CN106759458A - The U-shape structure of bridge pile foundation underpins transfer system and its applies method - Google Patents

The U-shape structure of bridge pile foundation underpins transfer system and its applies method Download PDF

Info

Publication number
CN106759458A
CN106759458A CN201710077009.6A CN201710077009A CN106759458A CN 106759458 A CN106759458 A CN 106759458A CN 201710077009 A CN201710077009 A CN 201710077009A CN 106759458 A CN106759458 A CN 106759458A
Authority
CN
China
Prior art keywords
bridge
pile foundation
existing
existing bridge
shape structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710077009.6A
Other languages
Chinese (zh)
Inventor
斯明勇
罗俊国
王永文
李强
李士达
王江华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201710077009.6A priority Critical patent/CN106759458A/en
Publication of CN106759458A publication Critical patent/CN106759458A/en
Priority to PCT/CN2018/075425 priority patent/WO2018145623A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions

Abstract

Transfer system being underpined the invention discloses a kind of U-shape structure of bridge pile foundation and its applying method, shifting risk property of stress system is big when solving the problems, such as to be transferred to the stress system of former bridge pile foundation in newly-built pile foundation system.In high-pressure rotary jet grouting pile(6)Top applied graded broken stone mattress layer(15), in the bridge pile foundation support table of existing bridge(3)Medial surface on applied cushion cap bar planting(9), in the bridge pier base abutment of existing bridge(4)Medial surface on applied abutment bar planting(10), in the bridge pile foundation support table of existing bridge(3)Inner side, the bridge pier base abutment of existing bridge(4)Inner side and plain concrete cushion layer(7)Between applied cast-in-place U-shape structure raft plate(8), in cast-in-place U-shape structure raft plate(8)Top surface and existing bridge bridge plate(5)Bottom surface between be formed with 4 centimetres of gap(11).Present invention saves a cost is changed, the uncertainty and risk for changing the transfer of bridge load stress point during stake and causing is evaded.

