CN113685189A - Automatic measuring method for tunnel face excavation deformation - Google Patents

Automatic measuring method for tunnel face excavation deformation Download PDF

Info

Publication number
CN113685189A
CN113685189A CN202110984336.6A CN202110984336A CN113685189A CN 113685189 A CN113685189 A CN 113685189A CN 202110984336 A CN202110984336 A CN 202110984336A CN 113685189 A CN113685189 A CN 113685189A
Authority
CN
China
Prior art keywords
tunnel
camera
tunnel face
deformation
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110984336.6A
Other languages
Chinese (zh)
Other versions
CN113685189B (en
Inventor
谢雄耀
周彪
徐金峰
周应新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Chuyao Expressway Co ltd
Tongji University
Original Assignee
Yunnan Wuyi Expressway Construction Headquarters
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Wuyi Expressway Construction Headquarters, Tongji University filed Critical Yunnan Wuyi Expressway Construction Headquarters
Priority to CN202110984336.6A priority Critical patent/CN113685189B/en
Publication of CN113685189A publication Critical patent/CN113685189A/en
Application granted granted Critical
Publication of CN113685189B publication Critical patent/CN113685189B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses an automatic measuring method for tunnel face excavation deformation, which comprises the following steps: a plurality of sets of single-eye lamp targets are arranged on a steel arch frame at a working stage of working face excavation, a camera and an industrial personal computer are arranged on a working face excavation lower step and an inverted arch section, and a wireless transmitting module is arranged at a tunnel opening of a tunnel; the automatic deformation measuring method comprises the following steps: three lamp targets are arranged on one steel arch frame; pictures shot by the camera are transmitted to the industrial personal computer through the LORA relay module; the industrial personal computer inputs field construction parameters and processes the pictures to obtain a section coordinate signal; the signal conversion module converts the coordinate signal into a wireless data signal and sends the wireless data signal to the cloud server through the wireless transmitting module; downloading monitoring data from a cloud server; continuously excavating the tunnel face of the tunnel forwards, and continuously installing the single-eye lamp targets at set intervals; and repeating the previous steps, and remotely monitoring the section deformation of the tunnel face in the actual excavation process in real time. The method has the advantage of accurately measuring the dynamic deformation data of the tunnel surrounding rock.

