CN109706909A - The structures foundation reinforcing structure and its construction method worn under reply metro shield - Google Patents

The structures foundation reinforcing structure and its construction method worn under reply metro shield Download PDF

Info

Publication number
CN109706909A
CN109706909A CN201910129990.1A CN201910129990A CN109706909A CN 109706909 A CN109706909 A CN 109706909A CN 201910129990 A CN201910129990 A CN 201910129990A CN 109706909 A CN109706909 A CN 109706909A
Authority
CN
China
Prior art keywords
cement
structures
layer
broken stone
graded broken
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910129990.1A
Other languages
Chinese (zh)
Inventor
吴纪东
王明远
曹静
陈波
光军伟
李琪勇
李巍
张力文
王松阳
刘军
邢瑞新
马国强
冯林伟
张亮
赵娜
罗浩栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Municipal Engineering General Corp
Original Assignee
Zhengzhou Municipal Engineering General Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Municipal Engineering General Corp filed Critical Zhengzhou Municipal Engineering General Corp
Priority to CN201910129990.1A priority Critical patent/CN109706909A/en
Publication of CN109706909A publication Critical patent/CN109706909A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses the structures foundation reinforcing structures worn under a kind of reply metro shield, including graded broken stone layer and cement stabilizing soil layer, the upper surface of graded broken stone layer and the lower surface flush of structure base, the lower surface of graded broken stone layer connect with cement stabilizing soil layer;Graded broken stone layer and cement stabilizing soil layer are respectively positioned on the top of the subway line in planning;Several vertically arranged cement mixing piles are uniformly provided in the soil body below cement stabilizing soil layer, the top of cement mixing pile connects with cement stabilizing soil layer.The invention also discloses the construction methods of above-mentioned foundation structure.The present invention effectively enhances the self-stable ability of the soil body, can resist and be evenly distributed with the load of transmitting from below, avoid the basic local pressure of structures excessive, effectively reduce adverse effect when shield machine passes through to structures.By the way that graded broken stone layer is arranged, deformation can be absorbed, further ensures that the stabilization of structures above shield machine.

