11-20 2014-02-05 中铁十三局集团第一工程有限公司 Method and device for dynamically analyzing big arch springing CRD stratified excavation footage of cross-section tunnel
CN103698817A (en) * 2013-12-27 2014-04-02 上海川海信息科技有限公司 Method for rapidly and safely predicting tunnel face of underground cavity on basis of image
CN105756711A (en) * 2016-03-02 2016-07-13 中交第二航务工程局有限公司 Tunnel construction primary support limit invasion monitoring analysis early-warning method based on three-dimensional laser scanning
CN106224007A (en) * 2016-08-26 2016-12-14 招商局重庆交通科研设计院有限公司 Safety for tunnel engineering monitoring and warning management system
CN208089351U (en) * 2018-04-20 2018-11-13 中国水利水电第十四工程局有限公司 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110174695A (en) * 2019-06-13 2019-08-27 成都畅达通检测技术股份有限公司 A kind of Geological Advanced Prediction detection system and detection method for constructing tunnel
CN113685189A (en) * 2021-08-25 2021-11-23 同济大学 Automatic measuring method for tunnel face excavation deformation
CN113685189B (en) * 2021-08-25 2023-02-17 同济大学 Automatic measuring method for tunnel face excavation deformation

Also Published As

Publication number Publication date
CN109707452B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN103778681B (en) A kind of vehicle-mounted highway cruising inspection system and data acquisition and disposal route
CN106780284B (en) Tunnel wall surrounding rock integrity information acquisition device and evaluation method
CN108335377B (en) GIS technology-based automatic check method for road inspection vehicle service
CN109460947A (en) Highway engineering process based on BIM+GIS technology is applied for checking and examination system
CN109615723B (en) Automatic analysis method and system for patrol route coverage condition
CN109707452A (en) A kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision
CN113256082A (en) Intelligent geological sketch and geological evaluation method for tunnel face
KR102059444B1 (en) Real time remote system and method for observing tunnel working face
CN109278053A (en) A kind of railway tunnel detection method
CN110542388A (en) Tunnel face deformation alarm method based on mobile three-dimensional laser scanning
CN114623776B (en) Tunnel deformation monitoring-based tunnel damage prediction method
KR102669058B1 (en) SAFETY INSPECTION SYSTEM FOR STRUCTURE USING SMART PORTABLE DEVICE, AND METHOD FOR THe SAME
Huang et al. Rapid surface damage detection equipment for subway tunnels based on machine vision system
CN108981618A (en) A kind of tunnel just branch flatness analysis method and system
CN116091477A (en) Deep learning multi-mode image fusion-based building exterior wall defect detection method
KR20200098817A (en) Multilateral integrated management system and tunnel excavation method on construction site
CN112685807A (en) Scaffold construction process application method and system based on BIM technology
CN113074694B (en) Automatic monitoring device for tunnel section deformation
CN114722480A (en) Safety monitoring system of house building structure and building and monitoring method thereof
CN111926662A (en) Online monitoring method and system for pavement settlement
CN111101949B (en) Dynamic monitoring management system and method related to risk source crossing process
CN116579601B (en) Mine safety production risk monitoring and early warning system and method
CN110348145B (en) Construction method for building tunnel based on BIM technology
CN115615407A (en) Solid structure substance quality detection method based on three-dimensional laser scanning
CN117037530A (en) Dynamic supervision and analysis method for parking resources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No.35, Taisheng North Road, Chengdu, Sichuan 610000

Applicant after: SICHUAN COMMUNICATION SURVEYING & DESIGN INSTITUTE Co.,Ltd.