Description

Automatic measuring method for tunnel face excavation deformation
Technical Field
The invention belongs to the technical field of tunnel engineering, and particularly relates to an automatic measuring method for tunnel face excavation deformation.
Background
For the excavation construction safety of tunnel engineering, the deformation can most directly reflect the safety state of surrounding rocks. According to the convergence constraint theory, after the tunnel is blasted and excavated, the surrounding rock begins to deform, so that the deformation of the excavated section is measured earlier, and the deformation dynamic information of the surrounding rock can be obtained faster.
At present, the method for measuring the deformation of the tunnel face after excavation mainly comprises point-to-point measurement and point cloud measurement. In the former, three to five target points are mainly installed on the tunnel profile after the tunnel face is excavated, and then the deformation of the profile is calculated according to the coordinate information or relative coordinate information of the target points, and representative methods include a total station, a convergence gauge, a static level gauge and the like. The latter mainly calculates the deformation of the profile by acquiring point cloud information of a large number of tunnel profiles after tunnel face excavation and performing a series of post-processing, and a representative method is a laser scanner. The CN101608897A document discloses a precision rod type convergence meter, which is an accurate, stable, economical and reliable measurement method. The CN10458069B document discloses a tunnel surrounding rock deformation monitoring method and a detection system thereof, which utilize a laser installed on a stable surrounding rock to measure a photosensitive displacement signal monitor on an unstable surrounding rock. The CN112254637A document discloses a tunnel excavation surface scanning device and a detection method based on multiple fusion data, which are based on a fixed solid state laser radar to collect and process three-dimensional point cloud data.
The target point installed by the method is easy to damage and unstable, the point cloud measuring method is too high in economic cost, is easy to interfere during blasting construction, causes inaccurate measurement, and is not suitable for measurement immediately after the tunnel face is excavated. This is where the application needs to be focused on.
Disclosure of Invention
The invention aims to provide an automatic tunnel face excavation deformation measuring method for accurately monitoring surrounding rock dynamic deformation data under the condition that a tunnel face is just excavated in real time.
In order to solve the technical problems, the invention provides an automatic measuring method for excavation deformation of a tunnel face, which comprises the following steps:
a plurality of sets of single-eye lamp targets are arranged on a steel arch frame of an upper step section of the tunnel face excavation of the tunnel which is just excavated;
the camera is arranged on the tunnel face of the tunnel, excavates the lower step and the inverted arch section and photographs the cross section according to set time;
the industrial personal computer comprises a central processing module, an LORA relay module and a signal conversion module, and is arranged on the tunnel face of the tunnel to dig a lower step and an inverted arch section;
the wireless transmitting module is arranged at the opening of the tunnel;
the automatic deformation measuring method comprises the following steps:
s1: mounting a first set of single-eye lamp targets on a steel arch frame, wherein three lamp targets are mounted on one steel arch frame and are respectively mounted at the arch crown and the arch waists at two sides;
s2: the camera is arranged on the tunnel face of the tunnel to dig a lower step and an inverted arch section, and picture data shot by the camera is transmitted to the central processing module through the LORA relay module;
s3: the industrial personal computer is arranged on a tunnel face excavation lower step and an inverted arch section, the central processing module receives pictures transmitted by the camera, and the pictures are processed through site construction parameters input in advance to obtain a section coordinate signal;
s4: the signal conversion module converts the section coordinate signal in the step S3 into a wireless data signal, and the wireless data signal is sent to the cloud server through the wireless transmitting module;
s5: downloading monitoring data from a cloud server, and performing remote real-time monitoring;
s6: the tunnel face of the tunnel is continuously excavated forwards, and a second set of single-eye lamp targets are continuously installed at intervals of a set distance, so that the first set of single-eye lamp targets and the second set of single-eye lamp targets are ensured to be shot by a camera at the same time;
s7: and repeating the steps S2 to S6, and remotely monitoring the section deformation of the tunnel face in the actual excavation process in real time.
The single-eye lamp target comprises a lamp target, a magnet, a wireless switch and an explosion-proof plate, and the lamp target is rigidly connected with the steel arch frame to provide illumination in the tunnel.
The protection of the single-eye lamp target and the camera is protected outside the single-eye lamp target by a steel bracket or a steel block, and the camera lens and the lamp target surface are protected by transparent explosion-proof glass plates.