Description

The structures foundation reinforcing structure and its construction method worn under reply metro shield
Technical field
The present invention relates to technical field of building construction.
Background technique
Current social carries out underground engineering construction extensively, and underground engineering construction equally exists successive problem and crossings on different level is asked Topic can generate adverse effect to existing structure above, cause when metro shield passes through under built underground structure The position of the underground structure built up changes and (may move up or tilt).Currently, not yet before carrying out Underground Construction The technical solution for considering subway crossing problem in advance, cannot prevent from wearing structures under metro shield and cause bad shadow to structures It rings.
Metro shield causes uplift of soil reason: 1, swelling in face of shield tunneling mainly since soil pressure (muddy water pressure) controls It is worth excessive and causes soil body elastic-plastic deformation immediately ahead of shield machine, so that stratum is caused to swell.2, protuberance when shield machine passes through is It swells on stratum caused by due to bored top, deficient digging, friction of shield shell and the soil body etc..3, it is logical to appear in shield tail for shield tail portion protuberance After crossing, the outer diameter of general shield is bigger than the outer diameter of tunnel-liner, exists between shield shell outer surface and lining cutting outer surface certain empty Gap needs to fill, if filling grouting pressure is excessive, bottom can be caused to swell.
Summary of the invention
The purpose of the present invention is to provide the structures foundation reinforcing structures worn under a kind of reply metro shield, it is ensured that reduces Or eliminate adverse effect of shield machine when passing through to structures.
To achieve the above object, the present invention provides the structures foundation reinforcing structure worn under a kind of reply metro shield, The structures are located at the top of the subway line in planning, and structures have basis,
Including graded broken stone layer and cement stabilizing soil layer, the upper surface of graded broken stone layer and the lower surface of structure base are equal Together, the lower surface of graded broken stone layer connects with cement stabilizing soil layer;Graded broken stone layer and cement stabilizing soil layer are respectively positioned in planning Subway line top;Several vertically arranged cement mixing piles, water are uniformly provided in the soil body below cement stabilizing soil layer The top of mud mixing pile connects with cement stabilizing soil layer, and the bottom end of cement mixing pile is lower than the subway line in planning.
The bottom end of cement mixing pile is lower than 50 centimetres of the bottom end of subway line or more in planning;Graded broken stone layer and cement The thickness of steady soil is 30 centimetres, and the diameter of the cement mixing pile is 60 centimetres.
The present invention also provides a kind of construction method for the structures foundation reinforcing structure worn under above-mentioned reply metro shield, It carries out before structures are constructed, successively sequentially includes the following steps:
First step is the pass course of determining shield machine;
Second step is constructed vertically arranged cement mixing pile along the pass course of shield machine, the setting area of cement mixing pile Domain is: the region for being included after the distance for peripherally and outwardly extending a shield outer diameter of structures;Cement mixing pile is set at it It sets in region and is uniformly distributed;
The upper end of cement mixing pile is equal to or higher than the foundation pit bottom design position of structures, and the lower end of cement mixing pile is lower than shield The pass course of machine;
Third step is the pass course along shield machine, excavates structure pit extremely design foundation pit bottom position, will in digging process It abolishes the part that cement mixing pile is located above structure pit bottom;Cleaning is tamped behind foundation pit bottom, is flattened;
Four steps is to tamp in two layers of the laying cement stabilizing soil layer in foundation pit bottom point and successively, and every layer of cement stabilizing soil thickness is 15 centimetres, two layers of laying graded broken stone layer is divided in the cement steady soil of upper layer and is successively tamped, every level matches fractured-rock layer thickness It is 15 centimetres,
The lower end flush on the basis of the upper surface and structures of the graded broken stone layer after ensuring to tamp.
In third step, 60 centimetres of ground beneath of excavation superstructure to structures;In four steps, cement stabilized soil The laying depth of layer and graded broken stone layer is 30 centimetres.
The present invention has the advantage that:
The present invention effectively enhances the certainly steady of the soil body by being uniformly arranged cement mixing pile in advance at the pass course of shield machine Ability.By presetting cement stabilizing soil layer, energy above at the pass course of shield machine, below scheduled structure base The load (i.e. shield machine by when the load that generates) of transmitting from below is enough resisted and be evenly distributed with, it is logical on the one hand to reduce shield machine The active force on the out-of-date basis to structures, on the other hand avoids the basic local pressure of structures excessive.
By the way that graded broken stone layer is arranged, deformation can be absorbed, further ensures that the stable structure of structures above shield machine Property.
Construction method of the invention can quickly and effectively set up the structures worn under the reply metro shield through strengthening Foundation reinforcing structure, the basis as subsequent construction structures.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is schematic top plan view when shield machine passes through at shield machine.
Specific embodiment
As depicted in figs. 1 and 2, the invention discloses the structures foundation reinforcing structure worn under a kind of reply metro shield, The structures are located at the top of the subway line in planning, and structures have basis.
The structures foundation reinforcing structure worn under reply metro shield of the invention includes graded broken stone layer 1 and cement stabilizing Soil layer 2, the upper surface of graded broken stone layer 1 and the lower surface flush of structure base, the lower surface of graded broken stone layer 1 and cement Steady soil 2 connects;Graded broken stone layer 1 and cement stabilizing soil layer 2 are respectively positioned on the top of the subway line in planning;Cement stabilizing Several vertically arranged cement mixing piles 3 are uniformly provided in the soil body of 2 lower section of soil layer, the top of cement mixing pile 3 and cement are steady Determine soil layer 2 to connect, the bottom end of cement mixing pile 3 is lower than the subway line in planning.
The bottom end of cement mixing pile 3 is lower than 50 centimetres of the bottom end of subway line or more in planning;Graded broken stone layer 1 and water The thickness of mud steady soil 2 is 30 centimetres, and the diameter of the cement mixing pile 3 is 60 centimetres.
The invention also discloses the construction methods for the structures foundation reinforcing structure worn under above-mentioned reply metro shield, in structure It is successively sequentially included the following steps: before building object construction
First step is the position for determining the subway line in planning, so that it is determined that the pass course of shield machine 4;
Second step is the cement mixing pile 3 for constructing vertically arranged along the pass course of shield machine 4, the setting of cement mixing pile 3 Region is: the region for being included after the distance for peripherally and outwardly extending a shield outer diameter of structures;Cement mixing pile 3 is at it It is uniformly distributed in setting area;The upper end of cement mixing pile 3 is equal to or higher than the design position at the foundation pit bottom of structures, and cement stirs The lower end for mixing stake 3 is lower than the pass course of shield machine 4;
Third step is the pass course along shield machine 4, excavates structure pit to foundation pit bottom position;By cement in digging process It abolishes the part that mixing pile 3 is located above structure pit bottom;Cleaning is tamped behind foundation pit bottom, is flattened.
Four steps is to tamp in two layers of the laying cement stabilizing soil layer in foundation pit bottom point and successively, every layer of cement stabilized soil thickness Degree is 15 centimetres, and two layers of laying graded broken stone layer 1 is divided on cement stabilizing soil layer 2 and is successively tamped, every level matches rubble thickness Degree is 15 centimetres;The lower end flush on the basis of the upper surface and structures of the graded broken stone layer 1 after ensuring to tamp.
After four steps, the construction of the bed course of progress structures, basis and main body on graded broken stone layer 1.
In third step, 60 centimetres of ground beneath of excavation superstructure to structures;In four steps, cement stabilized soil The laying depth of layer 2 and graded broken stone layer 1 is 30 centimetres.
This construction method can also first construct in advance to the cement mixing pile outside the range of structure pit bottom, be excavated to away from foundation pit It constructs again when the 20 centimetres of high positions in bottom remaining cement mixing pile.
After the structures foundation reinforcing structure construction worn under reply metro shield in the present invention, it can be constructed The construction of object.After structures are constructed, through after a period of time after (such as several years), shield-tunneling construction is carried out below structures When, shield machine 4 is passed through by scheduled by route, by when the cement mixing pile 3 on route abolished, to build subway line Road section.Shield machine 4 by when, since shield machine direction of advance and its surrounding soil are reinforced by cement mixing pile 3, soil Body self-stability is good, and more difficult compared to the common natural soil body sediment failure phenomenon occur.Before the appearance of uplift of soil phenomenon, water Mud steady soil 2 can intercept the active force transmitted from bottom to top, on the one hand weaken upward active force, on the other hand will be upward Active force spread out, upward pressure is greatly lowered, the higher trend of local eminence is reduced to whole protuberance upwards Very low trend significantly reduces the height of protuberance.Graded broken stone layer 1 has the ability for absorbing deformation, so that graded broken stone layer 1 The structures of top are barely affected.After the advance of shield machine 4, upward active force calms down at this, and cement stabilizing soil layer 2 can Local damage can occur, but this structural failure absorbs upward active force, enhance the stability of foundation structure.Gradation is broken Rock layers 1 occur certain deformation in stress and absorb active force.In short, using foundation structure and construction method of the invention, energy It is enough construct below structures subway line when, protect structures not by shield machine 4 by when upward active force influenced, avoid Top structures are damaged when subway line construction.
The above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although referring to above-described embodiment to this hair It is bright to be described in detail, those skilled in the art should understand that: still the present invention can be modified or be waited With replacement, without departing from the spirit or scope of the invention, or any substitutions, should all cover in power of the invention In sharp claimed range.