Description

The U-shape structure of bridge pile foundation underpins transfer system and its applies method
Technical field
The present invention relates to a kind of transfer system that underpins of bridge pile foundation, the transfer that underpins of more particularly to a kind of bridge pile foundation is Unite and its apply method.
Background technology
Bridge pile foundation is the base unit for carrying bridge load, and the load of bridge passes to pile foundation by abutment body, cushion cap. , it is necessary to carry out protection treatment to existing bridge pile foundation during the new construction of structures in existing bridge pile foundation region, to realize new construction of structures Structure.Prior art has two kinds, and one kind is first to remove existing bridge, and pulls out pile foundation, then carries out the construction of new structures, Rebuilt bridges again.In the presence of investing big, long in time limit and influenceing big defect to surrounding enviroment, particularly in down town, traffic is numerous Busy, pipeline gathers, proximate building, it is impossible to the construction method rebuilded using dismounting to bridge.Another construction method is:Using Actively change the mode of stake, will the stress system of former bridge pile foundation be transferred in newly-built pile foundation system, in this way, bridge The transfer of stress system is disposable completion, easily in stress transfer process, is destroyed former bridge superstructure, is made Inclined into the body of a bridge, bridge floor cracking, cause to have bridge can not normally use.In Urban Metro Construction, shield can be run into interval The small part pile foundation of existing bridge pile foundation is only passed through, during shield, it is only necessary to the small part being arranged on shield interval There is bridge pile foundation to be cut off, a mode is changed according to above-mentioned active, the existing bridge pile foundation not on shield interval can be made Effect can not play again, cause the waste of existing resource, in addition, pile driving construction is changed in disposable stress system transfer, exist not The big defect of certainty risk, it is difficult to ensure that the uninterrupted current of existing bridge is used.
The content of the invention
Transfer system is underpined the invention provides a kind of U-shape structure of bridge pile foundation and its apply method, solve original The stress system of bridge pile foundation is transferred to disposable shifting risk property of stress system big technical problem when in newly-built pile foundation system.
The present invention is to solve above technical problem by the following technical programs:
A kind of U-shape structure of bridge pile foundation underpins transfer system, the cofferdam that existing bridge both sides apply is included in, in existing bridge Existing pile foundation periphery and cofferdam in applied high-pressure rotary jet grouting pile on riverbed, the existing pile foundation of existing bridge is existing by what is retained The existing bridge pile foundation composition of bridge pile foundation and pre-cut, the existing bridge pile foundation of pre-cut is provided on shield interval , graded broken stone mattress layer has been applied at the top of high-pressure rotary jet grouting pile, plain concrete pad is provided with graded broken stone mattress layer Layer, has applied cushion cap bar planting, in the bridge pier base abutment of existing bridge on the medial surface of the bridge pile foundation support table of existing bridge Abutment bar planting is applied on side, in the inner side of the bridge pile foundation support table of existing bridge, the inner side of the bridge pier base abutment of existing bridge And applied cast-in-place U-shape structure raft plate between plain concrete cushion layer, in the bridge of top surface and the existing bridge of cast-in-place U-shape structure raft plate 4 centimetres of gap is formed between the bottom surface of plate.
The seam of 4 centimetres formed between the bottom surface of the bridge plate of the top surface and existing bridge of cast-in-place U-shape structure raft plate The cushion of 2 cm thicks is provided with gap.
A kind of U-shape structure of bridge pile foundation underpins transfer system and applies method
The first step, in existing bridge both sides construction cofferdam, pump drainage cofferdam internal water accumulation on the existing pile foundation periphery of existing bridge and encloses High-pressure rotary jet grouting pile is applied in weir on riverbed, graded broken stone mattress layer, form compound foundation are applied at the top of high-pressure rotary jet grouting pile;
Second step, on the medial surface of the bridge pile foundation support table of existing bridge, apply cushion cap bar planting, meanwhile, in the bridge of existing bridge On the medial surface of pile foundation abutment, abutment bar planting is applied;
3rd step, the first step complete composite foundation on, apply plain concrete cushion layer, applied in plain concrete cushion layer cast-in-place U-shape structure raft plate, makes the gap of 4 centimetres of formation between the bottom surface of the top surface of cast-in-place U-shape structure raft plate and the bridge plate of existing bridge, And make together with cast-in-place U-shape structure raft plate both sides side wall is brought into close contact with the abutment medial surface of existing bridge, the bridge of existing bridge The stress of pile framing, is delivered on cast-in-place U-shape structure raft plate by cushion cap bar planting and abutment bar planting;
4th step, the cushion for being encased inside in gap 2 cm thicks;
5th step, startup are arranged on the shield machine on front side of the existing bridge pile foundation of the pre-cut on shield interval, in riverbed Shield uplink and downlink carry out shield-tunneling construction, the existing bridge pile foundation of the pre-cut on shield excision shield interval;
After 6th step, existing bridge pile foundation are removed, existing bridge can occur slow sedimentation, slowly with gap in be encased inside 2 lis The thick cushion of rice fits together, and cast-in-place U-shape structure raft plate is carried existing bridge jointly with the existing bridge pile foundation for retaining Weight.
The present invention is greatlyd save and changes a cost, and evaded change during stake due to bridge load stress point transfer and The uncertainty and risk for causing.Construction cost is low, and can guarantee that existing bridge is safe in work progress, unimpeded.
Brief description of the drawings
Fig. 1 is structural representation of the present invention on main view direction;
Fig. 2 is structural representation of the present invention in side-looking direction;
