- Publication number
- CN106593069A CN106593069A CN201611262051.7A CN201611262051A CN106593069A CN 106593069 A CN106593069 A CN 106593069A CN 201611262051 A CN201611262051 A CN 201611262051A CN 106593069 A CN106593069 A CN 106593069A
- Authority
- CN
- China
- Prior art keywords
- monomer
- iron tower
- telescopic joint
- section
- power line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 27
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 239000000178 monomer Substances 0.000 claims description 45
- 230000007246 mechanism Effects 0.000 claims description 12
- 230000008439 repair process Effects 0.000 claims description 12
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 description 6
- 239000004020 conductor Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004807 localization Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/18—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
- E04H12/182—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic telescopic
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Claims (4)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811335966.5A CN109681018B (zh) | 2016-12-30 | 2016-12-30 | 一种线路抢修铁塔组件 |
CN201611262051.7A CN106593069B (zh) | 2016-12-30 | 2016-12-30 | 一种线路抢修铁塔组件 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611262051.7A CN106593069B (zh) | 2016-12-30 | 2016-12-30 | 一种线路抢修铁塔组件 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811335966.5A Division CN109681018B (zh) | 2016-12-30 | 2016-12-30 | 一种线路抢修铁塔组件 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106593069A true CN106593069A (zh) | 2017-04-26 |
CN106593069B CN106593069B (zh) | 2019-01-15 |
Family
ID=58582392
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611262051.7A Expired - Fee Related CN106593069B (zh) | 2016-12-30 | 2016-12-30 | 一种线路抢修铁塔组件 |
CN201811335966.5A Active CN109681018B (zh) | 2016-12-30 | 2016-12-30 | 一种线路抢修铁塔组件 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811335966.5A Active CN109681018B (zh) | 2016-12-30 | 2016-12-30 | 一种线路抢修铁塔组件 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106593069B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR0305581A (pt) * | 2003-10-16 | 2005-05-31 | Implo Technologies | Torre com estrutura modular para reparos de linhas de transmissão elétricas |
US20080295424A1 (en) * | 2007-06-01 | 2008-12-04 | Crosbie Patrick J | Tower module, system and method |
CN101824932A (zh) * | 2010-03-23 | 2010-09-08 | 宁波天弘电力器具有限公司 | 抢修塔的塔段 |
CN104863407A (zh) * | 2015-05-29 | 2015-08-26 | 中国电力科学研究院 | 一种输电线路的抢修塔 |
CN105332540A (zh) * | 2015-11-18 | 2016-02-17 | 刘操 | 一种自走式高压线路快速抢修塔 |
CN106150176A (zh) * | 2016-08-09 | 2016-11-23 | 国网上海市电力公司 | 一种超高压输电线路应急抢修用耐张杆塔立柱模块 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4590720A (en) * | 1984-02-06 | 1986-05-27 | Parco Mast And Substructure, Inc. | Telescoping derrick |
ES2362758B1 (es) * | 2007-12-29 | 2012-04-27 | Universidad De M�?Laga | Torre telescópica. |
CN104074389A (zh) * | 2013-03-28 | 2014-10-01 | 国家电网公司 | 一种组合式高压线路铁塔立柱式抢修塔 |
CN103243959B (zh) * | 2013-05-22 | 2015-09-30 | 四川擎烽通信有限责任公司 | 一种快装式通信铁塔及其安装方法 |
CN103967314B (zh) * | 2014-05-14 | 2016-07-06 | 国家电网公司 | 一种10kv-110kv应急抢修杆 |