Claims (4)

1. the structures foundation reinforcing structure worn under reply metro shield, the structures are located at the upper of the subway line in planning Side, structures have basis,
It is characterized by comprising graded broken stone layer and cement stabilizing soil layer, the upper surface of graded broken stone layer and structure base The lower surface of lower surface flush, graded broken stone layer connects with cement stabilizing soil layer;Graded broken stone layer and cement stabilizing soil layer are equal The top of subway line in planning;Several vertically arranged cement are uniformly provided in the soil body below cement stabilizing soil layer The top of mixing pile, cement mixing pile connects with cement stabilizing soil layer, and the bottom end of cement mixing pile is lower than the subway line in planning Road.
2. the structures foundation reinforcing structure worn under reply metro shield according to claim 1, it is characterised in that: cement The bottom end of mixing pile is lower than 50 centimetres of the bottom end of subway line or more in planning;The thickness of graded broken stone layer and cement stabilizing soil layer Degree is 30 centimetres, and the diameter of the cement mixing pile is 60 centimetres.
3. the construction method for the structures foundation reinforcing structure worn under reply metro shield described in claims 1 or 2, in structure It is carried out before building object construction, it is characterised in that successively sequentially include the following steps:
First step is the pass course of determining shield machine;
Second step is constructed vertically arranged cement mixing pile along the pass course of shield machine, the setting area of cement mixing pile Domain is: the region for being included after the distance for peripherally and outwardly extending a shield outer diameter of structures;Cement mixing pile is set at it It sets in region and is uniformly distributed;
The upper end of cement mixing pile is equal to or higher than the foundation pit bottom design position of structures, and the lower end of cement mixing pile is lower than shield The pass course of machine;
Third step is the pass course along shield machine, excavates structure pit extremely design foundation pit bottom position, will in digging process It abolishes the part that cement mixing pile is located above structure pit bottom;Cleaning is tamped behind foundation pit bottom, is flattened;
Four steps is to tamp in two layers of the laying cement stabilizing soil layer in foundation pit bottom point and successively, and every layer of cement stabilizing soil thickness is 15 centimetres, two layers of laying graded broken stone layer is divided in the cement steady soil of upper layer and is successively tamped, every level matches fractured-rock layer thickness It is 15 centimetres,
The lower end flush on the basis of the upper surface and structures of the graded broken stone layer after ensuring to tamp.
4. construction method according to claim 3, it is characterised in that: in third step, excavate superstructure to structures 60 centimetres of ground beneath;In four steps, the laying depth of cement stabilizing soil layer and graded broken stone layer is 30 centimetres.
CN201910129990.1A 2019-02-21 2019-02-21 The structures foundation reinforcing structure and its construction method worn under reply metro shield Pending CN109706909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910129990.1A CN109706909A (en) 2019-02-21 2019-02-21 The structures foundation reinforcing structure and its construction method worn under reply metro shield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910129990.1A CN109706909A (en) 2019-02-21 2019-02-21 The structures foundation reinforcing structure and its construction method worn under reply metro shield