Fig. 3 be existing bridge of the invention existing pile foundation and cofferdam in the structural representation of high-pressure rotary jet grouting pile 6 is applied on riverbed.
Specific embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of U-shape structure of bridge pile foundation underpins transfer system, the cofferdam that existing bridge both sides apply is included in, in existing bridge Existing pile foundation periphery and cofferdam in applied high-pressure rotary jet grouting pile 6 on riverbed, the existing pile foundation of existing bridge is by retaining both It is made up of the existing bridge pile foundation 12 of bridge pile foundation 2 and pre-cut, the existing bridge pile foundation 12 of pre-cut is provided in shield On interval, graded broken stone mattress layer 15 is applied at the top of high-pressure rotary jet grouting pile 6, be provided with graded broken stone mattress layer 15 Plain concrete cushion layer 7, has applied cushion cap bar planting 9, in the bridge of existing bridge on the medial surface of the bridge pile foundation support table 3 of existing bridge Abutment bar planting 10 is applied on the medial surface of pile foundation abutment 4, in the inner side of the bridge pile foundation support table 3 of existing bridge, existing bridge Cast-in-place U-shape structure raft plate 8 is applied between the inner side of bridge pier base abutment 4 and plain concrete cushion layer 7, in cast-in-place U-shape structure raft plate 8 Top surface and existing bridge bridge plate 5 bottom surface between be formed with 4 centimetres of gap 11.
4 centimetres formed between the bottom surface of the bridge plate 5 of the top surface and existing bridge of cast-in-place U-shape structure raft plate 8 The cushion of 2 cm thicks is provided with gap 11.
A kind of U-shape structure of bridge pile foundation underpins transfer system and applies method
The first step, in existing bridge both sides construction cofferdam, pump drainage cofferdam internal water accumulation on the existing pile foundation periphery of existing bridge and encloses High-pressure rotary jet grouting pile 6 is applied in weir on riverbed, graded broken stone mattress layer 15 is applied at the top of high-pressure rotary jet grouting pile 6, form stabilization Composite foundation;
Second step, on the medial surface of the bridge pile foundation support table 3 of existing bridge, apply cushion cap bar planting 9, meanwhile, in existing bridge On the medial surface of bridge pier base abutment 4, abutment bar planting 10 is applied;
3rd step, on the composite foundation that the first step is completed, apply plain concrete cushion layer 7, applied in plain concrete cushion layer 7 existing U-shape structure raft plate 8 is poured, makes to form 4 centimetres between the bottom surface of the top surface of cast-in-place U-shape structure raft plate 8 and the bridge plate 5 of existing bridge Gap 11, and make together with the cast-in-place both sides side wall of U-shape structure raft plate 8 is brought into close contact with the abutment medial surface of existing bridge, it is existing The stress of the bridge pier cushion cap 3 of bridge, is delivered on cast-in-place U-shape structure raft plate 8 by cushion cap bar planting 9 and abutment bar planting 10;
4th step, the cushion for being encased inside in gap 11 2 cm thicks, are buffered when the bridge plate 5 of existing bridge is sunk;
5th step, startup are arranged on the shield machine 16 of the front side of existing bridge pile foundation 12 of the pre-cut on shield interval, to riverbed 1 In shield uplink 13 and downlink 14 carry out shield-tunneling construction, the existing Bridge Pile of the pre-cut on shield excision shield interval Base 12;Because the existing bridge pile foundation 12 of pre-cut has passed through 10 turns of cushion cap bar planting 9 and abutment bar planting to the load of existing bridge Move on on cast-in-place U-shape structure raft plate 8, and carried by the soil body after being improved by high-pressure rotary jet grouting pile 6 under cast-in-place U-shape structure raft plate 8, Existing bridge pile foundation 12 is formd to the load of existing bridge by cast-in-place U-shape structure raft plate 8 and the existing bridge pile foundation of pre-cut 12 common carryings;
After 6th step, existing bridge pile foundation 12 are removed, because the existing bridge pile foundation 12 of pre-cut is to the load of existing bridge It is transferred on cast-in-place U-shape structure raft plate 8 by cushion cap bar planting 9 and abutment bar planting 10 completely, existing bridge can occur slow sedimentation, This process is that lentamente substep is shifted, the bridge plate 5 of existing bridge slowly with the cushion of 2 cm thicks that is encased inside in gap 11 Fit together, so as to avoid the disposable and swiftness of the existing stress transfer changed existing for piling method, it is to avoid change stake In the phenomenon such as the cracking of existing bridge floor that often occurs generation;Realize cast-in-place U-shape structure raft plate 8 and retain both There is bridge pile foundation 2 to carry the weight of existing bridge jointly, realize during existing bridge pile foundation 12 is entirely cut off, protect as far as possible Hold not changing for existing bridge force-bearing point, it is ensured that the stability under loading of existing bridge.
The part of existing bridge is carried and passes through cushion cap respectively by this method on the premise of existing bridge hard point is not changed Bar planting 9, abutment bar planting 10 and cushion substep are transferred on cast-in-place U-shape structure raft plate 8, and by under cast-in-place U-shape structure raft plate 8 The soil body after being improved by high-pressure rotary jet grouting pile 6 is carried.In shield tunneling process, it is only necessary to cut off the part pile foundation of existing bridge, And the bridge pier is located at downtown area, superstructure and landscape planting are more perfect, and surrounding enviroment are complicated, the traffic of existing bridge Throughput is big, and closure construction can cause heavy economic losses and have a strong impact on civil plantation, can use construction method of the invention.
The present invention also explores one in the case of former bridge pile foundation partial destruction, without removing bridge, carries out bridge A kind of new construction method reinforced, has given full play to the bearing function for not destroying former bridge pier, greatlys save construction investment and makes Valency, shortens construction period, routine has been evaded well and has changed the uncertain risk that stake is brought, with extensive popularization and application Value and social benefit.

Claims (3)

1. a kind of U-shape structure of bridge pile foundation underpins transfer system, the cofferdam that existing bridge both sides apply is included in, in existing bridge In the existing pile foundation periphery of beam and cofferdam high-pressure rotary jet grouting pile has been applied on riverbed(6), the existing pile foundation of existing bridge is by retaining Existing bridge pile foundation(2)With the existing bridge pile foundation of pre-cut(12)Composition, the existing bridge pile foundation of pre-cut(12)It is It is arranged on shield interval, in high-pressure rotary jet grouting pile(6)Top applied graded broken stone mattress layer(15), in graded broken stone cotton-padded mattress Bed course(15)On be provided with plain concrete cushion layer(7), it is characterised in that in the bridge pile foundation support table of existing bridge(3)Medial surface On applied cushion cap bar planting(9), in the bridge pier base abutment of existing bridge(4)Medial surface on applied abutment bar planting(10), The bridge pile foundation support table of existing bridge(3)Inner side, the bridge pier base abutment of existing bridge(4)Inner side and plain concrete cushion layer(7) Between applied cast-in-place U-shape structure raft plate(8), in cast-in-place U-shape structure raft plate(8)Top surface and existing bridge bridge plate(5)'s 4 centimetres of gap is formed between bottom surface(11).
2. a kind of U-shape structure of bridge pile foundation according to claim 1 underpins transfer system, it is characterised in that in cast-in-place U Type structure raft plate(8)Top surface and existing bridge bridge plate(5)Bottom surface between formed 4 centimetres of gap(11)In set It is equipped with the cushion of 2 cm thicks.
3. a kind of U-shape structure of bridge pile foundation underpins transfer system and applies method
The first step, in existing bridge both sides construction cofferdam, pump drainage cofferdam internal water accumulation on the existing pile foundation periphery of existing bridge and encloses High-pressure rotary jet grouting pile is applied in weir on riverbed(6), in high-pressure rotary jet grouting pile(6)Top apply graded broken stone mattress layer(15), formed Composite foundation;
Second step, the bridge pile foundation support table in existing bridge(3)Medial surface on, apply cushion cap bar planting(9), meanwhile, in existing bridge The bridge pier base abutment of beam(4)Medial surface on, apply abutment bar planting(10);
3rd step, the first step complete composite foundation on, apply plain concrete cushion layer(7), in plain concrete cushion layer(7)On apply Make cast-in-place U-shape structure raft plate(8), make cast-in-place U-shape structure raft plate(8)Top surface and existing bridge bridge plate(5)Bottom surface between Form 4 centimetres of gap(11), and make cast-in-place U-shape structure raft plate(8)Both sides side wall is tight with the abutment medial surface of existing bridge Fit together, the bridge pier cushion cap of existing bridge(3)Stress, by cushion cap bar planting(9)With abutment bar planting(10)It is delivered to existing Pour U-shape structure raft plate(8)On;
4th step, in gap(11)In be encased inside the cushion of 2 cm thicks;
5th step, startup are arranged on the existing bridge pile foundation of the pre-cut on shield interval(12)The shield machine of front side(16), it is right Riverbed(1)In shield uplink(13)And downlink(14)Carry out shield-tunneling construction, the pre-cut on shield excision shield interval Existing bridge pile foundation(12);
6th step, existing bridge pile foundation(12)After being removed, existing bridge can occur slow sedimentation, slowly with gap(11)Middle pad The cushion of 2 cm thicks for entering fits together, and makes cast-in-place U-shape structure raft plate(8)With the existing bridge pile foundation for retaining(2)Jointly Carry the weight of existing bridge.
CN201710077009.6A 2017-02-13 2017-02-13 The U-shape structure of bridge pile foundation underpins transfer system and its applies method Pending CN106759458A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710077009.6A CN106759458A (en) 2017-02-13 2017-02-13 The U-shape structure of bridge pile foundation underpins transfer system and its applies method
PCT/CN2018/075425 WO2018145623A1 (en) 2017-02-13 2018-02-06 U-shaped structural underpinning transfer system for bridge pile foundation and construction method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710077009.6A CN106759458A (en) 2017-02-13 2017-02-13 The U-shape structure of bridge pile foundation underpins transfer system and its applies method

