CN109697545A - Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system - Google Patents

Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system Download PDF

Info

Publication number
CN109697545A
CN109697545A CN201711001446.6A CN201711001446A CN109697545A CN 109697545 A CN109697545 A CN 109697545A CN 201711001446 A CN201711001446 A CN 201711001446A CN 109697545 A CN109697545 A CN 109697545A
Authority
CN
China
Prior art keywords
user
management system
audit
manufacturing management
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711001446.6A
Other languages
Chinese (zh)
Inventor
张超
阮美琴
李发林
杨兆辉
周志昌
江浩杰
蔡琦
周凌云
王佳宇
张世康
贾永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiashi (group) Co Ltd
Original Assignee
Shanghai Jiashi (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiashi (group) Co Ltd filed Critical Shanghai Jiashi (group) Co Ltd
Priority to CN201711001446.6A priority Critical patent/CN109697545A/en
Publication of CN109697545A publication Critical patent/CN109697545A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides bulletin method, apparatus, memory and electronic equipment based on manufacturing management system.Wherein, described device include: today reminding module, process auditing module, news/announcement module, project dynamic module.The present invention in manufacturing management system directly on the day of user's push project danger sources information, need construction job sheet, the project news messages audited etc., the task reminders provided convenience by way of bulletin for user, so that user eliminates the troublesome operation for searching key message in manufacturing management system.