Publications (1)

Publication Number Publication Date
CN109706909A true CN109706909A (en) 2019-05-03

Family

ID=66264728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910129990.1A Pending CN109706909A (en) 2019-02-21 2019-02-21 The structures foundation reinforcing structure and its construction method worn under reply metro shield

Country Status (1)

Country Link
CN (1) CN109706909A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738381A (en) * 2021-09-23 2021-12-03 北京市政建设集团有限责任公司 Construction method for pile body at junction of underground excavation station and shield region

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE849748A (en) * 1975-12-22 1977-04-15 DEVICE FOR DIGGING TUNNELS UNDER HYDRAULIC PROTECTION
CN201695407U (en) * 2010-05-04 2011-01-05 中国水电顾问集团华东勘测设计研究院 Enclosure structure of foundation pit of subway station with downwards penetrating shield tunnel
CN102061923A (en) * 2010-11-28 2011-05-18 山东科技大学 Tunnel construction method capable of protecting existing building
CN104533434A (en) * 2014-12-28 2015-04-22 上海隧道工程股份有限公司 Construction method of rectangular ultra-shallow covered soil tunnel
CN104846829A (en) * 2014-02-18 2015-08-19 宏润建设集团股份有限公司 Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN106759458A (en) * 2017-02-13 2017-05-31 中铁十九局集团轨道交通工程有限公司 The U-shape structure of bridge pile foundation underpins transfer system and its applies method
CN209619985U (en) * 2019-02-21 2019-11-12 郑州市市政工程总公司 The structures foundation reinforcing structure worn under reply metro shield

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE849748A (en) * 1975-12-22 1977-04-15 DEVICE FOR DIGGING TUNNELS UNDER HYDRAULIC PROTECTION
CN201695407U (en) * 2010-05-04 2011-01-05 中国水电顾问集团华东勘测设计研究院 Enclosure structure of foundation pit of subway station with downwards penetrating shield tunnel
CN102061923A (en) * 2010-11-28 2011-05-18 山东科技大学 Tunnel construction method capable of protecting existing building
CN104846829A (en) * 2014-02-18 2015-08-19 宏润建设集团股份有限公司 Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN104533434A (en) * 2014-12-28 2015-04-22 上海隧道工程股份有限公司 Construction method of rectangular ultra-shallow covered soil tunnel
CN106759458A (en) * 2017-02-13 2017-05-31 中铁十九局集团轨道交通工程有限公司 The U-shape structure of bridge pile foundation underpins transfer system and its applies method
CN209619985U (en) * 2019-02-21 2019-11-12 郑州市市政工程总公司 The structures foundation reinforcing structure worn under reply metro shield

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
田海波等: "新建隧道下方预留盾构穿越条件的结构设计", 《中国市政工程》, no. 02, pages 30 - 33 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738381A (en) * 2021-09-23 2021-12-03 北京市政建设集团有限责任公司 Construction method for pile body at junction of underground excavation station and shield region
CN113738381B (en) * 2021-09-23 2023-11-14 北京市政建设集团有限责任公司 Construction method for pile body at joint of underground excavation station and shield zone

Similar Documents

Publication Publication Date Title
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN110318770A (en) A kind of hazy start tunneling method of vcehicular tunnel
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN108150190B (en) Unevenly-pressured shallow tunnel rock crusher section excavates safeguard structure and construction method
CN109487804A (en) The low disturbance reinforcement protection system of red soft rock cut slope and construction method
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN207598248U (en) A kind of Mountainous high speed railway tunnel protects bridge open-cut tunnel structure
CN110107303A (en) The deformation control method of shallow earthing shield boring across underneath high-speed railway
CN108412503A (en) Bias shallow tunnel entrance construction safeguard structure and its construction method
CN112832802B (en) Large-bottom plate supporting structure and method for asymmetric pressure
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN108374672B (en) A method of reinforcing Deep Mine soft coal level roadway surrounding rock
CN104895111B (en) The construction method of integrated pipe canal in weak soil ground
CN101838957A (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN104594371A (en) Reinforcing structure of existing foundation bottom plate and construction method thereof
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN209619985U (en) The structures foundation reinforcing structure worn under reply metro shield
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN109706909A (en) The structures foundation reinforcing structure and its construction method worn under reply metro shield
CN108952752A (en) A kind of combined type highway Tunnel Portal Structures suitable for big bias landform
CN209555945U (en) The low disturbance reinforcement protection system of red soft rock cut slope
CN110439572A (en) A kind of ductule zero brushes slope and appears construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination