CN109681018B - 一种线路抢修铁塔组件 - Google Patents

一种线路抢修铁塔组件 Download PDF

Info

Publication number
CN109681018B
CN109681018B CN201811335966.5A CN201811335966A CN109681018B CN 109681018 B CN109681018 B CN 109681018B CN 201811335966 A CN201811335966 A CN 201811335966A CN 109681018 B CN109681018 B CN 109681018B
Authority
CN
China
Prior art keywords
telescopic joint
section
pair
iron tower
rectangular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811335966.5A
Other languages
English (en)
Other versions
CN109681018A (zh
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI BOYUAN AUTOMATION INSTRUMENTATION Co.,Ltd.
Original Assignee
Yueqing Fengjie Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueqing Fengjie Electronic Technology Co Ltd filed Critical Yueqing Fengjie Electronic Technology Co Ltd
Priority to CN201811335966.5A priority Critical patent/CN109681018B/zh
Publication of CN109681018A publication Critical patent/CN109681018A/zh
Application granted granted Critical
Publication of CN109681018B publication Critical patent/CN109681018B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/18Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
    • E04H12/182Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明公开了一种线路抢修铁塔组件,包括本体,本体由若干单体组装而成,单个单体的大体为矩形框架,矩形框架由一对立柱和一对横杆通过转角连接板拼装而成,单个立柱的中部设置有一段伸缩节,且一段伸缩节上活动套设有至少一个具备自锁装置的滑索,单个立柱在非伸缩节的框架上设置有多个角钢,单个单体通过对称设置的滑索或角钢安装有若干支撑杆,且单体的转角处设置有安装板与转角连接板相连接。本发明采用单体拼装集成的方式完成抢修塔的现场组装,整体框架结构合理,方便拆装,解决了散件运输、现场拼装所带来的大难度、大误差、高消耗的问题,有助于成本控制,易于推广。

Description

一种线路抢修铁塔组件
技术领域
本发明涉及了高压塔技术领域,尤其涉及了一种线路抢修铁塔组件。
背景技术
随着电网建设的发展,输电线路的电压等级越来越高,输送容量越来越大,杆塔与变电站构架荷载不断增加,对线路安全性、可靠性和经济性的要求越来越高,管式电力铁塔、构架、梁就应运而生,因其是空心结构,具有跨度大、承载力大、风载阻力小、传力清晰、结构稳定等特点在超高压、特高压输电线路中得到越来越广泛的应用。在输电线路遭遇狂风暴雨、地震等极端恶劣的自然灾害时,常会引起超高压输电线路铁塔的倒塌,以及各种民用设施及厂矿企业生产设备,导致严重的生产及安全事故的发生。
通常在事故现场紧急抢险,临时搭起超高压输电线路支撑用铁塔,待线路抢修完成后,再拆除该临时搭建的超高压输电线路支撑用铁塔。因此在抢修铁塔的现场组装过程中,,其重量很大,其竖立、提升、接长和加固非常麻烦,费力,各种现场环境复杂多变,导致施工的难度大、消耗大,占用抢修工程的直线工期,成本投入大,后期安装不方便,实用性不高,操作不方便,而且部件框架难以进行再利用,经济效益较差,给铁塔及其输电线路的抢修带来延误和损失。
因此,为了解决上述存在的问题,本发明特提供了一种新的技术方案。
发明内容
本发明的目的是提供了一种线路抢修铁塔组件,用于提高整体框架结构的合理性、方便现场安装、二次利用率高以及成本低。
本发明针对上述技术缺陷所采用的技术方案是:一种线路抢修铁塔组件,包括本体,所述本体由若干单体组装而成,单个所述单体的大体为矩形框架,矩形框架由一对立柱和一对横杆通过转角连接板拼装而成,单个所述立柱的中部设置有一段伸缩节,且一段伸缩节上活动套设有至少一个具备自锁装置的滑索,单个所述立柱在非伸缩节的框架上设置有多个角钢,单个所述单体通过对称设置的滑索或角钢安装有若干支撑杆,且单体的转角处设置有安装板与转角连接板相连接。
进一步地,所述本体通过单体上的安装板实现不同数量的单体的连接与分离。
进一步地,单个所述单体的一段伸缩节上设置有定位机构,多个单体通过定位机构和支撑杆的连接用于组合成本体上端的导线杆。
进一步地,单体两两之间的安装板形成折叠界面,且折叠界面具有锁紧机构。
本发明的有益效果是:本发明采用单体拼装集成的方式完成抢修塔的现场组装,适用性广,且单体上增设伸缩节用于实现单体高度的调节,能够减少单体组装的数量和时间,及时完成线路的抢修工程,方便实用,而且整体框架结构合理,单体两两之间形成折叠界面,方便拆装,并实现再利用,大大的减少了资源的浪费,解决了散件运输、现场拼装所带来的大难度、大误差、高消耗的问题,有助于成本控制,易于推广。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细描述
图1为本发明所述单体的结构示意图。
图2为本发明所述单体组装形成本体的结构示意图。
其中:1、本体,2、单体,3、立柱,4、横杆,5、转角连接板,6、伸缩节,7、滑索,8、角钢,9、支撑杆,10、安装板,11、定位机构,12、导线杆,13、折叠界面,14、锁紧机构。
具体实施方式
如图1和图2所示的一种线路抢修铁塔组件,包括本体1,本体1由若干单体2组装而成,单个单体2的大体为矩形框架,矩形框架由一对立柱3和一对横杆4通过转角连接板5拼装而成,单个立柱3的中部设置有一段伸缩节6,且一段伸缩节6上活动套设有至少一个具备自锁装置的滑索7,单个立柱3在非伸缩节6的框架上设置有多个角钢8,单个单体2通过对称设置的滑索7或角钢8安装有若干支撑杆9,且单体2的转角处设置有安装板10与转角连接板5相连接。
在本实施例中,本体1通过单体2上的安装板10实现不同数量的单体的连接与分离,采用单体2拼装集成的方式完成抢修塔的现场组装,适用性广。
在本实施例中,单个单体2的一段伸缩节6上设置有定位机构11,多个单体2通过定位机构11和支撑杆9的连接用于组合成本体1上端的导线杆12,在单体2的立柱3上增设伸缩节6用于实现单体2高度的调节,在单体2拼装达到相同高度时,相较于传统单体框架而言,只需利用数量较少的单体2即可快速完成组装,大大减少单体2组装的数量和时间,其中定位机构为常见的紧固件即可,也可为多个紧固件组合的定位结构,充分利用单体2每个部件,使得单体2组装简单方便,降低现场组装的高难度和高消耗,保证整体框架结构合理,及时完成线路的抢修工程,使得生产、安全及时恢复,避免因现场组装难度大、消耗大,占用抢修工程的直线工期而导致抢修延误和损失较大等现象。
在本实施例中,单体2两两之间的安装板10形成折叠界面13,且折叠界面13具有锁紧机构14,折叠方式的设置便于后期的拆卸和运输,实现再利用,大大减少资源浪费,而且设置有锁紧机构14用于保证本体1框架的稳定性和安全性。
本发明的有益效果是:本发明采用单体拼装集成的方式完成抢修塔的现场组装,整体框架结构合理,方便拆装,解决了散件运输、现场拼装所带来的大难度、大误差、高消耗的问题,有助于成本控制,易于推广。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (1)

1.一种线路抢修铁塔组件,包括本体,所述本体由若干单体组装而成,其特征在于:单个所述单体为矩形框架,矩形框架由一对立柱和一对横杆通过转角连接板拼装而成,单个所述立柱的中部设置有一段伸缩节,且一段伸缩节上活动套设有至少一个具备自锁装置的滑索,单个所述立柱在非伸缩节的框架上设置有多个角钢,单个所述单体通过对称设置的滑索或角钢安装有若干支撑杆,且单体的转角处设置有安装板与转角连接板相连接;所述本体通过单体上的安装板实现不同数量的单体的连接与分离;单个所述单体的一段伸缩节上设置有定位机构,多个单体通过定位机构和支撑杆的连接用于组合成本体上端的导线杆;单体两两之间的安装板形成折叠界面,且折叠界面具有锁紧机构。
CN201811335966.5A 2016-12-30 2016-12-30 一种线路抢修铁塔组件 Active CN109681018B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811335966.5A CN109681018B (zh) 2016-12-30 2016-12-30 一种线路抢修铁塔组件

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201811335966.5A CN109681018B (zh) 2016-12-30 2016-12-30 一种线路抢修铁塔组件
CN201611262051.7A CN106593069B (zh) 2016-12-30 2016-12-30 一种线路抢修铁塔组件

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201611262051.7A Division CN106593069B (zh) 2016-12-30 2016-12-30 一种线路抢修铁塔组件

Publications (2)

Publication Number Publication Date
CN109681018A CN109681018A (zh) 2019-04-26
CN109681018B true CN109681018B (zh) 2020-07-03

Family

ID=58582392

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201611262051.7A Expired - Fee Related CN106593069B (zh) 2016-12-30 2016-12-30 一种线路抢修铁塔组件
CN201811335966.5A Active CN109681018B (zh) 2016-12-30 2016-12-30 一种线路抢修铁塔组件

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201611262051.7A Expired - Fee Related CN106593069B (zh) 2016-12-30 2016-12-30 一种线路抢修铁塔组件

Country Status (1)

Country Link
CN (2) CN106593069B (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4590720A (en) * 1984-02-06 1986-05-27 Parco Mast And Substructure, Inc. Telescoping derrick
CN101824932A (zh) * 2010-03-23 2010-09-08 宁波天弘电力器具有限公司 抢修塔的塔段
ES2362758B1 (es) * 2007-12-29 2012-04-27 Universidad De M�?Laga Torre telescópica.
CN103243959A (zh) * 2013-05-22 2013-08-14 四川擎烽通信有限责任公司 一种快装式通信铁塔及其安装方法
CN104074389A (zh) * 2013-03-28 2014-10-01 国家电网公司 一种组合式高压线路铁塔立柱式抢修塔
CN104863407A (zh) * 2015-05-29 2015-08-26 中国电力科学研究院 一种输电线路的抢修塔
CN204876739U (zh) * 2015-06-17 2015-12-16 哈尔滨工业大学 一种抢修塔标准节
CN103967314B (zh) * 2014-05-14 2016-07-06 国家电网公司 一种10kv-110kv应急抢修杆

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR0305581C1 (pt) * 2003-10-16 2005-08-09 Implo Technologies Torre com estrutura modular para reparos de linhas de transmissão elétricas
US7836656B2 (en) * 2007-06-01 2010-11-23 Crosbie Patrick J Tower module, system and method
CN105332540B (zh) * 2015-11-18 2018-03-23 山东得胜电力股份有限公司 一种自走式高压线路快速抢修塔
CN106150176B (zh) * 2016-08-09 2018-09-18 国网上海市电力公司 超高压输电线路应急抢修用耐张杆塔立柱模块

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4590720A (en) * 1984-02-06 1986-05-27 Parco Mast And Substructure, Inc. Telescoping derrick
ES2362758B1 (es) * 2007-12-29 2012-04-27 Universidad De M�?Laga Torre telescópica.
CN101824932A (zh) * 2010-03-23 2010-09-08 宁波天弘电力器具有限公司 抢修塔的塔段
CN104074389A (zh) * 2013-03-28 2014-10-01 国家电网公司 一种组合式高压线路铁塔立柱式抢修塔
CN103243959A (zh) * 2013-05-22 2013-08-14 四川擎烽通信有限责任公司 一种快装式通信铁塔及其安装方法
CN103967314B (zh) * 2014-05-14 2016-07-06 国家电网公司 一种10kv-110kv应急抢修杆
CN104863407A (zh) * 2015-05-29 2015-08-26 中国电力科学研究院 一种输电线路的抢修塔
CN204876739U (zh) * 2015-06-17 2015-12-16 哈尔滨工业大学 一种抢修塔标准节

Also Published As

Publication number Publication date
CN106593069A (zh) 2017-04-26
CN106593069B (zh) 2019-01-15
CN109681018A (zh) 2019-04-26

Similar Documents

Publication Publication Date Title
CN102912736B (zh) 桁架拱桥的立拼装施工方法
CN110306658B (zh) 用于装配式建筑的钢结构装配体系及施工方法
CN210603852U (zh) 一种全装配式钢结构反力架
CN104790644A (zh) 屋面装饰底板伸缩性滑移支撑架
CN105155828A (zh) 一种升降平台及其四立柱导轨架
CN210002931U (zh) 一种用于超高层外框柱施工可伸缩调节的工具式防护系统
CN204662931U (zh) 屋面装饰底板伸缩性滑移支撑架
CN206219069U (zh) 一种配电柜搬运吊装装置
CN213204915U (zh) 超高层住宅转换层超重外挑悬空构件支撑系统
CN109681018B (zh) 一种线路抢修铁塔组件
CN203475310U (zh) 钢混结合箱梁混凝土翼板模板
CN203461693U (zh) 贝雷桁架组合门式起重机超高钢支腿
CN202785387U (zh) 一种室内悬臂起重机
CN205025154U (zh) 一种330kV GIS配电装置场地刚接风帆式构架
CN203223035U (zh) 一种组合式高压线路抢修塔用单元体
CN203856069U (zh) 一种高层建筑钢结构
CN202831628U (zh) 浇筑大跨度混凝土梁用组合式贝雷架承重排架
CN204919363U (zh) 一种抗强风高墩拼装式劲性骨架
CN104074388A (zh) 一种组合式高压线路抢修塔用单元体
CN203225074U (zh) 网架结构广告牌
WO2014153962A1 (zh) 一种组合式高压线路铁塔立柱式抢修塔
CN111593874A (zh) 超高层住宅转换层超重外挑悬空构件支撑系统及施工方法
CN203145547U (zh) 一种组合式高压线路铁塔四立柱式抢修塔
CN105350814A (zh) 一种输电塔
CN203097399U (zh) 一种组合式高压线路铁塔双立柱式抢修塔

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200525

Address after: 325600 No. 29 Daxing West Road, Liushi Town, Yueqing City, Wenzhou City, Zhejiang Province

Applicant after: YUEQING FENGJIE ELECTRONIC TECHNOLOGY Co.,Ltd.

Address before: 325600 Nanshan Village, Huanghua Community, Liushi Town, Yueqing City, Wenzhou City, Zhejiang Province

Applicant before: Xin Junyi

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210618

Address after: 239300 No.87 Jingqi Road, Tianchang Economic Development Zone, Chuzhou City, Anhui Province

Patentee after: ANHUI BOYUAN AUTOMATION INSTRUMENTATION Co.,Ltd.

Address before: 325600 No.29 Daxing West Road, Liushi Town, Yueqing City, Wenzhou City, Zhejiang Province

Patentee before: YUEQING FENGJIE ELECTRONIC TECHNOLOGY Co.,Ltd.