CN204876739U (zh) * | 2015-06-17 | 2015-12-16 | 哈尔滨工业大学 | 一种抢修塔标准节 |
-
2016
- 2016-12-30 CN CN201611262051.7A patent/CN106593069B/zh not_active Expired - Fee Related
- 2016-12-30 CN CN201811335966.5A patent/CN109681018B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR0305581A (pt) * | 2003-10-16 | 2005-05-31 | Implo Technologies | Torre com estrutura modular para reparos de linhas de transmissão elétricas |
US20080295424A1 (en) * | 2007-06-01 | 2008-12-04 | Crosbie Patrick J | Tower module, system and method |
CN101824932A (zh) * | 2010-03-23 | 2010-09-08 | 宁波天弘电力器具有限公司 | 抢修塔的塔段 |
CN104863407A (zh) * | 2015-05-29 | 2015-08-26 | 中国电力科学研究院 | 一种输电线路的抢修塔 |
CN105332540A (zh) * | 2015-11-18 | 2016-02-17 | 刘操 | 一种自走式高压线路快速抢修塔 |
CN106150176A (zh) * | 2016-08-09 | 2016-11-23 | 国网上海市电力公司 | 一种超高压输电线路应急抢修用耐张杆塔立柱模块 |
Also Published As
Publication number | Publication date |
---|---|
CN106593069B (zh) | 2019-01-15 |
CN109681018B (zh) | 2020-07-03 |
CN109681018A (zh) | 2019-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105780925A (zh) | 一种桁架-吊挂组合体系安装施工方法 | |
CN105952239B (zh) | 铁塔角钢防弯扭失稳加固装置 | |
CN109441101B (zh) | 一种高空作业混凝土圆形屋顶的施工平台 | |
CN205688924U (zh) | 铁塔角钢防弯扭失稳加固装置 | |
CN207160309U (zh) | 半刚性节点摩擦耗能器 | |
CN106593069A (zh) | 一种线路抢修铁塔组件 | |
CN206562827U (zh) | 一种用于塔器设备的模块化钢框架结构 | |
CN103469920B (zh) | 一种免维护钢-复合材料屈曲约束支撑的设计方法 | |
CN203223035U (zh) | 一种组合式高压线路抢修塔用单元体 | |
CN206110793U (zh) | 一种不占用地面积的构架 | |
CN104074388A (zh) | 一种组合式高压线路抢修塔用单元体 | |
CN102041849A (zh) | 双角钢拼接型屈曲约束支撑 | |
CN214994627U (zh) | 一种空间钢结构节点 | |
CN204919363U (zh) | 一种抗强风高墩拼装式劲性骨架 | |
CN205742523U (zh) | 一种防连续倒塌转换框架结构 | |
CN203225074U (zh) | 网架结构广告牌 | |
CN204152239U (zh) | 一种装配式格构承重h型钢支架 | |
CN205036146U (zh) | 输电铁塔角钢的补强构件 | |
CN204298741U (zh) | 一种桥墩快速施工内工作平台 | |
CN202595911U (zh) | 旋转盘式连接器 | |
CN203626212U (zh) | 一种快速拆装式墩柱施工操作平台 | |
CN202321919U (zh) | 自动扶梯的金属骨架结构 | |
CN104074389A (zh) | 一种组合式高压线路铁塔立柱式抢修塔 | |
CN205917848U (zh) | 一种钢结构连接节点 | |
CN205742743U (zh) | 一种钢结构梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180911 Address after: 215000 Room 101, 15 happy future garden, hi tech Zone, Suzhou, Jiangsu. Applicant after: SUZHOU GUTESI ELECTRONIC SCIENCE & TECHNOLOGY CO., LTD. Address before: 215000 6 Wenchang Road, hi tech Zone, Suzhou, Jiangsu Applicant before: Suzhou wournos Pml Precision Mechanism Ltd |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20181107 Address after: 325600 Yuhong Road, Hongqiao Town, Yueqing, Zhejiang Province, No. 14 Applicant after: Gao Yanni Address before: 215000 Room 101, 15 happy future garden, hi tech Zone, Suzhou, Jiangsu. Applicant before: SUZHOU GUTESI ELECTRONIC SCIENCE & TECHNOLOGY CO., LTD. |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181126 Address after: 314006 Yaao Road, Asia-Pacific Science and Technology Industrial Park, Jiaxing City, Zhejiang Province Applicant after: Zhejiang Ruibang intelligent equipment Limited by Share Ltd Address before: 325600 Yuhong Road, Hongqiao Town, Yueqing, Zhejiang Province, No. 14 Applicant before: Gao Yanni |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190115 Termination date: 20191230 |