Publications (1)

Publication Number Publication Date
CN106759458A true CN106759458A (en) 2017-05-31

Family

ID=58955401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710077009.6A Pending CN106759458A (en) 2017-02-13 2017-02-13 The U-shape structure of bridge pile foundation underpins transfer system and its applies method

Country Status (2)

Country Link
CN (1) CN106759458A (en)
WO (1) WO2018145623A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018145623A1 (en) * 2017-02-13 2018-08-16 中铁十九局集团有限公司 U-shaped structural underpinning transfer system for bridge pile foundation and construction method therefor
CN109706909A (en) * 2019-02-21 2019-05-03 郑州市市政工程总公司 The structures foundation reinforcing structure and its construction method worn under reply metro shield
CN111926854A (en) * 2020-07-21 2020-11-13 广州地铁设计研究院股份有限公司 Pile foundation reinforcing method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439025A (en) * 2019-08-30 2019-11-12 江苏省地质矿产局第三地质大队 Portal type building pile foundation underpinning structure in narrow space and construction method
CN110905014A (en) * 2019-12-10 2020-03-24 中建八局第二建设有限公司 Construction structure and construction method for underpinning pile foundation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002671A (en) * 2003-06-12 2005-01-06 Kajima Corp Underpinning method and viaduct
CN101294447A (en) * 2007-04-23 2008-10-29 上海市城市建设设计研究院 Buildings pile underpinning method
CN101761068A (en) * 2009-11-10 2010-06-30 同济大学 Box-raft pressure-bearing type foundation underpinning and construction reinforcing method for tunnel across pile foundation of bridge above river
CN101936167A (en) * 2009-06-29 2011-01-05 上海市基础工程公司 Construction method for crossing bridge pile foundation by combining bridge underpinning with shield construction
CN103981816A (en) * 2014-04-15 2014-08-13 河南省公路工程局集团有限公司 Construction method for underpinning of overpass framework pier columns
CN206570839U (en) * 2017-02-13 2017-10-20 中铁十九局集团轨道交通工程有限公司 The U-shape structure of bridge pile foundation underpins transfer system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4281567B2 (en) * 2004-02-13 2009-06-17 株式会社大林組 Reinforcement structure of existing pier foundation and reinforcement method of existing pier foundation
JP5092705B2 (en) * 2007-11-14 2012-12-05 株式会社大林組 Support structure of structure, construction method of underground structure, replacement method of foundation load
KR100970766B1 (en) * 2008-06-16 2010-07-16 양형칠 Process for reinforcing base and preventing wash-out of earth under the bridges
CN105672348A (en) * 2016-01-27 2016-06-15 重庆大学 Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN106759458A (en) * 2017-02-13 2017-05-31 中铁十九局集团轨道交通工程有限公司 The U-shape structure of bridge pile foundation underpins transfer system and its applies method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002671A (en) * 2003-06-12 2005-01-06 Kajima Corp Underpinning method and viaduct
CN101294447A (en) * 2007-04-23 2008-10-29 上海市城市建设设计研究院 Buildings pile underpinning method
CN101936167A (en) * 2009-06-29 2011-01-05 上海市基础工程公司 Construction method for crossing bridge pile foundation by combining bridge underpinning with shield construction
CN101761068A (en) * 2009-11-10 2010-06-30 同济大学 Box-raft pressure-bearing type foundation underpinning and construction reinforcing method for tunnel across pile foundation of bridge above river
CN103981816A (en) * 2014-04-15 2014-08-13 河南省公路工程局集团有限公司 Construction method for underpinning of overpass framework pier columns
CN206570839U (en) * 2017-02-13 2017-10-20 中铁十九局集团轨道交通工程有限公司 The U-shape structure of bridge pile foundation underpins transfer system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018145623A1 (en) * 2017-02-13 2018-08-16 中铁十九局集团有限公司 U-shaped structural underpinning transfer system for bridge pile foundation and construction method therefor
CN109706909A (en) * 2019-02-21 2019-05-03 郑州市市政工程总公司 The structures foundation reinforcing structure and its construction method worn under reply metro shield
CN111926854A (en) * 2020-07-21 2020-11-13 广州地铁设计研究院股份有限公司 Pile foundation reinforcing method

Also Published As

Publication number Publication date
WO2018145623A1 (en) 2018-08-16

Similar Documents

Publication Publication Date Title
CN106759458A (en) The U-shape structure of bridge pile foundation underpins transfer system and its applies method
CN102296507B (en) Treatment method of subgrade cracks
CN108999097B (en) Modification structure and construction method of existing bridge abutment in bridge jacking
CN102660936A (en) Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film
CN108589771A (en) One kind having runed underground station increasing layer transfer node construction method
KR101260397B1 (en) Single Pile Concrete Track Structure and Its Settlement Recovering Device
JP5425646B2 (en) Airtight bag body embankment
CN109056508A (en) The construction method of the bridge pier of basic protection against erosion, bridge and underwater foundation protection against erosion
CN108755453A (en) A kind of water punching is damaged the composite reinforcement structure and its reinforcement means of bridge pier
CN109339065A (en) A kind of method of deep-water bare basement rock close pile supporting construction cushion cap
CN206570839U (en) The U-shape structure of bridge pile foundation underpins transfer system
CN203654308U (en) Anchor jacked pile reinforced bearing platform structure for reinforcing deformed bridge pile
JPH06220865A (en) Double cofferdam process
CN108360369A (en) The road and bridge end of the bridge engaging portion structure of pre- anti-jump vehicle phenomenon
CN105064373B (en) Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, river course and construction method thereof
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN109653226A (en) A kind of cofferdam structure based on the double steel sheet pile of core filling type
CN109653223A (en) River anti-floating weighting board construction method
CN109723143A (en) A kind of construction method of the super short prominent concrete bearing platform of rigidity
CN105155377A (en) Roadbed structure close to expressway pier
CN110184952B (en) Modification structure of existing bridge abutment and construction method thereof
CN209619985U (en) The structures foundation reinforcing structure worn under reply metro shield
CN109338909B (en) Integral pier reinforcing structure and construction method thereof
CN207331754U (en) A kind of municipal administration inspection shaft
CN209636574U (en) A kind of friction pile for spelling broad way base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ming Yong Si

Inventor after: Gao Chong

Inventor after: Luo Junguo

Inventor after: Wang Yongwen

Inventor after: Li Qiang

Inventor after: Li Shida

Inventor after: Wang Jianghua

Inventor before: Ming Yong Si

Inventor before: Luo Junguo

Inventor before: Wang Yongwen

Inventor before: Li Qiang

Inventor before: Li Shida

Inventor before: Wang Jianghua

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531