The distance between the camera and the rear part of the tunnel face of the tunnel just excavated is 35m +/-10 m.
The invention has the following advantages:
1) the multiple sets of single-eye lamp targets are rigidly connected with the tunnel steel arch frame to provide illumination in the tunnel, and the cameras are about 30m away from the tunnel face of the tunnel, so that dynamic deformation data of tunnel surrounding rock can be accurately measured;
2) the periphery of the single-eye lamp target and the camera is provided with the explosion-proof glass, so that the single-eye lamp target and the camera are not influenced by blasting construction, the measurement is simple, the safety and the precision are high, and the single-eye lamp target and the camera are suitable for tunnel face excavation deformation measurement of the blasting construction.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the invention and, together with the description, serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
1-monocular lamp target; 2-a camera;
3, an industrial personal computer;
5, a wireless transmitting module; 6-monitoring center;
7-palm surface; 8, excavating a stage;
9-stage of excavating middle platform; and 10, excavating a lower step and an inverted arch section.
Detailed Description
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
Fig. 1 shows a schematic structural diagram of an embodiment of the present invention. As shown in fig. 1, the invention provides an automatic measuring method for tunnel face excavation deformation, which comprises the following steps:
the single-eye lamp targets 1 are arranged on steel arch frames of an excavation upper stage 8 of a tunnel face of a tunnel which is just excavated, and three single-eye lamp targets 1 are arranged on one steel arch frame and are respectively arranged on the arch crown and the arch waists on two sides of the steel arch frame. The single-eye lamp target 1 and the steel arch center are fixedly installed by adopting strong magnets or are fixed by using bolts. The single-eye lamp target 1 automatically emits light to provide illumination for the interior of a tunnel, a 12V rechargeable battery is adopted for power supply, the power is continuously supplied for at least 3 months after the single-eye lamp target 1 is fully charged, the periphery of the single-eye lamp target 1 is surrounded by a steel support, and a transparent explosion-proof plate is arranged on the surface of the lamp target, so that the single-eye lamp target is prevented from being damaged by flying stone impact generated during subsequent tunnel face blasting construction; the single-eye lamp target 1 comprises a lamp target, a magnet, a wireless switch and an explosion-proof plate. The wireless switch is controlled by a central processing module of the industrial personal computer to control the opening and closing time of the single-eye lamp target 1.
The camera 2 is arranged on the excavation lower step and the inverted arch section of the tunnel face, the camera is 30-40 m away from the excavation face 2, the position of the camera 2 is flexibly adjusted according to the step pitch of the field tunnel construction, and the camera 2 and the monocular lamp target 1 are ensured to be shielded by no obstacles. The camera 2 is wrapped by a steel bracket, and the transparent explosion-proof plate is arranged in front of the lens of the camera 2, so that the lens is prevented from being polluted by dust, water and the like on a construction site, the impact of flying stones and the like generated in blasting construction is also prevented, and the transparent explosion-proof plate is convenient to clean frequently.
The industrial personal computer 3 comprises a microprocessor, an LORA repeater and an LORA signal conversion module, the microprocessor receives the pictures transmitted by the camera 2, inputs on-site construction parameters such as distance parameters between the camera 2 and the monocular lamp target 1, carries out a self-calibration method of the camera based on coordinate conversion of a Kruppa equation, and obtains the relative coordinate value of the monocular lamp target 1. The LORA repeater transmits low-frequency signals with an LORA protocol, transmits picture data of the camera to the microprocessor, the microprocessor controls photographing time of the camera 2 through the LORA repeater, and the LORA signal conversion module converts signals transmitted by LORA in the tunnel and transmits the signals to the wireless transmitting module of the tunnel opening.
And the wireless transmitting module transmits the real-time monitoring data to the monitoring center 6 at the tunnel portal.
The invention discloses an automatic measuring method for tunnel face excavation deformation based on the modules, which comprises the following steps:
s1: numbering a first set of single-eye lamp targets 1, and then installing the first set of single-eye lamp targets on a newly-erected steel arch frame behind the tunnel face of a tunnel which is just excavated, wherein three single-eye lamp targets 1 are installed on one steel arch frame and are respectively installed at the arch crown and the arch waists at two sides;
s2: a fixed camera 2 is arranged at a position which is 30m away from the first set of single-eye lamp targets 1, and no fixed shielding barrier exists between the camera 2 and the single-eye lamp targets 1;
s3: digging a lower step and an inverted arch section on the tunnel face of the tunnel, installing an industrial personal computer, and supplying power to the wiring of the industrial personal computer by utilizing an on-site power supply or installing a distribution box for supplying power; the microprocessor receives the pictures transmitted by the camera 2, presets engineering parameters, such as distance parameters between the camera 2 and the monocular lamp target 1, and performs a self-calibration method of coordinate conversion of the camera based on a Kruppa equation to obtain a relative coordinate value of the monocular lamp target 1; the LORA signal conversion module converts signals transmitted by the LORA in the tunnel and transmits the signals to the wireless transmitting module at the tunnel port;
s4: a wireless transmitting module is installed at a tunnel entrance, and a telephone card is inserted, so that signals transmitted by an LORA in a tunnel can be received, and data signals can be transmitted; in the embodiment, the wireless transmitting module transmits 4G signals and transmits real-time monitoring data to the monitoring center 6;
s5: logging in the corresponding monitoring center 6 by using a remote computer or a mobile phone, downloading monitoring data in the monitoring center 6 and checking the monitoring data in real time to realize remote real-time monitoring;
s6: the tunnel face is excavated forwards continuously according to the arrow direction in fig. 1, and in this embodiment, the second set of one-eye lamp targets 1 is installed continuously every 5m, so that the camera 2 can shoot the first set of one-eye lamp targets 1 and the second set of one-eye lamp targets 1 simultaneously;
s7: and repeating the steps S3 to S6, and remotely monitoring the section deformation of the tunnel face in the actual excavation process in real time to obtain the deformation dynamic information of the surrounding rock.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1. An automatic measuring method for tunnel face excavation deformation comprises the following steps:
a plurality of sets of single-eye lamp targets are arranged on a steel arch frame of an upper step section of the tunnel face excavation of the tunnel which is just excavated;
the camera is arranged on the tunnel face of the tunnel, excavates the lower step and the inverted arch section and photographs the cross section according to set time;
the industrial personal computer comprises a central processing module, an LORA relay module and a signal conversion module, and is arranged on the tunnel face of the tunnel to dig a lower step and an inverted arch section;
the wireless transmitting module is arranged at the opening of the tunnel;
the automatic deformation measuring method comprises the following steps:
s1: mounting a first set of single-eye lamp targets on a steel arch frame, wherein three lamp targets are mounted on one steel arch frame and are respectively mounted at the arch crown and the arch waists at two sides;
s2: the camera is arranged on the tunnel face of the tunnel to dig a lower step and an inverted arch section, and picture data shot by the camera is transmitted to the central processing module through the LORA relay module;
s3: the industrial personal computer is arranged on a tunnel face excavation lower step and an inverted arch section, the central processing module receives pictures transmitted by the camera, and the pictures are processed through site construction parameters input in advance to obtain a section coordinate signal;
s4: the signal conversion module converts the section coordinate signal in the step S3 into a wireless data signal, and the wireless data signal is sent to the cloud server through the wireless transmitting module;
s5: downloading monitoring data from a cloud server, and performing remote real-time monitoring;
s6: the tunnel face of the tunnel is continuously excavated forwards, and a second set of single-eye lamp targets are continuously installed at intervals of a set distance, so that the first set of single-eye lamp targets and the second set of single-eye lamp targets are ensured to be shot by a camera at the same time;
s7: and repeating the steps S2 to S6, and remotely monitoring the section deformation of the tunnel face in the actual excavation process in real time.
2. The automatic measuring method for excavation deformation of the tunnel face of claim 1, characterized in that: the single-eye lamp target comprises a lamp target, a magnet, a wireless switch and an explosion-proof plate, and the lamp target is rigidly connected with the steel arch frame.
3. The automatic measuring method for excavation deformation of the tunnel face of claim 1, characterized in that: the protection of the single-eye lamp target and the camera is protected outside the single-eye lamp target by a steel bracket or a steel block, and the camera lens and the lamp target surface are protected by transparent explosion-proof glass plates.
4. The automatic measuring method for excavation deformation of the tunnel face of claim 1, characterized in that: the distance between the camera and the rear part of the tunnel face of the tunnel just excavated is 35m +/-10 m.
CN202110984336.6A 2021-08-25 2021-08-25 Automatic measuring method for tunnel face excavation deformation Active CN113685189B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110984336.6A CN113685189B (en) 2021-08-25 2021-08-25 Automatic measuring method for tunnel face excavation deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110984336.6A CN113685189B (en) 2021-08-25 2021-08-25 Automatic measuring method for tunnel face excavation deformation