Description

Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system
Technical field
The present invention relates to the manufacturing platform management system fields of building trade, more particularly to based on manufacturing management system Announce method, apparatus, memory and electronic equipment.
Background technique
At this stage, the manufacturing management platform of building trade lacks the bulletin function of important information, so that registration user needs Important information related with the action that oneself is responsible for is inquired one by one in manufacturing management platform, not only bad for raising work Make efficiency, is also easy to lead to the omission of important information.Such as: when user wishes to know that the multiple projects under construction oneself being responsible for It when related situation, needs to search project under construction one by one in manufacturing management platform, then can just check that project under construction whether there is Problem to be solved etc..
Summary of the invention
In view of the foregoing deficiencies of prior art, the purpose of the present invention is to provide the bulletins based on manufacturing management system Method, apparatus, memory and electronic equipment, for solving problem above in the prior art.
In order to achieve the above objects and other related objects, the present invention provides a kind of bulletin side based on manufacturing management system Method, comprising: obtain the newly-increased user's operation for reminding entry today;Having inside the Pass for prompting information creating today is inputted according to user Hold, and be published on the bulletin page of the manufacturing management system, wherein the related content that described today reminds includes: project danger Dangerous source information.
In one embodiment of the invention, further includes: show pending construction job sheet;It obtains and audits the construction task Single user's operation;The related content that information adds audit in the construction job sheet is inputted according to user, wherein described to examine The related content of core includes: audit conclusion, and/or audit opinion.
In one embodiment of the invention, the content of the construction job sheet is included at least: auditing the at different levels of the construction task User information, the method also includes: each rank of the construction job sheet is shown according to the user's sequence for auditing the construction task The audit status information of section.
In one embodiment of the invention, further includes: obtain the user's operation of newly-increased news/notice entry;It is defeated according to user Enter the related content of information creating news/notice, and be published on the bulletin page of the manufacturing management system, wherein is described new The related content of news/notice includes: the cover pictorial information of upload.
In one embodiment of the invention, further includes: obtain the user's operation of new projects dynamic environment;It is inputted according to user Information creating project is published on the bulletin page of the manufacturing management system dynamically in relation to content, wherein the project is dynamic The related content of state includes: project news messages.
In order to achieve the above objects and other related objects, the present invention provides a kind of bulletin dress based on manufacturing management system Set, comprising: today reminding module, be used for: obtaining the user's operation for reminding entry newly-increased today;Information creating is inputted according to user The related content that today reminds, and it is published on the bulletin page of the manufacturing management device, wherein described today reminds related Content includes: project danger sources information.
In one embodiment of the invention, further includes: process auditing module is used for: showing pending construction job sheet;It obtains Take the user's operation for auditing the construction job sheet;Information is inputted according to user, and having for audit is added in the construction job sheet Hold inside the Pass, wherein the related content of the audit includes: audit conclusion, and/or audit opinion.
In one embodiment of the invention, the content of the construction job sheet is included at least: auditing the at different levels of the construction task User information, the process auditing module are also used to: showing the construction task according to the user's sequence for auditing the construction task The audit status information in single each stage.
In one embodiment of the invention, further includes: news/announcement module is used for: obtaining newly-increased news/notice entry User's operation;The related content of information creating news/notice is inputted according to user, and is published on the public affairs of the manufacturing management system Accuse the page, wherein the related content of the news/notice includes: the cover pictorial information of upload.
In one embodiment of the invention, further includes: project dynamic module is used for: obtaining the use of new projects dynamic environment Family operation;Information creating project is inputted dynamically in relation to content according to user, and is published on the bulletin of the manufacturing management system The page, wherein dynamically related content includes: project news messages to the project.
In order to achieve the above objects and other related objects, the present invention provides a kind of storage medium, wherein being stored with computer Program when the computer program is by processor load and execution, realizes as above any public affairs based on manufacturing management system Announcement method.
In order to achieve the above objects and other related objects, the present invention provides a kind of electronic equipment characterized by comprising Processor and memory;Wherein, the memory is for storing computer program;The processor is for described in load and execution Computer program, so that the electronic equipment executes as above any bulletin method based on manufacturing management system.
As described above, bulletin method, apparatus, memory and the electronic equipment of the invention based on manufacturing management system, It is new that the project danger sources information on the same day, the construction job sheet for needing to audit, project directly are pushed to user in manufacturing management system Message etc. is heard, the task reminders provided convenience by way of bulletin for user, so that user eliminates in manufacturing management system The troublesome operation of key message is searched in system.
Detailed description of the invention
Fig. 1 is shown as the module diagram of the bulletin device based on manufacturing management system in one embodiment of the invention.
Fig. 2 be shown as in one embodiment of the invention today reminding module display interface schematic diagram.
Fig. 3 is shown as the display interface schematic diagram of the process auditing module in one embodiment of the invention.
Fig. 4 is shown as another display interface schematic diagram of the process auditing module in one embodiment of the invention.
Fig. 5 is shown as the another display interface schematic diagram of the process auditing module in one embodiment of the invention.
Fig. 6 is shown as the display interface schematic diagram of the news template in one embodiment of the invention.
Fig. 7 is shown as another display interface schematic diagram of the news template in one embodiment of the invention.
Specific embodiment
Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from Various modifications or alterations are carried out under spirit of the invention.It should be noted that in the absence of conflict, following embodiment and implementation Feature in example can be combined with each other.
It should be noted that illustrating the basic structure that only the invention is illustrated in a schematic way provided in following embodiment Think, only shown in schema then with related component in the present invention rather than component count, shape and size when according to actual implementation Draw, when actual implementation kenel, quantity and the ratio of each component can arbitrarily change for one kind, and its assembly layout kenel It is likely more complexity.
As shown in Figure 1, the present embodiment provides a kind of bulletin devices 1 based on manufacturing management system.The manufacturing management system System is equipped on and can be attached and exchange in the mobile terminal of data with internet and computer, in a particular embodiment, The computer is, for example, desktop computer, laptop or tablet computer etc., and the mobile terminal may be, for example, intelligent hand Electronic equipment having data processing function such as machine, tablet computer, PDA etc..It should be noted that using the manufacturing management system The relevant staff of system user's registration need to be completed before using the manufacturing management system and user logs in.The manufacturing management system System provides a variety of work post/skills for occupation for registration user, and user need to be according to oneself in engineering project when inputting registration information The practical role taken on carries out work post/skills for occupation selection of account.
Described device 1 include: today reminding module 101, process auditing module 102, news/announcement module 103, project it is dynamic Morphotype block 104.
Today, reminding module 101 was for issuing daily project danger source prompting.Fig. 2 shows reminding module today 101 A kind of user interface, the number " 1 " shown in " prompting today " entry is statistical value, indicates that current generated today mentions The item number for information of waking up.As shown, showing the reminder message that publisher is issued in issuing time in the user interface, click The reminder message can check the detailed content of the reminder message, comprising: title, content, picture etc.;It clicks on the prompting message Editing key and delete key, the editor to this reminder message and delete operation can be realized.It is clicked when getting registration user When the mouse action of " newly-increased today remind ", a display interface is provided to enable user input the related content that creation is reminded today, Include: title, project danger sources information, uploading pictures etc., and be published on the bulletin page of the manufacturing management system, wherein Publisher and issuing time are obtained automatically by the manufacturing platform system, and are made an addition in the content of this today of prompting.
Process auditing module 102, after builder issues construction job sheet in the manufacturing management system, the system The document for needing to audit can be shown in the process auditing module 102 of the auditor of the construction job sheet by making management system, To facilitate audit fast to be handled, working efficiency is improved.Fig. 3 shows a kind of user interface of process auditing module 102, The number " 14 " shown in " process audit " entry is statistical value, indicates the item number of current generated process msu message. As shown, showing the reminder message that different publishers are issued in different issuing times in the user interface, clicks and remind Message can check the detailed content of the reminder message, as shown in Figure 4, comprising: the essential information of content of constructing (construction type, Project amount, unit, personnel, limit unit price, customized unit price, price aggregate, attendance wage, limit compare etc.), auditing flow Situation information (audit the msu messages at different levels of the construction task, comprising: audit time, auditor, audit post, whether agree to, Next step state, suggestions made after examination etc.), it is preferred that information is suitable according to the auditor for auditing the construction task the case where auditing flow Sequence shows the audit status information in each stage of the construction job sheet in the form of a list.It is clicked when getting audit user When the mouse action of " audit construction job sheet ", the interface shown such as Fig. 5 is provided to enable user input audit conclusion and audit meaning See, wherein auditor and audit time are obtained automatically by the manufacturing platform system, and make an addition to the content of this process audit In.
News/announcement module 103 is the entrance that company is used to issue relevant information, and the corresponding administrative staff of company can send out The news of cloth our company and important notice etc..Fig. 6 shows the interfacial effect figure of news/announcement module 103, shows on the interface Show that the news information that different publishers are issued in different issuing times, every news information have cover picture and news Title, the detailed content of the news information can be checked by clicking the cover picture;Click the editing key in the cover picture upper right corner And delete key, the editor to this news information and delete operation can be realized.When getting, registration user click is " newly-increased new When the mouse action of news ", interface as shown in Figure 7 is provided to enable user input the related content of creation news information, comprising: mark Topic, cover picture (uploads successfully can preview show), news content etc., wherein publisher and issuing time are put down by described manufacture Platform system obtains automatically, and makes an addition in the content of this news information.
Project dynamic module 104 issues all kinds of news messages of project for project manager, similar with the display effect of Fig. 6, The project dynamic that different publishers are issued in different issuing times, every item are shown on the interface of project dynamic module 104 Mesh dynamic has cover picture and title, and the dynamic detailed content of the project can be checked by clicking the cover picture;Clicking should The editing key and delete key in the cover picture upper right corner can be realized and dynamically edit to this project and delete operation.Work as acquisition When clicking the mouse action of " new projects dynamic " to registration user, display interface is provided to enable user input creation project dynamic Related content, comprising: title, cover picture (upload successfully can preview show), project news messages etc., wherein publisher It is obtained, and made an addition in the dynamic content of this project automatically by the manufacturing platform system with issuing time.
In addition to this, the bulletin device 1 further include: demand feedback module is needed for providing the submission under personal account It asks function, version to be promoted and suggests prompting etc..
Corresponding with the bulletin device provided by the above embodiment based on manufacturing management system, the present embodiment provides based on system The bulletin method for making management system, one of includes the following steps or multiple combinations.It should be noted that being between each step Mutually independent, the present embodiment does not limit the sequence between combined step, due in aforementioned device embodiment Technical characteristic can be applied to this method embodiment, thus no longer heavy burden repeats.Specifically, the public affairs based on manufacturing management system Announcement method includes:
Step 1: the newly-increased user's operation for reminding entry today is obtained;Input what information creating today reminded according to user Related content, and be published on the bulletin page of the manufacturing management system, wherein the related content that described today reminds includes: Project danger sources information.
Step 2: pending construction job sheet is shown;Obtain the user's operation for auditing the construction job sheet;According to Family input information adds the related content of audit in the construction job sheet, wherein the related content of the audit includes: careful Core conclusion, and/or audit opinion.In a preferable embodiment, the content of the construction job sheet is included at least: audit should The user informations at different levels of construction task, the method also includes: it is applied described in user's sequence display of the construction task according to auditing The audit status information in each stage of work job order.
Step 3: the user's operation of newly-increased news/notice entry is obtained;Information creating news/notice is inputted according to user Related content, and be published on the bulletin page of the manufacturing management system, wherein the related content packet of the news/notice It includes: the cover pictorial information of upload.
Step 4: the user's operation of new projects dynamic environment is obtained;It is dynamic that information creating project is inputted according to user Related content, and it is published on the bulletin page of the manufacturing management system, wherein dynamically related content includes: the project Project news messages.
In addition to this, the invention also includes a kind of storage medium and a kind of electronic equipment, due to the skill in previous embodiment Art feature can be applied to storage medium embodiment, electronic equipment embodiment, thus it is no longer repeated.
The storage medium includes: the various media that can store program code such as ROM, RAM, magnetic or disk, In be stored with computer program, the computer program when by processor load and execution, realize previous embodiment in based on manufacture The all or part of the steps of the bulletin method of management system.
The electronic equipment be include processor (CPU/MCU/SOC), memory (ROM/RAM), communication module (it is wired/ Wireless network), the equipment of display module, preferably smart phone.Particularly, it is stored with computer program in the memory, it should When processor computer program described in load and execution, the bulletin method based on manufacturing management system in previous embodiment is realized All or part of the steps.
In conclusion bulletin method, system, memory and the electronic equipment of the invention based on manufacturing management system, has Effect overcomes various shortcoming in the prior art and has high industrial utilization value.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should be covered by the claims of the present invention.

Claims (12)

1. a kind of bulletin method based on manufacturing management system characterized by comprising
Obtain the newly-increased user's operation for reminding entry today;
The related content reminded information creating today is inputted according to user, and is published on the bulletin page of the manufacturing management system Face, wherein the related content that described today reminds includes: project danger sources information.
2. the method according to claim 1, wherein further include:
Show pending construction job sheet;
Obtain the user's operation for auditing the construction job sheet;
Input information according to user and add the related content of audit in the construction job sheet, wherein the audit it is related Content includes: audit conclusion, and/or audit opinion.
3. according to the method described in claim 2, it is characterized in that, the content of the construction job sheet includes at least: audit should The user informations at different levels of construction task, the method also includes: it is applied described in user's sequence display of the construction task according to auditing The audit status information in each stage of work job order.
4. the method according to claim 1, wherein further include:
Obtain the user's operation of newly-increased news/notice entry;
The related content of information creating news/notice is inputted according to user, and is published on the bulletin page of the manufacturing management system Face, wherein the related content of the news/notice includes: the cover pictorial information of upload.
5. the method according to claim 1, wherein further include:
Obtain the user's operation of new projects dynamic environment;
Information creating project is inputted dynamically in relation to content according to user, and is published on the bulletin page of the manufacturing management system Face, wherein dynamically related content includes: project news messages to the project.
6. a kind of bulletin device based on manufacturing management system characterized by comprising today reminding module, be used for:
Obtain the newly-increased user's operation for reminding entry today;
The related content reminded information creating today is inputted according to user, and is published on the bulletin page of the manufacturing management device Face, wherein the related content that described today reminds includes: project danger sources information.
7. device according to claim 6, which is characterized in that further include: process auditing module is used for:
Show pending construction job sheet;
Obtain the user's operation for auditing the construction job sheet;
Input information according to user and add the related content of audit in the construction job sheet, wherein the audit it is related Content includes: audit conclusion, and/or audit opinion.
8. device according to claim 7, which is characterized in that the content of the construction job sheet includes at least: audit should The user informations at different levels of construction task, the process auditing module are also used to: aobvious according to the user's sequence for auditing the construction task Show the audit status information in each stage of the construction job sheet.
9. device according to claim 6, which is characterized in that further include: news/announcement module is used for:
Obtain the user's operation of newly-increased news/notice entry;
The related content of information creating news/notice is inputted according to user, and is published on the bulletin page of the manufacturing management system Face, wherein the related content of the news/notice includes: the cover pictorial information of upload.
10. device according to claim 6, which is characterized in that further include: project dynamic module is used for:
Obtain the user's operation of new projects dynamic environment;
Information creating project is inputted dynamically in relation to content according to user, and is published on the bulletin page of the manufacturing management system Face, wherein dynamically related content includes: project news messages to the project.
11. a kind of storage medium, wherein being stored with computer program, which is characterized in that the computer program is added by processor When carrying execution, the bulletin method based on manufacturing management system as described in any in claim 1 to 5 is realized.
12. a kind of electronic equipment characterized by comprising processor and memory;Wherein,
The memory is for storing computer program;
The processor is for computer program described in load and execution, so that the electronic equipment is executed as in claim 1 to 5 Any bulletin method based on manufacturing management system.
CN201711001446.6A 2017-10-24 2017-10-24 Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system Pending CN109697545A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711001446.6A CN109697545A (en) 2017-10-24 2017-10-24 Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711001446.6A CN109697545A (en) 2017-10-24 2017-10-24 Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system

Publications (1)

Publication Number Publication Date
CN109697545A true CN109697545A (en) 2019-04-30

Family

ID=66228083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711001446.6A Pending CN109697545A (en) 2017-10-24 2017-10-24 Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system

Country Status (1)

Country Link
CN (1) CN109697545A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111626836A (en) * 2020-05-18 2020-09-04 成都集致生活科技有限公司 Modular method for bookkeeping construction work in order or for contractor

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324062A (en) * 2011-08-18 2012-01-18 北京思创银联科技股份有限公司 Prompting message obtains system and method
CN103136621A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for checking procedures of project submission form
CN104412217A (en) * 2012-06-26 2015-03-11 谷歌公司 Prioritized management and presentation of notifications
CN105162689A (en) * 2015-08-19 2015-12-16 阿里巴巴集团控股有限公司 Group announcement showing method and device of instant messaging application
US20160048806A1 (en) * 2014-08-18 2016-02-18 Jobfilez, Inc. Computer-based project management methods and systems
CN105787673A (en) * 2016-03-23 2016-07-20 焦磊 Internet service flow management system
CN106600222A (en) * 2016-12-09 2017-04-26 武汉中瀚科技有限公司 Mobile office information processing system and method
CN107133338A (en) * 2017-05-16 2017-09-05 廊坊市新思维科技有限公司 Non-destructive Testing Data auditing system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324062A (en) * 2011-08-18 2012-01-18 北京思创银联科技股份有限公司 Prompting message obtains system and method
CN103136621A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for checking procedures of project submission form
CN104412217A (en) * 2012-06-26 2015-03-11 谷歌公司 Prioritized management and presentation of notifications
US20160048806A1 (en) * 2014-08-18 2016-02-18 Jobfilez, Inc. Computer-based project management methods and systems
CN105162689A (en) * 2015-08-19 2015-12-16 阿里巴巴集团控股有限公司 Group announcement showing method and device of instant messaging application
CN105787673A (en) * 2016-03-23 2016-07-20 焦磊 Internet service flow management system
CN106600222A (en) * 2016-12-09 2017-04-26 武汉中瀚科技有限公司 Mobile office information processing system and method
CN107133338A (en) * 2017-05-16 2017-09-05 廊坊市新思维科技有限公司 Non-destructive Testing Data auditing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111626836A (en) * 2020-05-18 2020-09-04 成都集致生活科技有限公司 Modular method for bookkeeping construction work in order or for contractor

Similar Documents

Publication Publication Date Title
US20190050812A1 (en) Project management and activity tracking methods and systems
CN107341643B (en) Visual process display method and system
US9905043B2 (en) Techniques to generate digital maps
US8631021B2 (en) Systems and methods for managing organizational information
US9893905B2 (en) Collaborative platform for teams with messaging and learning across groups
CN110717320A (en) Form/report designer and method suitable for multiple platforms and information management system
Lykourentzou et al. Wikis in enterprise settings: a survey
US10510044B2 (en) Project management system providing digital form-based inspections in the field
CN105678521A (en) Schedule reminding method and device
CN109242288B (en) Performance data matching method and system
US20140156763A1 (en) Person centric feeds and direct messaging in business systems
US20160086290A1 (en) Social project management
CN111917560A (en) Communication method, device and equipment
CN111445102A (en) Cloud service platform on enterprise
KR20140013578A (en) Method for managing meeting using internet
CN103955745A (en) Restaurant order processing system and method
CN114218291A (en) Portrait generation method, apparatus, device and storage medium based on target object
CN113741860A (en) Data processing method and device based on RPA robot
CN109697545A (en) Bulletin method, apparatus, memory and electronic equipment based on manufacturing management system
Wu et al. The benefits of using unified communications systems for SMEs
WO2020027948A1 (en) Automated calendar event association via implicit tagging
CN112700093B (en) Project progress Gantt chart construction method, terminal device and storage medium
CN112288406B (en) Service object retrieval method based on scientific and technological information crowd-sourced platform
CN109120783A (en) Information acquisition method and device, mobile terminal and computer readable storage medium
JP2004310563A (en) Project management integration support system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190430

RJ01 Rejection of invention patent application after publication