Publications (2)

Publication Number Publication Date
CN113685189A true CN113685189A (en) 2021-11-23
CN113685189B CN113685189B (en) 2023-02-17

Family

ID=78582701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110984336.6A Active CN113685189B (en) 2021-08-25 2021-08-25 Automatic measuring method for tunnel face excavation deformation

Country Status (1)

Country Link
CN (1) CN113685189B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370417A (en) * 2022-07-22 2022-11-22 北京交通大学 Tunnel face extrusion deformation testing method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180038683A1 (en) * 2015-12-25 2018-02-08 Tongji University System for quickly detecting tunnel deformation
CN109707452A (en) * 2018-11-22 2019-05-03 四川省交通运输厅交通勘察设计研究院 A kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision
CN109839073A (en) * 2019-03-06 2019-06-04 上海数久信息科技有限公司 A kind of the tunnel convergence deformation detection method and system of view-based access control model image
CN111473734A (en) * 2020-04-29 2020-07-31 同济大学 System and method for monitoring stability of clamped rock in small-clear-distance tunnel
CN112556600A (en) * 2021-02-22 2021-03-26 南京派光智慧感知信息技术有限公司 Tunnel deformation real-time monitoring method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180038683A1 (en) * 2015-12-25 2018-02-08 Tongji University System for quickly detecting tunnel deformation
CN109707452A (en) * 2018-11-22 2019-05-03 四川省交通运输厅交通勘察设计研究院 A kind of remote operating system for tunnel tunnel face Grades of Surrounding Rock intelligent decision
CN109839073A (en) * 2019-03-06 2019-06-04 上海数久信息科技有限公司 A kind of the tunnel convergence deformation detection method and system of view-based access control model image
CN111473734A (en) * 2020-04-29 2020-07-31 同济大学 System and method for monitoring stability of clamped rock in small-clear-distance tunnel
CN112556600A (en) * 2021-02-22 2021-03-26 南京派光智慧感知信息技术有限公司 Tunnel deformation real-time monitoring method and device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370417A (en) * 2022-07-22 2022-11-22 北京交通大学 Tunnel face extrusion deformation testing method and device

Also Published As

Publication number Publication date
CN113685189B (en) 2023-02-17

Similar Documents

Publication Publication Date Title
US11673587B2 (en) Comprehensive inspection vehicle for subway tunnel
CN112525093B (en) System for establishing tunnel three-dimensional model based on double-shield TBM (Tunnel boring machine) process
KR102273691B1 (en) Construction site process management system using drone and construction site process management method using the same
CN110996048B (en) Remote visualization system and method for coal roadway heading machine
CN103808271B (en) Method and device for remotely measuring cracks
CN102661737B (en) Automatic group measurement system and automatic group measurement method for settlement deformation of tunnel structure
CN201181203Y (en) Tunnel displacement monitoring system based on image sensor
KR20090020359A (en) Automatic control equipment and method for tunnel mappling
CN104879169A (en) Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof
CN110954015B (en) Shield tail gap measuring method based on laser focusing and image recognition
CN108007378B (en) Deformation monitoring integrated system and use method thereof
CN113685189B (en) Automatic measuring method for tunnel face excavation deformation
KR100640000B1 (en) Measurement method for tunnel surface by laser scanning
CN111366101A (en) Real-time monitoring and early warning method for deep foundation pit based on three-dimensional laser scanning technology
CN103234464A (en) Dynamic automatic measuring device for overall dimension of vehicle
CN104793637A (en) Real-time tracking system and method of mobile equipment
CN205352389U (en) System for realize subway shield tunnel earth's surface displacement real -time supervision through high definition video
CN112211657B (en) Method for intelligently judging closing of coal discharge port of top coal caving hydraulic support
CN110130921B (en) TBM and belt feeder slag information acquisition device thereof
CN210513017U (en) High formwork upright rod displacement real-time monitoring system based on CCD sensor
CN109440834B (en) Foundation pit monitoring system
CN105592294B (en) A kind of monitoring system of VSP excitations big gun group
CN117940650A (en) Method and control node for controlling a mining drilling machine
KR101319039B1 (en) System for upgrading space image picture
CN114964025A (en) Tunnel inverted arch deformation monitoring and early warning method based on binocular vision and early warning system thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220429

Address after: 200092 Siping Road 1239, Shanghai, Yangpu District

Applicant after: TONGJI University

Applicant after: Yunnan Chuyao Expressway Co.,Ltd.

Address before: 200092 Siping Road 1239, Shanghai, Yangpu District

Applicant before: TONGJI University

Applicant before: Yunnan Wuyi Expressway Construction Headquarters

TA01 Transfer of patent application right
CB03 Change of inventor or designer information

Inventor after: Xie Xiongyao

Inventor after: Xu Jinfeng

Inventor after: Zhou Biao

Inventor after: Zhou Yingxin

Inventor before: Xie Xiongyao

Inventor before: Zhou Biao

Inventor before: Xu Jinfeng

Inventor before: Zhou Yingxin

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant